Infrastructure Projects in Cordillera Administrative Region — Cordillera Administrative Region - Cordillera Administrative Region, 2023
This page lists public infrastructure projects implemented by Cordillera Administrative Region - Cordillera Administrative Region in Cordillera Administrative Region during 2023. All data are sourced from the Department of Public Works and Highways (DPWH) official database (as of 9/30/2025): https://www.dpwh.gov.ph/dpwh/projects/infrastructure
This information is shared to promote transparency and public awareness. We encourage visitors to validate project details using the official DPWH source. In case of discrepancies, please refer to the original records published by the DPWH.
| Contractor | Projects | Total Price |
|---|---|---|
| MG SAMIDAN CONSTRUCTION (33234) | 13 | ₱1,663,660,000.00 |
| SILVERWOLVES CONSTRUCTION CORPORATION (48466) | 4 | ₱820,250,000.00 |
| 3K ROCK ENGINEERING (27908) | 5 | ₱775,167,058.00 |
| M.P. TABERAO CONSTRUCTION SERVICES AND SUPPLIES (46017) / R.S. SEPIAN CONSTRUCTION & TRUCKING (20519) | 2 | ₱482,450,480.00 |
| ROCK-WBL CONSTRUCTION CORP. (FOR: ROCK-WBL CONSTRUCTION TRADING & SERVICES) (44551) | 2 | ₱289,500,000.00 |
- BALANTOY-DAO-ANGAN-POSWOY-ABABA-AN ROAD IN SUPPORT OF COFF EE PROCESSING INDUSTRY, HOMESTYLES INDUSTRY (BASKETRY AND SOFTBROOM MAKING) AND FOOD PROCESSING INDUSTRY, BALBALAN, KALINGA
- Contractor: BHM CONSTRUCTION (30724)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2024-05-31
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱110,685,504.00
- Contract status: Completed Report
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATION AL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINK S/ NEW ROADS - KIANGAN-ASIPULO-AMBAGUIO-BAYOMBONG ROAD, IFUGAO
- Contractor: DJY CONSTRUCTION (35651) / SOUTHLAND CONSTRUCTION AND SUPPLIES (39555)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2024-01-06
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱134,852,960.00
- Contract status: Completed Report
- CONSTRUCTION OF MEGA DIKE PROJECT ALONG CHICO RIVER (LEFT BANK), TABUK CITY, KALINGA
- Contractor: JTM CONSTRUCTION (41136) / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) (13722)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2024-04-11
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱144,750,000.00
- Contract status: Completed Report
- REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - GOV. BADO DANGWA NATIONAL ROAD, K0286+750 - K0286+900, KAPANGAN, BENGUET
- Contractor: MG SAMIDAN CONSTRUCTION (33234)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2023-11-20
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱135,100,000.00
- Contract status: Completed Report
- BAGUIO-LA TRINIDAD-ITOGON-SABLAN-TUBA AND TUBLAY, GUISSET- BINGA-BALOY-TINONGDAN (SECTION 5 OF BLISTT OUTER RING CIRCUMFERENTIAL ROAD) , PACKAGE 3, BENGUET
- Contractor: MG SAMIDAN CONSTRUCTION (33234)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2024-03-07
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱123,520,000.00
- Contract status: Completed Report
- BAGUIO-LA TRINIDAD-ITOGON-SABLAN-TUBA AND TUBLAY, GUISSET- BINGA-BALOY-TINONGDAN (SECTION 5 OF BLISTT OUTER RING CIRCUMFERENTIAL ROAD) , PACKAGE 1, BENGUET
- Contractor: MG SAMIDAN CONSTRUCTION (33234)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2024-03-31
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱106,150,000.00
- Contract status: Completed Report
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATION AL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTIO N OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - KENN ON RD - K0238 + 240 - K0238 + 260TUBA,BENGUET
- Contractor: UNIVERSAL DE LEON CONSTRUCTION AND AGGREGATES (35079)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2024-01-07
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱43,425,000.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, BOLIWONG - ABINUAN - NATTUM - ALIMI T, MAYOYAO, IFUGAO
- Contractor: M.P. TABERAO CONSTRUCTION SERVICES AND SUPPLIES (46017) / R.S. SEPIAN CONSTRUCTION & TRUCKING (20519)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2024-05-24
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱241,200,480.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, GUMHANG - LUHONG - DANGGO - AMBAGUI O, TINOC, IFUGAO
- Contractor: M.P. TABERAO CONSTRUCTION SERVICES AND SUPPLIES (46017) / R.S. SEPIAN CONSTRUCTION & TRUCKING (20519)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2024-05-31
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱241,250,000.00
- Contract status: Completed Report
