Infrastructure Projects in National Capital Region — National Capital Region - Metro Manila 1st District Engineering Office, 2023
This page lists public infrastructure projects implemented by National Capital Region - Metro Manila 1st District Engineering Office in National Capital Region during 2023. All data are sourced from the Department of Public Works and Highways (DPWH) official database (as of 9/30/2025): https://www.dpwh.gov.ph/dpwh/projects/infrastructure
This information is shared to promote transparency and public awareness. We encourage visitors to validate project details using the official DPWH source. In case of discrepancies, please refer to the original records published by the DPWH.
| Contractor | Projects | Total Price |
|---|---|---|
| VIRAC NRC CONSTRUCTION (11396) | 16 | ₱859,641,477.50 |
| DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION) (8931) | 15 | ₱702,287,706.50 |
| BELL CONSTRUCTION (27851) | 14 | ₱529,238,932.00 |
| ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958) | 7 | ₱488,730,824.00 |
| 729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.) (21923) | 19 | ₱428,713,166.50 |
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BRG Y. LITTLE BAGUIO, SAN JUAN CITY
- Contractor: KING SKY BUILDERS AND SUPPLY INC., FORMERLY (KING EIGHT BUILDERS AND SUPPLY INC.) (53938)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-07-15
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱23,752,244.00
- Contract status: Completed Report
- RIVERBANK IMPROVEMENT ALONG MARIKINA RIVER, MARIKINA CIT Y PACKAGE 1
- Contractor: ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-11-25
- Fund source: Regular Infra - GAA 2022 OO-2
- Contract price: ₱83,800,408.00
- Contract status: Completed Report
- RIVERBANK IMPROVEMENT ALONG MARIKINA RIVER, MARIKINA CIT Y PACKAGE 2
- Contractor: ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-11-19
- Fund source: Regular Infra - GAA 2022 OO-2
- Contract price: ₱83,401,184.00
- Contract status: Completed Report
- RIVERBANK IMPROVEMENT ALONG MARIKINA RIVER, MARIKINA CIT Y PACKAGE 3
- Contractor: ST. TIMOTHY CONSTRUCTION CORPORATION (39196)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-11-19
- Fund source: Regular Infra - GAA 2022 OO-2
- Contract price: ₱83,362,696.00
- Contract status: Completed Report
- RIVERBANK IMPROVEMENT ALONG MARIKINA RIVER, MARIKINA CIT Y PACKAGE 4
- Contractor: ST. TIMOTHY CONSTRUCTION CORPORATION (39196)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-11-19
- Fund source: Regular Infra - GAA 2022 OO-2
- Contract price: ₱83,379,136.00
- Contract status: Completed Report
- RIVER IMPROVEMENT ALONG MARIKINA RIVER, MARIKINA CITY (P ACKAGE VII)
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-02-05
- Fund source: Regular Infra - GAA 2022 OO-2
- Contract price: ₱83,861,544.00
- Contract status: Completed Report
- RIVER IMPROVEMENT ALONG MARIKINA RIVER, MARIKINA CITY (P ACKAGE VIII)
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-02-05
- Fund source: Regular Infra - GAA 2022 OO-2
- Contract price: ₱83,852,928.00
- Contract status: Completed Report
- RIVER IMPROVEMENT ALONG MARIKINA RIVER, MARIKINA CITY (P ACKAGE X)
- Contractor: ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-02-05
- Fund source: Regular Infra - GAA 2022 OO-2
- Contract price: ₱83,793,368.00
- Contract status: Completed Report
- REHABILITATION OF ROAD NETWORK, BARANGAY CONCEPCION UNO, MARIKINA CITY
- Contractor: STREAMLINE BUILDERS CORPORATION (40804)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-08-11
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱9,306,892.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT M ANDALUYONG HIGH SCHOOL, MANDALUYONG CITY
- Contractor: NEWBIG FOUR J CONSTRUCTION INC. (FORMERLY: FOUR J CONSTRUCTION) (15104)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-03-11
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,506,285.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT B ARANGAY WACK-WACK, PACKAGE 3, MANDALUYONG CITY
- Contractor: VIRAC NRC CONSTRUCTION (11396)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-05-29
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱93,594,472.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BLOCK 38-B WELFAREVILLE COMPOUND, BARANGAY ADDITION HILLS, MANDALUYONG CITY
- Contractor: KYRO BUILDERS, INC. (19567)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-09-22
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,505,873.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BLOCK 39-B WELFAREVILLE COMPOUND, BARANGAY ADDITION HILLS, MANDALUYONG CITY
- Contractor: 121 CONSTRUCTION CORPORATION (FORMERLY 121 CONSTUC (21686)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-02-11
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,482,318.00
- Contract status: Completed Report
- ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE TERTIA RY ROADS - GIL FERNANDO AVE. - K0018 + 315 - K0018 + 515
- Contractor: STREAMLINE BUILDERS CORPORATION (40804)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-05-11
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱9,495,166.00
- Contract status: Completed Report
- CONSTRUCTION OF BOX CULVERT ALONG SAPANG BAHO CREEK, MAR IKINA CITY
- Contractor: BELL CONSTRUCTION (27851)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-06-22
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱46,531,320.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION ALONG BALANTI CREEK AT KATIPUNAN EXTENSION, MARIKINA CITY
- Contractor: ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-04-28
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱56,741,660.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION ALONG BALANTI CREEK, BA RANGAY SAN ROQUE, MARIKINA CITY
- Contractor: METER KING INC. (36620) / JASMIG CONSTRUCTION CORPORATION (FORMERLY: JASMIG CONSTRUCTION SUPPLY) (26069)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-02-03
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱83,533,776.00
- Contract status: Completed Report
- REHABILITATION OF ROAD NETWORK AT BARANGAY STO. NI C3 91 O, MARIKINA CITY
- Contractor: BELL CONSTRUCTION (27851)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-07-05
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱46,489,436.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY TA C3 91ONG, MARIKINA CITY
- Contractor: LTDL BUILDERS (38371)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-08-04
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱23,683,926.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, LEODEGARIO VICTO RINO ELEMENTARY SCHOOL, BARANGAY JESUS DELA PE C3 91A, MARIKINA CITY
- Contractor: LTDL BUILDERS (38371)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-09-03
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱23,734,862.00
- Contract status: Completed Report
- CONSTRUCTION OF MARIKINA CITY PARKING COMPLEX, BRGY. STA . ELENA, MARIKINA CITY
- Contractor: BELL CONSTRUCTION (27851)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-11-16
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱47,504,428.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SANTO N I C3 91O, MARIKINA CITY
- Contractor: AYANA CONSTRUCTION AND TRADING (38623)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-04-06
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,753,945.00
- Contract status: Completed Report
- ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE TERTIA RY ROADS - MARIKINA-SN MATEO RD - K0017 + 627 - K0020 + 000
- Contractor: STREAMLINE BUILDERS CORPORATION (40804)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-06-20
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱16,650,464.00
- Contract status: Completed Report
- ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE TERTIA RY ROADS - MARIKINA-SN MATEO RD - K0020 + 000 - K0020 + 390
- Contractor: STREAMLINE BUILDERS CORPORATION (40804)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-03-27
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱6,417,386.00
- Contract status: Completed Report
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGE - NANGKA BR. (B01341LZ) ALONG MARIKINA-SN MATEO RD
- Contractor: 729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.) (21923)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-05-20
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱4,652,507.50
- Contract status: Completed Report
- CONSTRUCTION OF BOX CULVERT ALONG SUMMER HOMES, BARANGAY CONCEPCION UNO, MARIKINA CITY
- Contractor: 729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.) (21923)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-12-01
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱46,546,400.00
- Contract status: Completed Report
- CONSTRUCTION OF BOX CULVERT ALONG ZENAIDA SUBDIVISION, B ARANGAY CONCEPCION UNO, MARIKINA CITY
- Contractor: YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC. (45002)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-10-03
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱35,355,764.00
- Contract status: Completed Report
- CONSTRUCTION OF BOX CULVERT RAINBOW STREET, BARANGAY CON CEPCION DOS, MARIKINA CITY
- Contractor: GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC. ([REVOKED] 45914) / J.M.L.R. CONSTRUCTION AND SUPPLY (51759)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-03-31
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱41,878,276.00
- Contract status: Completed Report
- REHABILITATION OF ROAD NETWORK AT BARANGAY CONCEPCION DO S, MARIKINA CITY
- Contractor: LTDL BUILDERS (38371)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-03-22
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱18,979,726.00
- Contract status: Completed Report
- REHABILITATION OF ROAD NETWORK, BARANGAY PARANG, MARIKIN A CITY
- Contractor: LTDL BUILDERS (38371)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-03-07
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,297,267.00
- Contract status: Completed Report
- CONSTRUCTION OF LA CONSOLACION MULTI-PURPOSE BUILDING IN CLUDING SITE DEVELOPMENT, BARANGAY PARANG, MARIKINA CITY
- Contractor: RED MATRIX BUILDERS AND TRADING (38828)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-07-05
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱15,210,731.00
- Contract status: Completed Report
- CONSTRUCTION OF PARANG MULTI-PURPOSE BUILDING, INCLUDING SITE DEVELOPMENT, BARANGAY PARANG, MARIKINA CITY
- Contractor: ANDREW LOUIS CONSTRUCTION AND TRADING (39135)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-05-06
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱6,652,048.50
- Contract status: Completed Report
- CONSTRUCTION OF TUMANA MULTI-PURPOSE BUILDING, INCLUDING SITE DEVELOPMENT, BARANGAY TUMANA, MARIKINA CITY
- Contractor: LTDL BUILDERS (38371)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-06-05
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱5,696,844.50
- Contract status: Completed Report
- REHABILITATION OF MULTI-PURPOSE BUILDING INCLUDING SITE DEVELOPMENT, BARANGAY FORTUNE, MARIKINA CITY
- Contractor: VICTORIA BUILDERS AND TRADING (37455)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-06-05
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱5,693,830.00
- Contract status: Completed Report
- REHABILITATION OF MULTI-PURPOSE BUILDING INCLUDING SITE DEVELOPMENT, BARANGAY MARIKINA HEIGHTS, MARIKINA CITY
- Contractor: W. GOMEZ TRADING AND CONSTRUCTION (39250)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-05-06
