Infrastructure Projects in Cordillera Administrative Region — Cordillera Administrative Region - Cordillera Administrative Region, 2016
This page lists public infrastructure projects implemented by Cordillera Administrative Region - Cordillera Administrative Region in Cordillera Administrative Region during 2016. All data are sourced from the Department of Public Works and Highways (DPWH) official database (as of 9/30/2025): https://www.dpwh.gov.ph/dpwh/projects/infrastructure
This information is shared to promote transparency and public awareness. We encourage visitors to validate project details using the official DPWH source. In case of discrepancies, please refer to the original records published by the DPWH.
| Contractor | Projects | Total Price |
|---|---|---|
| ALFALFA CONSTRUCTION (29712) | 7 | ₱989,196,656.00 |
| OMENGAN CONSTRUCTION & DEVELOPMENT CORPORATION (5119) | 8 | ₱972,823,648.00 |
| FIAT CONSTRUCTION SERVICES (05463) | 4 | ₱569,277,936.00 |
| KVC CONSTRUCTION (28959) | 4 | ₱411,206,928.00 |
| NORTHERN BUILDERS (8789) | 3 | ₱359,857,864.00 |
- RD UPGRDNG (UNPVD TO PVD) CLAVERIA - CALANASAN - KABUGAO R OAD K0638+275
- Contractor: KVC CONSTRUCTION (28959)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-04-10
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱146,249,952.00
- Contract status: Completed Report
- RD UPGRDNG (UNPVD TO PVD) ACOP - KAPANGAN - KIBUNGAN - BAK UN ROAD K0312+939
- Contractor: NORTHERN BUILDERS (8789)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-10-29
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱146,250,000.00
- Contract status: Completed Report
- RD UPGRDNG (UNPVD TO PVD) ACOP - KAPANGAN - KIBUNGAN - BAK UN ROAD K0316+908
- Contractor: DJY CONSTRUCTION (35651) / STAY CONSTRUCTION (23323)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-07-09
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱146,250,000.00
- Contract status: Completed Report
- RD UPGRDNG (UNPVD TO PVD) KIANGAN - TINOC - BUGUIAS ROAD C HAINAGE 1047
- Contractor: FIAT CONSTRUCTION SERVICES (05463) / RODEKOM GENERAL CONSTRUCTION AND ENTERPRISE (38656)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2016-11-09
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱127,062,000.00
- Contract status: Completed Report
- RD UPGRNG CLAVERIA - CALANASAN - KABUGAO ROAD, K0661+929
- Contractor: JOMARCANN GENERAL CONSTRUCTION (30599) / KOUZBARY BUILDERS (36446)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-04-06
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱123,283,872.00
- Contract status: Completed Report
- ROAD UPGRADING CLAVERIA - CALANASAN - KABUGAO ROAD K0 646+ 173
- Contractor: KVC CONSTRUCTION (28959) / TRYST BUILDERS ENTERPRISES (31164)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-08-20
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱140,672,976.00
- Contract status: Completed Report
- RD UPGRDNG CLAVERIA - CALANASAN - KABUGAO ROAD, K0658+343< /span>
- Contractor: FIAT CONSTRUCTION SERVICES (05463)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-05-23
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱142,935,008.00
- Contract status: Completed Report
- RD UPGRADNG (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATE GIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED RD STDS (HDM-4 ANALYSIS) CLA VERIA - CALANASAN - KABUGAO ROAD, K0653+541-K0655+420, K0656+935-K0657+702, K0657+720-K0658+343
- Contractor: ALFALFA CONSTRUCTION (29712)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-09-04
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱144,846,000.00
- Contract status: Completed Report
- ROAD UPGRADING (UNPAVED TO PAVED) TABUK - BANAWE VIA TANUD AN - BARLIG ROAD K0522+831
- Contractor: OMENGAN CONSTRUCTION & DEVELOPMENT CORPORATION (5119)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-07-28
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱99,111,512.00
- Contract status: Completed Report
- ROAD UPGRADING (UNPAVED TO PAVED) ACOP - KAPANGAN - KIBUNG AN - BAKUN ROAD, K0330+238 - K0333+979
- Contractor: E.K.C. CONSTRUCTION AND AGGREGATES (14833) / GONZALO CONSTRUCTION (1826)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-07-13
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱146,248,928.00
- Contract status: Completed Report
- ROAD UPGRADING (UNPAVED TO PAVED) KIANGAN - TINOC - BUGUI AS ROAD CHAINAGE 8074
- Contractor: ALCEL CONSTRUCTION (15129)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-09-11
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱127,461,680.00
- Contract status: Completed Report
- ROAD UPGRADING (UNPAVED TO PAVED) ACOP - KAPANGAN - KIBUN GAN - BAKUN ROAD K0266+963
- Contractor: NORTHERN BUILDERS (8789)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-09-22
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱135,607,872.00
- Contract status: Completed Report