- KENNON RD - K0232+535 - K0232+580TUBA, BENGUET
- Contractor: MG SAMIDAN CONSTRUCTION (33234)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2023-10-14
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱46,320,000.00
- Contract status: Completed Report
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIO NAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTI ON OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - KEN NON RD - K0218+480 - K0218+835TUBA, BENGUET
- Contractor: UNIVERSAL DE LEON CONSTRUCTION AND AGGREGATES (35079)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2024-02-12
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱43,444,300.00
- Contract status: Completed Report
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIO NAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTI ON OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - KEN NON RD - K0216+000 - K0216+115, K0224+037 - K022
- Contractor: UNIVERSAL DE LEON CONSTRUCTION AND AGGREGATES (35079)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2024-01-29
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱41,260,812.00
- Contract status: Completed Report
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIO NAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LIN KS/ NEW ROADS - BAGUIO-LA TRINIDAD-ITOGON-SABLAN-TUBA AND TUBLAY, POBLACION JCT.-BATUANG- CARANTES JCT-BALATOC JCT. (SECTIO
- Contractor: MG SAMIDAN CONSTRUCTION (33234) / ALBER AND SEVEN CONSTRUCTION (43470)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2024-11-23
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱106,150,000.00
- Contract status: Completed Report
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIO NAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTIO N OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - PRIMARY ROADS - KENNO N ROAD, K0241+798 -K0241+920BAGUIO CITY
- Contractor: BALINTUGAN CONSTRUCTION (34566)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2024-09-12
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱96,500,000.00
- Contract status: Completed Report
- CONSTRUCTION OF BARREN RIVER (DOWNSTREAM) FLOOD CONTROL W ITHIN CHICO RIVER BASIN, STA. 37+995 - STA. 39+300 (L/S), CONNER, APAYAO
- Contractor: JOMARCANN GENERAL CONSTRUCTION (30599) / RODEKOM GENERAL CONSTRUCTION AND ENTERPRISE (38656)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2024-02-29
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱115,800,000.00
- Contract status: Completed Report
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIO NAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTIO N OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - BEN GUET NUEVA VIZCAYA RD, K0275+324 - K0275+505
- Contractor: ROCK-WBL CONSTRUCTION CORP. (FOR: ROCK-WBL CONSTRUCTION TRADING & SERVICES) (44551)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2024-02-18
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱193,000,000.00
- Contract status: Completed Report
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATION AL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS - BENGUET NU EVA VIZCAYA RD, K0278+250 - K0278+320, K0278+320
- Contractor: MG SAMIDAN CONSTRUCTION (33234)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2023-12-07
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱144,750,000.00
- Contract status: Completed Report
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIO NAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTIO N OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - BEN GUET NUEVA VIZCAYA RD, K0283+368 - K0283+475
- Contractor: SILVERWOLVES CONSTRUCTION CORPORATION (48466)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2024-04-05
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱241,250,000.00
- Contract status: Completed Report
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIO NAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTIO N OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - BEN GUET NUEVA VIZCAYA RD, K0283+475 - K0283+575
- Contractor: SILVERWOLVES CONSTRUCTION CORPORATION (48466)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2024-04-18
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱241,250,000.00
- Contract status: Completed Report
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIO NAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTIO N OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - BEN GUET NUEVA VIZCAYA RD, K0292+100 - K0292+350
- Contractor: MG SAMIDAN CONSTRUCTION (33234)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2024-02-05
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱144,750,000.00