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱7,602,088.50
- Contract status: Completed Report
- REHABILITATION OF MULTI-PURPOSE BUILDING INCLUDING SITE DEVELOPMENT, MARIKINA CITY
- Contractor: KAI CONSTRUCTION (33741)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-01-02
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,502,476.00
- Contract status: Completed Report
- REHABILITATION OF MULTI-PURPOSE BUILDING, BARANGAY PARAN G, MARIKINA CITY
- Contractor: GREEN ARCH, BUILDER & TRADING (32519)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-05-06
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,740,518.00
- Contract status: Completed Report
- ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE PRIMAR Y ROADS - C-5 ROAD - K0015 + 665 - K0016 + 261
- Contractor: READYCON TRADING & CONSTRUCTION CORP. (15452)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-07-20
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱37,234,616.00
- Contract status: Completed Report
- ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE PRIMAR Y ROADS - C-5 ROAD - K0016 + (-986) - K0016 + 076
- Contractor: READYCON TRADING & CONSTRUCTION CORP. (15452)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-05-06
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱28,596,066.00
- Contract status: Completed Report
- ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE PRIMAR Y ROADS - C-5 ROAD - K0016 + 268.10 - K0014 + 675
- Contractor: READYCON TRADING & CONSTRUCTION CORP. (15452)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-10-28
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱91,665,104.00
- Contract status: Completed Report
- ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE PRIMAR Y ROADS - ORTIGAS AVE - K0012 + (-277) - K0012 + 103
- Contractor: READYCON TRADING & CONSTRUCTION CORP. (15452)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-03-07
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱11,036,745.00
- Contract status: Completed Report
- ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE PRIMAR Y ROADS - ORTIGAS AVE - K0014 + (-464) - K0014 + (-202.90)
- Contractor: READYCON TRADING & CONSTRUCTION CORP. (15452)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-03-07
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱9,285,020.00
- Contract status: Completed Report
- ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE SECOND ARY ROADS - PASIG BLVD - (S04526LZ) CHAINAGE 0 - CHAINAGE 488, (S04527LZ) C HAINAGE 0 - CHAINAGE 341
- Contractor: DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION) (8931)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-03-07
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱13,372,142.00
- Contract status: Completed Report
- ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE SECON DARY ROADS - PASIG BLVD - (S04526LZ) CHAINAGE 488 - CHAINAGE 623
- Contractor: DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION) (8931)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-03-07
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱1,103,008.50
- Contract status: Completed Report
- ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE SECO NDARY ROADS - SHAW BLVD - K0011 + 026 - K0012 + 086
- Contractor: AARCON BUILDERS (28336)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-05-06
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱13,406,063.00
- Contract status: Completed Report
- ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE TERTI ARY ROADS - AMANG RODRIGUEZ RD - K0019 + 819 - K0020 + 791
- Contractor: READYCON TRADING & CONSTRUCTION CORP. (15452)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-04-06
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱24,826,026.00
- Contract status: Completed Report
- ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE TERTIA RY ROADS - DR SIXTO ANTONIO - K0015 + (-240) - K0017 + 000
- Contractor: READYCON TRADING & CONSTRUCTION CORP. (15452)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-05-13
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱50,115,460.00
- Contract status: Completed Report
- ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE TERTIA RY ROADS ALONG SN NICOLAS-SAGAD RD - K0016 + (-823) - K0016 + 000
- Contractor: READYCON TRADING & CONSTRUCTION CORP. (15452)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-04-22
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱11,079,820.00
- Contract status: Completed Report
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGE - ORTIGAS /C5 FLYOVER (B03321LZ) ALONG ORTIGAS-C5 FLYOVER
- Contractor: A.M. SALONG CONSTRUCTION (43109)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-06-06
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱9,306,050.00
- Contract status: Completed Report
- REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGE - PASIG BLVD-C5 FLYOVER (B01876LZ) ALONG C-5 ROAD
- Contractor: JIIK CONSTRUCTION SERVICES (50966)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-05-21
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱21,403,966.00
- Contract status: Completed Report
- CONSTRUCTION OF BOX CULVERT ALONG EASTBANK ROAD OPEN CHA NNEL, PASIG CITY
- Contractor: 816 EMBER CONSTRUCTION CORPORATION (51107)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-05-06
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱4,649,673.00
- Contract status: Completed Report
- CONSTRUCTION OF BOX CULVERT ALONG TRAMO ROAD, BARANGAY S TA. LUCIA, PASIG CITY
- Contractor: ST. TIMOTHY CONSTRUCTION CORPORATION (39196)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-03-21
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱46,516,088.00
- Contract status: Completed Report
- CONSTRUCTION OF DRAINAGE SYSTEM ALONG EAST CAPITOL DRIVE AND STA. ROSA ST., AND VICINITY KAPITOLYO, PASIG CITY
- Contractor: 816 EMBER CONSTRUCTION CORPORATION (51107)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-05-06
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱5,119,086.00
- Contract status: Completed Report
- CONSTRUCTION OF DRAINAGE SYSTEM ALONG SOLDIER ST. AND VI CINITY, BARANGAY STA. LUCIA AND VICINITY, PASIG CITY
- Contractor: WAY MAKER GENERAL CONTRACTOR OPC (52351)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-05-06
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱3,726,263.50
- Contract status: Completed Report
- CONSTRUCTION OF DRAINAGE SYSTEM ALONG VENICE ST., CIUDAD GRANDE, BARANGAY ROSARIO AND VICINITY, PASIG CITY
- Contractor: CALCON ENGINEERING (39961)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-09-01
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱7,405,117.50
- Contract status: Completed Report
- CONSTRUCTION OF DRAINAGE SYSTEM AT KALAWAAN HOUSING PROJ ECT, BARANGAY KALAWAAN AND VICINITY, PASIG CITY
- Contractor: B. VALENCERINA TRADING & CONSTRUCTION (22147)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-07-20
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱9,308,599.00
- Contract status: Completed Report
- REHABILITATION OF DRAINAGE SYSTEM AT BARANGAY BAGONG ILO G, PASIG CITY
- Contractor: W. GOMEZ TRADING AND CONSTRUCTION (39250)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-08-20
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱3,702,257.75
- Contract status: Completed Report
- CONSTRUCTION OF DRAINAGE SYSTEM AT PASEO DE ANIMALES (DO ROTEO TO SGT. DE LEON), BARANGAY SANTOLAN AND VICINITY, PASIG CITY
- Contractor: ANDREW LOUIS CONSTRUCTION AND TRADING (39135)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-12-02
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱13,031,103.00
- Contract status: Completed Report
- REHABILITATION OF DRAINAGE SYSTEM ALONG E. SANTOS ST., B ARANGAY PINAGBUHATAN AND VICINITY, PASIG CITY
- Contractor: ANDREW LOUIS CONSTRUCTION AND TRADING (39135)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-05-06
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱6,514,929.50
- Contract status: Completed Report
- REHABILITATION OF DRAINAGE SYSTEM ALONG ESGUERRA ST., BA RANGAY PINAGBUHATAN AND VICINITY, PASIG CITY
- Contractor: JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS (24748)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-07-05
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱7,910,500.00
- Contract status: Completed Report
- REHABILITATION OF DRAINAGE SYSTEM ALONG INTERIOR ROADS I SLA HOME 1, 2 AND 3, BARANGAY PINAGBUHATAN AND VICINITY, PASIG CITY< /li>
- Contractor: E.S. JOSEFA CONSTRUCTION (31179)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-09-05
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱6,514,476.50
- Contract status: Completed Report
- CONSTRUCTION OF DRAINAGE OUTFALL AT DILANG AND VICINITY, BARANGAY PINAGBUHATAN, PASIG CITY
- Contractor: 1HB CONSTRUCTION CORP. (FORMERLY: HB CONSTRUCTION) (32855)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-10-15
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱14,887,658.00
- Contract status: Completed Report
- REHABILITATION OF DRAINAGE SYSTEM ALONG INTERIOR ROADS S UAREZ VILLE, BARANGAY PINAGBUHATAN AND VICINITY, PASIG CITY
- Contractor: WAY MAKER GENERAL CONTRACTOR OPC (52351)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-11-17
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱27,947,310.00
- Contract status: Completed Report
- REHABILITATION OF DRAINAGE SYSTEM ALONG INTERIOR ROADS V ILLA ALEGRE, BARANGAY PINAGBUHATAN AND VICINITY, PASIG CITY
- Contractor: JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS (24748)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-08-04
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱13,497,696.00
- Contract status: Completed Report
- REHABILITATION OF DRAINAGE SYSTEM ALONG INTERIOR ROADS V ILLA MIGUELA BARANGAY PINAGBUHATAN AND VICINITY, PASIG CITY
- Contractor: WAY MAKER GENERAL CONTRACTOR OPC (52351)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-07-05
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱4,192,131.25
- Contract status: Completed Report
- REHABILITATION OF DRAINAGE SYSTEM ALONG PILAPIL ST., BAR ANGAY KAPASIGAN AND VICINITY, PASIG CITY
- Contractor: E.S. JOSEFA CONSTRUCTION (31179)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-06-20
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱11,154,489.00
- Contract status: Completed Report
- REHABILITATION OF DRAINAGE SYSTEM AT EUSEBIO AVENUE AND VICINITY, BARANGAY PINAGBUHATAN, PASIG CITY
- Contractor: 816 EMBER CONSTRUCTION CORPORATION (51107)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-10-15
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱13,491,856.00
- Contract status: Completed Report
- REHABILITATION OF DRAINAGE SYSTEM AT NAGPAYONG AND VICIN ITY, BARANGAY PINAGBUHATAN, PASIG CITY
- Contractor: ANDREW LOUIS CONSTRUCTION AND TRADING (39135)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-08-20
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱5,584,065.00
- Contract status: Completed Report
- REHABILITATION OF DRAINAGE SYSTEM AT ILUGIN AND VICINITY , BARANGAY PINAGBUHATAN, PASIG CITY
- Contractor: B. VALENCERINA TRADING & CONSTRUCTION (22147)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-08-20
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱4,653,250.00
- Contract status: Completed Report
- REHABILITATION OF DRAINAGE SYSTEM AT HOUSING BLISS AND V ICINITY, PASIG CITY
- Contractor: DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION) (8931)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-10-03