- ROAD UPGRADING (UNPAVED TO PAVED) ACOP - KAPANGAN - KIBUN GAN - BAKUN ROAD K0320+771
- Contractor: ALFALFA CONSTRUCTION (29712)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-10-01
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱146,249,968.00
- Contract status: Completed Report
- REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - COLORA DO BRIDGE (B02170LZ) ALONG KENNON ROAD
- Contractor: LOC CONSTRUCTION AND SUPPLY (34764)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2016-03-08
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱969,547.19
- Contract status: Completed Report
- RD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL RD STRATE GIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED RD STDS (HDM-4 PROJ ANALYSIS ) LUBUAGAN-BATONG BUHAY - ABRA BDRY ROAD, K0462+032-K0464+536, LUBUAGAN, K ALINGA
- Contractor: R.S. SEPIAN CONSTRUCTION & TRUCKING (20519)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-09-24
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱93,186,888.00
- Contract status: Completed Report
- RD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL RD STRATE GIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED RD STDS (HDM-4 PROJ ANALYSIS ) LUBUAGAN - BATONG BUHAY - ABRA BDRY ROAD, K0464+536-K0465+789, KALINGA
- Contractor: KVC CONSTRUCTION (28959)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-10-05
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱45,669,336.00
- Contract status: Completed Report
- RD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRA TEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED RD STDS (HDM-4 PROJ ANALYS IS) ASIN (KM 8) NANGALISAN SAN PASCUAL, TUBA, BENGUET - LU ROAD), K0266+072 -K0267+007, K0267+036-K0267+055,K0268+412-K0268+
- Contractor: 3K ROCK ENGINEERING (27908)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-05-31
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱121,558,520.00
- Contract status: Completed Report
- RD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL RD STRATE GIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED RD STDS (HDM-4 PROJ ANALYSIS ) JCT TALUBIN-BARLIG-NATONIN-PARACELIS-CALACCAD RD, K0443+054-K0446+000, NA TONIN, MT. PROVINCE
- Contractor: A.P.O. GENERAL CONSTRUCTION (7010)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-06-15
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱97,499,992.00
- Contract status: Completed Report
- RD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL RD STRATE GIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED RD STDS (HDM-4 PROJ ANALYSIS ) JCT TALUBIN-BARLIG-NATONIN-PARACELIS-CALACCAD RD, K0408+567-K0411+793, K0 411+813-K0411+876, K0411+896-K0412+450, BARLIG,
- Contractor: MG SAMIDAN CONSTRUCTION (33234) / TADIAN GENERAL CONSTRUCTION (35339) / FIAT CONSTRUCTION SERVICES (05463)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-03-03
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱146,249,872.00
- Contract status: Completed Report
- RD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL RD STRATE GIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED RD STDS (HDM-4 PROJ ANALYSIS ) BANAUE-HUNGDUAN-BENGUET BDRY RD, CHAINAGE 1075 - CHAINAGE 4825, TINOC, IF UGAO
- Contractor: ALFALFA CONSTRUCTION (29712)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-02-05
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱135,219,088.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGED BASED ON PAVEMENT MANAGEMENT SYSTEM HIGH WAY - 4, BAGUIO - BONTOC ROAD, K0258+178-K0259+000, K0259+380-K0259+531,K02 59+832-K0260+015, K0260+500-K0261+982, BENGUET
- Contractor: E.K.C. CONSTRUCTION AND AGGREGATES (14833)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-03-13
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱47,862,060.00
- Contract status: Completed Report
- ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD ST RATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED RD STDS (HDM-4 PROJ ANAL YSIS) TABUK-BANAWE VIA TANUDAN-BARLIG RD, K0527+291-K0528+000, K0528+000-K0 528+122,K0528+122-K0529+388,K0529+388-K0529+444,
- Contractor: VUC HIGHLAND DEVELOPERS INC. (FORMERLY: VUC ENGINEERING) (7918)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-06-22
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱75,880,512.00
- Contract status: Completed Report
- RD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL RD STRATE GIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED RD STDS (HDM-4 PROJ ANALYSIS ) TABUK-BANAWE VIA TANUDAN-BARLIG RD, K0530+540-K0532+680, TANUDAN, KALINGA
- Contractor: R.S. SEPIAN CONSTRUCTION & TRUCKING (20519)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-04-15
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱51,587,704.00
- Contract status: Completed Report
