Infrastructure Projects in Cordillera Administrative Region — Cordillera Administrative Region - Baguio City District Engineering Office, 2020
This page lists public infrastructure projects implemented by Cordillera Administrative Region - Baguio City District Engineering Office in Cordillera Administrative Region during 2020. All data are sourced from the Department of Public Works and Highways (DPWH) official database (as of 9/30/2025): https://www.dpwh.gov.ph/dpwh/projects/infrastructure
This information is shared to promote transparency and public awareness. We encourage visitors to validate project details using the official DPWH source. In case of discrepancies, please refer to the original records published by the DPWH.
| Contractor | Projects | Total Price |
|---|---|---|
| GOLDRICH CONSTRUCTION & TRADING (16489) | 17 | ₱466,220,359.50 |
| KAIRO KONSTRAK, INC. (35985) | 1 | ₱82,420,432.00 |
| JFALMAZAN CONSTRUCTION AND SUPPLY (36384) | 5 | ₱54,717,029.00 |
| KYRO BUILDERS, INC. (19567) | 2 | ₱52,294,236.00 |
| VISION 3000 BUILDERS INC. (FORMERLY VISION 3000 BU (32327) | 1 | ₱48,166,212.00 |
- REHABILITATION OF DAMAGED REVETMENT WALL ALONG BUED RIVE R NEAR LION'S HEAD, CAMP 7, BAGUIO CITY, STA. 0+000-STA. 0+291 (CATEGORIZED AS PRIORITY I), WHICH WAS DAMAGED BY TYPHOON OMPONG
- Contractor: GOLDRICH CONSTRUCTION & TRADING (16489)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-01-12
- Fund source: Regular Infra - GAA 2019 CSSP
- Contract price: ₱38,086,620.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-LOAKAN ROAD KO250+098 TO KO250+389
- Contractor: GUAVA CONSTRUCTION (37027)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-02-06
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱6,530,720.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION OF NATIONAL ROAD WITH SLIP S, SLOPE COLLAPSE, AND LANDSLIDE GOV. PACK ROAD (S00409LZ) CHAINAGE 92-CHAI NAGE 200, CHAINAGE 130-CHAINAGE 200
- Contractor: KYRO BUILDERS, INC. (19567)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-12-08
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱27,242,040.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION OF NATIONAL ROAD WITH SLIP S, SLOPE COLLAPSE, AND LANDSLIDE-PRIMARY ROADS-KENNON ROAD. K0241+611-K0241 +681, K0241+611-K0241+681, K0246+182-K0246+205, K0246+182-K0246+228< /li>
- Contractor: AKSUM CONTRACTING CORPORATION (46919)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-06-22
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱10,507,682.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - QUIRINO H-WAY (BAGUIO-BAUANG) K0305+286 - K0305+860
- Contractor: JABEN GENERAL CONTRACTING & ENG'G SERVICES (34934) / KANE CONSTRUCTION, INC. (2888)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-09-29
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱44,305,180.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE -MARCOS HI-WAY K0281+755 - K0283+454, K0281+755 - K0282+000, K0281+755 - K0283+454, K0282+000 - K0283+454
- Contractor: GOLDRICH CONSTRUCTION & TRADING (16489)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-10-13
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱80,433,048.00
- Contract status: Completed Report
- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS, WESTERNLINK CIRCUMFERENTIAL ROAD. KO246+(-184)+K0246+(-030)
- Contractor: JASHV CONSTRUCTION AND SUPPLY (39439)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-12-23
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱1,289,095.00
- Contract status: Completed Report
- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-ABANAO EXT. (S00429LZ) CHAINAGE 000-CHAINAGE 150
- Contractor: FORTHRIGHT CONSTRUCTION (32883)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-03-18
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱6,122,844.00
- Contract status: Completed Report
- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-QUEZON HILL ROAD # 1 - K0 307+795 - K0 307+907
- Contractor: BOYDROCK CONSTRUCTION (40604)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-10-26
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱2,974,712.50
- Contract status: Completed Report
- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROAD-OUTLOOK DRIVE-K0253+(-199)-K0253+(-109)
- Contractor: JABEN GENERAL CONTRACTING & ENG'G SERVICES (34934)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-03-18
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱9,800,000.00
- Contract status: Completed Report
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - MAJOR MANE AND KENNON ROAD BYPASS ROAD, BAGUIO CITY
- Contractor: GOLDRICH CONSTRUCTION & TRADING (16489)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-02-15
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱19,600,000.00
- Contract status: Completed Report
- OFF CARRIAGEWAY IMPROVEMENT-GOV. PACK ROAD -K0249+023-K0 249+120, K0249+043-K0249+087, K0249+160-K0249+200, K0249+194-K0249+320, K02 49+215-K0249+262, K0249+372-K0249+453