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱37,224,156.00
- Contract status: Completed Report
- REHABILITATION OF DRAINAGE SYSTEM AT KARANGALAN AND VICI NITY, BARANGAY MANGGAHAN, PASIG CITY
- Contractor: 816 EMBER CONSTRUCTION CORPORATION (51107)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-02-10
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱13,960,450.00
- Contract status: Completed Report
- REHABILITATION OF DRAINAGE SYSTEM INCLUDING SITE DEVELOP MENT AT BRGY. MANGGAHAN AND VICINITY, PASIG CITY
- Contractor: TUCHAR CONSTRUCTION CORP. (FORMERLY:TUCHAR CONSTRU (13644)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-08-04
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱9,306,350.00
- Contract status: Completed Report
- REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG BULI CRE EK, PASIG CITY PHASE II
- Contractor: DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION) (8931)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-10-03
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱46,535,104.00
- Contract status: Completed Report
- REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG EASTBANK ROAD, MANGGAHAN FLOODWAY (PACKAGE 4), PASIG CITY
- Contractor: ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-11-09
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱68,598,216.00
- Contract status: Completed Report
- REHABILITATION OF FLOOD MITIGATION STRUCTURE, BULI CREEK AT BARANGAY SAN MIGUEL AND PINAGBUHATAN, PASIG CITY
- Contractor: ST. TIMOTHY CONSTRUCTION CORPORATION (39196)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-09-03
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱26,918,502.00
- Contract status: Completed Report
- REHABILITATION OF FLOOD MITIGATION STRUCTURE, BULI CREEK AT BARANGAY STA. LUCIA, PASIG CITY
- Contractor: ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-08-04
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱26,522,268.00
- Contract status: Completed Report
- REHABILITATION OF FLOOD MITIGATION STRUCTURE, DAANG PAA CREEK AT BARANGAY SAN JOAQUIN AND KALAWAAN AND VICINITY, PASIG CITY< /li>
- Contractor: B. VALENCERINA TRADING & CONSTRUCTION (22147)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-07-20
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱7,442,044.00
- Contract status: Completed Report
- REHABILITATION OF FLOOD MITIGATION STRUCTURE, HAKBANGAN CREEK AT BARANGAY DELA PAZ, PASIG CITY
- Contractor: B. VALENCERINA TRADING & CONSTRUCTION (22147)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-08-04
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱5,118,489.00
- Contract status: Completed Report
- REHABILITATION OF FLOOD MITIGATION STRUCTURE, ILUGIN CRE EK AT BARANGAY PINAGBUHATAN, PASIG CITY
- Contractor: AARCON BUILDERS (28336)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-06-05
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱8,377,306.00
- Contract status: Completed Report
- REHABILITATION OF FLOOD MITIGATION STRUCTURE, MAHABANG I LOG CREEK AT BARANGAY MAYBUNGA, PASIG CITY
- Contractor: EL KAPITAN CONSTRUCTION SERVICES (33123)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-07-05
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱4,645,985.50
- Contract status: Completed Report
- REHABILITATION OF FLOOD MITIGATION STRUCTURE, MANMADE CR EEK AT BARANGAY MANGGAHAN, PASIG CITY
- Contractor: B. BERNARDO CONST., INC. (6196)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-07-05
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱18,613,450.00
- Contract status: Completed Report
- REHABILITATION OF FLOOD MITIGATION STRUCTURE, NAGCRUZ CR EEK AT BARANGAY ROSARIO, PASIG CITY
- Contractor: 1HB CONSTRUCTION CORP. (FORMERLY: HB CONSTRUCTION) (32855)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-07-05
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱13,917,186.00
- Contract status: Completed Report
- REHABILITATION OF FLOOD MITIGATION STRUCTURE, NAGCRUZ CR EEK AT BARANGAY ROSARIO AND VICINITY, PASIG CITY
- Contractor: 1HB CONSTRUCTION CORP. (FORMERLY: HB CONSTRUCTION) (32855)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-05-04
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱3,717,255.00
- Contract status: Completed Report
- REHABILITATION OF FLOOD MITIGATION STRUCTURE, PARIAN CRE EK AT BARANGAY KAPASIGAN, SAGAD, STO. TOMAS, PALATIW, SAN MIGUEL AND PINAGB UHATAN, PASIG CITY
- Contractor: WAY MAKER GENERAL CONTRACTOR OPC (52351)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-05-06
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱14,881,389.00
- Contract status: Completed Report
- REHABILITATION OF FLOOD MITIGATION STRUCTURE, SAN AGUSTI N CREEK AT BARANGAY PINAGBUHATAN, BAMBANG, STO. TOMAS AND KALAWAAN, PASIG C ITY
- Contractor: EL KAPITAN CONSTRUCTION SERVICES (33123)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-07-05
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱6,979,271.00
- Contract status: Completed Report
- REHABILITATION OF FLOOD MITIGATION STRUCTURE, SAPANG LIW ANAG CREEK AT BARANGAY SAN MIGUEL, PASIG CITY
- Contractor: 1HB CONSTRUCTION CORP. (FORMERLY: HB CONSTRUCTION) (32855)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-03-07
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱4,416,000.00
- Contract status: Completed Report
- BANK IMPROVEMENT OF SLOPE PROTECTION ALONG MARIKINA RIVE R (PACKAGE 6), PASIG CITY
- Contractor: M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION) (20201)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-07-03
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱92,869,776.00
- Contract status: Completed Report
- BANK IMPROVEMENT OF SLOPE PROTECTION ALONG MARIKINA RIVE R (PACKAGE 7), PASIG CITY
- Contractor: M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION) (20201)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2025-02-18
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱46,475,996.00
- Contract status: Completed Report
- ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE PRIMAR Y ROADS - EPIFANIO DELOS SANTOS AVE (EDSA) - K0021 + (-659) - K0021 + (-229 )
- Contractor: AARCON BUILDERS (28336)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-11-22
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱14,039,499.00
- Contract status: Completed Report
- ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE TERTIA RY ROADS BLUMENTRITT - K0007 + (-1147) - K0007 + (-217)
- Contractor: A.M. SALONG CONSTRUCTION (43109)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-05-03
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱15,841,955.00
- Contract status: Completed Report
- ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE TERTIA RY ROADS - BLUMENTRITT - K0007 + (-217) - K0007 + 424
- Contractor: A.M. SALONG CONSTRUCTION (43109)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-06-02
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱10,483,116.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF FLOOD CONTROL, BRGY. LITTLE BAGUIO, SAN JUAN CITY
- Contractor: JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS (24748)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-08-04
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱33,505,658.00
- Contract status: Completed Report
- REHABILITATION OF SLOPE PROTECTION ALONG ERMITA C3 91O C REEK, SAN JUAN CITY
- Contractor: B. BERNARDO CONST., INC. (6196)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-11-24
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱59,589,300.00
- Contract status: Completed Report
- CONSTRUCTION OF SAN LUIS PUMPING STATION, BARANGAY BATIS , SAN JUAN CITY
- Contractor: R.D. TALENS CONSTRUCTION AND TRADING (36817) / NEW EASTPOINT BUILDERS CORP. (45563)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-08-11
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱65,573,724.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION ALONG SALAPAN CREEK, BA RANGAY SALAPAN, SAN JUAN CITY
- Contractor: DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION) (8931)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-09-18
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱46,526,296.00
- Contract status: Completed Report
- ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE TERTIA RY ROADS - TAGUIG DIVERSION RD - K0018 + (-052) - K0018 + 665
- Contractor: KAEL CONSTRUCTION AND SUPPLY (49152)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-06-06
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱5,853,671.50
- Contract status: Completed Report
- ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE TERTIA RY ROADS - TAGUIG-STA. ANA ROAD - K0020 + (-721) - K0020 + 013
- Contractor: KAEL CONSTRUCTION AND SUPPLY (49152)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-05-22
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱5,991,945.50
- Contract status: Completed Report
- ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE TERTIA RY ROADS - TIPAS-NAPINDAN RD - K0023 + 000 - K0023 + 611
- Contractor: KAMAGONG BUILDERS & DEVELOPERS CORP. (1720)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-08-20
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱9,116,899.00
- Contract status: Completed Report
- CONSTRUCTION OF DRAINAGE OUTFALL INCLUDING LATERALS AT B ARANGAY USUSAN, TAGUIG CITY
- Contractor: TWENTYSIX CONSTRUCTION INC. (47228)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-08-10
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱27,915,032.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE (PUMPING STATION ) AT BAGUMBAYAN RIVER INCLUDING UPGRADING OF DRAINAGE OUTFALL/LATERALS (PHA SE 2), BARANGAY BAGUMBAYAN, TAGUIG CITY
- Contractor: FRANZCOR TRADING & CONSTRUCTION (18082)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-06-04
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱88,875,984.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION AT CONGA CREEK, TAGUIG CITY
- Contractor: FRANZCOR TRADING & CONSTRUCTION (18082)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-12-30
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱87,090,824.00
- Contract status: Completed Report
- ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE PRIMAR Y ROADS - C-5 ROAD - K0015 + (-1851) - K0015 + (-386)
- Contractor: AARCON BUILDERS (28336)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-10-14
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱25,101,150.00
- Contract status: Completed Report
- ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE PRIMAR Y ROADS - C-5 ROAD - K0015 + (-234) - K0016 + 000
- Contractor: AARCON BUILDERS (28336)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-10-14
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱18,592,708.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION ALONG LAGUNA LAKESHORE (PACKAGE 6), TAGUIG CITY
- Contractor: 11-16 CONSTRUCTION (29646) / HAWK KEY CONSTRUCTION AND GENERAL MERCHANDISE CORPORATION (41810)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-10-10
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱71,706,856.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION ALONG LAGUNA LAKESHORE (PACKAGE 7), TAGUIG CITY
- Contractor: 11-16 CONSTRUCTION (29646) / HAWK KEY CONSTRUCTION AND GENERAL MERCHANDISE CORPORATION (41810)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-10-10
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱71,744,360.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION ALONG LAGUNA LAKESHORE (PACKAGE 8), TAGUIG CITY