- RD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL RD STRATE GIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED RD STDS (HDM-4 PROJ ANALYSIS ) RIZAL NATIONAL ROAD (ROMUALDEZ-SANTOR-CALAOCAN-SN PASCUA SECTION) K0425+2 40-K0425+388,K0425+388-K0425+426,K0425+426-K0425
- Contractor: OMENGAN CONSTRUCTION & DEVELOPMENT CORPORATION (5119)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-03-18
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱124,253,512.00
- Contract status: Completed Report
- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG N ATIONAL ROADS ABANAO ROAD, CHAINAGE 0+000 - CHAINAGE 0+352, BAGUIO CITY
- Contractor: JABEN GENERAL CONTRACTING & ENG'G SERVICES (34934)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2016-07-29
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱5,591,907.50
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGED BASED ON PAVEMENT MANAGEMENT SYSTEM HIGH WAY-4, KENNON ROAD, K0239+048 - K0239+593, TUBA, BENGUET
- Contractor: F.B. BANTALES ENGINEERING CONSTRUCTION (31045)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2016-11-09
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱15,718,953.00
- Contract status: Completed Report
- REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - CAMP 6 BRIDGE (B02183LZ) ALONG KENNON ROAD, CAMP 6, TUBA, BENGUET
- Contractor: LOC CONSTRUCTION AND SUPPLY (34764)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2016-03-08
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱1,123,481.62
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIP S, SLOPE COLLAPSE AND LANDSLIDE - BAGUIO-BAUANG ROAD, K0288+710-K0288+730, SABLAN, BENGUET
- Contractor: LOC CONSTRUCTION AND SUPPLY (34764)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2016-08-24
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱3,860,122.25
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIP S, SLOPE COLLAPSE AND LANDSLIDE - QUIRINO HIGHWAY (BAGUIO - BAUANG), K0301+ 690 - K0301+705 (RIGHT SIDE). K0302+285 - K0302+350 (RIGHT SIDE), BAGUIO CI TY
- Contractor: LOC CONSTRUCTION AND SUPPLY (34764)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2016-08-05
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱4,798,241.50
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPO RTS, SEAPORTS AND DECLARED TOURISM DESTINATIONS - MANGKINGAO-AM-AM VIA MASC A-SAYAPOT ROAD LEADING TO AM-AM OBSERVATORY ROCK, BURIAL CAVE, CADA FARM AN D KENNY FARM, MANKAYAN, BENGUET
- Contractor: MG SAMIDAN CONSTRUCTION (33234)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-05-28
- Fund source: Regular Infra - GAA 2016 MFO-3
- Contract price: ₱97,605,176.00
- Contract status: Completed Report
- RD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL RD STRATE GIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED RD STDS (HDM-4 PROJ ANALYSIS ) BANAUE-HUNGDUAN-BENGUET BDRY RD, CHAINAGE 4825 - CHAINAGE 8385, TINOC, IF UGAO
- Contractor: ALFALFA CONSTRUCTION (29712)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-09-30
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱136,612,752.00
- Contract status: Completed Report
- ROAD UPGRADING (UNPAVED TO PAVED) CLAVERIA - CALANASAN - KABUGAO ROAD KO642+034
- Contractor: OMENGAN CONSTRUCTION & DEVELOPMENT CORPORATION (5119)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2016-12-25
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱140,330,336.00
- Contract status: Completed Report
- REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, ALIOG BRIDGE (B00977LZ) ALONG KALINGA-CAGAYAN ROAD (CALANAN-ENRILE SECTION), KALI NGA
- Contractor: VUC HIGHLAND DEVELOPERS INC. (FORMERLY: VUC ENGINEERING) (7918)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2016-11-20
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱23,391,460.00
- Contract status: Completed Report
- REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, LIWAN BRIDGE (B00980LZ) ALONG KALINGA-CAGAYAN ROAD (CALANAN-ENRILE SECTION), KALI NGA
- Contractor: VUC HIGHLAND DEVELOPERS INC. (FORMERLY: VUC ENGINEERING) (7918)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2016-11-27
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱6,619,479.00
- Contract status: Completed Report
- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS, KAYANG ST., CHAINAGE 0 - CHAINAGE 90, BAGUIO CITY
- Contractor: P.G. VELASCO CONSTRUCTION (36638)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2016-07-06
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱1,494,607.88
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGED ON PAVEMENT MGMT SYSTEM/HIGHWAY-4, ASIN (KM 8)-NANGALISAN SAN PASCUAL,TUBA, BENGUET - LU ROAD, K0275+1278 - K0275+ 1967, K0275+1967-K0275+2029,K0275+2054-K0275+2716
- Contractor: 3K ROCK ENGINEERING (27908)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-04-11
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱62,877,468.00