- Contract status: Completed Report
- GOV. BADO DANGWA NATIONAL ROAD, K0328+579 - K0328+684, K0 328+789 - K0328+844KIBUNGAN. BENGUET
- Contractor: MG SAMIDAN CONSTRUCTION (33234)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2024-02-18
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱193,000,000.00
- Contract status: Completed Report
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIO NAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTIO N OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS - GOV. BADO DANGWA NATIONAL ROAD, K0328+844 - K0329+00
- Contractor: SILVERWOLVES CONSTRUCTION CORPORATION (48466)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2024-03-06
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱193,000,000.00
- Contract status: Completed Report
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATION AL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS - GOV. BADO DANGWA NATIONAL ROAD, K0329+000 - K0329+150
- Contractor: MG SAMIDAN CONSTRUCTION (33234)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2024-03-19
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱193,000,000.00
- Contract status: Completed Report
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIO NAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTIO N OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - BAG UIO - BONTOC ROAD, K0301+655 - K0301+750
- Contractor: ROCK-WBL CONSTRUCTION CORP. (FOR: ROCK-WBL CONSTRUCTION TRADING & SERVICES) (44551)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2024-01-15
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱96,500,000.00
- Contract status: Completed Report
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIO NAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTIO N OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - BAG UIO - BONTOC ROAD, K0276+468 - K0276+588
- Contractor: MG SAMIDAN CONSTRUCTION (33234)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2024-02-09
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱144,750,000.00
- Contract status: Completed Report
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIO NAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTIO N OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - BAG UIO - BONTOC ROAD, K0276+745 - K0276+885
- Contractor: SILVERWOLVES CONSTRUCTION CORPORATION (48466)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2024-03-08
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱144,750,000.00
- Contract status: Completed Report
- ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES A GAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF FLOO D CONTROL ALONG TINOC RIVER, STA. 98+960 - STA.
- Contractor: DJY CONSTRUCTION (35651) / BEGAL DESIGN & CONSTRUCTION (34000)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2024-01-19
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱32,009,050.00
- Contract status: Completed Report
- ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES A GAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF FLOO D CONTROL ALONG TINOC RIVER, STA. 21+310 - STA.
- Contractor: DJY CONSTRUCTION (35651) / BEGAL DESIGN & CONSTRUCTION (34000)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2024-02-01
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱29,731,650.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL ALONG TINOC RIVER, STA. 104 +400 - STA.105+535 (DANGGO SECTION), TINOC, IFUGAO
- Contractor: PAULA MAE BUHONG CONSTRUCTION (26128) / DJY CONSTRUCTION (35651)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2024-01-07
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱78,908,048.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FU ND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF ROAD SAFETY DEVICES AND STREET LIGHTINGS ALONG BAGUIO - BONTOC ROAD, K0300 +000 - K0308+203
- Contractor: MG SAMIDAN CONSTRUCTION (33234)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2024-02-13
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱96,500,000.00
- Contract status: Completed Report
- KENNON ROAD, K0216+814 - K0219+092, K0220+182 - K0221+000 , K0221+090 - K0221+481, K0221+543 - K0223+264, K0223+958 - K0227+122, K022 8+078 - K0228+433, K0228+797 - K0229+363, K0229+631 - K0230+600, K0230+681 - K0231+765, K0231+811 - K0232+454.50, K0232+544
- Contractor: 3K ROCK ENGINEERING (27908)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2024-03-06
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱289,500,000.00
- Contract status: Completed Report
- BANAUE-MAYOYAO-ALFONSO LISTA-ISABELA BNDRY RD, K0361 +090 - K0361 + 380, BANAUE, IFUGAO