- Contractor: ZYRE TRADING AND CONSTRUCTION (42364) / DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION) (8931)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-10-10
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱71,675,528.00
- Contract status: Completed Report
- CONSTRUCTION OF AGH HEADQUARTERS WITH PARKING, FORT BONI FACIO, TAGUIG CITY, PHASE II
- Contractor: TWENTYSIX CONSTRUCTION INC. (47228)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-10-10
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱12,238,021.00
- Contract status: Completed Report
- CONSTRUCTION OF CYBER BATTALION AND NETWORK ENTERPRISE T ECHNOLOGY BATTALION ADMIN BUILDING WITH PARKING AND OUTSIDE DEVELOPMENT, TA GUIG CITY, PHASE II
- Contractor: TUCHAR CONSTRUCTION CORP. (FORMERLY:TUCHAR CONSTRU (13644)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-10-09
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,505,537.00
- Contract status: Completed Report
- CONSTRUCTION OF ENLISTED PERSONNEL BARRACKS (BUILDING 1) , FORT BONIFACIO, TAGUIG CITY, PHASE II
- Contractor: SPRING STAR CONSTRUCTION AND SUPPLY (20240)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2025-07-12
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱13,697,187.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING HQS, AIR, LEGASPI COMPOUND, FORT BONIFACIO, TAGUIG CITY, PHASE II
- Contractor: J.S. GENERAL CONTRACTOR (15258)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-02-11
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,499,125.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE CENTER HHSG, PA, FORT BONI FACIO, TAGUIG CITY, PHASE II
- Contractor: RED MATRIX BUILDERS AND TRADING (38828)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-12-25
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱14,243,586.00
- Contract status: Completed Report
- CONSTRUCTION OF SECURITY AND ESCORT BATTALION ADMINISTRA TION BUILDING, FORT ANDRES BONIFACIO, TAGUIG CITY, PHASE IV
- Contractor: AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP. ([REVOKED] 49129)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-10-10
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱38,074,648.00
- Contract status: Completed Report
- CONSTRUCTION OF SIX (6) STOREY ACADEMIC BUILDING, PAICOE , AIR, PHILIPPINE ARMY, LEGASPI COMPOUND, FORT BONIFACIO, TAGUIG CITY, PHAS E IV
- Contractor: HONY TRADING & CONSTRUCTION (26898)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-06-05
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,500,844.00
- Contract status: Completed Report
- CONSTRUCTION OF STAFF OFFICERS QUARTERS WITH PARKING ARE A AT THE BASEMENT AND GROUND IMPROVEMENT, HPA, FORT BONIFACIO, TAGUIG CITY, PHASE IV
- Contractor: DYNAMIC PLANNERS & CONSTRUCTION CORPORATION (7681)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-08-04
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱14,251,393.00
- Contract status: Completed Report
- IMPROVEMENT OF ROAD, PHILIPPINE MARINE CORPS HEADQUARTER S, FORT BONIFACIO, TAGUIG CITY
- Contractor: TUCHAR CONSTRUCTION CORP. (FORMERLY:TUCHAR CONSTRU (13644)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-09-17
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,652,278.00
- Contract status: Completed Report
- IMPROVEMENT/ EXTENSION OF SPD FIRING RANGE AND CONSTRUCT ION OF COVERED PARKING, SOUTHERN POLICE DISTRICT PHASE II, TAGUIG CITY
- Contractor: J.S. GENERAL CONTRACTOR (15258)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-10-22
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,498,864.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT B ARANGAY PLAINVIEW, MANDALUYONG CITY
- Contractor: FRANZCOR TRADING & CONSTRUCTION (18082)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-03-02
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,501,059.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (COV ERED COURT) AT DOH-NCR AT BARANGAY ADDITION HILLS, MANDALUYONG CITY< /li>
- Contractor: C.B. GARAY PHILWIDE BUILDERS (6004)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-11-16
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱48,017,540.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, SENATE PRESIDENT NEPTALI A. GONZALES INTEGRATED SCHOOL, MANDALUYONG CITY
- Contractor: TRACSOM BUILDERS, INC. (5935)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-02-14
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱33,267,448.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (ALT ERNATIVE LEARNING SYSTEMS), MANDALUYONG CITY
- Contractor: FRANZCOR TRADING & CONSTRUCTION (18082)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-06-19
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱5,653,594.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI PURPOSE BUILDING (CISTERN) INCLUDI NG SITE DEVELOPMENT AT SENATE PRESIDENT NEPTALI A. GONZALES INTEGRATED SCHO OL, MANDALUYONG CITY
- Contractor: VIRAC NRC CONSTRUCTION (11396)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-01-17
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱19,004,082.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT M ANDALUYONG CITY COLLEGE, MANDALUYONG CITY
- Contractor: C.B. GARAY PHILWIDE BUILDERS (6004)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-03-02
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱28,775,120.00
- Contract status: Completed Report
- REHABILITATION OF MULTI-PURPOSE BUILDING (SENIOR CITIZEN CENTER) AT BARANGAY ADDITION HILLS, MANDALUYONG CITY
- Contractor: RED MATRIX BUILDERS AND TRADING (38828)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-05-20
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱2,850,257.50
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (WAR EHOUSE), DOH-NCR AT BARANGAY ADDITION HILLS, MANDALUYONG CITY
- Contractor: C.B. GARAY PHILWIDE BUILDERS (6004)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-09-17
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱19,207,108.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (CISTERN), MANDAL UYONG ELEMENTARY SCHOOL, MANDALUYONG CITY
- Contractor: FRANZCOR TRADING & CONSTRUCTION (18082)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-11-18
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱19,004,094.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (CISTERN), EULOGI O RODRIGUEZ INTEGRATED SCHOOL, MANDALUYONG CITY
- Contractor: FRANZCOR TRADING & CONSTRUCTION (18082)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-11-18
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱19,011,734.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (CISTERN), MANDAL UYONG HIGH SCHOOL, MANDALUYONG CITY
- Contractor: 121 CONSTRUCTION CORPORATION (FORMERLY 121 CONSTUC (21686)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-01-27
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱19,001,782.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI PURPOSE BUILDING AT CENTRAL DAY CA RE CENTER, BARANGAY ADDITION HILLS, MANDALUYONG CITY
- Contractor: FRANZCOR TRADING & CONSTRUCTION (18082)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-04-22
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱38,018,548.00
- Contract status: Completed Report
- CONSTRUCTION/COMPLETION OF MULTI PURPOSE BUILDING AT HIG HWAY HILLS INTEGRATED SCHOOL, MANDALUYONG CITY
- Contractor: TRACSOM BUILDERS, INC. (5935)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-09-30
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱19,010,012.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI PURPOSE BUILDING INCLUDING GROUND IMPROVEMENT AT MATAAS NA PAARALANG NEPTALI A. GONZALES, MANDALUYONG CITY
- Contractor: VIRAC NRC CONSTRUCTION (11396)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-09-30
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱19,001,708.00
- Contract status: Completed Report
- REHABILITATION (EXTENSION) OF MULTI PURPOSE BUILDING AT MOLAVE BARANGAY ADDITION HILLS, MANDALUYONG CITY
- Contractor: FRANZCOR TRADING & CONSTRUCTION (18082)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-07-02
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱5,702,555.00
- Contract status: Completed Report
- REHABILITATION OF MULTI PURPOSE BUILDING AT JUSTICE HALL BARANGAY PLAINVIEW, MANDALUYONG CITY
- Contractor: VIRAC NRC CONSTRUCTION (11396)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-07-02
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,751,052.50
- Contract status: Completed Report
- REHABILITATION/COMPLETION OF MULTIPURPOSE BUILDING (TITU S COMPOUND) AT BRGY. BARANGKA IBABA, MANDALUYONG CITY
- Contractor: 5.J.B.P. PREMIUM CONSTRUCTION CORPORATION (41298)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-06-18
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱2,745,299.50
- Contract status: Completed Report
- REHABILITATION/COMPLETION OF MULTIPURPOSE BUILDING ( COV ERED COURT ) AT BARANGAY BUROL, MANDALUYONG CITY
- Contractor: RED MATRIX BUILDERS AND TRADING (38828)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-06-02
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱2,851,057.75
- Contract status: Completed Report
- REHABILITATION OF MULTI PURPOSE BUILDING (MORTUARY) AT B LOCK 27 BARANGAY ADDITION HILLS, MANDALUYONG CITY
- Contractor: 5.J.B.P. PREMIUM CONSTRUCTION CORPORATION (41298)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-09-30
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,507,923.00
- Contract status: Completed Report
- REHABILITATION/COMPLETION OF MULTIPURPOSE BUILDING AT PL AINVIEW ELEMENTARY SCHOOL
- Contractor: 5.J.B.P. PREMIUM CONSTRUCTION CORPORATION (41298)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-06-02
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱2,852,068.50
- Contract status: Completed Report
- REHABILITATION OF MULTIPURPOSE BUILDING IN HIGHWAY HILLS INTEGRATED SCHOOL PHASE I, CALBAYOG STREET, BARANGAY HIGHWAY HILLS, MANDAL UYONG CITY
- Contractor: KYRO BUILDERS, INC. (19567)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-06-09
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱20,434,778.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (COV ERED COURT) AT MANDALUYONG HIGH SCHOOL, MANDALUYONG CITY
- Contractor: JUSTBILT BUILDERS (39754)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-05-28
- Fund source: Regular Infra - GAA 2023 LP
- Contract price: ₱9,502,068.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (RES EARCH AND DEVELOPMENT) INCLUDING GROUND IMPROVEMENT AT BARANGAY MAUWAY, MAN DALUYONG CITY
- Contractor: FRANZCOR TRADING & CONSTRUCTION (18082)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-09-22
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,505,935.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (MORTUARY) AT BAR ANGAY MAUWAY, MANDALUYONG CITY
- Contractor: FRANZCOR TRADING & CONSTRUCTION (18082)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-02-26
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱23,752,664.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) A T BLOCK 5, BARANGAY MAUWAY, MANDALUYONG CITY
- Contractor: VIRAC NRC CONSTRUCTION (11396)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-08-23
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱23,794,864.00
- Contract status: Completed Report
- REHABILITATION OF MULTI-PURPOSE BUILDING (FIRE SUBSTATIO N) AT BARANGAY MAUWAY, MANDALUYONG CITY