- Contract status: Completed Report
- RD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL RD STRAT EGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED RD STDS (HDM-4 PROJECT ANAL YSIS) RIZAL NATIONAL ROAD (BABALAG-KINAMA-SN FRANCISCO SECTION), K0529+520 - K0534+475, KALINGA
- Contractor: OMENGAN CONSTRUCTION & DEVELOPMENT CORPORATION (5119)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-04-01
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱119,212,784.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGED BASED ON PAVEMENT MGMT SYSTEM/HIGHWAY - 4, KENNON ROAD, K0238+880-K0239+048, K0237+123-K0238+000, K0228+791-K0229+ 000, K0228+080-K0228+440, TUBA, BENGUET
- Contractor: 3K ROCK ENGINEERING (27908)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2016-12-22
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱46,620,176.00
- Contract status: Completed Report
- IMPROVEMENT/WIDENING OF NATIONAL ROADS KENNON ROAD K0241 +340 - K0241+566, KO246+375 - KO246+563, KO248+047 - KO248+147
- Contractor: TONKA CONSTRUCTION (4064)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-08-12
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱19,749,740.00
- Contract status: Completed Report
- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - HARRISON ROAD, CHAINAGE 0 - CHAINAGE 0+807 (S04713LZ); CHA INAGE 0 - CHAINAGE 0+807 (S04714LZ)
- Contractor: R.A. FANGLAYAN (RAF) GENERAL CONSTRUCTION INC. (FORMERLY:RAF GENERAL CONSTRUCTION) (06699)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2016-09-08
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱15,433,224.00
- Contract status: Completed Report
- ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD S TRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 P ROJECT ANALYSIS) MALALAO NATIONAL ROAD (AGBANNAWAG-MALALAO-BULO SECTION), K 0519+178 - K0523+631, KALINGA
- Contractor: J.C. BAAC CONSTRUCTION CORPORATION (25974)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-05-20
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱129,557,696.00
- Contract status: Completed Report
- ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD S TRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 P ROJECT ANALYSIS) MALALAO NATIONAL ROAD (AGBANNAWAG-MALALAO-BULO SECTION), K 0514+690 - K0516+440, K0516+553 - K0518+356)
- Contractor: DCEBUILDERS CORPORATION (FORMERLY: DCESTRANERO CORPORATION) (29347)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-06-19
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱92,624,992.00
- Contract status: Completed Report
- RD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL RD STRAT EGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED RD STDS (HDM-4 PROJECT ANAL YSIS) RIZAL NATIONAL RD (BABALAG-KINAMA-SN FRANCISCO SECT), K0534+475 - K05 35+297, K0535+313 - K0535+596, K0535+996 - K0536+
- Contractor: OMENGAN CONSTRUCTION & DEVELOPMENT CORPORATION (5119)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-03-18
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱123,619,224.00
- Contract status: Completed Report
- RD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL RD STRAT EGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED RD STDS (HDM-4 PROJ ANALYSI S) JUNCTION TALUBIN-BARLIG-NATONIN-PARACELIS-CALACCAD RD, K0457+218 - K0460 +000
- Contractor: VUC HIGHLAND DEVELOPERS INC. (FORMERLY: VUC ENGINEERING) (7918)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-07-10
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱134,236,256.00
- Contract status: Completed Report
- RD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL RD STRAT EGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED RD STDS (HDM-4 PROJ ANALYSI S) JUNCTION TALUBIN - BARLIG - NATONIN - PARACELIS - CALACCAD RD, K0453+000 - K0454+731
- Contractor: OMENGAN CONSTRUCTION & DEVELOPMENT CORPORATION (5119)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-08-15
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱64,138,768.00
- Contract status: Completed Report
- RD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL RD STRAT EGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STDS (HDM-4 PROJ ANALY SIS) ACOP-KAPANGAN-KIBUNGAN-BAKUN ROAD, K0333+976 - K0334+690, K0336+100 - K0336+218, K0336+288 - K0336+465, K0328+738 - K03
- Contractor: SMA BUILDER (38380) / FIAT CONSTRUCTION SERVICES (05463) / RODEKOM GENERAL CONSTRUCTION AND ENTERPRISE (38656)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-06-09
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱114,348,000.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLI PS, SLOPE COLLAPSE AND LANDSLIDE, KENNON ROAD, K0247+644 - K0248+147 (LEFT SIDE), K0247+644 - K0247+724 (RIGHT SIDE), K0246+852 -K0247+000 (RIGHT SID E)
- Contractor: TRYST BUILDERS ENTERPRISES (31164)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-07-08
