Check

Track public works. Empower communities.

InfraWatch empowers citizens to document roads, bridges, and flood control projects within their communities. By submitting verified photos and project details, Filipinos help promote transparency, integrity, and accountability in public infrastructure.

RELY CONSTRUCTION & SUPPLY INC.(FORMERLY: RELY CONSTRUCTION AND SUPPLY) (10433)

COMPLETED PROJECTS IN 2020

Discover the complete record of infrastructure projects awarded to this contractor, organized by year, region, and implementing agency. Each entry shows detailed contract information including project title, amount, fund source, and completion status — giving a transparent view of performance over time. This data is compiled from the official Department of Public Works and Highways (DPWH) project listings. Source: https://www.dpwh.gov.ph/dpwh/projects/infrastructure (as of 09/25/2025)

Active in the following regions:

Region XI (310)Region I (5)Region XIII (4)Region X (2)Region IV-B (2)Region III (1)Cordillera Administrative Region (1)Region IV-A (1)Region XII (1)
Back to Contractor Profile

Region XRegion X - Bukidnon 2nd District Engineering Office
  • REHAB/RECONST/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS ALONG MARAMAG-MARADUGAO ROAD, K1560+361-K1561+427, BASE CAMP, MARAMA G, BUKIDNON
    • Contract effectivity: 2020-12-10
    • Contract expiry: 2021-09-17
    • Fund source: Regular Infra - GAA 2020 OO-1
    • Contract price: ₱34,047,160.00
    • Contract status: Completed
    • Report
Region XIRegion XI - Region XI
  • ROAD WIDENING ON SPECIFIC LOCATIONS-ALONG MABUHAY-PA C3 91ALUM-PAQUIBATO ROAD (S01339MN), K1525+470-K1527+750, DAVAO CITY
    • Contract effectivity: 2020-12-28
    • Contract expiry: 2022-10-29
    • Fund source: Regular Infra - GAA 2020 OO-1
    • Contract price: ₱89,439,896.00
    • Contract status: Completed
    • Report
  • CONSTRUCTION (COMPLETION) OF ADDITIONAL FLOORS (2ND-4TH STOREY) OF DPWH REGIONAL OFFICE XI BUILDING, R. MAGSAYSAY COR. CHAVEZ STS., DAVAO CITY
    • Contract effectivity: 2020-12-28
    • Contract expiry: 2021-02-25
    • Fund source: Regular Infra - GAA 2020 LP
    • Contract price: ₱29,894,252.00
    • Contract status: Completed
    • Report
  • REPAIR/REHABILITATION/IMPROVEMENT OF ROAD (ASPHALT OVERL AY) ALONG MONTEVISTA - COMPOSTELA - NEW BATAAN - MARAGUSAN - MATI BDRY. ROA D, COMPOSTELA VALLEY
    • Contract effectivity: 2020-12-28
    • Contract expiry: 2021-06-26
    • Fund source: Regular Infra - GAA 2020 LP
    • Contract price: ₱98,996,336.00
    • Contract status: Completed
    • Report
  • PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - SPECIF IC LOCATIONS ALONG DIGOS - MAKAR ROAD (S00202MN) K1580 + 897 - K1584 + 066 DAVAO DEL SUR
    • Contract effectivity: 2020-12-28
    • Contract expiry: 2021-08-05
    • Fund source: Regular Infra - GAA 2020 LP
    • Contract price: ₱97,422,352.00
    • Contract status: Completed
    • Report
  • Project in other completion status.
  • CONSTRUCTION OF BAGANGA MUNICIPAL POLICE STATION, BAGANGA , DAVAO ORIENTAL
    • Contract effectivity: 2020-07-20
    • Contract expiry: 2021-01-15
    • Fund source: Regular Infra - GAA 2020 CSSP
    • Contract price: ₱8,849,584.00
    • Contract status: Completed
    • Report
  • CONSTRUCTION (COMPLETION) OF DPWH REGIONAL OFFICE XI, R. MAGSAYSAY COR. CHAVEZ ST., DAVAO CITY
    • Contract effectivity: 2020-06-09
    • Contract expiry: 2020-12-05
    • Fund source: Regular Infra - GAA 2020 LP