- Contractor: FRANZCOR TRADING & CONSTRUCTION (18082)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-05-27
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,750,489.50
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT B ARANGAY BARANGKA ILAYA, MANDALUYONG CITY
- Contractor: VIRAC NRC CONSTRUCTION (11396)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-03-02
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱23,772,388.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BAR ANGAY ROSARIO, PASIG CITY
- Contractor: WAY MAKER GENERAL CONTRACTOR OPC (52351)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-09-17
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱23,762,000.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF FOUR STOREY BUILDING, STA. LUCIA ELEMENTARY SCHOOL, SAN JUAN CITY
- Contractor: MAGNIFICUS BUILDERS INC. (53782)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-08-18
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,503,101.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (COV ERED COURT) INCLUDING FIRE PROTECTION AND FACILITIES, BRGY. SALAPAN, SAN JU AN CITY
- Contractor: 816 EMBER CONSTRUCTION CORPORATION (51107)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-06-19
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱7,602,730.50
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF FOUR STOREY BUILDING INCLUD ING FIRE PROTECTION AND FACILITIES, SAN JUAN ELEMENTARY SCHOOL, SAN JUAN CI TY
- Contractor: B. VALENCERINA TRADING & CONSTRUCTION (22147)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-06-19
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱11,401,530.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI PURPOSE BUILDING INCLUDING SITE DE VELOPMENT AT SENATE PRESIDENT NEPTALI A. GONZALES INTEGRATED SCHOOL, MANDAL UYONG CITY
- Contractor: VIRAC NRC CONSTRUCTION (11396)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-01-17
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱19,002,212.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI PURPOSE BUILDING INCL UDING SITE DEVELOPMENT AT BARANGAY NAMAYAN, MANDALUYONG CITY
- Contractor: B. VALENCERINA TRADING & CONSTRUCTION (22147)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-05-22
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱2,850,349.25
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI PURPOSE BUILDING (COT TAGE NEAR ALS BUILDING) INCLUDING SITE DEVELOPMENT AT NATIONAL CENTER FOR M ENTAL HEALTH, MANDALUYONG CITY
- Contractor: FRANZCOR TRADING & CONSTRUCTION (18082)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-06-21
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱2,850,313.25
- Contract status: Completed Report
- CONSTRUCTION OF MULTI PURPOSE FACILITY (COVERED COURT/SP ORTS CENTER), NATIONAL CENTER FOR MENTAL HEALTH COMPOUND, MANDALUYONG CITY< /span>
- Contractor: DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION) (8931)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-01-28
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱47,529,420.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (EXTENSION), INCL UDING REHABILITATION OF EXISTING FACILITIES AT THE FABELLA MEMORIAL HIGH SC HOOL, BRGY. ADDITION HILLS, MANDALUYONG CITY
- Contractor: 5.J.B.P. PREMIUM CONSTRUCTION CORPORATION (41298)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-03-17
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱14,251,623.00
- Contract status: Completed Report
- CONSTRUCTION OF EMERGENCY ROOM COMPLEX, NATIONAL CENTER FOR MENTAL HEALTH, BRGY. MAUWAY, MANDALUYONG CITY
- Contractor: TOPNOTCH CATALYST BUILDERS INC. (34061)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-02-29
- Fund source: Regular Infra - GAA 2023 LP
- Contract price: ₱47,509,876.00
- Contract status: Completed Report
- REHABILITATION OF ROAD AT BARANGAY BARANGKA & TA C3 91ONG, MARIKINA CITY
- Contractor: BELL CONSTRUCTION (27851)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-01-11
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱44,436,256.00
- Contract status: Completed Report
- REHABILITATION OF ROAD AT BARANGAY STA ELENA & SAN R OQUE, MARIKINA CITY
- Contractor: BELL CONSTRUCTION (27851)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-06-20
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱44,418,292.00
- Contract status: Completed Report
- REHABILITATION OF MULTI-PURPOSE BUILDING, IVC NATIONAL H IGH SCHOOL, MARIKINA CITY
- Contractor: BELL CONSTRUCTION (27851)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-01-06
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱38,010,868.00
- Contract status: Completed Report
- REHABILITATION OF MULTI-PURPOSE BUILDING, KALUMPANG ELEM ENTARY SCHOOL, BARANGAY KALUMPANG, MARIKINA CITY
- Contractor: STREAMLINE BUILDERS CORPORATION (40804)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-09-05
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,502,620.00
- Contract status: Completed Report
- REHABILITATION OF MULTI-PURPOSE BUILDING, MALANDAY NATIO NAL HIGH SCHOOL, BARANGAY MALANDAY, MARIKINA CITY
- Contractor: BELL CONSTRUCTION (27851)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-10-05
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱14,171,925.00
- Contract status: Completed Report
- REHABILITATION OF MULTI-PURPOSE BUILDING, MALANDAY ELEME NTARY SCHOOL, BARANGAY MALANDAY, MARIKINA CITY
- Contractor: STREAMLINE BUILDERS CORPORATION (40804)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-11-05
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,500,606.00
- Contract status: Completed Report
- REHABILITATION OF MULTI-PURPOSE BUILDING, BARANGKA ELEME NTARY SCHOOL, BARANGAY BARANGKA, MARIKINA CITY
- Contractor: STREAMLINE BUILDERS CORPORATION (40804)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-01-03
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,499,144.00
- Contract status: Completed Report
- REHABILITATION OF MULTI-PURPOSE BUILDING, STA ELENA HIGH SCHOOL, BARANGAY STA ELENA, MARIKINA CITY
- Contractor: STREAMLINE BUILDERS CORPORATION (40804)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-12-04
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,485,822.00
- Contract status: Completed Report
- DRAINAGE IMPROVEMENT IN BRGY. MALANDAY, MARIKINA CITY
- Contractor: BELL CONSTRUCTION (27851)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-01-03
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱15,747,899.00
- Contract status: Completed Report
- COMPLETION OF AMANG RODRIGUEZ MEMORIAL MEDICAL CENTER MO LECULAR LAB, MARIKINA CITY
- Contractor: AASJ CONSTRUCTION (46968)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-11-04
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,500,400.00
- Contract status: Completed Report
- REHABILITATION/UPGRADING OF MARIKINA POLYTECHNIC COLLEGE (ELECTRICAL POWER SYSTEM), MARIKINA CITY
- Contractor: PRUDENT DIAMOND SQUARE CONSTRUCTION CO. (31726)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-09-30
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱47,505,496.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF MARIKINA POLYTECHNIC COLL EGE ACADEMIC BUILDING INCLUDING SITE DEVELOPMENT, MARIKINA CITY
- Contractor: STREAMLINE BUILDERS CORPORATION (40804)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-02-28
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,498,113.00
- Contract status: Completed Report
- COMPLETION OF MARIKINA POLYTECHNIC COLLEGE MULTI-PURPOSE BUILDING, MARIKINA CITY
- Contractor: PRUDENT DIAMOND SQUARE CONSTRUCTION CO. (31726)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-09-30
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱28,503,796.00
- Contract status: Completed Report
- CONSTRUCTION OF MARIKINA POLYTECHNIC COLLEGE ACADEMIC BU ILDING 3 PHASE 4, MARIKINA CITY
- Contractor: STREAMLINE BUILDERS CORPORATION (40804)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-02-28
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱14,246,774.00
- Contract status: Completed Report
- REHABILITATION OF ROAD, LA COLINA SUBDIVISION, SECOND DI STRICT, MARIKINA CITY
- Contractor: 729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.) (21923)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-06-09
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,305,947.00
- Contract status: Completed Report
- IMPROVEMENT OF PARANG ROAD NETWORK INCLUDING LATERALS, B ARANGAY PARANG, MARIKINA CITY
- Contractor: STREAMLINE BUILDERS CORPORATION (40804)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-04-25
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,490,224.00
- Contract status: Completed Report
- IMPROVEMENT OF ROAD NETWORK, BARANGAY PARANG, MARIKINA C ITY
- Contractor: STREAMLINE BUILDERS CORPORATION (40804)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-04-25
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,489,886.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION, BRGY. FORTUNE, MARIKIN A CITY
- Contractor: 729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.) (21923)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-10-20
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱41,879,376.00
- Contract status: Completed Report
- IMPROVEMENT OF ROAD NETWORK, SECOND DISTRICT, MARIKINA C ITY
- Contractor: STREAMLINE BUILDERS CORPORATION (40804)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-07-02
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱18,594,944.00
- Contract status: Completed Report
- IMPROVEMENT OF ROAD, TWINRIVER SUBDIVISION, BARANGAY NAN GKA, MARIKINA CITY
- Contractor: 729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.) (21923)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-04-27
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱13,953,170.00
- Contract status: Completed Report
- IMPROVEMENT OF ROAD, BARANGAY PARANG, MARIKINA CITY, PHA SE I
- Contractor: M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION) (20201)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-06-02
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,300,959.00
- Contract status: Completed Report
- IMPROVEMENT OF ROAD, BARANGAY MARIKINA HEIGHTS, MARIKINA CITY
- Contractor: W. GOMEZ TRADING AND CONSTRUCTION (39250)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-04-27
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,305,272.00
- Contract status: Completed Report
- IMPROVEMENT OF ROAD, BARANGAY PARANG, MARIKINA CITY, PHA SE II
- Contractor: M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION) (20201)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-06-02
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,300,102.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, SECOND DISTRICT, MARIKINA CITY
- Contractor: MAVCON BUILDERS & SUPPLIES (42578)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-02-03
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱23,760,742.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (CLUBHOUSE), BARA NGAY NANGKA, MARIKINA CITY
- Contractor: PRUDENT DIAMOND SQUARE CONSTRUCTION CO. (31726)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-02-03
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱19,006,376.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY FORTUNE , MARIKINA CITY
- Contractor: GREEN ARCH, BUILDER & TRADING (32519)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-05-20
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,748,961.00
- Contract status: Completed Report
