Infrastructure Projects in Cordillera Administrative Region — Cordillera Administrative Region - Benguet 1st District Engineering Office, 2020
This page lists public infrastructure projects implemented by Cordillera Administrative Region - Benguet 1st District Engineering Office in Cordillera Administrative Region during 2020. All data are sourced from the Department of Public Works and Highways (DPWH) official database (as of 9/30/2025): https://www.dpwh.gov.ph/dpwh/projects/infrastructure
This information is shared to promote transparency and public awareness. We encourage visitors to validate project details using the official DPWH source. In case of discrepancies, please refer to the original records published by the DPWH.
| Contractor | Projects | Total Price |
|---|---|---|
| RODEKOM GENERAL CONSTRUCTION AND ENTERPRISE (38656) | 3 | ₱233,806,800.00 |
| GOLDRICH CONSTRUCTION & TRADING (16489) | 1 | ₱89,376,000.00 |
| BALINTUGAN CONSTRUCTION (34566) | 3 | ₱84,432,164.00 |
| F.B. BANTALES ENGINEERING CONSTRUCTION (31045) | 2 | ₱82,641,364.00 |
| BAKUN CONSTRUCTION (29128) | 5 | ₱67,897,807.00 |
- REPAIR/ REHABILITATION OF ROADSLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG BAGUIO-BUA-ITOGON ROAD
- Contractor: SKALYNDRA CONSTRUCTION AND SUPPLY (43747)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-11-03
- Fund source: Regular Infra - GAA 2019 CSSP
- Contract price: ₱967,914.00
- Contract status: Completed Report
- CLUSTERED REPAIR / REHABILITATION OF ROADS WITH SLIPS, S LOPE COLLAPSE AND LAND SLIDE ALONG BAGUIO- BUA- ITOGON ROAD
- Contractor: BALINTUGAN CONSTRUCTION (34566)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-02-08
- Fund source: Regular Infra - GAA 2019 CSSP
- Contract price: ₱30,856,322.00
- Contract status: Completed Report
- REPAIR / REHABILITATION OF ROADS WITH SLIPS, SLOPE COLLA PSE AND LAND SLIDES ALONG ITOGON -DALUPIRIP ROAD
- Contractor: GALMOR CONSTRUCTION SERVICES (46916)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-11-12
- Fund source: Regular Infra - GAA 2019 CSSP
- Contract price: ₱7,652,450.00
- Contract status: Completed Report
- CLUSTERED REPAIR/REHABILITATION OF ROADS ALONG BENGUET N UEVA-VIZCAYA ROAD
- Contractor: GALMOR CONSTRUCTION SERVICES (46916)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-09-03
- Fund source: Regular Infra - GAA 2019 CSSP
- Contract price: ₱1,728,247.25
- Contract status: Completed Report
- CLUSTERED PREVENTIVE MAINTENANCE OF ROAD ALONG BAGUIO-BO NTOC ROAD AND MARCOS HIGHWAY, K0253+400 - K0255+061 LA TRINIDAD AND K0273+9 51 - K0276+885 TUBA, BENGUET
- Contractor: GOLDRICH CONSTRUCTION & TRADING (16489)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-11-15
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱89,376,000.00
- Contract status: Completed Report
- PREVENTIVE MAINTENANCE OF ROAD : CONCRETE REBLOCKING 280 MM - SPECIFIC LOCATION ALONG BENGUET-NUEVA VISCAYA ROAD (S00382LZ), K0254+6 00 - K0282+000, LA TRINIDAD/ITOGON & BOKOD, BENGUET
- Contractor: BOYET BUILDERS (40505)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-11-23
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱4,736,563.50
- Contract status: Completed Report
- PREVENTIVE MAINTENANCE OF ROAD : CONCRETE REBLOCKING 280 MM - SPECIFIC LOCATION ALONG CONG. ANDRES ACOP COSALAN ROAD (S00386LZ), K03 18+265 - K0327+127, KABAYAN, BENGUET
- Contractor: COMPASS ROSE BUILDERS (27024)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-12-05
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱5,018,051.00
- Contract status: Completed Report
- PREVENTIVE MAINTENANCE OF ROAD : CONCRETE REBLOCKING 280 MM - SPECIFIC LOCATION ALONG PICO - LAMTANG ROAD (S00401LZ), K0258+563 - K0 260+277, LA TRINIDAD, BENGUET
- Contractor: 4RMCONSTRUCTION & SUPPLIES (35767)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-10-31
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱1,600,069.62
- Contract status: Completed Report
- RECONSTRUCTION TO CONCRETE PAVEMENT, 280MM WITH SLOPE PR OTECTION (REINFORCED PCCP) - ALONG BAGUIO-BAUANG ROAD (S00397LZ), K0291+150 - K0291+500, SABLAN, BENGUET
- Contractor: HGW3D3 ENGINEERING & CONSTRUCTION (34574)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-04-02
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱13,695,432.00
- Contract status: Completed Report
- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILIT IES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF FLOOD M ITIGATION STRUCTURE ALONG AGNO RIVER BASIN, SITIO SALAPSAP SECTION, DALUPIR IP, ITOGON, BENGUET
- Contractor: BAKUN CONSTRUCTION (29128) / UNIVERSAL DE LEON CONSTRUCTION AND AGGREGATES (35079)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-09-22
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱14,574,477.00
- Contract status: Completed Report
- REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES: NANGA LISAN BR. (B04277LZ) ALONG ASIN (KM. 8)-NANGALISAN-SN PASCUAL, TUBA, BENGUE T-LU BDRY RD, TUBA, BENGUET
- Contractor: BAKUN CONSTRUCTION (29128)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-06-19
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱4,609,426.50
- Contract status: Completed Report
- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILIT IES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF FLOOD M ITIGATION STRUCTURE ALONG ARINGAY RIVER BASIN, HYDRO-NANGALISAN SECTION, TU BA, BENGUET
- Contractor: BTCJR CONSTRUCTION AND ENGINEERING SERVICES (38675)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-11-12
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱11,793,477.00
- Contract status: Completed Report
- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILIT IES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF FLOOD M ITIGATION STRUCTURE ALONG ARINGAY RIVER BASIN, LASILAS-NANGALISAN SECTION, TUBA, BENGUET
- Contractor: HDG CONSTRUCTION AND ENTERPRISES (35955)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-03-02
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱12,255,605.00
- Contract status: Completed Report
- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILIT IES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF FLOOD M ITIGATION STRUCTURE ALONG ARINGAY RIVER BASIN, ASIN PROPER-LUCEB SECTION, T UBA, BENGUET
- Contractor: CAD-ERA DESIGN AND BUILDER (33076)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-11-24
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱16,384,623.00
- Contract status: Completed Report
- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILIT IES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF FLOOD M ITIGATION STRUCTURE ALONG ARINGAY RIVER BASIN, PENGED-NANGALISAN SECTION, T UBA, BENGUET
- Contractor: HDG CONSTRUCTION AND ENTERPRISES (35955)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-10-27
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱12,255,854.00
- Contract status: Completed Report
- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILIT IES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF FLOOD M ITIGATION STRUCTURE ALONG BUED RIVER BASIN, CAMP 6 SECTION, TUBA, BENGUET
- Contractor: MAKK BUILDERS (36414)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-11-04
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱12,594,080.00
- Contract status: Completed Report
- PAVING OF UNPAVED ROADS : ALONG CONG. ANDRES ACOP COSALA N ROAD (S00379LZ), K0333+1495 - K0333+1585, KABAYAN, BENGUET
- Contractor: M.P. TABERAO CONSTRUCTION SERVICES AND SUPPLIES (46017)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-07-09
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱1,746,472.88
- Contract status: Completed Report
- PAVING OF UNPAVED ROADS - ALONG BAGUIO CITY LIMIT - STO. TOMAS ROAD (S00404LZ), K0263+630 - K0263+820, TUBA, BENGUET
- Contractor: PECDASEN BUILDERS (40316)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-06-27
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱3,558,693.25
- Contract status: Completed Report
- CONSTRUCTION OF CONCRETE PAVEMENT - ALONG BALLAY-TABIO-T ONOMAN-BULALACAO-TAWANGAN-LUSOD ROAD LEADING TO BULALACAO LAKES AND MT. TAB EO, KABAYAN, BENGUET
- Contractor: BALINTUGAN CONSTRUCTION (34566)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-09-08
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱9,750,366.00
- Contract status: Completed Report
- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILIT IES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF FLOOD M ITIGATION STRUCTURE ALONG BAUANG RIVER BASIN, SABDANG SECTION, SABLAN, BENG UET
- Contractor: ANAS CONSTRUCTION (31655)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-03-25
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱21,876,040.00