- Contractor: PECDASEN BUILDERS (40316)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-07-01
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱13,720,000.00
- Contract status: Completed Report
- OFF-CARRIAGEWAY IMPROVEMENT-LEONARD WOOD ROAD K0250+(-24 9)-K0250+046, K0250+(-677)-K0250+(-122)
- Contractor: KYRO BUILDERS, INC. (19567)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-12-08
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱25,052,196.00
- Contract status: Completed Report
- OFF-CARRIAGEWAY IMPROVEMENT - FR. F. CARLU ST. (S00460LZ ) - CHAINAGE 000
- Contractor: JABEN GENERAL CONTRACTING & ENG'G SERVICES (34934)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-03-20
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱1,375,920.00
- Contract status: Completed Report
- CONTRACT PACKAGE 2: A) CONST/REH OF FLOOD MIT. FACILITIE S W/IN MAJ. RIVER BASINS AND PRINCIPAL RIVERS-CONST. OF FLOOD MIT. FACILITI ES ALONG BALILI RIVER(MAIN), BAGUIO CITY B) CONST./MAINT OF FLOOD MITIGATIO N STRUCT. AND DRAINAGE SYSTEM-BALILI RIVER (TRIB)
- Contractor: GOLDRICH CONSTRUCTION & TRADING (16489)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-11-07
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱42,233,588.00
- Contract status: Completed Report
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION FACILITIES ALONG BUED RIVER (MAIN), BAGUIO CITY
- Contractor: JFALMAZAN CONSTRUCTION AND SUPPLY (36384)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-09-07
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱22,508,304.00
- Contract status: Completed Report
- CONSTRUCTION/MAINTENANCE OF FLOOD CONTROL MITIGATION STR UCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION FACILITIES AL ONG BUED RIVER (TRIBUTARIES), BAGUIO CITY
- Contractor: JFALMAZAN CONSTRUCTION AND SUPPLY (36384)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-11-06
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱23,232,280.00
- Contract status: Completed Report
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION FACILITIES ALONG CITY CAMP LAGOON DRAIN TUNNEL, BAGUIO CITY
- Contractor: KANE CONSTRUCTION, INC. (2888)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-02-11
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱18,130,000.00
- Contract status: Completed Report
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM-CONSTRUCTION OF FLOOD MITIGATION FACILITIES ALONG ABAD SANTOS DRIVE TO LAKE DRIVE TO PERFECTO ST. AND HARRISON ROAD, BAGUIO CITY
- Contractor: GOLDRICH CONSTRUCTION & TRADING (16489)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-09-10
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱96,500,000.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE IN SU PPORT OF NATIONAL SECURITY-CONSTRUCTION OF KILL HOUSE, PHILIPPINE MILITARY ACADEMY, BAGUIO CITY
- Contractor: BOYDROCK CONSTRUCTION (40604)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-12-02
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱6,639,912.50
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE IN SU PPORT OF NATIONAL SECURITY-CONSTRUCTION OF PERIMETER ACCESS ROAD, PHILIPPIN E MILITARY ACADEMY, BAGUIO CITY
- Contractor: KAIRO KONSTRAK, INC. (35985)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-04-20
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱82,420,432.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENTOF VARIOUS INFRASTRUCTURE IN SUP PORT OF NATIONAL SECURITY-CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG CONCESSIONAIRE AREA, PMA, BAGUIO CITY
- Contractor: RIMATYRE CONSTRUCTION SERVICES (42485)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-08-04
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱5,080,516.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE IN SU PPORT OF NATIONAL SECURITY-CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG HORSE SHOE AREA PMA, BAGUIO CITY, BENGUET
- Contractor: RIMATYRE CONSTRUCTION SERVICES (42485)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-06-06
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱2,401,000.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE IN SU PPORT OF NATIONAL SECURITY-CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG ROAD GOING TO SUPPORT GROUP HEADQUARTERS, PMA, BAGUIO CITY
- Contractor: RIMATYRE CONSTRUCTION SERVICES (42485)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-05-20
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱1,632,680.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE IN SU PPORT OF NATIONAL SECURITY- CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALON G SUPPORT GROUP PARKING AREA, PMA, BAGUIO CITY
- Contractor: RIMATYRE CONSTRUCTION SERVICES (42485)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-11-01
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱22,179,956.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE IN SU PPORT OF NATIONAL SECURITY-CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG SUPPORT GROUP, PMA, BAGUIO CITY