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱48,749,944.00
- Contract status: Completed Report
- RD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL RD STRAT EGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED RD STDS (HDM-4 PROJ ANALYSI S) BULO NATIONAL ROAD (AGBANNAWAG-BULO-CALLAGDAO SECTION), K0503+400 - K050 7+291
- Contractor: OMENGAN CONSTRUCTION & DEVELOPMENT CORPORATION (5119)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-03-25
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱113,500,008.00
- Contract status: Completed Report
- RD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL RD STRAT EGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED RD STANDARDS (HDM-4 PROJECT ANALYSIS) KIANGAN-TINOC-BUGUIAS ROAD, CHAINAGE 39337 - CHAINAGE 43087
- Contractor: PHRANARET CONSTRUCTION (16878) / ALFALFA CONSTRUCTION (29712)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-12-20
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱146,242,896.00
- Contract status: Completed Report
- RD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL RD STRAT EGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED RD STDS (HDM-4 PROJ ANALYSI S) MT. PROVINCE - ISABELA ROAD, CHAINAGE 13140 - CHAINAGE 16100
- Contractor: DPJ ENGINEERS & CONSULTANTS (33619) / ROMA CONSTRUCTION & DEVELOPMENT CORPORATION (6514)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-04-25
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱97,500,000.00
- Contract status: Completed Report
- RD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL RD STRAT EGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED RD STDS (HDM-4 PROJECT ANAL YSIS) MT. PROVINCE - ISABELA ROAD, CHAINAGE 9300 - CHAINAGE 13140
- Contractor: DPJ ENGINEERS & CONSULTANTS (33619) / ROMA CONSTRUCTION & DEVELOPMENT CORPORATION (6514)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-06-04
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱97,500,000.00
- Contract status: Completed Report
- RD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL RD STRAT EGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED RD STDS (HDM-4 PROJECT ANAL YSIS), KIANGAN-TINOC-BUGUIAS RD, CHAINAGE 43087-CHAINAGE 44907, CHAINAGE 45 668 - CHAINAGE 46347, TINOC, IFUGAO
- Contractor: PAULA MAE BUHONG CONSTRUCTION (26128)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-05-04
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱97,500,000.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRP ORTS, SEAPORTS, AND DECLARED TOURISM DESTINATIONS, BALLAY - TABIO - TONOMAN - BULALACAO LAKES AND MT. TABEO, KABAYAN, BENGUET
- Contractor: KVC CONSTRUCTION (28959) / BALINTUGAN CONSTRUCTION (34566)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2019-02-10
- Fund source: Regular Infra - GAA 2016 MFO-3
- Contract price: ₱189,621,536.00
- Contract status: Completed Report
- RD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL RD STRAT EGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED RD STDS (HDM-4 PROJ ANALYSI S) JCT TALUBIN - BARLIG - NATONIN - PARACELIS - CALACCAD ROAD, K0412+450 - K0416+064
- Contractor: A.I.P. CONSTRUCTION (32458) / BMK CONSTRUCTION CORPORATION (FORMERLY B.M.K. CONSTRUCTION) (8292)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-05-14
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱140,334,960.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRP ORTS, SEAPORTS, AND DECLARED TOURISM DESTINATIONS, GUINZADAN-CAGUBATAN-BALI LI (MANKAYAN) ROAD LEADING TO MOGAO MOUNTAIN AND GAWAAN LAKE, BAUKO AND TAD IAN, MT. PROVINCE
- Contractor: MG SAMIDAN CONSTRUCTION (33234) / TADIAN GENERAL CONSTRUCTION (35339) / FIAT CONSTRUCTION SERVICES (05463)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-02-02
- Fund source: Regular Infra - GAA 2016 MFO-3
- Contract price: ₱183,350,000.00
- Contract status: Completed Report
- REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, IRISAN BRIDGE (B02186LZ) ALONG BAGUIO-BAUANG ROAD, BENGUET
- Contractor: NORTHBASE CONSTRUCTION (34306)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2016-12-28
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱1,767,686.50
- Contract status: Completed Report
- CONST/IMPVT OF ACCESS RDS LDG TO AIRPORTS, SEAPORTS, AND DECLARED TOURISM DESTINATIONS SABANGAN-SAGADA RD LEADING TO POBLACION SAGA DA, SUMAGUING CAVE, HANGING COFFINS, BOMOD-OK FALLS, BOKONG FALLS, MARCOS C AVE, SAGADA, MT. PROVINCE
- Contractor: E.T. LATAWAN CONSTRUCTION (13919)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-10-14
- Fund source: Regular Infra - GAA 2016 MFO-3
- Contract price: ₱57,887,372.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRP ORTS, SEAPORTS, AND DECLARED TOURISM DESTINATIONS POBLACION-LAPPA-MARAG ROA D LEADING TO MARAG VALLEY, LUNA, APAYAO
- Contractor: KVC CONSTRUCTION (28959)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-10-14
