Infrastructure Projects in Cordillera Administrative Region — Cordillera Administrative Region - Benguet 1st District Engineering Office, 2018
This page lists public infrastructure projects implemented by Cordillera Administrative Region - Benguet 1st District Engineering Office in Cordillera Administrative Region during 2018. All data are sourced from the Department of Public Works and Highways (DPWH) official database (as of 9/30/2025): https://www.dpwh.gov.ph/dpwh/projects/infrastructure
This information is shared to promote transparency and public awareness. We encourage visitors to validate project details using the official DPWH source. In case of discrepancies, please refer to the original records published by the DPWH.
| Contractor | Projects | Total Price |
|---|---|---|
| F.B. BANTALES ENGINEERING CONSTRUCTION (31045) | 7 | ₱297,116,652.00 |
| RODEKOM GENERAL CONSTRUCTION AND ENTERPRISE (38656) | 8 | ₱193,645,972.50 |
| F.B. BANTALES ENGINEERING CONSTRUCTION (31045) / BALINTUGAN CONSTRUCTION (34566) | 2 | ₱145,194,376.00 |
| A.I.P. CONSTRUCTION (32458) | 1 | ₱70,471,784.00 |
| F.B. BANTALES ENGINEERING CONSTRUCTION (31045) / KALAHAN GENERAL CONSTRUCTION AND SUPPLIES (38324) | 1 | ₱47,500,976.00 |
- ORGANIZATIONAL OUTCOME I: ENSURE SAFE AND RELIABLE NATION AL ROAD SYSTEM REPLACEMENT OF PERMANENT WEAK BRIDGES CAMP 5 BRIDGE 2 (B0218 2LZ) ALONG KENNON ROAD (PHASE II), K0235+504
- Contractor: 3K ROCK ENGINEERING (27908)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2019-03-02
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱23,883,748.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE COVERED COURT,BARANGAY LUB AS, LA TRINIDAD, BENGUET
- Contractor: POLO ENGINEERING & CONSTRUCTION (34966)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-06-25
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱4,900,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE COVERED COURT,BARANGAY BAH ONG, LA TRINIDAD, BENGUET
- Contractor: POLO ENGINEERING & CONSTRUCTION (34966)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-05-11
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,960,000.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BUED RI VER BASIN, TWIN PEAKS SECTION, TUBA, BENGUET, BENGUET
- Contractor: VALLEY CONSTRUCTION AND AGGREGATES (14315)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-05-22
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱9,071,490.00
- Contract status: Completed Report
- IMPROVEMENT OF SITIO BAYABAS, PICO ROAD, STA. 0+000 - ST A. 1+000, BARANGAY PICO, LA TRINIDAD, BENGUET, BENGUET
- Contractor: KALAHAN GENERAL CONSTRUCTION AND SUPPLIES (38324)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-05-26
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱2,798,138.25
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION STRUCTURE -BENGUET-NUEV A VIZCAYA ROAD, K0271+780 - 0271+824, ITOGON, BENGUET, BENGUET
- Contractor: F.B. BANTALES ENGINEERING CONSTRUCTION (31045) / BALINTUGAN CONSTRUCTION (34566)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-11-06
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱96,337,912.00
- Contract status: Completed Report
- PREVENTIVE MAINTENANCE OF ROAD: CONCRETE REBLOCKING - BE NGUET-NUEVA VISCAYA ROAD, K0260+423-K0260+459, K0267+200-K0267+245, K0270+9 60-K0270+996, ITOGON, BENGUET, BENGUET
- Contractor: RODEKOM GENERAL CONSTRUCTION AND ENTERPRISE (38656)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-03-27
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱1,916,057.00
- Contract status: Completed Report
- REHABILITATION OF PAVED ROAD - BENGUET-NUEVAVISCAYA ROAD , K0286+430-K0286+592, BOKOD, BENGUET, BENGUET
- Contractor: RODEKOM GENERAL CONSTRUCTION AND ENTERPRISE (38656)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-04-16
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱4,756,384.50
- Contract status: Completed Report
- OFF-CARRIAGEWAY IMPROVEMENT: SHOULDER PAVING / CONSTRUCT ION - BENGUET-NUEVA VISCAYA ROAD, K0304+000 - K0307+000, BOKOD, BENGUET, BE NGUET
- Contractor: RODEKOM GENERAL CONSTRUCTION AND ENTERPRISE (38656)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-06-19
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱17,458,088.00
- Contract status: Completed Report
- REHABILITATION OF PAVED ROAD - GUREL-BOKODKABAYAN-BUGUIA S-ABATAN ROAD, K0302+968-K0303+600, K0303+900-K0304+024, BENGUET