- Contractor: AG CONSTRUCTION (42175)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-07-27
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱6,144,136.50
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE IN SU PPORT OF NATIONAL SECURITY-CONSTRUCTION OF SLOPE PROTECTION STRUCTURE BESID E MRF, PMA, BAGUIO CITY, BENGUET
- Contractor: RIMATYRE CONSTRUCTION SERVICES (42485)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-06-24
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱3,169,320.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE FACIL ITIES IN SUPPORT OF NATIONAL SECURITY-ROADS AT FORT DEL PILAR, CAMP ALLEN A ND NAVY BASE, BAGUIO CITY, BENGUET
- Contractor: JABEN GENERAL CONTRACTING & ENG'G SERVICES (34934)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-12-02
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱25,804,956.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION/IMPROVEMENT OF MULTI-PURPOSE BUILDING AND ATHLETIC BOWL OVAL, BURNHAM PARK, BAGUIO CITY REHABILITATION/ IMPROVEMENT
- Contractor: VISION 3000 BUILDERS INC. (FORMERLY VISION 3000 BU (32327)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2022-04-30
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱48,166,212.00
- Contract status: Completed Report
- CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOU S INFRASTRUCTURE INCLUDING LOCAL PROJECTS-CONSTRUCTION/REHABILITATION OF FL OOD CONTROL MITIGATION FACILITIES/DRAINAGE SYSTEM ALONG LUALHATI, BAGUIO CI TY
- Contractor: FAMILY CIRCLE CONSTRUCTION (32608)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-10-25
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,681,045.50
- Contract status: Completed Report
- CONST/REP/REH/IMPVT OF VAR. INFRA INCLDG LOCAL PROJS: CO NST. OF WATER SUPPLY IN BAGUIO CITY A) M. ROXAS ROAD B) WOODSGATE SUBD. C) MARCOS HWAY-GOV.PACK ROAD-KISAD ROAD D) BOKAWKAN RD-MAGSAYSAY AVE. E) BAKAK ENG RD. F. AMPARO HTS SUBD-KENNON ROAD
- Contractor: KANE CONSTRUCTION, INC. (2888)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-02-17
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱22,548,512.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF THREE CLASS ROOMS AT HAPPY HOLLOW NATIONAL HIGH SCHOOL, HAPPY HOLLOW, BAGUIO CITY
- Contractor: THRIVING KING ENTERPRISES (41182)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-03-13
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,970,000.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF MULTI-PURPO SE BUILDING (FBASECA), SALUD MITRA, BAGUIO CITY
- Contractor: BOTJACK CONSTRUCTION (45515)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-08-06
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,702,207.25
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM- CONSTRUCTION OF MULTI-PURP OSE BUILDING AT LEONILA HILL/WEST BAYAN PARK, BAGUIO CITY
- Contractor: HAIGHT'S CONSTRUCTION (41572)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-07-05
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,738,738.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF MULTI-PURPO SE BUILDING AT MABINI ELEMENTARY SCHOOL, SALUD MITRA, BAGUIO CITY
- Contractor: RC PULMANO CONSTRUCTION AND SUPPLY (41668)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-08-05
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,939,393.88
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF MULTI-PURPO SE BUILDING AT PUROK 3 KM4 ASIN ROAD NEAR HEALTH CENTER, ASIN ROAD, BAGUIO CITY
- Contractor: SUMMERLIN CONSTRUCTION AND DEVELOPMENT CORPORATION (39773)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-07-31
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,920,569.25
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF MULTI-PURPO SE BUILDING AT QUEZON HILL NATIONAL HIGH SCHOOL, MIDDLE QUEZON HILL, BAGUIO CITY
- Contractor: RC PULMANO CONSTRUCTION AND SUPPLY (41668)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-09-18
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,765,070.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF MULTI-PURPO SE BUILDING AT QUIRINO HILL, ELEMENTARY SCHOOL, MIDDLE QUIRINO HILL, BAGUIO CITY
- Contractor: RNQ CONSTRUCTION AND ENGINEERING SERVICES (40915)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-10-14
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,730,087.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF MULTI-PURPO SE BUILDING, BGH COMPOUND, BAGUIO CITY
- Contractor: HAIGHT'S CONSTRUCTION (41572)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-08-05
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,845,538.12
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF MULTI-PURPO SE BUILDING, ENGINEER' S HILL, BAGUIO CITY
- Contractor: H.D. DE CASTRO CONSTRUCTION (33146)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-06-07
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,960,161.38