    • Contract price: ₱29,349,500.00
    • Contract status: Completed
    • Report
  • Project in other completion status.
  • CONSTRUCTION OF CONCRETE ROAD-MONKAYO-BOSTON ROAD (BOSTON SECTION) PACKAGE 3, DAVAO ORIENTAL
    • Contract effectivity: 2020-03-23
    • Contract expiry: 2021-03-07
    • Fund source: Regular Infra - GAA 2020 OO-1
    • Contract price: ₱112,326,016.00
    • Contract status: Completed
    • Report
Region XI - Davao City District Engineering Office
  • CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MATINA RIVER, MATINA APLAYA SECTION, RIGHT BANK, DAVAO CITY
    • Contract effectivity: 2020-12-17
    • Contract expiry: 2021-12-08
    • Fund source: Regular Infra - GAA 2020 LP
    • Contract price: ₱24,500,000.00
    • Contract status: Completed
    • Report
  • CONSTRUCTION OF MULTI-PURPOSE BUILDING, CITY LIBRARY COM PLEX, ROXAS AVE., DAVAO CITY
    • Contract effectivity: 2020-12-16
    • Contract expiry: 2022-05-29
    • Fund source: Regular Infra - GAA 2020 LP
    • Contract price: ₱12,870,000.00
    • Contract status: Completed
    • Report
  • CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BAGO RIVER, STA. 3+370 - STA. 3+422, STA. 3+426 - STA. 3+480, STA. 3+545 - STA. 3+848, STA. 3+851 - STA. 3+876, STA. 3+880 - STA. 3+897,STA. 3+901 - STA. 3+915, D AVAO CITY
    • Contract effectivity: 2020-12-16
    • Contract expiry: 2021-06-02
    • Fund source: Regular Infra - GAA 2020 LP
    • Contract price: ₱28,934,452.00
    • Contract status: Completed
    • Report
  • CONSTRUCTION OF DRAINAGE STRUCTURE - DAVAO CITY DIV RD - K1501+020 - K1501+414
    • Contract effectivity: 2020-12-16
    • Contract expiry: 2023-04-15
    • Fund source: Regular Infra - GAA 2020 OO-1
    • Contract price: ₱39,929,768.00
    • Contract status: Completed
    • Report
  • ASPHALT OVERLAY - DAVAO-COTABATO RD (DAVAO CITY - JCT. D IGOS SECTION), K1516+329 - K1517+229
    • Contract effectivity: 2020-12-16
    • Contract expiry: 2021-04-04
    • Fund source: Regular Infra - GAA 2020 LP
    • Contract price: ₱29,400,000.00
    • Contract status: Completed
    • Report
  • CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MATINA RIVER, MATINA RIVER OUTFALL SECTION, BOTH BANK, DAVAO CITY
    • Contract effectivity: 2020-12-16
    • Contract expiry: 2021-12-22
    • Fund source: Regular Infra - GAA 2020 LP
    • Contract price: ₱28,420,000.00
    • Contract status: Completed
    • Report
  • PREVENTIVE MAINTENANCE:ASPHALT OVERLAY - DAVAO CITY DIV RD - K1506+931 - K1507+000, K1512+238 - K1513+726
    • Contract effectivity: 2020-12-10
    • Contract expiry: 2021-05-20
    • Fund source: Regular Infra - GAA 2020 OO-1
    • Contract price: ₱82,410,184.00
    • Contract status: Completed
    • Report
  • CONSTRUCTION OF DRAINAGE STRUCTURE - DAANG MAHARLIKA (MN ) - K1495 + 768 - K1497 + 211
    • Contract effectivity: 2020-12-10
    • Contract expiry: 2022-06-30
    • Fund source: Regular Infra - GAA 2020 OO-1
    • Contract price: ₱92,254,000.00
    • Contract status: Completed
    • Report
  • ROAD WIDENING - DAANG MAHARLIKA (MN) - K1488+739 - K1489 +049, K1494+442 - K1495+016, K1495+151 - K1495+229, K1497+339 - K1497+792
    • Contract effectivity: 2020-12-10
    • Contract expiry: 2023-03-29
    • Fund source: Regular Infra - GAA 2020 OO-1
    • Contract price: ₱61,123,100.00
    • Contract status: Completed
    • Report
  • CONSTRUCTION OF GRAVEL ROAD AT SITIO BANBAN, BRGY. LUMIA D TO BRGY. MALABOG, PAQUIBATO DISTRICT, DAVAO CITY