- Contract status: Completed Report
- RECONSTRUCTION TO CONCRETE PAVEMENT, 280MM - SPECIFIC LO CATION ALONG SHILAN-BECKEL ROAD (S00385LZ), K0261+050 - K0263+3358, LA TRIN IDAD, BENGUET
- Contractor: F.B. BANTALES ENGINEERING CONSTRUCTION (31045) / CLIFF CONSTRUCTION & AGGREGATES (34224)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-06-22
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱57,629,412.00
- Contract status: Completed Report
- RECONSTRUCTION TO CONCRETE PAVEMENT, 280MM - SPECIFIC LO CATIONS ALONG TAWANG-AMBIONG ROAD (S00387LZ), K0260+(-609) - K0264+358, LA TRINIDAD, BENGUET
- Contractor: SANGIN GENERAL CONSTRUCTION (40257)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-12-20
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱27,930,000.00
- Contract status: Completed Report
- OFF-CARRIAGE IMPROVEMENT: SHOULDER PAVING / RECONSTRUCTI ON - SPECIFIC LOCATION ALONG KENNON ROAD (S00393LZ), K0216+(-845)-K0216+270 , TUBA, BENGUET
- Contractor: BLC CONSTRUCTION & AGGREGATES (16424)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-09-06
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱10,574,196.00
- Contract status: Completed Report
- OFF-CARRIAGE IMPROVEMENT: SHOULDER PAVING / RECONSTRUCTI ON - SPECIFIC LOCATION ALONG BENGUET NUEVA VIZCAYA ROAD (S00382LZ), K0308+0 00 - K0310+500, BOKOD, BENGUET
- Contractor: TAGEL CORPORATION (43554)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-01-31
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱18,354,972.00
- Contract status: Completed Report
- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILIT IES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF FLOOD M ITIGATION STRUCTURE ALONG AGNO RIVER BASIN, PITO RIVER SECTION, BOKOD, BENG UET
- Contractor: BAKUN CONSTRUCTION (29128)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-10-22
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱19,185,646.00
- Contract status: Completed Report
- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILIT IES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF FLOOD M ITIGATION STRUCTURE ALONG AGNO RIVER BASIN, POBLACION-KARAO SECTION, BOKOD, BENGUET
- Contractor: AG CONSTRUCTION (42175)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-10-01
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱14,376,612.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - ALONG KENNON ROAD (S00393LZ), K0227+169 - K0227+214, TUBA, BENGUET
- Contractor: BALINTUGAN CONSTRUCTION (34566)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-11-19
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱43,825,476.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - ALONG BENGUET - NUEVA VIZCAYA ROAD (S00382LZ), K0254+255 - K0254+370, LA TRINIDAD , BENGUET
- Contractor: F.B. BANTALES ENGINEERING CONSTRUCTION (31045) / KALAHAN GENERAL CONSTRUCTION AND SUPPLIES (38324)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-01-28
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱48,020,000.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - ALONG CONG. ANDRES ACOP COSALAN ROAD (S00379LZ), K0328+520 - K0328+640, KABAYAN, BENGUET
- Contractor: F.B. BANTALES ENGINEERING CONSTRUCTION (31045)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-01-31
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱47,921,996.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - SPECIF IC LOCATION ALONG BAGUIO-ITOGON ROAD (S00390LZ), K0256+170 - K0257+322, ITO GON, BENGUET
- Contractor: BOYET BUILDERS (40505)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-03-08
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱9,788,680.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - SPECIF IC LOCATION ALONG CITY LIMIT - STO. TOMAS ROAD (S00404LZ), K0262+532 - K026 3+412, TUBA, BENGUET
- Contractor: 4RMCONSTRUCTION & SUPPLIES (35767)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-11-02
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱16,170,000.00
- Contract status: Completed Report
- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILIT IES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF FLOOD M ITIGATION STRUCTURE ALONG AGNO RIVER BASIN, ALANOD BRIDGE SECTION, KABAYAN, BENGUET
- Contractor: JAMIL SEAN CONSTRUCTION (39079)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-10-05