- Contractor: RODEKOM GENERAL CONSTRUCTION AND ENTERPRISE (38656)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-08-18
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱23,285,808.00
- Contract status: Completed Report
- CONSTRUCTION OF TACDIAN E/S SHILAN, LA TRINIDAD,BENGUET MULTI-PURPOSE BUILDING (GYM), SHILAN, LA TRINIDAD, BENGUET
- Contractor: POLO ENGINEERING & CONSTRUCTION (34966)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-06-25
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱2,938,739.25
- Contract status: Completed Report
- COMPLETION OF SAN PASCUAL, TUBA, BENGUET MULTI-PURPOSE B UILDING (GYM), PHASE 2, SAN PASCUAL, TUBA, BENGUET
- Contractor: DJY CONSTRUCTION (35651)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-05-26
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,960,000.00
- Contract status: Completed Report
- COMPLETION OF NANGALISAN, TUBA, BENGUET MULTI-PURPOSE BU ILDING (GYM), PHASE 2, NANGALISAN, TUBA, BENGUET
- Contractor: DJY CONSTRUCTION (35651)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-05-26
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,960,000.00
- Contract status: Completed Report
- REHABILITATION/ MAJOR REPAIR OF BRIDGE - ADUNOT BR. (B02 368LZ) ALONG BENGUET-NUEVA VIZCAYA ROAD, K0275+536, BOKOD, BENGUET
- Contractor: AROBOAN CONSTRUCTION AND SUPPLY (37917)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-04-11
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱1,151,878.25
- Contract status: Completed Report
- REHABILITATION/ MAJOR REPAIR OF BRIDGE - PACHEL BR. (B02 662LZ) ALONG GUREL-BOKOD-KABAYAN-BUGUIAS-ABATAN ROAD, K0324+336,KABAYAN, BE NGUET
- Contractor: KALAHAN GENERAL CONSTRUCTION AND SUPPLIES (38324)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-05-06
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱1,853,999.38
- Contract status: Completed Report
- REHABILITATION/ MAJOR REPAIR OF BRIDGE - PITO BR.(B00908 LZ) ALONG BENGUET-NUEVA VIZCAYA ROAD, K0316+094, BOKOD, BENGUET
- Contractor: KALAHAN GENERAL CONSTRUCTION AND SUPPLIES (38324)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-04-06
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱953,636.25
- Contract status: Completed Report
- IMPROVEMENT OF ADAOAY NHS ROAD, STA. 0+000 - STA. 0+800 (V.S.), ADAOAY, KABAYAN, BENGUET
- Contractor: KALAHAN GENERAL CONSTRUCTION AND SUPPLIES (38324)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-04-11
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,866,166.75
- Contract status: Completed Report
- REHABILITATION/ MAJOR REPAIR OF BRIDGE - NEW BADIWAN BR. (B01359LZ) ALONG MARCOS HIGHWAY, K0276+885, TUBA, BENGUET
- Contractor: KALAHAN GENERAL CONSTRUCTION AND SUPPLIES (38324)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-04-26
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱6,072,731.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE -CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BAUANG RIVER BASIN SABDANG SECTION, ST A. 036+280 - STA. 036+680, SABLAN, BENGUET
- Contractor: HGW3D3 ENGINEERING & CONSTRUCTION (34574)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-07-26
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱13,602,936.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE -CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGNO RIVER BASIN PANGTAL- COTCOT SECTI ON, STA. 023+950 - STA. 024+270, KABAYAN, BENGUET
- Contractor: SYMON ENGINEERING AND CONSTRUCTION (36742)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-07-19
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱9,156,281.00
- Contract status: Completed Report
- REHABILITATION/MAJOR REPAIR OF BRIDGE - DUNGONBRIDGE (B0 2190LZ) ALONG KENNON AGAT ROAD, K0217+680, TUBA, BENGUET
- Contractor: AROBOAN CONSTRUCTION AND SUPPLY (37917)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-04-06
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱922,076.25
- Contract status: Completed Report
- REHABILITATION/ MAJOR REPAIR OF BRIDGE - PICAO BR. (B021 62LZ) ALONG BAGUIO - ITOGON ROAD, K0262+812, ITOGON, BENGUET
- Contractor: AROBOAN CONSTRUCTION AND SUPPLY (37917)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-04-11
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱905,373.38
- Contract status: Completed Report