    • Contract effectivity: 2020-12-10
    • Contract expiry: 2021-06-14
    • Fund source: Regular Infra - GAA 2020 LP
    • Contract price: ₱39,200,000.00
    • Contract status: Completed
    • Report
  • CONSTRUCTION OF REVETMENT ALONG DAVAO RIVER, STA. 2+550 TO STA. 2+687, STA. 2+782 TO STA. 3+253, DAVAO CITY
    • Contract effectivity: 2020-12-09
    • Contract expiry: 2022-06-17
    • Fund source: Regular Infra - GAA 2020 OO-2
    • Contract price: ₱86,136,864.00
    • Contract status: Completed
    • Report
  • CONSTRUCTION OF REVETMENT - LASANG RIVER FLOOD CONTROL, LASANG SECTION, DAVAO CITY
    • Contract effectivity: 2020-12-09
    • Contract expiry: 2021-09-17
    • Fund source: Regular Infra - GAA 2020 OO-2
    • Contract price: ₱96,500,000.00
    • Contract status: Completed
    • Report
  • CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - FATIMA -MALABOG RD - K1502+558 - K1502+596, K1503+112 - K1503+212, K1504+407 - K15 04+438
    • Contract effectivity: 2020-12-09
    • Contract expiry: 2021-11-04
    • Fund source: Regular Infra - GAA 2020 OO-1
    • Contract price: ₱88,780,000.00
    • Contract status: Completed
    • Report
  • CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - LASANG RIVE R FLOOD CONTROL, STA. 40+925 - STA. 41+575, RIGHT BANK, DAVAO CITY
    • Contract effectivity: 2020-10-16
    • Contract expiry: 2021-04-21
    • Fund source: Regular Infra - GAA 2020 OO-2
    • Contract price: ₱49,000,000.00
    • Contract status: Completed
    • Report
  • CONCRETING OF ROAD FROM PUROK I TO TIBULAO, BRGY. PARADI SE EMBAC, DAVAO CITY
    • Contract effectivity: 2020-09-28
    • Contract expiry: 2020-11-26
    • Fund source: Regular Infra - GAA 2020 LP
    • Contract price: ₱4,900,000.00
    • Contract status: Completed
    • Report
  • CONSTRUCTION OF ROAD AT SITIO AYAGON, BRGY. LUMIAD TO SI TIO SALUKADANG, BRGY. MAPULA, PAQUIBATO DISTRICT, DAVAO CITY
    • Contract effectivity: 2020-06-01
    • Contract expiry: 2020-12-26
    • Fund source: Regular Infra - GAA 2020 LP
    • Contract price: ₱49,000,000.00
    • Contract status: Completed
    • Report
  • CONSTRUCTION OF MULTIPURPOSE ATTACK CRAFT (MPAC) SLIPWAY AND BOATHOUSE, NAVAL STATION FELIX APOLINARIO, BRGY. PANACAN, DAVAO CITY
    • Contract effectivity: 2020-06-01
    • Contract expiry: 2021-12-27
    • Fund source: Regular Infra - GAA 2020 CSSP
    • Contract price: ₱82,025,000.00
    • Contract status: Completed
    • Report
  • CONSTRUCTION OF DRAINAGE STRUCTURE - DAANG MAHARLIKA (MN ) - K1502+480
    • Contract effectivity: 2020-03-10
    • Contract expiry: 2022-10-02
    • Fund source: Regular Infra - GAA 2020 OO-1
    • Contract price: ₱88,962,384.00
    • Contract status: Completed
    • Report
  • OPENING OF ROAD FROM PUROK BAUNGON, BRGY. MABUHAY TO PUR OK TAGAYTAY, BRGY. PARADISE EMBAC, DAVAO CITY
    • Contract effectivity: 2020-02-27
    • Contract expiry: 2020-06-10
    • Fund source: Regular Infra - GAA 2020 LP
    • Contract price: ₱2,970,000.00
    • Contract status: Completed
    • Report
  • CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - LASANG RIVE R FLOOD CONTROL, PAQUIBATO PROPER SECTION, BRGY. PAQUIBATO PROPER, DAVAO CI TY
    • Contract effectivity: 2020-02-27
    • Contract expiry: 2020-09-01
    • Fund source: Regular Infra - GAA 2020 OO-2
    • Contract price: ₱49,000,000.00
    • Contract status: Completed
    • Report
Region XI - Davao City 2nd District Engineering Office