- Contractor: C.T. LEONCIO CONSTRUCTION & TRADING (17371)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2024-05-17
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱115,800,000.00
- Contract status: Completed Report
- BANAUE-MAYOYAO-ALFONSO LISTA-ISABELA BNDRY RD, K0346 +880 - K0347 + 130, BANAUE, IFUGAO
- Contractor: C.T. LEONCIO CONSTRUCTION & TRADING (17371)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2024-05-03
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱96,500,000.00
- Contract status: Completed Report
- BANAUE-MAYOYAO-ALFONSO LISTA-ISABELA BNDRY RD, K0351 +160 - K0351 + 260, K0351+300 - K0351+400, BANAUE, IFUGAO
- Contractor: MAER SUMMIT KONSTRUKT CO. (25262)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2024-08-04
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱115,800,000.00
- Contract status: Completed Report
- ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONA L ROAD SYSTEM - ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - CONG. ANDRES ACOP COSALAN RD, K0321+250 - K0321+515
- Contractor: MG SAMIDAN CONSTRUCTION (33234)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2024-03-06
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱193,000,000.00
- Contract status: Completed Report
- CONSTRUCTION OF RAIN WATER COLLECTOR - CONSTRUCTION OF A RAIN HARVESTING FACILITY (PHASE II), BUSOL WATERSHED, AMBIONG, BAGUIO CITY< /span>
- Contractor: GOLDRICH CONSTRUCTION & TRADING (16489)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2024-08-01
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱48,250,000.00
- Contract status: Completed Report
- CAPITAL OUTLAY - CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION / REHABILITATION OF WATER SUPPLY / SEPTAGE & SEWERAGE / RAIN WATER COLLECTOR SYSTEMS - RAIN WATER COLLECTORS IN PUBLIC FACILITIES - CAR - FY 2023
- Contractor: MARYUKAN CONSTRUCTION (45324)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2024-01-19
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱7,362,950.00
- Contract status: Completed Report
- REHABILITATION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LA NDSLIDE ALONG KIANGAN - TINOC - BUGUIAS ROAD, K0354+200 - K0354+500, GUMHAN G, TINOC, IFUGAO
- Contractor: PAULA MAE BUHONG CONSTRUCTION (26128)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2024-12-20
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱47,492,476.00
- Contract status: Completed Report
- KENNON RD - KO239+395 - KO239+480TUBA, BENGUET
- Contractor: 3K ROCK ENGINEERING (27908)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2023-07-04
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱106,574,600.00
- Contract status: Completed Report
- KENNON RD - KO228+810 - KO228+874TUBA, BENGUET
- Contractor: 3K ROCK ENGINEERING (27908)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2023-06-19
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱89,523,048.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/ IM PROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - LAGAWE-BOLIWONG-ABINUAN ROAD LEADING TO INCHANG FALLS, LAGAWE, IFUGAO
- Contractor: DJY CONSTRUCTION (35651) / LN BUILDERS AND CONSTRUCTION SUPPLY (49224)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2024-09-03
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱144,750,000.00
- Contract status: On-Going Report
- BAGUIO-LA TRINIDAD-ITOGON-SABLAN-TUBA AND TUBLAY, GUISSET- BINGA-BALOY-TINONGDAN (SECTION 5 OF BLISTT OUTER RING CIRCUMFERENTIAL ROAD) , PACKAGE 2, BENGUET
- Contractor: SEJ CONSTRUCTION & AGGREGATES (36378) / E.T. LATAWAN CONSTRUCTION (13919)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2025-04-10
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱67,550,000.00
- Contract status: On-Going Report
- CONSTRUCTION OF REVETMENT AND EMBANKMENT OF DIKE AND CHANN ELING ALONG CHICO RIVER, TABUK CITY, KALINGA
- Contractor: OMENGAN CONSTRUCTION & DEVELOPMENT CORPORATION (5119)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2024-05-11
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱144,750,000.00
- Contract status: On-Going Report
- CONSTRUCTION OF CONCRETE ROAD BALLAY - TABIO - TONOMAN - BULALACAO - TAWANGAN - LUSOD ROAD LEADING TO BULALACAO LAKES AND MT. TABEO, KABAYAN, BENGUET
- Contractor: MG SAMIDAN CONSTRUCTION (33234) / D.L. SUIDTA CONSTRUCTION (43961)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2025-08-14
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱149,490,000.00
- Contract status: On-Going Report
- KENNON RD - K0223+050 - K0223+126TUBA, BENGUET
- Contractor: MG SAMIDAN CONSTRUCTION (33234)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2024-03-31