- Fund source: Regular Infra - GAA 2016 MFO-3
- Contract price: ₱140,118,000.00
- Contract status: Completed Report
- ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD S TRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 P ROJECT ANALYSIS), KALINGA - ABRA ROAD, K0484+442 - K0485+148, K0485+309 - K 0485+333, K0485+333 - K0485+989, K0497+863 - K049
- Contractor: BHM CONSTRUCTION (30724)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-10-07
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱69,701,728.00
- Contract status: Completed Report
- ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD S TRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 P ROJECT ANALYSIS), KIANGAN - TINOC - BUGUIAS ROAD, CHAINAGE 46347 - CHAINAGE 48348
- Contractor: KVC CONSTRUCTION (28959) / BALINTUGAN CONSTRUCTION (34566)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-09-02
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱77,990,248.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS RDS LEADING TO AIRPOR TS, AND DECLARED TOURISM DESTINATIONS, KINAKIN-CAMBULO ROAD LEADING TO KINA KIN AND CAMBULO NATIVE VILLAGES, RICE TERRACES, BANAO RICE TERRACES, BANAUE IFUGAO
- Contractor: R.S. SEPIAN CONSTRUCTION & TRUCKING (20519)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-04-03
- Fund source: Regular Infra - GAA 2016 MFO-3
- Contract price: ₱136,160,560.00
- Contract status: Completed Report
- RD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL RD STRAT EGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED RD STDS (HDM-4 PROJ ANALYSI S) APAYAO-ILOCOS NORTE ROAD, K0611+186 - K0614+476, K0615+485 - K0616+000
- Contractor: A.M. ORETA & CO., INC. (108)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-09-03
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱123,346,032.00
- Contract status: Completed Report
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF BAYUDAN-CHICO RIVER FLOOD-EROSION CON TROL PROJECT
- Contractor: FIAT CONSTRUCTION SERVICES (05463)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-04-03
- Fund source: Regular Infra - GAA 2016 MFO-2
- Contract price: ₱97,499,968.00
- Contract status: Completed Report
- NETWORK DEVT - IMPVT/WIDENING OF NATL RDS, KALINGA-CAGAY AN RD (CALANAN-ENRILE SECTION), K0507+200 - K0507+941 (RS), K0508+292 - K05 09+260 (RS), K0507+200 - K0507+884 (LS), K0508+292 - K0509+260 (LS)< /li>
- Contractor: VUC HIGHLAND DEVELOPERS INC. (FORMERLY: VUC ENGINEERING) (7918)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2016-08-23
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱23,346,556.00
- Contract status: Completed Report
- RD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL RD STRAT EGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED RD STDS (HDM-4 PROJECT ANAL YSIS), BANAUE-MAYOYAO-A.LISTA-ISABELA BDRY ROAD, K0349+948 - K0350+038, K03 52+226 - K0352+503, K0364+753 - K0364+801, K0377+
- Contractor: ALFALFA CONSTRUCTION (29712)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-09-19
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱146,176,160.00
- Contract status: Completed Report
- RD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL RD STRAT EGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED RD STDS (HDM-4 PROJ ANALYSI S), BANAUE-MAYOYAO-A.LISTA-ISABELA RD, K0386+328 - K0388+581, K0388+581 - K 0389+663, K0389+757 - K0391+066, K0391+197 - K039
- Contractor: ALFALFA CONSTRUCTION (29712) / COLBY CONSTRUCTION (33969)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-10-01
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱140,990,864.00
- Contract status: Completed Report
- RD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL RD STRAT EGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED RD STDS (HDM-4 PROJ ANALYSI S), UBAO-TAANG ROAD, K0399+280 - K0399+390, K0400+849 - K0401+083, K0404+90 8-K0408+314, IFUGAO
- Contractor: ALFALFA CONSTRUCTION (29712) / LUCKY A CONSTRUCTION CORPORATION (38293)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-10-15
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱131,619,888.00
- Contract status: Completed Report
- CONST/IMPVT OF ACCESS RDS LEADING TO AIRPORTS, SEAPORTS, AND DTD, CUDOG-MUNGAYANG-KIANGAN ROAD LEADING TO AMBUAYA LAKE, YAMASHITA S HRINE, AND KIYANGAN SETTLEMENT, KIANGAN AND LAGAWE, IFUGAO (INCLUDING CONST RUCTION OF BRIDGES)
- Contractor: OMENGAN CONSTRUCTION & DEVELOPMENT CORPORATION (5119)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-03-07
- Fund source: Regular Infra - GAA 2016 MFO-3
- Contract price: ₱188,657,504.00
- Contract status: Completed Report
- MFO-3 - CONST/IMPVT OF ACCESS RDS LEADING TO AIRPORTS, S EAPORTS AND DTD, GUISSET-BINGA-BALOY-TINONGDAN RD LEADING TO BINGA DAM AND MT. UGO, SITE FOR THE INTERNATIONAL SKY RUNNING EVENT, ITOGON (INCLUDING 18 0LM. BRIDGE)