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - PUGUIS BRIDGE (B02189LZ) ALONG PICO LAMTANG ROAD, K0255+832, LA TRINIDAD, BENGUET
- Contractor: ATOLBA CONSTRUCTION (33768)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-05-23
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱2,464,194.00
- Contract status: Completed Report
- REHABILITATION OF PAVED ROAD - BAGUIO-ITOGON ROAD, K0267 +546-K0268+055, ITOGON, BENGUET
- Contractor: SUMMERLIN CONSTRUCTION AND DEVELOPMENT CORPORATION (39773)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-05-26
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱6,356,122.50
- Contract status: Completed Report
- RECONSTRUCTION FROM PAVED TO CONCRETE - P.A. CADRE ROAD - (00402LZ) CHAIN. 0-CHAIN. 234, (S00405LZ) CHAIN. 0-CHAIN. 465, LA TRINIDA D, BENGUET
- Contractor: JABEN GENERAL CONTRACTING & ENG'G SERVICES (34934)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-07-28
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱15,273,365.00
- Contract status: Completed Report
- CONSTRUCTION OF CONCRETE ROAD - KALING BRIDGE-LOWER BASH OY-UPPER BABADAK ROAD LEADING TO MOUNT PULAG, KABAYAN, BENGUET
- Contractor: F.B. BANTALES ENGINEERING CONSTRUCTION (31045)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-07-12
- Fund source: Regular Infra - GAA 2018 Other Infrastructure (CSSP)
- Contract price: ₱23,870,964.00
- Contract status: Completed Report
- CONSTRUCTION OF CONCRETE ROAD - BAGUIO-BONTOC ROAD JCT. TO BATAN-ADAOAY, KABAYAN ROAD IN SUPPORT OF VEGETABLE, AND PROCESSED TEA AN D COFFEE INDUSTRY, KABAYAN, BENGUET
- Contractor: DJY CONSTRUCTION (35651)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-08-09
- Fund source: Regular Infra - GAA 2018 Other Infrastructure (CSSP)
- Contract price: ₱28,880,510.00
- Contract status: Completed Report
- CONSTRUCTION OF CONCRETE ROAD - BAGUIO-BONTOC ROAD JCT. TO GUIWENG-NAWAL-TICKEY-DACLAN ROAD IN SUPPORT OF COFFEE, AND PROCESSED FOO D MEAT INDUSTRIES, BOKOD, BENGUET
- Contractor: RODEKOM GENERAL CONSTRUCTION AND ENTERPRISE (38656)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-07-27
- Fund source: Regular Infra - GAA 2018 Other Infrastructure (CSSP)
- Contract price: ₱28,900,552.00
- Contract status: Completed Report
- CONSTRUCTION OF CONCRETE ROAD - CAMP 3 TORRE-MANGGA-BELI S-PIMIMINGGAN-ANSAGAN PROPER ROAD IN SUPPORT OF CACAO AND COFFEE INDUSTRY, TUBA, BENGUET
- Contractor: F.B. BANTALES ENGINEERING CONSTRUCTION (31045)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-07-27
- Fund source: Regular Infra - GAA 2018 Other Infrastructure (CSSP)
- Contract price: ₱35,284,144.00
- Contract status: Completed Report
- OFF-CARRIAGEWAY IMPROVEMENT: SHOULDER PAVING / CONSTRUCT ION-BAGUIO-BAUANG ROAD, K0293+342-K0298+035, SABLAN, BENGUET
- Contractor: F.B. BANTALES ENGINEERING CONSTRUCTION (31045)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-11-06
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱38,536,188.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - BENGUE T-NUEVA VISCAYA ROAD, K0254+(-034) - K0254+255, K0314+570-K0314 + 680, LA T RINIDAD AND BOKOD, BENGUET
- Contractor: F.B. BANTALES ENGINEERING CONSTRUCTION (31045)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-08-26
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱47,897,044.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION STRUCTURE - GUREL-BOKOD -KABAYAN-BUGUIAS-ABATAN ROAD, K0313+314-K0313+388, K0314+103-K0314+227, K03 14+439-K0314+496, K0314+520-K0314+570, BOKOD, BENGUET
- Contractor: F.B. BANTALES ENGINEERING CONSTRUCTION (31045)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-11-29
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱47,750,020.00
- Contract status: Completed Report
- CONSTRUCTION OF CONCRETE ROAD - BALLAY-TABIO-TONOMAN-BUL ALACAO-TAWANGAN-LUSOD ROAD LEADING TO BULALACAO LAKES AND MT. TABEO, KABAYA N, BENGUET
- Contractor: F.B. BANTALES ENGINEERING CONSTRUCTION (31045)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2019-01-29
- Fund source: Regular Infra - GAA 2018 Other Infrastructure (CSSP)
- Contract price: ₱55,831,096.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - ITOGON - DALUPIRIP - SN. MANUEL BDRY ROAD, K0275+504 - K0275+852, ITOGON, BENGUET
- Contractor: A.I.P. CONSTRUCTION (32458)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2019-04-08