- REHABILITATION OF MULTI-PURPOSE BUILDING, BARANGAY FORTU NE, MARIKINA CITY
- Contractor: W. GOMEZ TRADING AND CONSTRUCTION (39250)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-09-05
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,798,923.50
- Contract status: Completed Report
- REHABILITATION OF APITONG STREET ROAD NETWORK, BARANGAY MARIKINA HEIGHTS, MARIKINA CITY
- Contractor: W. GOMEZ TRADING AND CONSTRUCTION (39250)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-06-21
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,311,320.00
- Contract status: Completed Report
- REHABILITATION OF BALITE DRIVE ROAD NETWORK, BARANGAY FO RTUNE, MARIKINA CITY
- Contractor: 729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.) (21923)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-07-06
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱14,085,914.00
- Contract status: Completed Report
- REHABILITATION OF TANGERINE ROAD NETWORK, BARANGAY CONCE PCION DOS, MARIKINA CITY
- Contractor: TUCHAR CONSTRUCTION CORP. (FORMERLY:TUCHAR CONSTRU (13644)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-07-26
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱18,796,306.00
- Contract status: Completed Report
- IMPROVEMENT OF TWINVILLE SUBDIVISION ROAD NETWORK, SECON D DISTRICT, MARIKINA CITY
- Contractor: 729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.) (21923)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-06-21
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,398,125.00
- Contract status: Completed Report
- REHABILITATION OF SAN MIGUEL PHASE 2 ROAD NETWORK, BARAN GAY FORTUNE, MARIKINA CITY
- Contractor: WBX CONSTRUCTION, INC (FORMERLY WBX CONSTRUCTION) (28370)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-12-12
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,393,831.00
- Contract status: Completed Report
- REHABILITATION OF ROAD NETWORK, BARANGAY FORTUNE, MARIKI NA CITY
- Contractor: 729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.) (21923)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-04-25
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱14,233,075.00
- Contract status: Completed Report
- REHABILITATION OF TANGUILE STREET ROAD NETWORK, BARANGAY MARIKINA HEIGHTS, MARIKINA CITY
- Contractor: 729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.) (21923)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-04-25
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,302,770.00
- Contract status: Completed Report
- REHABILITATION OF LA COLINA SUBDIVISION ROAD NETWORK, SE COND DISTRICT, MARIKINA CITY
- Contractor: M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION) (20201)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-06-14
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,306,206.00
- Contract status: Completed Report
- IMPROVEMENT OF TWINRIVER SUBDIVISION ROAD NETWORK, BARAN GAY NANGKA, MARIKINA CITY
- Contractor: W. GOMEZ TRADING AND CONSTRUCTION (39250)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-07-28
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱14,102,950.00
- Contract status: Completed Report
- IMPROVEMENT OF ROAD NETWORK, BARANGAY MARIKINA HEIGHTS, MARIKINA CITY
- Contractor: M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION) (20201)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-06-21
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,306,799.00
- Contract status: Completed Report
- REHABILITATION OF ROAD NETWORK, BARANGAY MARIKINA HEIGHT S, MARIKINA CITY
- Contractor: AASJ CONSTRUCTION (46968)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-02-01
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱13,956,346.00
- Contract status: Completed Report
- REHABILITATION OF ROAD NETWORK, BARANGAY NANGKA, MARIKIN A CITY
- Contractor: 729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.) (21923)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-10-19
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱13,913,601.00
- Contract status: Completed Report
- REHABILITATION OF ROAD NETWORK, BARANGAY CONCEPCION DOS, PHASE 2, MARIKINA CITY
- Contractor: AASJ CONSTRUCTION (46968)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-12-26
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱7,444,677.50
- Contract status: Completed Report
- RIVER IMPROVEMENT ALONG NANGKA RIVER PHASE 1, NANGKA RIV ER, MARIKINA CITY
- Contractor: M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION) (20201)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-03-06
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱46,525,056.00
- Contract status: Completed Report
- RIVER IMPROVEMENT ALONG NANGKA RIVER PHASE 2, NANGKA RIV ER, MARIKINA CITY
- Contractor: 729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.) (21923)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-01-18
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱46,526,328.00
- Contract status: Completed Report
- CONSTRUCTION OF RCBC DRAINAGE SYSTEM, BARANGAY TUMANA, M ARIKINA CITY
- Contractor: 729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.) (21923)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-04-14
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱46,535,320.00
- Contract status: Completed Report
- CONSTRUCTION OF DRAINAGE OUTFALL, SECOND DISTRICT, MARIK INA CITY
- Contractor: 729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.) (21923)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-12-19
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱46,525,912.00
- Contract status: Completed Report
- REPAIR/REHABILITATION OF MULTI-PURPOSE BUILDING, SECOND DISTRICT, MARIKINA CITY
- Contractor: RED MATRIX BUILDERS AND TRADING (38828)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-10-06
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,498,548.00
- Contract status: Completed Report
- CONSTRUCTION OF CONCEPCION ELEMENTARY SCHOOL MULTI-PURPO SE BUILDING INCLUDING SITE DEVELOPMENT, BARANGAY CONCEPCION UNO, MARIKINA C ITY
- Contractor: JK2CS CONSTRUCTION AND TRADING CORPORATION (40972)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-10-27
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,497,580.00
- Contract status: Completed Report
- REHABILITATION OF SANTAN MULTI-PURPOSE BUILDING, BARANGA Y FORTUNE, MARIKINA CITY
- Contractor: AASJ CONSTRUCTION (46968)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-07-02
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,740,315.50
- Contract status: Completed Report
- REHABILITATION OF FORTUNE MULTI-PURPOSE BUILDING, BARANG AY FORTUNE, MARIKINA CITY
- Contractor: VICTORIA BUILDERS AND TRADING (37455)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-08-01
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,748,530.50
- Contract status: Completed Report
- REHABILITATION OF PACHECO COMPOUND MULTI-PURPOSE BUILDIN G INCLUDING SITE DEVELOPMENT, BARANGAY FORTUNE, MARIKINA CITY
- Contractor: W. GOMEZ TRADING AND CONSTRUCTION (39250)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-07-02
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,741,736.00
- Contract status: Completed Report
- REHABILITATION OF KUIBI MULTI-PURPOSE BUILDING INCLUDING SITE DEVELOPMENT, BARANGAY FORTUNE, MARIKINA CITY
- Contractor: W. GOMEZ TRADING AND CONSTRUCTION (39250)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-07-02
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,744,646.00
- Contract status: Completed Report
- CONSTRUCTION OF LOT 2B MULTI-PURPOSE BUILDING INCLUDING SITE DEVELOPMENT, BARANGAY MARIKINA HEIGHTS, MARIKINA CITY
- Contractor: B. VALENCERINA TRADING & CONSTRUCTION (22147)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-07-02
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,749,707.50
- Contract status: Completed Report
- REHABILITATION OF MEJIA COMPOUND MULTI-PURPOSE BUILDING, BARANGAY MARIKINA HEIGHTS, MARIKINA CITY
- Contractor: VICTORIA BUILDERS AND TRADING (37455)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-08-06
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,750,828.50
- Contract status: Completed Report
- REHABILITATION OF FORTUNE VILLAGE 2 MULTI-PURPOSE BUILDI NG INCLUDING SITE DEVELOPMENT, BARANGAY FORTUNE, MARIKINA CITY
- Contractor: B. VALENCERINA TRADING & CONSTRUCTION (22147)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-08-07
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,799,449.00
- Contract status: Completed Report
- BALUBAD NHA PHASE 3 MULTI-PURPOSE BUILDING, BARANGAY NAN GKA, MARIKINA CITY
- Contractor: MAVCON BUILDERS & SUPPLIES (42578)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-07-02
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,750,134.50
- Contract status: Completed Report
- COMPLETION OF MARIST VILLAGE MULTI-PURPOSE BUILDING INCL UDING SITE DEVELOPMENT, BARANGAY MARIKINA HEIGHTS, MARIKINA CITY
- Contractor: GREEN ARCH, BUILDER & TRADING (32519)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-07-02
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,743,540.50
- Contract status: Completed Report
- REHABILITATION OF BARANGAY NANGKA ROAD NETWORK, BARANGAY NANGKA, MARIKINA CITY
- Contractor: STREAMLINE BUILDERS CORPORATION (40804)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-10-30
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,300,212.00
- Contract status: Completed Report
- REHABILITATION OF BARANGAY FORTUNE ROAD NETWORK, BARANGA Y FORTUNE, MARIKINA CITY
- Contractor: RJJC CONSTRUCTION (52648)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-09-05
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,307,482.00
- Contract status: Completed Report
- REHABILITATION OF MARIKINA HEIGHTS ROAD NETWORK, BARANGA Y MARIKINA HEIGHTS, MARIKINA CITY
- Contractor: AASJ CONSTRUCTION (46968)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-12-20
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,305,068.00
- Contract status: Completed Report
- REHABILITATION OF BARANGAY CONCEPCION UNO ROAD NETWORK, BARANGAY CONCEPCION UNO, MARIKINA CITY
- Contractor: W. GOMEZ TRADING AND CONSTRUCTION (39250)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-04-22
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,306,509.00
- Contract status: Completed Report
- REHABILITATION OF BARANGAY TUMANA ROAD NETWORK, SECOND D ISTRICT, MARIKINA CITY
- Contractor: W. GOMEZ TRADING AND CONSTRUCTION (39250)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-07-18
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱13,956,926.00
- Contract status: Completed Report
- REHABILITATION OF ROAD NETWORK INCLUDING DRAINAGE, BARAN GAY NANGKA, MARIKINA CITY
- Contractor: LTDL BUILDERS (38371)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-01-17
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱18,609,900.00
- Contract status: Completed Report
- REHABILITATION OF GREENLAND PHASE 1 ROAD NETWORK INCLUDI NG LATERALS, BARANGAY NANGKA, MARIKINA CITY
- Contractor: 729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.) (21923)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-04-20
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱13,959,978.00
- Contract status: Completed Report
- REHABILITATION OF BALUBAD STREET ROAD NETWORK, BARANGAY NANGKA, MARIKINA CITY
- Contractor: AASJ CONSTRUCTION (46968)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-07-19
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,486,163.00
- Contract status: Completed Report