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PRORAM-CONSTRUCTION OF MULTI-PURPOS E BUILDING, LOURDES SUBDIVISION PROPER, BAGUIO CITY
- Contractor: ALEPHNORTH PEAK CONSTRUCTION AND DEVELOPMENT CO. (45344)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-07-21
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,917,870.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF MULTI-PURPO SE BUILDING AT IDOGAN VILLAGE PUROK 20, IRISAN, BAGUIO CITY
- Contractor: HAIGHT'S CONSTRUCTION (41572)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-05-22
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱3,960,000.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM-REHABILITATION OF MULTI-PUR POSE BUILDING AT QUEZON HILL ELEMENTARY SCHOOL, MIDDLE QUEZON HILL, BAGUIO CITY
- Contractor: REGKEN CONSTRUCTION (41849)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-10-24
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱995,000.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM-REHABILITATION OF MULTI-PUR POSE BUILDING, CAMDAS, BAGUIO CITY
- Contractor: BOTJACK CONSTRUCTION (45515)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-02-21
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,960,000.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM-REHABILITATION OF MULTI-PUR POSE BUILDING, DPS COMPOUND, BAGUIO CITY
- Contractor: REGKEN CONSTRUCTION (41849)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-10-24
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱895,500.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM-REHABILITATION OF MULTI-PUR POSE BUILDING, SLU-SVP, BAGUIO CITY, BENGUET
- Contractor: BILANIAN GENERAL CONSTRUCTION (FORMERLY: BILANIAN GENERAL MERCHANDISE) (41897)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-06-25
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱902,828.12
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM-REHABILITATION OF MULTI-PUR POSE BUILDING, STO. NINO SLAUGHTER COMPOUND, BAGUIO CITY
- Contractor: RC PULMANO CONSTRUCTION AND SUPPLY (41668)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-08-06
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,880,708.25
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF DRAINAGE CA NAL ALONG RIMANDO BUGALLON ROAD, WEST MODERNSITE, BAGUIO CITY
- Contractor: H.D. DE CASTRO CONSTRUCTION (33146)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-01-02
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱990,000.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF DRAINAGE CA NAL FROM PUROK 1 TO PUROK 7, EAST MODERNSITE, BAGUIO CITY
- Contractor: ICO CONSTRUCTION SERVICES (37144)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-08-17
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,929,689.75
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION/REHABILITATION OF DRAINAGE CANAL, BAYAN PARK VILLAGE, BAGUIO CITY
- Contractor: M.P. TABERAO CONSTRUCTION SERVICES AND SUPPLIES (46017)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-12-23
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,485,000.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM-REHABILITATION OF ROAD AND DRAINAGE SYSTEM ALONG LAUBACH ROAD, UPPER GENERAL LUNA, BAGUIO CITY< /li>
- Contractor: BOYDROCK CONSTRUCTION (40604)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-01-06
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,472,763.62
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF RIPRAP/CRIB WALL ALONG BACLILI GOING TO SAWILAN AT BADIHOY GUISAD SURONG, BAGUIO CITY
- Contractor: H.D. DE CASTRO CONSTRUCTION (33146)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-01-02
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,842,182.75
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF RIPRAP WITH CONCRETE ARMOUR, PUROK GREENHILS, BARANGAY STO. NI C3 91O, SLAUGHTER COMPO UND, BAGUIO CITY
- Contractor: A.L. SAGANDOY CONSTRUCTION (34998)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-12-26
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱965,150.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF RIPRAP/CRIB WALL ALONG PUROK 8, HONEYMOON-HOLYGHOST, BAGUIO CITY
- Contractor: TUQUER BUILDERS (36753)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-12-28
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,852,181.38
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF SLOPE PROTE CTION BELOW THE PRECIPICE IN PUROK 3 (REAR PORTION OF BARANGAY HALL EXTENDI NG NORTHWARD IN PUROK 3) MIDDLE ROCK QUARRY, BAGUIO CITY
- Contractor: RC PULMANO CONSTRUCTION AND SUPPLY (41668)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-07-24
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,880,590.12
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF RIPRAP/CRIB WALL, SAINT JOSEPH VILLAGE, BAGUIO CITY
- Contractor: ALEPHNORTH PEAK CONSTRUCTION AND DEVELOPMENT CO. (45344)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-01-27