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱14,527,456.00
- Contract status: Completed Report
- CONSTRUCTION OF DRAINAGE STRUCTURES ALONG ROAD: ALONG BA GUIO-BONTOC ROAD (S00367LZ), K0256+219.10 - K0257+079, LA TRINIDAD, BENGUET
- Contractor: ALEC CONSTRUCTION AND TRADING (46524)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-03-08
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱8,983,480.00
- Contract status: Completed Report
- CONSTRUCTION OF CONCRETE PAVEMENT - ALONG BILA ACCESS RO AD LEADING TO ABIANG HOT SPRING, BOKOD, BENGUET
- Contractor: POLO ENGINEERING & CONSTRUCTION (34966)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-09-13
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱8,481,075.00
- Contract status: Completed Report
- CONSTRUCTION OF CONCRETE PAVEMENT - ALONG GUISSET-BINGA- BALOY-TINONGDAN ROAD LEADING TO BINGA DAM AND MT. UGO, SITE FOR THE INTERNA TIONAL SKY RUNNING EVENT, ITOGON, BENGUET
- Contractor: COMPASS ROSE BUILDERS (27024)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-09-12
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱8,503,572.00
- Contract status: Completed Report
- CONSTRUCTION OF CONCRETE PAVEMENT - SPECIFIC LOCATION AL ONG KALING BRIDGE-LOWER BASHOY-UPPER BABADAK ROAD LEADING TO MT. PULAG, KAB AYAN, BENGUET
- Contractor: A.P.O. GENERAL CONSTRUCTION (7010)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-12-15
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱48,903,960.00
- Contract status: Completed Report
- CONSTRUCTION OF CONCRETE PAVEMENT - ALONG POBLACION-KARA O-EKIP ACCESS ROAD LEADING TO MOUNT PURGATORY, BOKOD, BENGUET
- Contractor: E.K.C. CONSTRUCTION AND AGGREGATES (14833)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-09-11
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱9,673,256.00
- Contract status: Completed Report
- CONSTRUCTION OF CONCRETE PAVEMENT - ALONG TIMBAK CAVES R OAD LEADING TO TIMBAK CAVES AND MUMMY OF APO ANNO, ATOK/KABAYAN, BENGUET
- Contractor: BTCJR CONSTRUCTION AND ENGINEERING SERVICES (38675)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-08-28
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱9,793,606.00
- Contract status: Completed Report
- CONSTRUCTION OF CONCRETE ROAD - ALONG BAGUIO-BONTOC ROAD JCT. TO BATAN ADAOAY, KABAYAN ROAD IN SUPPORT OF VEGETABLE, PROCESSED TEA AND COFFEE INDUSTRY, KABAYAN, BENGUET
- Contractor: BOTJACK CONSTRUCTION (45515)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-09-07
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱9,394,198.00
- Contract status: Completed Report
- CONSTRUCTION OF CONCRETE ROAD - ALONG BAGUIO-BONTOC JCT. TO GUIWENG-NAWAL-TICKEY-DACLAN ROAD IN SUPPORT OF COFFEE, AND PROCESSED FO OD MEAT INDUSTRIES, BOKOD, BENGUET
- Contractor: AROBOAN CONSTRUCTION AND SUPPLY (37917)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-09-11
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱9,735,675.00
- Contract status: Completed Report
- CONSTRUCTION OF CONCRETE ROAD - ALONG BECKES-BULALA ROAD IN SUPPORTOF COFFEE, CACAO, BAMBOO, CUTFLOWER, TIGER GRASS, FRUIT TREES, H EIRLOOM RICE, LIVESTOCK, HIGH VALUE VEGETABLES AND SERVICES, SABLAN, BENGUE T
- Contractor: ANAS CONSTRUCTION (31655)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-06-25
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱9,754,745.00
- Contract status: Completed Report
- CONSTRUCTION OF CONCRETE ROAD - ALONG CAMP 3 TORRE-ANTAM OK-MANGGA-BELIS-PIMINGGAN-ANSAGAN PROPER ROAD IN SUPPORT OF CACAO AND COFFE E INDUSTRY, TUBA, BENGUET
- Contractor: MAKK BUILDERS (36414)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-10-03
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱8,071,992.50
- Contract status: Completed Report
- CONSTRUCTION OF CONCRETE ROAD - ALONG CAWAYAN-CALEW-BALO COC-CASHET ROAD TO SAN MANUEL, PANGASINAN IN SUPPORT TO COFFEE, CACAO,BAMBO O, BANANA, LIVESTOCK, HEIRLOOM RICE, GOLD, HIGH VALUE VEGETABLES, LOOM WEAV ING, SEWING, DRESS MAKING, HONEY, FOOD PROCESSI
- Contractor: AKSUM CONTRACTING CORPORATION (46919)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-09-11
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱9,701,764.00
- Contract status: Completed Report
- CONSTRUCTION OF CONCRETE ROAD - ALONG PIMINGGAN-SAGUITLA NG-LUBAS-DUNGON ROAD IN SUPPORT TO COFFEE, CACAO, BAMBOO, GOLD, LIVESTOCK,H IGH VALUE VEGETABLES AND FOOD PROCESSING, TUBA, BENGUET