- REHABILITATION OF ROAD NETWORK INCLUDING LATERALS AT BAR ANGAY CONCEPCION DOS, MARIKINA CITY
- Contractor: AASJ CONSTRUCTION (46968)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-07-24
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,303,401.00
- Contract status: Completed Report
- REHABILITATION OF TWINRIVER SUBDIVISION ROAD NETWORK INC LUDING LATERALS, BARANGAY PARANG, MARIKINA CITY
- Contractor: 729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.) (21923)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-06-02
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱13,959,839.00
- Contract status: Completed Report
- IMPROVEMENT OF FORTUNE BRIDGE, BARANGAY FORTUNE, MARIKIN A CITY
- Contractor: 729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.) (21923)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-06-24
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,300,166.00
- Contract status: Completed Report
- REHABILITATION OF ROAD NETWORK AT BARANGAY TUMANA, MARIK INA CITY
- Contractor: W. GOMEZ TRADING AND CONSTRUCTION (39250)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-06-19
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,652,698.50
- Contract status: Completed Report
- REPAIR/REHABILITATION OF ROAD NETWORK PHASE 1, MARIKINA CITY, SECOND DISTRICT
- Contractor: W. GOMEZ TRADING AND CONSTRUCTION (39250)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-04-27
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱11,167,393.00
- Contract status: Completed Report
- REPAIR/REHABILITATION OF ROAD NETWORK PHASE 2, MARIKINA CITY, SECOND DISTRICT
- Contractor: 729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.) (21923)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-08-20
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱13,953,914.00
- Contract status: Completed Report
- CONSTRUCTION OF BARANGAY CONCEPCION DOS MULTI-PURPOSE BU ILDING (NACIDA INCUBATOR FACILITY) PHASE 2, BARANGAY, CONCEPCION DOS, MARIK INA CITY
- Contractor: EIGHT J'S CONSTRUCTION SERVICES (41912)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-01-04
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱48,520,612.00
- Contract status: Completed Report
- CONSTRUCTION OF BARANGAY CONCEPCION DOS MULTI-PURPOSE BU ILDING (NACIDA INCUBATOR FACILITY) PHASE 3, BARANGAY, CONCEPCION DOS, MARIK INA CITY
- Contractor: EIGHT J'S CONSTRUCTION SERVICES (41912)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-01-04
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱48,511,708.00
- Contract status: Completed Report
- CONSTRUCTION OF FORTUNE MULTI-PURPOSE BUILDINGS INCLUDIN G SITE DEVELOPMENT, BARANGAY FORTUNE, MARIKINA CITY
- Contractor: AASJ CONSTRUCTION (46968)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-08-01
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,749,028.50
- Contract status: Completed Report
- CONSTRUCTION OF MARIKINA POLYTECHNIC COLLEGE AUDITORIUM, PHASE 3, MARIKINA CITY
- Contractor: VICTORIA BUILDERS AND TRADING (37455)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-01-04
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱47,518,388.00
- Contract status: Completed Report
- REPAIR/REHABILITATION OF MULTI-PURPOSE BUILDING INCLUDIN G SITE DEVELOPMENT, BARANGAY NANGKA, MARIKINA CITY
- Contractor: KAI CONSTRUCTION (33741)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-08-20
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱6,718,126.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF MARIKINA HEIGHTS MULTI-PU RPOSE BUILDING, BARANGAY MARIKINA HEIGHTS, MARIKINA CITY
- Contractor: AASJ CONSTRUCTION (46968)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-07-22
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,752,501.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING IN CLUDING SITE DEVELOPMENT AT BARANGAY FORTUNE, MARIKINA CITY
- Contractor: TRIDENT PEAKS BUILDERS & SERVICES INC. (41188)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-03-02
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱14,257,853.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING IN CLUDING SITE DEVELOPMENT AT BARANGAY TUMANA, MARIKINA CITY
- Contractor: W. GOMEZ TRADING AND CONSTRUCTION (39250)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-09-06
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,493,923.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF TUMANA MULTI-PURPOSE BUIL DING, BARANGAY TUMANA, MARIKINA CITY
- Contractor: W. GOMEZ TRADING AND CONSTRUCTION (39250)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-10-06
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱13,282,380.00
- Contract status: Completed Report
- REHABILITATION OF Q STUDENT CENTER, BARANGAY MARIKINA HE IGHTS, MARIKINA CITY
- Contractor: AASJ CONSTRUCTION (46968)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-12-07
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,751,677.00
- Contract status: Completed Report
- REHABILITATION OF ST. MARY ELEMENTARY SCHOOL, BARANGAY N ANGKA, MARIKINA CITY
- Contractor: W. GOMEZ TRADING AND CONSTRUCTION (39250)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-10-16
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,744,318.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTIPURPOSE BUILDING AT NATIONAL CENTER FOR MENTAL HEALTH BARANGAY MAUWAY, MANDALUYONG CITY
- Contractor: FRANZCOR TRADING & CONSTRUCTION (18082)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-10-19
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱7,604,686.50
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI PURPOSE BUILDING INCL UDING UPGRADING OF ELECTRICAL FACILITIES AT ANDRES BONIFACIO INTEGRATED SCH OOL, MANDALUYONG CITY
- Contractor: WAY MAKER GENERAL CONTRACTOR OPC (52351)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-06-08
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,496,498.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI PURPOSE BUILDING INCL UDING UPGRADING OF ELECTRICAL FACILITIES AT SANCTUARY DSWD NCR BARANGAY ADD ITION HILLS, MANDALUYONG CITY
- Contractor: RED MATRIX BUILDERS AND TRADING (38828)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-07-27
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,494,231.00
- Contract status: Completed Report
- REPAIR/REHABILITATION OF MULTIPURPOSE BUILDING AT MANDAL UYONG SCIENCE HIGH SCHOOL, MANDALUYONG CITY
- Contractor: 5.J.B.P. PREMIUM CONSTRUCTION CORPORATION (41298)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-05-20
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱2,850,322.75
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI PURPOSE BUILDING AT B LOCK 37 BARANGAY ADDITION HILLS, MANDALUYONG CITY
- Contractor: VIRAC NRC CONSTRUCTION (11396)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-05-27
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱2,850,627.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI PURPOSE BUILDING (CISTERN) AT ILAY A BARANGKA INTEGRATED SCHOOL, MANDALUYONG CITY
- Contractor: YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC. (45002)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-01-02
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,501,105.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT T AGUIG-PATEROS DISTRICT HOSPITAL, BARANGAY WESTERN BICUTAN, TAGUIG CITY
- Contractor: GIGA PREMIER BUILDERS, INC. (55642)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2025-01-18
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱28,958,880.00
- Contract status: Completed Report
- REHABILITATION OF ALLEYS AND DRAINAGES AT PUROK 13 AND 1 4, BARANGAY SOUTH DAANG HARI, TAGUIG CITY
- Contractor: ZYRE TRADING AND CONSTRUCTION (42364)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-02-03
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱28,214,620.00
- Contract status: Completed Report
- REHABILITATION OF BARANGAY TUMANA ROAD NETWORK, BARANGAY TUMANA, MARIKINA CITY
- Contractor: W. GOMEZ TRADING AND CONSTRUCTION (39250)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-09-19
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,393,094.00
- Contract status: Completed Report
- IMPROVEMENT OF ROAD NETWORK, BARANGAY TUMANA, MARIKINA C ITY
- Contractor: W. GOMEZ TRADING AND CONSTRUCTION (39250)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-09-05
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,657,342.50
- Contract status: Completed Report
- REPAIR/REHABILITATION OF ROAD NETWORK, MARIKINA CITY, SE COND DISTRICT
- Contractor: W. GOMEZ TRADING AND CONSTRUCTION (39250)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-07-21
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱14,104,100.00
- Contract status: Completed Report
- REHABILITATION OF ROAD, NEW MARIKINA, BRGY. SAN ROQUE, M ARIKINA
- Contractor: STREAMLINE BUILDERS CORPORATION (40804)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-07-21
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱18,554,332.00
- Contract status: Completed Report
- CONSTRUCTION OF MALANDAY ACCESS ROAD ALONG MARIKINA RIVE R, MARIKINA CITY
- Contractor: STREAMLINE BUILDERS CORPORATION (40804)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-09-20
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,319,092.00
- Contract status: Completed Report
- REPAIR/REHABILITATION OF DRAINAGE IN PROVIDENT VILLAGES IN BRGY. TA C3 91ONG AND JESUS DELA PE C3 91A, MARIKINA CITY
- Contractor: BELL CONSTRUCTION (27851)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-01-03
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱27,933,956.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTIPURPOSE BUILDING AT LEODEGARIO VICT ORINO ELEMENTARY SCHOOL PHASE 2, BARANGAY JESUS DELA PE C3 91A, MARIKINA CI TY
- Contractor: STREAMLINE BUILDERS CORPORATION (40804)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-09-30
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱11,409,594.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, (CITY ENVIRONMEN T AND MANAGEMENT OFFICE (CEMO) COMPLEX), BRGY. STO. NINO MARIKINA CITY
- Contractor: BELL CONSTRUCTION (27851)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-08-01
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱37,690,584.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE 2), LUWALH ATI NG MAYNILA, BOYS TOWN COMPOUND, MARIKINA CITY
- Contractor: RICHBIM CONSTRUCTION INC. (48351)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-01-06
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,840,073.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (ANIMAL PROTECTIO N AND COUNCIL OFFICE), MARIKINA CITY
- Contractor: STREAMLINE BUILDERS CORPORATION (40804)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-06-02
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱18,891,624.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (TRANSPORT TERMIN AL) ALONG EASTBANK ROAD, PASIG CITY
- Contractor: OLYMPUS MINING AND BUILDERS GROUP PHILS. CORP. (FORMERLY: OLYMPUS BUILDERS AND MINING CORP.) (51087)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-07-02
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱7,603,388.50
- Contract status: Completed Report
- REHABILITATION OF MULTI-PURPOSE BUILDING AT P. CONDUCTO, PASIG CITY
- Contractor: W. GOMEZ TRADING AND CONSTRUCTION (39250)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-07-02
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,502,169.00
- Contract status: Completed Report
- REHABILITATION OF DRAINAGE SYSTEM AT BARANGAY PINAGBUHAT AN AND VICINITY, PASIG CITY