  • ROAD CONCRETING AT BARANGAY LUBOGAN, TORIL DISTRICT, DA VAO CITY
    • Contract effectivity: 2020-12-15
    • Contract expiry: 2021-08-23
    • Fund source: Regular Infra - GAA 2020 LP
    • Contract price: ₱39,199,984.00
    • Contract status: Completed
    • Report
  • ROAD CONCRETING AT BRGY. STO. NI C3 91O, TUGBOK DISTRIC T, DAVAO CITY
    • Contract effectivity: 2020-12-15
    • Contract expiry: 2021-09-05
    • Fund source: Regular Infra - GAA 2020 LP
    • Contract price: ₱38,918,376.00
    • Contract status: Completed
    • Report
  • OFF-CARRIAGEWAY IMPROVEMENT ALONG DAVAO-BUKIDNON RD- K1 673+605-K1680+384
    • Contract effectivity: 2020-06-08
    • Contract expiry: 2020-11-25
    • Fund source: Regular Infra - GAA 2020 OO-1
    • Contract price: ₱48,129,084.00
    • Contract status: Completed
    • Report
  • OFF-CARRIAGEWAY/IMPROVEMENT ALONG DAVAO-BUKIDNON RD- K1 624+072-K1628+173
    • Contract effectivity: 2020-02-22
    • Contract expiry: 2020-10-25
    • Fund source: Regular Infra - GAA 2020 OO-1
    • Contract price: ₱30,054,598.00
    • Contract status: Completed
    • Report
  • CONSTRUCTION OF CUT-OFF WALL AT CALINAN CREEK, BRGY. CA LINAN POBLACION, CALINAN DISTRICT, DAVAO CITY
    • Contract effectivity: 2020-02-22
    • Contract expiry: 2020-11-09
    • Fund source: Regular Infra - GAA 2020 LP
    • Contract price: ₱66,935,864.00
    • Contract status: Completed
    • Report
  • ROAD CONCRETING FROM DAVAO-BUKIDNON NATIONAL HIGHWAY TO BARANGAY SALAYSAY TO MASAWANG TO BALLAH TO TAMBOBONG-MAGPET, NORTH COTABAT O ROAD, BARANGAY SALAYSAY, MARILOG DISTRICT, DAVAO CITY
    • Contract effectivity: 2020-02-22
    • Contract expiry: 2020-10-27
    • Fund source: Regular Infra - GAA 2020 LP
    • Contract price: ₱95,298,520.00
    • Contract status: Completed
    • Report
  • CONSTRUCTION OF MAINDRAIN AT BRGY. MINTAL, TUGBOK DISTR ICT, DAVAO CITY
    • Contract effectivity: 2020-02-22
    • Contract expiry: 2020-12-01
    • Fund source: Regular Infra - GAA 2020 LP
    • Contract price: ₱48,499,448.00
    • Contract status: Completed
    • Report
  • CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO BRG Y. TAGLUNO-BRGY. TUNGKALAN ROAD CONNECTING TO COCO COIR FACILITY IN SUPPORT TO COCO COIR INDUSTRY, TORIL DISTRICT, DAVAO CITY
    • Contract effectivity: 2020-02-22
    • Contract expiry: 2021-02-09
    • Fund source: Regular Infra - GAA 2020 CSSP
    • Contract price: ₱85,263,328.00
    • Contract status: Completed
    • Report
Region XI - Davao del Norte District Engineering Office
  • CARMEN-DAPECOL COMPOUND ROAD - K1472+(-005) - K1472+380, K1472+405 - K1473+695, DAVAO DEL NORTE
    • Contract effectivity: 2020-12-03
    • Contract expiry: 2021-08-20
    • Fund source: Regular Infra - GAA 2020 OO-1
    • Contract price: ₱31,798,060.00
    • Contract status: Completed
    • Report
  • CONSTRUCTION OF MANGALCAL BANK PROTECTION ALONG CARMEN - DAPECOL COMPOUND ROAD, CARMEN, DAVAO DEL NORTE
    • Contract effectivity: 2020-02-24
    • Contract expiry: 2020-09-11
    • Fund source: Regular Infra - GAA 2020 OO-2
    • Contract price: ₱38,413,760.00
    • Contract status: Completed
    • Report
Region XI - Davao Oriental 1st District Engineering Office
  • CONSTRUCTION OF REVETMENT ALONG CARAGA RIVER(DON LEON B ALANTE SECTION) CARAGA, DAVAO ORIENTAL
    • Contract effectivity: 2020-12-01
    • Contract expiry: 2021-08-17
    • Fund source: Regular Infra - GAA 2020 OO-2
    • Contract price: ₱39,200,000.00