- Contractor: MAKK BUILDERS (36414)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-09-23
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱8,064,058.50
- Contract status: Completed Report
- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILIT IES WITHIN MAJORRIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF FLOOD MI TIGATIONSTRUCTURE ALONG AGNO RIVER BASIN, ASOKONG BRIDGE SECTION, KABAYAN, BENGUET
- Contractor: ICO CONSTRUCTION SERVICES (37144)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-07-21
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱6,349,333.50
- Contract status: Completed Report
- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILIT IES WITHIN MAJORRIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF FLOOD MI TIGATIONSTRUCTURE ALONG AGNO RIVER BASIN, MANGKEW-NABNENG SECTION, KABAYAN, BENGUET
- Contractor: BTCJR CONSTRUCTION AND ENGINEERING SERVICES (38675)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-08-20
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱7,327,620.00
- Contract status: Completed Report
- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILIT IES WITHIN MAJORRIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF FLOOD MI TIGATIONSTRUCTURE ALONG AGNO RIVER BASIN, PACSO SECTION, KABAYAN, BENGUET
- Contractor: ALMOND ENGINEERING & CONSTRUCTION (35225)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-11-03
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱19,538,926.00
- Contract status: Completed Report
- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILIT IES WITHIN MAJORRIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF FLOOD MI TIGATIONSTRUCTURE ALONG AGNO RIVER BASIN, EKIP SECTIONG AND SERVICES, BOKOD , BENGUET
- Contractor: TAGEL CORPORATION (43554)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-03-19
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱23,719,638.00
- Contract status: Completed Report
- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILIT IES WITHIN MAJORRIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF FLOOD MI TIGATIONSTRUCTURE ALONG AGNO RIVER BASIN, COTCOT SECTION, KABAYAN, BENGUE
- Contractor: ALMOND ENGINEERING & CONSTRUCTION (35225) / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) (13722)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-06-07
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱60,955,192.00
- Contract status: Completed Report
- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILIT IES WITHIN MAJORRIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF FLOOD MI TIGATIONSTRUCTURE ALONG AGNO RIVER BASIN, TAAL-BENGAO SECTION, BRGY. AMBUKL AO, BOKOD, BENGUET
- Contractor: TAGEL CORPORATION (43554)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-01-18
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱9,701,000.00
- Contract status: Completed Report
- RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES: ALANOD BR. (B04831LZ) ALONG CONG. ANDRES ACOP COSALAN RD, KABAYAN, BENGUET
- Contractor: BOYET BUILDERS (40505)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-07-20
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱2,830,171.25
- Contract status: Completed Report
- REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES: ELLET BR. (B02663LZ) ALONG CONG. ANDRES ACOP COSALAN RD, KABAYAN, BENGUET
- Contractor: BOTJACK CONSTRUCTION (45515)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-07-04
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱1,534,731.00
- Contract status: Completed Report
- REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES: MINAC BR. (B02369LZ) ALONG BENGUET-NUEVA VIZCAYA RD, BOKOD, BENGUET
- Contractor: MXC CONSTRUCTION (46844)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-08-15
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱7,193,952.50
- Contract status: Completed Report
- REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES: PUGO BR. (B02177LZ) ALONG KENNON RD, TUBA, BENGUET
- Contractor: BAKUN CONSTRUCTION (29128)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-03-26
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱1,054,670.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTIPURPOSE BUILDING BARANGAY PUGUIS, L A TRINIDADBENGUET, LA TRINIDAD, BENGUET