- Contractor: A.I.P. CONSTRUCTION (32458) / BMK CONSTRUCTION CORPORATION (FORMERLY B.M.K. CONSTRUCTION) (8292)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-05-19
- Fund source: Regular Infra - GAA 2016 MFO-3
- Contract price: ₱173,700,000.00
- Contract status: Completed Report
- ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD S TRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 P ROJECT ANALYSIS)ABRA - ILOCOS NORTE ROADCHAINAGE 7058 - CHAINAGE 9088
- Contractor: KVC CONSTRUCTION (28959)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-03-06
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱79,169,640.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRP ORTS. SEAPORTS, AND DECLARED TOURISM DESTINATIONS TUROD-SAN GREGORIO-SHALOM -LUSSOK ROAD LEADING TO LUSSOK CAVE, LUNA, APAYAO
- Contractor: FIAT CONSTRUCTION SERVICES (05463)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-01-30
- Fund source: Regular Infra - GAA 2016 MFO-3
- Contract price: ₱164,793,056.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRP ORTS, SEAPORTS, AND DECLARED TOURISM DESTINATIONSJNR - NATUBLENG - NABALICO NG - CABUGUIASAN - PACSO - TONGLO - SACLALAN ROAD LEADING TO VARIOUS TOURIS T ATTRACTIONS, BUGUIAS, BENGUET
- Contractor: FIAT CONSTRUCTION SERVICES (05463)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-12-21
- Fund source: Regular Infra - GAA 2016 MFO-3
- Contract price: ₱164,049,904.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS CONSTRUCTION OF RAIN WATER COLLECTION SYSTEM (RWCS)
- Contractor: JFALMAZAN CONSTRUCTION AND SUPPLY (36384)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2016-07-30
- Fund source: Regular Infra - GAA 2016 MFO-3
- Contract price: ₱3,220,104.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITI ES ALONG MAJOR RIVER BASIN, BRGY MUDENG, LA PAZ, ABRA
- Contractor: C.R. DOMINGO CONSTRUCTION AND POWER DEVELOPMENT, INC. (FOR. C.R. DOMINGO CONSTRUCTION, INC.) (2992)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-09-04
- Fund source: Regular Infra - GAA 2016 MFO-2
- Contract price: ₱48,778,128.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION STRUCTUR ES AND DRAINAGE SYSTEMS, REPAIR OF FOLLOWING SWIP IN APAYAO - ABULOG RIVER BASIN (BARO-A LUBONG, FLORA; ZUMIGE, LUNA; BACUT, STA MARCELA), FLORA, LUNA , STA. MARCELA, APAYAO
- Contractor: NORTHERN BUILDERS (8789)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2018-01-05
- Fund source: Regular Infra - GAA 2016 MFO-2
- Contract price: ₱77,999,992.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITI ES ALONG MAJOR AND PRINCIPAL RIVER BASIN - ABRA RIVER BASIN - CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG ABRA RIVER BASIN (PHASE II), BRGY CAUPASA N & BRGY DANGLAS, ABRA
- Contractor: R.U. AQUINO CONSTRUCTION AND DEVELOPMENT CORP. (FO (23507)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-06-29
- Fund source: Regular Infra - GAA 2016 MFO-2
- Contract price: ₱46,088,128.00
- Contract status: Completed Report
- ROAD UPGRADING (UNPAVED TO PAVED) APAYAO - ILOCOS NORTE ROAD K0619+012
- Contractor: E.K.C. CONSTRUCTION AND AGGREGATES (14833)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2016-11-20
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱80,622,552.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS W/ SLIP, SLOPE COLLAPSE, AND LANDSLIDES ALONG CLAVERIA-CALANASAN-KABUGAO ROAD (K067 2+567 - K0672+632), (K0672+1100-K0672+1260), (K0673+260-K0673+360), CALANAS AN APAYAO
- Contractor: TRYST BUILDERS ENTERPRISES (31164)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2016-12-17
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱55,962,852.00
- Contract status: Completed Report
- ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD S TRATEGIES, TRAFFICE BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) ALONG UBAO-TAANG ROAD K0413+797-KO415+942
- Contractor: COLBY CONSTRUCTION (33969)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-08-26
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱81,010,008.00
- Contract status: Completed Report
- ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD S TRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 P ROJECT ANALYSIS) ALONGBANAUE-MAYOYAO-A LISTA-ISABELA BDRY RD K0392+285-K039 2+565, K0393+577-K0393+625, K0393+760-K0394+484
- Contractor: COLBY CONSTRUCTION (33969)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-08-03
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱61,941,408.00
- Contract status: Completed Report
- ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD S TRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 P ROJECT ANALYSIS) (INTERMITTENT SECTIONS) ALFONSO LISTA - AURORA BDRY. RD. - K0447+640-K0449+640
- Contractor: C.R. DOMINGO CONSTRUCTION AND POWER DEVELOPMENT, INC. (FOR. C.R. DOMINGO CONSTRUCTION, INC.) (2992)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-05-26