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱70,471,784.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE -CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BUED RIVER BASIN CAMP 6, SECTION, TUBA , BENGUET, BENGUET
- Contractor: MAKK BUILDERS (36414)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-06-07
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱9,786,873.00
- Contract status: Completed Report
- REHABILITATION / MAJOR REPAIR OF BRIDGE - BOLO BR. (B026 58LZ) ALONG GUREL-BOKOD-KABAYAN-BUGUIAS-ABATAN ROAD, K0301+(-431), BOKOD, B ENGUET, BENGUET
- Contractor: RODEKOM GENERAL CONSTRUCTION AND ENTERPRISE (38656)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-09-08
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱6,076,215.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE -CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGNO RIVER BASIN EDDET - ADAOAY SECTIO N, STA. 018+820 - STA. 019+011, KABAYAN, BENGUET
- Contractor: TRYST BUILDERS ENTERPRISES (31164)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-07-12
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱9,155,818.00
- Contract status: Completed Report
- REHABILITATION/MAJOR REPAIR OF BRIDGE - CAMP 1 BRIDGE (B 02168LZ) ALONG KENNON ROAD, K0216+120, TUBA, BENGUET
- Contractor: ATOLBA CONSTRUCTION (33768)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-04-23
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱1,446,091.12
- Contract status: Completed Report
- REHABILITATION/MAJOR REPAIR OF BRIDGE - CAMP 4 BRIDGE #2 (B02176LZ) ALONG KENNON ROAD, K0227+727, TUBA, BENGUET
- Contractor: ATOLBA CONSTRUCTION (33768)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-04-23
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱1,700,280.62
- Contract status: Completed Report
- COMPLETION OF CAMP 5, ACUPAN, ITOGON, BENGUET MULTI-PURP OSE BUILDING (GYM), PHASE 2, ACUPAN, ITOGON, BENGUET
- Contractor: AROBOAN CONSTRUCTION AND SUPPLY (37917)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-05-26
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,470,000.00
- Contract status: Completed Report
- COMPLETION/REHABILITATION OF DACLAN, BOKOD, BENGUET MULT I-PURPOSE BUILDING (GYM) PHASE 2, DACLAN, BOKOD, BENGUET
- Contractor: POLO ENGINEERING & CONSTRUCTION (34966)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-05-26
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,923,817.25
- Contract status: Completed Report
- CONSTRUCTION OF LEBENG E/S, BOKOD, BENGUET MULTI-PURPOSE BUILDING (GYM), LEBENG E/S, BOKOD, BENGUET
- Contractor: POLO ENGINEERING & CONSTRUCTION (34966)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-05-26
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱2,886,614.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE -CONSTRUCTION OF FLOOD CONTROL ADAOAY, STA. 17+590 - STA. 18+040, STA.17+880 - STA. 17+9 40, STA. 18+600 - STA. 18+820, KABAYAN, BENGUET
- Contractor: F.B. BANTALES ENGINEERING CONSTRUCTION (31045) / KALAHAN GENERAL CONSTRUCTION AND SUPPLIES (38324)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-11-09
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱47,500,976.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE -CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGNO RIVER BASIN, AMBALANGA SECTION, S TA. 155+560 - STA. 156+560, ITOGON, BENGUET
- Contractor: F.B. BANTALES ENGINEERING CONSTRUCTION (31045)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-12-24
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱47,947,196.00
- Contract status: Completed Report
- CONSTRUCTION OF BAHONG, LA TRINIDAD, BENGUET MULTI-PURPO SE BUILDING, BAHONG, LA TRINIDAD, BENGUET
- Contractor: POLO ENGINEERING & CONSTRUCTION (34966)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-07-25
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,928,737.62
- Contract status: Completed Report
- CONSTRUCTION OF LUSOD, KABAYAN, BENGUET MULTI-PURPOSE BU ILDING, LUSOD, KABAYAN, BENGUET
- Contractor: AROBOAN CONSTRUCTION AND SUPPLY (37917)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-05-26
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱988,405.62
- Contract status: Completed Report
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, MOATONG BRIDGE (B02660LZ) ALONG GUREL-BOKOD-KABAYAN-BUGUIAS-ABATANROAD, RETROFITTI NG/STRENGTHENING OF PERMANENT BRIDGES