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱987,744.88
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF FLOOD CONTR OL (BOX CULVERT) PHASE 2 PUROK 1-3, SAN ANTONIO VILLAGE, BAGUIO CITY
- Contractor: MARYUKAN CONSTRUCTION (45324)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-08-11
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,920,600.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF IRON STREET , UPPER QUEZON HILL, BAGUIO CITY
- Contractor: TUQUER BUILDERS (36753)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-08-01
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,802,770.12
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM-REHABILITATION OF ROAD, PAL MA-URBANO, BAGUIO CITY
- Contractor: JJJ-A CONSTRUCTION AND SUPPLIES (37143)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-12-03
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,980,000.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF ROAD, PUROK TIPTOP TO LITENG, PACDAL, BAGUIO CITY
- Contractor: BOTJACK CONSTRUCTION (45515)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-07-01
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,862,645.75
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM-REHABILITATION OF SECTOR 7, MALAYA ROAD, DOMINICAN MIRADOR, BAGUIO CITY
- Contractor: HDG CONSTRUCTION AND ENTERPRISES (35955)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-11-28
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱990,040.69
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM-REHABILITATION OF CONCRETE ROAD, WIDENING AND RIPRAPPING AT GLADIOLA EXTENSION, UPPER Q.M., BAGUIO CIT Y
- Contractor: JFALMAZAN CONSTRUCTION AND SUPPLY (36384)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-12-23
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,980,000.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM-REHABILITATION AND WIDENING OF DILAPIDATED ROADS INCLUDING DRAINAGES AND CANAL ALONG PUROK 2 AND CRYST AL CAVE, BAKAKENG, BAGUIO CITY
- Contractor: HARLANCE BUILDERS (42843)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-06-27
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,843,380.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM-REHABILITATION OF ROAD AND SIDEWALK ALONG TEODORA ALONZO STREET FROM ENTRY TO EXIT POINT, TEODORA ALON ZO, BAGUIO CITY
- Contractor: ALEPHNORTH PEAK CONSTRUCTION AND DEVELOPMENT CO. (45344)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-08-20
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱3,666,913.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM-REHABILITATION OF ROAD AND DRAINAGES FROM TURNING POINT TO GAMBOA RESIDENCE ALONG PUROK 2, 4 AND 7 (PH ASE II) VICTORIA VILLAGE, BAGUIO CITY
- Contractor: HAIGHT'S CONSTRUCTION (41572)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-11-28
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,000,000.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM-REHABILITATION OF THE PORTI ON OF THE BALBALEN ROAD AT PUROK 9A TO TAPAW, IRISAN, BAGUIO CITY
- Contractor: BALBALIN ENGINEERING AND CONSTRUCTION (42015)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-01-02
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,957,656.25
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM-COMPLETION OF FOOTBRIDGE, P HASE II ALONG UPPER BONIFACIO ADJACENT TO RIMANDO ROAD, ABCR, BAGUIO CITY
- Contractor: JJJ-A CONSTRUCTION AND SUPPLIES (37143)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-02-10
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,980,000.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM-REHABILITATION OF BUILDING INCLUDING CONCRETING OF PERIMETER ROAD/WALK-WAY, HEADQUARTERS SUPPORT GROUP , PHILIPPINE MILITARY ACADEMY, FORT DEL PILAR, BAGUIO CITY
- Contractor: BOYDROCK CONSTRUCTION (40604)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-03-18
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱8,642,471.00
- Contract status: Completed Report
- CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOU S INFRASTRUCTURE INCLUDING LOCAL PROJECTS-CONST. OF MULTI-PURPOSE CENTER AT PUROK 11, TETEPAN VILLAGE, BAGUIO CITY
- Contractor: RC PULMANO CONSTRUCTION AND SUPPLY (41668)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-02-21
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,940,000.00
- Contract status: Completed Report
- CONSTRUCTION/REPAIR/REHABILITATION OF VARIOUS INFRASTRUC TURE INCLUDING LOCAL PROJECTS-REHABILITATION OF MULTI-PURPOSE BUILDING (SEN IOR CITIZENS CENTER), BAGUIO CITY
- Contractor: HILLSTONE BUILDERS (33901)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-01-06
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱952,535.31
- Contract status: Completed Report
- CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOU S INFRASTRUCTURE INCLUDING LOCAL PROJECTS -CONST. OF MULTI-PURPOSE BUILDING (COVERED COURT) AT JOSE P. LAUREL ELEMENTARY SCHOOL, BRGY. UPPER DAGSIAN, BAGUIO CITY