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱76,598,864.00
- Contract status: Completed Report
- MFO 2 - CONST./REHAB. OF FLOOD MITIGATION FACILITIES ALO NG MAJOR RIVER BASINS-CONST./MAINTENCE OF FLOOD CONTROL MITIGATION STRUCTUR ES AND DRAINAGE SYSTEMS - CONST. OF BUCAY FLOOD CONTROL ALONG ABRA RIVER, B UCAY, ABRA (CONST. OF CONC. REVETMENT)
- Contractor: R.U. AQUINO CONSTRUCTION AND DEVELOPMENT CORP. (FO (23507)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-11-13
- Fund source: Regular Infra - GAA 2016 MFO-2
- Contract price: ₱156,625,696.00
- Contract status: Completed Report
- MFO 2 - FLOOD MANAGEMENT SERVICES - FLOOD MITIGATION STR UCTURES AND DRAINAGE SYSTEMS - CONST. OF LANGIDEN FLOOD CONTROL ALONG ABRA RIVER, LANGIDEN, ABRA
- Contractor: R.U. AQUINO CONSTRUCTION AND DEVELOPMENT CORP. (FO (23507)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-12-21
- Fund source: Regular Infra - GAA 2016 MFO-2
- Contract price: ₱149,944,560.00
- Contract status: Completed Report
- RD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL RD STRAT EGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED RD STDS (HDM-4 PROJ ANALYSI S) KIANGAN - TINOC - BUGUIAS ROAD, CHAINAGE 25277 - CHAINAGE 25393, CHAINAG E 35707 - CHAINAGE 39337
- Contractor: ALFALFA CONSTRUCTION (29712)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-08-02
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱140,124,512.00
- Contract status: Terminated Report
- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS, KENNON ROAD, K0244+881 - K0245+375, K0245+941 - K0246+228
- Contractor: JABEN GENERAL CONTRACTING & ENG'G SERVICES (34934)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2016-11-05
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱8,334,065.00
- Contract status: Terminated Report
- RD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL RD STRAT EGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED RD STDS (HDM-4 PROJ ANALYSI S) JCT TALUBIN - BARLIG - NATONIN - PARACELIS - CALACCAD RD, K0416+264 - K0 416+500, K0416+865 - K0416+948, K0417+119 - K0417
- Contractor: T.N.J. BUHONG CONSTRUCTION (19687) / FIAT CONSTRUCTION SERVICES (05463)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-11-29
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱139,616,208.00
- Contract status: Terminated Report
- ASSET PRESERVATION OF NATIONAL ROAD, REHAB/RECONST OF NA TL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDES, BENGUET-NUEVA VIZCAYA R OAD, K0254+236-K0254+338, K0257+810 -K0257+825, K0271+650 - K0271+990, K029 0+948-K0290+979,K0291+515 - K0291+551, K0293+312-
- Contractor: E.K.C. CONSTRUCTION AND AGGREGATES (14833)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-05-18
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱70,960,040.00
- Contract status: Terminated Report
- RD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL RD STRAT EGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED RD STDS (HDM-4 PROJ ANALYSI S), UBAO-TAANG ROAD K0408+314 - K0412+064
- Contractor: ALFALFA CONSTRUCTION (29712)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-08-23
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱139,968,176.00
- Contract status: Terminated Report
- CONSTRUCTION AND MAINTENANCE OF BRIDGE ALONG NATIONAL RO ADSREPLACEMENT OF PERMANENT WEAK BRIDGESBAAY BRIDGE (B02231LZ) ALONG ABRA CERVANTES ROAD
- Contractor: WERR CORPORATION INTERNATIONAL (14133)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-03-08
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱0.00
- Contract status: Terminated Report
- MFO 1 - NATIONAL ROAD NETWORK SERVICES - CONSTRUCTION AN D MAINTENANCE OF BRIDGE ALONG NATIONAL ROADS - REPLACEMENT OF BRIDGES - (TE MPORARY TO PERMANENT) MATALAG BRIDGE (B02242LZ) ALONG CONNER - KABUGAO ROAD [REPLACEMENT OF BRIDGES (TEMPORARY TO PERMANENT)
- Contractor: TOKWING CONSTRUCTION, CORP.(FOR; TOKWING CONSTRUC (9650)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-07-11
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱0.00
- Contract status: Terminated Report
- CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL R OADSREPLACEMENT OF PERMANENT WEAK BRIDGESCAMP 5 BRIDGE 2 (B02182LZ) ALONG K ENNON ROAD
- Contractor: TOKWING CONSTRUCTION, CORP.(FOR; TOKWING CONSTRUC (9650)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-01-28
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱9,119,565.00
- Contract status: Terminated Report
- ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD S TRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 P ROJECT ANALYSIS) ALONG UBAO-TAANG ROAD K0412+064-K0413+756
- Contractor: PHRANARET CONSTRUCTION (16878)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2017-04-08
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱63,179,664.00
- Contract status: Terminated Report