- Contractor: ALMOND ENGINEERING & CONSTRUCTION (35225)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-06-25
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱5,459,793.00
- Contract status: Completed Report
- CONSTRUCTION OF FOOTBRIDGE OF LIBOONG TO ANSHINGSHING, B OKOD, BENGUET
- Contractor: SYMON ENGINEERING AND CONSTRUCTION (36742)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-06-12
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱2,761,322.75
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTIO N OF FLOOD MITIGATION STRUCTURE ALONG NAGUILIAN RIVER BASIN BALILI RIVER SE CTION, STA. 0+700 - STA. 1+425 (W/EXCEPTIONS), LA TRINIDAD, BENGUET< /li>
- Contractor: F.B. BANTALES ENGINEERING CONSTRUCTION (31045) / D.G.O. CONSTRUCTION (6788)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-12-27
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱45,406,064.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTIO N OF FLOOD CONTROL POBLACION TO KARAO, BOKOD, BENGUET
- Contractor: RODEKOM GENERAL CONSTRUCTION AND ENTERPRISE (38656)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2019-03-01
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱92,561,712.00
- Contract status: Completed Report
- CONSTRUCTION OF FOOTBRIDGE SITIO COLORADO TO TWIN PEAKS NORTE, TUBA, BENGUET
- Contractor: LOC CONSTRUCTION AND SUPPLY (34764)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-05-13
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,873,797.75
- Contract status: Completed Report
- CONSTRUCTION OF WATERWORKS AT MIDWAY AMPUCAO, ITOGON, BE NGUET
- Contractor: COMPASS ROSE BUILDERS (27024)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-06-12
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,435,915.12
- Contract status: Completed Report
- IMPROVEMENT OF TWIN PEAKS BARANGAY ROAD, STA.0 + 000 - S TA.0 + 800 (VARIOUS SECTIONS), TUBA, BENGUET
- Contractor: LOC CONSTRUCTION AND SUPPLY (34764)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-05-13
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱4,626,404.00
- Contract status: Completed Report
- ROAD OPENING/IMPROVEMENT SADDLE, POBLACION, STA. 0+000 - STA. 0+420, TUBA, BENGUET
- Contractor: AROBOAN CONSTRUCTION AND SUPPLY (37917)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-05-07
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,852,682.88
- Contract status: Completed Report
- REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOP E COLLAPSE, AND LANDSLIDE ALONG KENNON ROAD, K0233+904-K0234+000,TUBA, BENG UET
- Contractor: F.B. BANTALES ENGINEERING CONSTRUCTION (31045) / BALINTUGAN CONSTRUCTION (34566)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-11-30
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱48,856,464.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL AT ATAD-ASIN, TUBA, BENGUE T
- Contractor: RODEKOM GENERAL CONSTRUCTION AND ENTERPRISE (38656)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-09-17
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱18,691,156.00
- Contract status: Completed Report
- CONSTRUCTION OF A MULTIPURPOSE BUILDING (OPEN GYM), ADAO AY NATIONAL HIGH SCHOOL, BARANGAY ADAOAY, KABAYAN, BENGUET
- Contractor: AROBOAN CONSTRUCTION AND SUPPLY (37917)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-08-11
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱5,900,000.00
- Contract status: Completed Report
- CONSTRUCTION OF A MULTIPURPOSE BUILDING, SAGUITLANG ELEM ENTARY SCHOOL, ANSAGAN, TUBA, BENGUET
- Contractor: ATOLBA CONSTRUCTION (33768)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-06-12
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱984,160.88
- Contract status: Completed Report
- CONCRETING OF BAGTO-BAKANGANGA ROAD, STA. 0+000 - STA. 1 +500 (V.S.), BALLAY, KABAYAN, BENGUET
- Contractor: AROBOAN CONSTRUCTION AND SUPPLY (37917)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-06-16
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱2,885,720.50
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS, BENGUET FIRST DISTRICT
- Contractor: KALAHAN GENERAL CONSTRUCTION AND SUPPLIES (38324)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-07-07
- Fund source: Regular Infra - GAA 2018 Other Infrastructure (CSSP)
- Contract price: ₱3,263,291.75
- Contract status: Completed Report