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱46,320,000.00
- Contract status: On-Going Report
- CONSTRUCTION OF FLOOD CONTROL ALONG LAMUT RIVER, STA. 18+ 300 - STA. 18+900 (LAWIG SIDE), LAMUT, IFUGAO
- Contractor: DJY CONSTRUCTION (35651) / BEGAL DESIGN & CONSTRUCTION (34000)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2024-06-28
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱38,117,500.00
- Contract status: On-Going Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INF RASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES F ROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILIT IES-CONSTRUCTION OF BOLOK-ADAOAY-BAJEN-BATAN ACC
- Contractor: MG SAMIDAN CONSTRUCTION (33234)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2025-01-07
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱96,500,000.00
- Contract status: On-Going Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRU CTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI PURPOSE BUILDING PHASE III, AT BARANGAY WA NGAL, LA TRINIDAD, BENGUET
- Contractor: SPIDERONE CONSTRUCTION COMPANY LTD. (42805)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2024-10-25
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱41,487,988.00
- Contract status: On-Going Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCT URE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERV ICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING (BENGUET SPORTS COMPLEX AND FAC ILITIES), WANGAL, LA TRINIDAD, BENGUET (PHASE 3)
- Contractor: SPIDERONE CONSTRUCTION COMPANY LTD. (42805)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2024-11-28
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱49,430,904.00
- Contract status: On-Going Report
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIO NAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTIO N OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - BAG UIO - BONTOC RD, K0359+510 - K0359+580
- Contractor: ARCINUE COMM'L CORPORATION (6746)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2024-10-27
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱144,750,000.00
- Contract status: On-Going Report
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIO NAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTIO N OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - BAG UIO - BONTOC RD, K0359+610 - K0359+693SABANGAN
- Contractor: ARCINUE COMM'L CORPORATION (6746)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2024-06-28
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱96,500,000.00
- Contract status: On-Going Report
- CONSTRUCTION OF POLICE REGIONAL OFFICE CORDILLERA ONE STO P-SHOP NATIONAL SUPPORT UNIT BUILDING, CAMP BADO DANGWA, LA TRINIDAD, BENGU ET, PHASE III
- Contractor: KULAT CONSTRUCTION (45050)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2024-09-11
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,650,000.00
- Contract status: On-Going Report
- CONSTRUCTION (COMPLETION) OF SALNEC-MADALIPAY-DUGONG BRID GE, SALNEC AND DUGONG, BUCAY, ABRA
- Contractor: KATHA BUILDERS & SUPPLIES INC. (34651) / UNIMAX STEEL STRUCTURE AND CONSTRUCTION CORP. (49389)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2024-03-01
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱159,224,992.00
- Contract status: On-Going Report
- CONSTRUCTION (COMPLETION) OF LANGIDEN BRIDGE, SUYO AND NA LNAS - DALAYAP, LANGIDEN AND PIDIGAN, ABRA
- Contractor: KATHA BUILDERS & SUPPLIES INC. (34651) / LUX DRAGON CONSTRUCTION CORPORATION (55330)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2024-03-18
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱178,470,192.00
- Contract status: On-Going Report
- REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOP E COLLAPSE AND LANDSLIDE - KENNON ROAD (S00393LZ) K0235+581 - K0235+630, TU BA, BENGUET
- Contractor: 3K ROCK ENGINEERING (27908)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2023-12-05
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱25,377,058.00
- Contract status: On-Going Report
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE & RELIABLE NAT IONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION / RECONSTRU CTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROAD - KENNON RD - KO237+529 - KO237+680TUBA, BENGUET
- Contractor: 3K ROCK ENGINEERING (27908)
- Implementing Agency: Cordillera Administrative Region - Cordillera Administrative Region
- Region: Cordillera Administrative Region
- Contract effectivity:
- Contract expiry: 2024-09-05
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱264,192,352.00
- Contract status: On-Going Report