    • Contract status: Completed
    • Report
  • CONSTRUCTION(COMPLETION) OF DPWH DAVAO ORIENTAL 1ST DIS TRICT ENGINEERING OFFICE QUARTER INCLUDING AREA SHOP AND BODEGA, BARANGAY L UCOD, BAGANGA, DAVAO ORIENTAL
    • Contract effectivity: 2020-11-26
    • Contract expiry: 2021-07-23
    • Fund source: Regular Infra - GAA 2020 LP
    • Contract price: ₱36,260,000.00
    • Contract status: Completed
    • Report
  • BRGY. OMPAO TO SITIO LANGGAWISAN ROAD CONNECTING TARRAG ONA PUBLIC TERMINAL TO ABACA, CORN & COFFEE PROCESSING SITE IN SUPPORT OF AGRIBUSINESS: ABACA, CORN & COFFEE INDUSTRIES, TARRAGONA, DAVAO ORIE NTAL
    • Contract effectivity: 2020-02-26
    • Contract expiry: 2020-09-11
    • Fund source: Regular Infra - GAA 2020 CSSP
    • Contract price: ₱19,597,110.00
    • Contract status: Completed
    • Report
  • CONSTRUCTION OF REVETMENT ALONG CASAUMAN RIVER, MANAY, DAVAO ORIENTAL
    • Contract effectivity: 2020-02-26
    • Contract expiry: 2020-11-14
    • Fund source: Regular Infra - GAA 2020 OO-2
    • Contract price: ₱48,612,708.00
    • Contract status: Completed
    • Report
  • NRJ SAN ANTONIO-LAMIAWAN-SANGAB ROAD LEADING TO SANGAB CULTURAL COMMUNITY, BRGY. PICHON, CARAGA, DAVAO ORIENTAL
    • Contract effectivity: 2020-02-26
    • Contract expiry: 2020-09-05
    • Fund source: Regular Infra - GAA 2020 CSSP
    • Contract price: ₱37,062,596.00
    • Contract status: Completed
    • Report
Region XI - Davao de Oro 1st District Engineering Office
  • CONSTRUCTION/CONCRETING OF ROAD NATIONAL HIGHWAY JUNCTIO N, BRGY. BINASBAS MANGLOY, IMELDA LAAK, COMPOSTELA VALLEY PROVINCE
    • Contract effectivity: 2020-11-27
    • Contract expiry: 2021-08-09
    • Fund source: Regular Infra - GAA 2020 LP
    • Contract price: ₱67,540,552.00
    • Contract status: Completed
    • Report
  • ROAD WIDENING - ALONG BENIGNO S. AQUINO JR. NATIONAL HIG HWAY (S01432MN), COMPOSTELA VALLEY PROVINCE
    • Contract effectivity: 2020-09-22
    • Contract expiry: 2021-09-06
    • Fund source: Regular Infra - GAA 2020 OO-1
    • Contract price: ₱67,392,496.00
    • Contract status: Completed
    • Report
  • CONSTRUCTION OF REVETMENT ALONG MANAT RIVER LEADING TO A GUSAN RIVER, TAPIA SECTION, MONTEVISTA COMPOSTELA VALLEY PROVINCE
    • Contract effectivity: 2020-02-20
    • Contract expiry: 2020-09-27
    • Fund source: Regular Infra - GAA 2020 OO-2
    • Contract price: ₱30,869,966.00
    • Contract status: Completed
    • Report
  • NRJ - LINOAN ROAD LEADING TO ECO-TOURISM PARK, NIA WATER IMPOUNDMENT AND BUILT FOREST, BRGY. LINOAN, MONTEVISTA COMPOSTELA VALLEY P ROVINCE
    • Contract effectivity: 2020-02-20
    • Contract expiry: 2020-09-18
    • Fund source: Regular Infra - GAA 2020 CSSP
    • Contract price: ₱38,210,200.00
    • Contract status: Completed
    • Report

Data Source:
Department of Public Works and Highways (DPWH) — https://www.dpwh.gov.ph/dpwh/projects/infrastructure

Disclaimer:
The data presented on this page was derived from publicly available information on the official DPWH website. While every effort has been made to ensure accuracy and completeness, discrepancies may occur due to updates or formatting differences. For validation or in case of dispute, please refer to the original source provided above.

Mobilize your barangay

Share InfraWatch with neighbors, tricycle drivers, barangay councils, parent-teacher associations, and disaster response volunteers. Quick uploads keep public funds on track.