- Contractor: THREE KCS BUILDERS AND SUPPLY (38544)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-05-22
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,886,022.25
- Contract status: Completed Report
- CONST/REP/REHAB/IMPVT OF VARIOUS INFRASTRUCTURE INCLUDIN G LOCAL PROJECTS-CONST. OF MULTI-PURPOSE BUILDING (COVERED COURT) AT QUEZON HILL NATIONAL HIGH SCHOOL, BAGUIO CITY
- Contractor: RC PULMANO CONSTRUCTION AND SUPPLY (41668)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-02-21
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,960,000.00
- Contract status: Completed Report
- CONST/REP/REHAB/IMPROVEMENT OF VARIOUS INFRASTRUCTURE IN CLUDING LOCAL PROJECTS -CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COU RT) AT QUIRINO HILL ELEMENTARY SCHOOL, BAGUIO CITY
- Contractor: RNQ CONSTRUCTION AND ENGINEERING SERVICES (40915)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-04-07
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,940,000.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION AND/OR REPAIR/ REHABILITATION OF MULTI-PURPOSE BUILDING BRGY. QUIRINO HILL, BAGUIO CITY
- Contractor: BOTJACK CONSTRUCTION (45515)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-02-26
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,860,000.00
- Contract status: Completed Report
- CONST/REP/REH/IMPVT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-CONSTRUCTION OF SEWERLINE, SESSION - GOVERNOR PACK ROAD, BAG UIO CITY
- Contractor: BOTJACK CONSTRUCTION (45515)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-12-23
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,953,890.12
- Contract status: Completed Report
- CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOU S INFRASTRUCTURE INCLUDING LOCAL PROJECTS-REHABILITATION OF MULTI-PURPOSE B UILDING (BPV COVERED COURT), BAGUIO CITY
- Contractor: GONZALO CONSTRUCTION (1826)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-02-06
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,380,000.00
- Contract status: Completed Report
- CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOU S INFRASTRUCTURE INCLUDING LOCAL PROJECTS-REHABILITATION OF MULTI-PURPOSE B UILDING AT PUROK CENTRAL, SAN VICENTE, BAGUIO CITY
- Contractor: R.M. BILOG CONSTRUCTION AND ENGINEERING SERVICES (40810)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-02-06
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,901,200.25
- Contract status: Completed Report
- CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOU S INFRASTRUCTURE INCLUDING LOCAL PROJECTS-REHABILITATION OF MULTI-PURPOSE B UILDING, BARANGAY PINGET, BAGUIO CITY
- Contractor: R.M. BILOG CONSTRUCTION AND ENGINEERING SERVICES (40810)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-03-08
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,960,000.00
- Contract status: Completed Report
- CONST/REP/REH/IMPVT OF VARIOUS INFRA INCLDG LOCAL PROJS- REHAB. OF MULTI-PURPOSE BUILDING (DAY CARE CENTER FOR HEALTH, NUTRITIOIN AN D SANITATION OFFICE AND EVACUATION CENTER), BAGUIO CITY
- Contractor: MARYUKAN CONSTRUCTION (45324)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-03-06
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,960,000.00
- Contract status: Completed Report
- CONST/REP/REH/IMPVT. OF VARIOUS INFRA INCLUDING LOCAL PR OJECTS-CONST. OF MULTI-PURPOSE BUILDING (COVERED COURT) AT IRISAN NATIONAL HIGH SCHOOL, BRGY. IRISAN, BAGUIO CITY
- Contractor: JFALMAZAN CONSTRUCTION AND SUPPLY (36384)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-05-22
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,940,000.00
- Contract status: Completed Report
- CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOU S INFRASTRUCTURE INCLUDING LOCAL PROJECT-REHABILITATION OF MULTI-PURPOSE HA LL, BAGUIO CITY
- Contractor: BOYDROCK CONSTRUCTION (40604)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-12-04
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱945,738.12
- Contract status: Completed Report
- CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOU S INFRASTRUCTURE INCLUDING LOCAL PROJECTS-REHABILITATION OF BARANGAY MULTI- PURPOSE HALL, BAGUIO CITY
- Contractor: RNQ CONSTRUCTION AND ENGINEERING SERVICES (40915)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-03-23
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,908,102.75
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION AND/OR REPAIR/ REHABILITATION OF MULTI-PURPOSE BUILDING, COVERED QUADRANGLE OF PINES CITY NATIONAL HIGH SCHOOL, BAGUIO CITY, BENGUET
- Contractor: MARYUKAN CONSTRUCTION (45324)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-02-16
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,970,000.00
- Contract status: Completed Report
- CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOU S INFRASTRUCTURE INCLUDING LOCAL PROJECTS-CONSTRUCTION OF RIP-RAP, BAGUIO C ITY