- Contractor: KALAHAN GENERAL CONSTRUCTION AND SUPPLIES (38324)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-03-01
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,965,013.75
- Contract status: Completed Report
- CONSTRUCTION OF MULTIPURPOSE BUILDING BARANGAY TUDING, I TOGON, BENGUET
- Contractor: ESTAKA BUILDERS (39976)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-08-24
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,886,720.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTIPURPOSE BUILDING BARANGAY TAWANGAN, KABAYAN, BENGUET
- Contractor: AROBOAN CONSTRUCTION AND SUPPLY (37917)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-02-17
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱6,897,151.50
- Contract status: Completed Report
- IMPROVEMENT ALONG LIANG-KUBO BARANGAY ROAD, KABAYAN, BEN GUET
- Contractor: JAMIL SEAN CONSTRUCTION (39079)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-11-10
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,957,310.88
- Contract status: Completed Report
- IMPROVEMENT OF BARANGAY ROAD, DALICNO, AMPUCAO, ITOGON, BENGUET
- Contractor: ICO CONSTRUCTION SERVICES (37144)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-11-27
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,926,005.50
- Contract status: Completed Report
- IMPROVEMENT OF PITO BARANGAY ROAD, ANOPLES, PITO, BOKOD, BENGUET
- Contractor: SANGIN GENERAL CONSTRUCTION (40257)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-12-25
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,896,873.00
- Contract status: Completed Report
- IMPROVEMENT AND OPENING OF SAWILI TO BULALA BARANGAY ROA D, SABLAN, BENGUET
- Contractor: HGW3D3 ENGINEERING & CONSTRUCTION (34574)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-11-09
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,908,861.75
- Contract status: Completed Report
- IMPROVEMENT AND OPENING OF TOYONG-SWAMP ROAD, PICO, LA T RINIDAD, BENGUET
- Contractor: CLIFF CONSTRUCTION & AGGREGATES (34224)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-05-25
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱13,668,613.00
- Contract status: Completed Report
- CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF LOC AL ROAD OF SABDANG SHILAN, BALUCAS
- Contractor: BOYDROCK CONSTRUCTION (40604)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-12-04
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,950,000.00
- Contract status: Completed Report
- CONSTRUCTION/ IMPROVEMENT OF BACTO-BAKANGGANGA ROAD
- Contractor: JAMIL SEAN CONSTRUCTION (39079)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-11-17
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,959,180.75
- Contract status: Completed Report
- REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOP E COLLAPSE AND LANDSLIDE ALONG GUREL- BOKOD- KABAYAN- BUGUIAS- ABATAN ROAD, K0340+500 - K0340+600, KABAYAN, BENGUET
- Contractor: RODEKOM GENERAL CONSTRUCTION AND ENTERPRISE (38656)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-07-25
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱92,547,072.00
- Contract status: Completed Report
- REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOP E COLLAPSE AND LANDSLIDE ALONG GUREL- BOKOD- KABAYAN- BUGUIAS- ABATAN ROAD, K0326+300 - K0326+420, KABAYAN, BENGUET
- Contractor: RODEKOM GENERAL CONSTRUCTION AND ENTERPRISE (38656)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-07-25
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱92,749,728.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY TAWANG, TAWANG, LA TRINIDAD, BENGUET
- Contractor: TAGEL CORPORATION (43554)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-10-30
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,954,978.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. PUGUIS, PU GUIS, LA TRINIDAD, BENGUET
- Contractor: PECDASEN BUILDERS (40316)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-08-31
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,955,580.50
- Contract status: Completed Report
- COMPLETION OF BENGUET SPORT GYMNASIUM, WANGAL, LA TRINID AD, BENGUET
- Contractor: MXC CONSTRUCTION (46844)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-01-18
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,936,013.50
- Contract status: Completed Report
- CONCRETING OF LOCAL ROAD AT SITIO NAIBA, BRGY. TUDING, I TOGON, BENGUET