- Contractor: MAKK BUILDERS (36414)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-01-12
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱939,371.00
- Contract status: Completed Report
- CONSTRUCTION/REPAIR/REHAB/IMPROVEMENT OF VARIOUS INFRAST RUCTURE INCLUDING LOCAL PROJECTS-CONCRETING OF ROAD, NORTH SANITARY CAMP, B AGUIO CITY
- Contractor: TANGO ROMEO GENERAL CONSTRUCTION (18926)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-11-28
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,900,846.00
- Contract status: Completed Report
- CONST/REP/REH/IMPVT. OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-REHABILITATION OF BALENBEN ROAD AT PUROK 9A, BALENBEN, BAGU IO CITY
- Contractor: BALBALIN ENGINEERING AND CONSTRUCTION (42015)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-02-23
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,883,729.25
- Contract status: Completed Report
- CONSTRUCTION/REPAIR/REHABILITATION/ IMPROVEMENT OF VARIO US INFRASTRUCTURE INCLUDING LOCAL PROJECTS-REHABILITATION OF ROAD AT BARANG AY IRISAN AND PINSAO PROPER, BAGUIO CITY
- Contractor: MARYUKAN CONSTRUCTION (45324)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-01-12
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,823,282.00
- Contract status: Completed Report
- CONSTRUCTION/REPAIR/REHABILITATION/ IMPROVEMENT OF VARIO US INFRASTRUCTURE INCLUDING LOCAL PROJECTS_ REHABILITATION OF ROAD AT PUROK 2 AND 3, BRGY. STA. ESCOLASTICA VILLAGE, BAGUIO CITY
- Contractor: GALMOR CONSTRUCTION SERVICES (46916)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-02-14
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,887,823.38
- Contract status: Completed Report
- CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOU S INFRASTRUCTURE INCLUDING LOCAL PROJECTS-REHABILITATION OF ROAD TEODORA AL ONZO, BAGUIO CITY
- Contractor: ALMOND ENGINEERING & CONSTRUCTION (35225)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-01-17
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,960,000.00
- Contract status: Completed Report
- CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOU S INFRASTRUCTURE INCLUDING LOCAL PROJECTS-ROAD REHABILITATION INCLUDING DRA INAGE ALONG LAUBACH ROAD, BAGUIO CITY
- Contractor: R.C. ESTEPA CONSTRUCTION & SUPPLY (44657)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-01-02
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,453,059.00
- Contract status: Completed Report
- CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOU S INFRASTRUCTURE INCLUDING LOCAL PROJECTS-WIDENING OF ROADS INCLUDING DRAIN AGES AND CANALS ALONG PUROK 2 AND 3, CRYSTAL CAVE, BAGUIO CITY
- Contractor: G. GALPO CONSTRUCTION (47692)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-12-08
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,960,000.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM-RENOVATION OF PFVR BUILDING , DEPARTMENT OF EDUCATION DIVISION OFFICE, BRGY. MILITARY CUT-OFF, BAGUIO C ITY, BENGUET
- Contractor: MEP CONSTRUCTION (18759)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-11-25
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱24,750,000.00
- Contract status: Completed Report
- CONST/REP/REHA/IMPVT OF VARIOUS INFRASTRUCTURE INCLDG. L OCAL PROJECTS-ROAD REHABILITATION AND CONST. OF DRAINAGE CANAL AT UPPER CRY STAL, BRGY. BAKAKENG CENTRAL, BAGUIO CITY
- Contractor: HAIGHT'S CONSTRUCTION (41572)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-12-28
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,470,000.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF SCHOOL COVE RED COURT MANUEL L. QUEZON ELEMENTARY SCHOOL, BRGY. UPPER SESSION ROAD, BAG UIO CITY, BENGUET
- Contractor: A.P.B. CONSTRUCTION (17055)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-09-05
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱9,209,410.00
- Contract status: Completed Report
- CONSTRUCTION/REPAIR.REHABILITATION/IMPROVEMENT OF VARIOU S INFRASTRUCTURE INCLUDING LOCAL PROJECTS-CONCRETING FERGUSON ROAD, BRGY. G UISAD CENTRAL, BAGUIO CITY
- Contractor: ALEPHNORTH PEAK CONSTRUCTION AND DEVELOPMENT CO. (45344)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-01-09
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,960,000.00
- Contract status: Completed Report
- CONST/REP/REH/IMPVT. OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS- REHABILITATION OF BRIDGE, BRGY. IMELDA VILLAGE, BAGUIO CIT Y
- Contractor: GONZALO CONSTRUCTION (1826)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-03-23
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,450,000.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF 3 STOREY AD MINISTRATIVE BUILDING, FAIRVIEW ELEMENTARY SCHOOL, BRGY. FAIRVIEW, BAGUIO C ITY, BENGUET
- Contractor: B-KILTEPAN BUILDERS (45783)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-09-07
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱14,850,000.00
- Contract status: Completed Report
- CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOU S INFRASTRUCTURE INCLUDING LOCAL PROJECTS: REHABILITATION OF MULTI-PURPOSE BUILDING (COVERED COURT), BAGUIO CITY
- Contractor: BOTJACK CONSTRUCTION (45515)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-01-02
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,000,000.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM-REHABILITATION/RECONSTRUCTI ON OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-MAGSAYSAY AVE. (TRINI DAD ROAD) - K0252+366 TO K0252+441
- Contractor: GOLDRICH CONSTRUCTION & TRADING (16489)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-04-12
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱19,800,000.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM-REHABILITATION/RECONSTRUCTI ON OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE -KENNON ROAD-K0242+(- 088) TO K0242+(-055)
- Contractor: GOLDRICH CONSTRUCTION & TRADING (16489)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-03-03
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱6,930,000.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM-REHABILITATION/RECONSTRUCTI ON OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-PMA CUT OFF RD. 1: K0 252+(-687)-K0252+(-558)
- Contractor: GOLDRICH CONSTRUCTION & TRADING (16489)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-04-12
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱17,523,000.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM-REHABILITATION/RECONSTRUCTI ON OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-PMA RD., K0249+232-K0 249+252
- Contractor: GOLDRICH CONSTRUCTION & TRADING (16489)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-03-04
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱5,247,000.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM-REHABILITATION/RECONSTRUCTI ON OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-MAJOR MANE-KENNON ROA D (BYPASS), CH 0+110-CH. 0+166
- Contractor: GOLDRICH CONSTRUCTION & TRADING (16489)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-05-02
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱24,750,000.00
- Contract status: Completed Report
- CONTRACT PACKAGE 4: REHABILITATION/RECONSTRUCTION OF ROA DS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE: A. KENNON RD. K0241+790-K0241+ 825, K0242+430-K0242+480, K0242+600-K0242+720, K0244+015-K0244+050, K0244+3 50 B. MAJOR MANE RD. K0247+865-K0247+895
- Contractor: GOLDRICH CONSTRUCTION & TRADING (16489)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-01-22
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱78,722,496.00
- Contract status: Completed Report
- CONTRACT PACKAGE 5: PREVENTIVE MAINTENANCE: A) LOAKAN RD . K0246+000-K0246+308 B) MANUEL ROXAS RD. 252+(-131)-K0252+499 C) LEONARD W OOD RD. - K0250+(-767)-K0250+(-717)
- Contractor: GOLDRICH CONSTRUCTION & TRADING (16489)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-10-01
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱16,122,568.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-QUEZON HILL RD. #1 K0308+153-K0308+175, K0308+428- K0308+447
- Contractor: GOLDRICH CONSTRUCTION & TRADING (16489)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-03-08
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱8,330,000.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAINWATER COLLECTORS -RAINWATER COLLECTORS IN PUBLIC FACILITIES (1 5 LOCATIONS)
- Contractor: JFALMAZAN CONSTRUCTION AND SUPPLY (36384)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-12-26
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱4,056,445.00
- Contract status: Completed Report
- PREVENTIVE MAINTENANCE-TERTIARY ROADS: ABANAO EXT. (SO50 52LZ)-CHAINAGE 008-CHAINAGE 111
- Contractor: GOLDRICH CONSTRUCTION & TRADING (16489)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-12-12
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱1,436,680.00
- Contract status: Completed Report
- PREVENTIVE MAINTENANCE-SECONDARY ROADS: MAJOR MANE ROAD (SO0489LZ) -CHAINAGE 057 CHAINAGE 112
- Contractor: GOLDRICH CONSTRUCTION & TRADING (16489)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-12-12
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱1,516,060.00
- Contract status: Completed Report
- PREVENTIVE MAINTENANCE-TERTIARY ROADS: QUEZON HILL DRIVE (SO0503LZ) -CHAINAGE 000-CHAINAGE 075
- Contractor: GOLDRICH CONSTRUCTION & TRADING (16489)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-12-11
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱1,161,300.00
- Contract status: Completed Report
- PREVENTIVE MAINTENANCE-PRIMARY ROADS: QUIRINO H-WAY (BAG UIO-BAUANG) -K0300+131-K0300+647
- Contractor: GOLDRICH CONSTRUCTION & TRADING (16489)
- Implementing Agency: Cordillera Administrative Region - Baguio City District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-12-27
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱7,827,999.50
- Contract status: Completed Report