- Contractor: ESTAKA BUILDERS (39976)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-06-10
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱6,846,680.50
- Contract status: Completed Report
- CONSTRUCTION/ IMPROVEMENT OF ROAD, BRGY. TWIN PEAKS, TUB A, BENGUET
- Contractor: BALANGCOD CONSTRUCTION (15038)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-11-19
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,949,976.62
- Contract status: Completed Report
- RECONSTRUCTION TO CONCRETE PAVEMENT, 280MM (REINFORCED P CCP) - SPECIFIC LOCATION ALONG BAGUIO - ITOGON ROAD (S00390LZ)
- Contractor: ESTAKA BUILDERS (39976)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-12-15
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱10,454,208.00
- Contract status: Completed Report
- RECONSTRUCTION TO CONCRETE PAVEMENT, 280MM - ALONG CITY LIMIT STO. TOMAS ROAD (S00404LZ)
- Contractor: HILLSTONE BUILDERS (33901)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-08-19
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱1,072,888.50
- Contract status: Completed Report
- CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE: ALONG B AGUIO - BAUANG ROAD (S00397LZ)
- Contractor: RODEKOM GENERAL CONSTRUCTION AND ENTERPRISE (38656)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-05-18
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱48,510,000.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - ALONG TAWANG-AMBIONG ROAD (S00387LZ)
- Contractor: KALAHAN GENERAL CONSTRUCTION AND SUPPLIES (38324)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-01-10
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱3,880,684.75
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS IN PUBLIC FACILITIES - RAIN WATER COLLECTOR S IN PUBLIC FACILITIES, VARIOUS LOCATIONS ALONG BENGUET FIRST DISTRICT
- Contractor: ANAS CONSTRUCTION (31655)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-08-18
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱4,070,500.00
- Contract status: Completed Report
- REPLACEMENT OF BRIDGE: DEMONSTRATION BR. (B02184LZ) ALON G KENNON ROAD, TUBA, BENGUET
- Contractor: BAKUN CONSTRUCTION (29128)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-04-19
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱29,350,538.00
- Contract status: Completed Report
- CONSTRUCTION OF EVACUATION CENTER, TABLAN, KABAYAN, BARR IO, KABAYAN, BENGUET
- Contractor: F.B. BANTALES ENGINEERING CONSTRUCTION (31045)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-08-18
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱34,719,368.00
- Contract status: Completed Report
- RECONSTRUCTION TO CONCRETE PAVEMENT, 280MM (REINFORCED P CCP)-SPECIFIC LOCATION ALONG BAGUIO-ITOGON ROAD (S00390LZ), K0258+595-K0259 +534, ITOGON, BENGUET
- Contractor: COMPASS ROSE BUILDERS (27024)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-02-12
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱9,090,807.00
- Contract status: Completed Report
- RECONSTRUCTION TO CONCRETE PAVEMENT, 280MM-ALONG CITY LI MIT-STO. TOMAS ROAD (S00404LZ)
- Contractor: HILLSTONE BUILDERS (33901)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2020-11-26
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱1,022,749.44
- Contract status: Completed Report
- CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE: ALONG B AGUIO-BAUANG ROAD (S00397LZ), K0288+631-K0288+745, SABLAN, BENGUET
- Contractor: MG SAMIDAN CONSTRUCTION (33234)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-07-09
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱13,355,030.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE-ALONG TA WANG-AMBIONG ROAD (S00387LZ), K0263+870-K0263+900, LA TRINIDAD, BENGUET
- Contractor: KALAHAN GENERAL CONSTRUCTION AND SUPPLIES (38324)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-05-21
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱15,579,368.00
- Contract status: Completed Report
- REPLACEMENT OF BRIDGES-DEMONSTRATION BR. (B02184LZ) ALON G KENNON ROAD, TUBA, BENGUET
- Contractor: BAKUN CONSTRUCTION (29128)
- Implementing Agency: Cordillera Administrative Region - Benguet 1st District Engineering Office
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2021-02-07
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱13,697,526.00
- Contract status: Completed Report