- Contractor: DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION) (8931)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-05-01
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱29,782,000.00
- Contract status: Completed Report
- REHABILITATION OF SLOPE PROTECTION AT MAYTUNAS CREEK, SA N JUAN CITY
- Contractor: DARCY & ANNA BUILDERS & TRADING (38559)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-10-17
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱40,203,392.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (GOVERNMENT CENTE R), BARANGAY ST. JOSEPH, SAN JUAN CITY, PACKAGE 11-A
- Contractor: DEVEX INCORPORATED (38684)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-01-21
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱76,008,808.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE IX-A) AT B ARANGAY ST. JOSEPH, SAN JUAN CITY
- Contractor: DEVEX INCORPORATED (38684)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-04-20
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱93,963,584.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. TIBAGAN, S AN JUAN CITY
- Contractor: KING EIGHT BUILDERS AND SUPPLY (37325)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-11-29
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱39,904,580.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. PEDRO CRUZ , SAN JUAN CITY
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-01-28
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱39,689,804.00
- Contract status: Completed Report
- COMPLETION OF MULTI-PURPOSE BUILDING / WOODEN BASKETBALL COURT AT BARANGAY GREENHILLS, SAN JUAN CITY
- Contractor: STRUKTURA TEKNIKA SERVICES CO. (16646)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-10-30
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱19,006,122.00
- Contract status: Completed Report
- COMPLETION OF MULTI-PURPOSE BUILDING / WOODEN BASKETBALL COURT AT BARANGAY KABAYANAN, SAN JUAN CITY
- Contractor: STRUKTURA TEKNIKA SERVICES CO. (16646)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2025-01-13
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱19,002,158.00
- Contract status: Completed Report
- COMPLETION OF MULTI-PURPOSE BUILDING / WOODEN BASKETBALL COURT AT BARANGAY STA. LUCIA, SAN JUAN CITY
- Contractor: STRUKTURA TEKNIKA SERVICES CO. (16646)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-11-08
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱19,013,744.00
- Contract status: Completed Report
- COMPLETION OF MULTI-PURPOSE BUILDING / WOODEN BASKETBALL COURT AT BARANGAY WEST CRAME, SAN JUAN CITY
- Contractor: STRUKTURA TEKNIKA SERVICES CO. (16646)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-11-03
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱18,913,346.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT S AN ISIDRO ST., BRGY. STA. ANA, TAGUIG CITY
- Contractor: EBUILDERS CONSTRUCTION & DEVELOPMENT CORP. (36855)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-01-15
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱47,471,024.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SAN ROQUE, TAGUIG CITY
- Contractor: DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION) (8931)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-01-10
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,500,662.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF DRAINAGE SYSTEM, BRGY. LOWER BICUTAN, TAGUIG CITY
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-01-21
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱49,000,000.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF DRAINAGE SYSTEM, BRGY. NEW L OWER BICUTAN, TAGUIG CITY
- Contractor: ROTAFLEX CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY:ROTA FLEX CONSTRUCTION) (23408)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-02-29
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱46,549,972.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF STO. ROSARIO SILANGAN MULTI -PURPOSE BUILDING AT BARANGAY STO. ROSARIO SILANGAN, PATEROS, METRO MANILA< /span>
- Contractor: TRILEX BUILDERS AND CONSTRUCTION SUPPLY INC. (FORMERLY: TRILEX BUILDERS AND CONSTRUCTION SUPPLY) (26590)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-01-04
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱47,505,984.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF FIVE (5) STOREY HALL OF JUS TICE BUILDING (PHASE 3), PATEROS, METRO MANILA
- Contractor: JUSTBILT BUILDERS (39754)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-01-02
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,505,785.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF FIVE (5) STOREY DISASTER RI SK MANAGEMENT BUILDING (PHASE 3), PATEROS, METRO MANILA
- Contractor: JUSTBILT BUILDERS (39754)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-01-02
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,505,785.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF PATEROS SPORTS COMPLEX, BRG Y. SAN PEDRO, PATEROS, METRO MANILA
- Contractor: FRANZCOR TRADING & CONSTRUCTION (18082)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-12-05
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱14,251,585.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BRG Y. AGUHO, PATEROS
- Contractor: B. VALENCERINA TRADING & CONSTRUCTION (22147)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-10-19
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,500,244.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (BAR ANGAY HALL) AT BRGY. LIGID TIPAS, TAGUIG CITY
- Contractor: FRANZCOR TRADING & CONSTRUCTION (18082)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-01-03
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱14,700,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY TABACAL ERA, PATEROS
- Contractor: L.P.O. ENTERPRISES (20730)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-03-06
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱48,519,460.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. STA ANA, P ATEROS
- Contractor: DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION) (8931)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-03-04
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱33,229,712.00
- Contract status: Completed Report
- CONSTRUCTION OF STO. ROSARIO SILANGAN MULTI-PURPOSE BUIL DING AT BARANGAY STO. ROSARIO SILANGAN, PATEROS, METRO MANILA
- Contractor: DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION) (8931)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-01-04
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱47,506,204.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. BAGUMBAYAN , TAGUIG CITY
- Contractor: HAWK KEY CONSTRUCTION AND GENERAL MERCHANDISE CORPORATION (41810)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-04-14
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱47,506,140.00
- Contract status: Completed Report
- REHABILITATION OF DRAINAGE SYSTEM (BOX CULVERT) AT PIO F ELIPE ST. AT BARANGAY NEW LOWER BICUTAN, TAGUIG CITY
- Contractor: JAYMAR BUILDERS (7900)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-01-03
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱27,924,104.00
- Contract status: Completed Report
- UPGRADING OF DRAINAGE SYSTEM AT JACINTO ST., ORELLANA ST ., LLAMERA ST., MARINDUQUE ST., FRANCO ST. AT BARANGAY NEW LOWER BICUTAN, T AGUIG CITY
- Contractor: RGDG CONSTRUCTION (37950)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-12-04
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,309,671.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (HEALTH CENTER) A T BARANGAY STA. ANA, PATEROS, METRO MANILA
- Contractor: ZYRE TRADING AND CONSTRUCTION (42364)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-12-29
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱28,502,466.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, PHA SE II AT BARANGAY KATUPARAN, TAGUIG CITY
- Contractor: TRILEX BUILDERS AND CONSTRUCTION SUPPLY INC. (FORMERLY: TRILEX BUILDERS AND CONSTRUCTION SUPPLY) (26590)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-04-27
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱85,509,872.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD WITH DRAINAGE SYSTEM AT QUIRINO ST. , BARANGAY SOUTH SIGNAL, TAGUIG CITY
- Contractor: J.M.L.R. CONSTRUCTION AND SUPPLY (51759)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-10-19
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱14,106,981.00
- Contract status: Completed Report
- CONSTRUCTION OF DOST NORTH COMPOUND PERIMETER ROAD WITHI N THE DOST BICUTAN COMPOUND, TAGUIG CITY
- Contractor: HONY TRADING & CONSTRUCTION (26898)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-11-05
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱18,807,946.00
- Contract status: Completed Report
- REHABILITATION AND ASPHALT OVERLAYING OF IDENTIFIED EXIS TING ROADS WITHIN THE DOST BICUTAN COMPOUND, TAGUIG CITY
- Contractor: BPV CONSTRUCTION INC. (47081)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-06-21
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱6,499,038.00
- Contract status: Completed Report
- CONSTRUCTION OF DRAINAGE SYSTEM AT ZONE 1, ZONE 2, ZONE 7 AND ZONE 8, BARANGAY FORT BONIFACIO, TAGUIG CITY
- Contractor: WAY MAKER GENERAL CONTRACTOR OPC (52351)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-02-03
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱26,064,196.00
- Contract status: Completed Report
- CONSTRUCTION OF DRAINAGE SYSTEM AT STO NI C3 91O AVE FRO M COR. MRT AVE. TO LIBIS STREET ZONE 5, BARANGAY CENTRAL SIGNAL, TAGUIG CIT Y
- Contractor: J.M.L.R. CONSTRUCTION AND SUPPLY (51759)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-12-18
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱13,963,925.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT B ARANGAY PINAGSAMA, TAGUIG CITY
- Contractor: HONY TRADING & CONSTRUCTION (26898)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-08-27
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱28,514,952.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (MORTUARY) AT QUI RINO EXTENSION, BARANGAY SOUTH SIGNAL, TAGUIG CITY
- Contractor: HONY TRADING & CONSTRUCTION (26898)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-03-07
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱11,880,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY CENTR AL SIGNAL VILLAGE, TAGUIG CITY
- Contractor: B. VALENCERINA TRADING & CONSTRUCTION (22147)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-07-09
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱29,102,370.00
- Contract status: Completed Report
- REHABILITATION OF ROADS AT BARANGAY UPPER BICUTAN, TAGUI G CITY
- Contractor: B. VALENCERINA TRADING & CONSTRUCTION (22147)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-12-05
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱14,107,072.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) MULTI-PURPOSE BUILDING (SENIOR CITIZEN BUILDING), BARANGAY STA ANA, PATEROS
- Contractor: NEWBIG FOUR J CONSTRUCTION INC. (FORMERLY: FOUR J CONSTRUCTION) (15104)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-10-30
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱33,267,334.00
- Contract status: Completed Report
- REHABILITATION OF ST. PETER ST., ST. JOHN ST., ST. THERE SE ST. AT PERPETUAL VILLAGE, BARANGAY BAGONG TANYAG, TAGUIG CITY
- Contractor: ZYRE TRADING AND CONSTRUCTION (42364) / RVDP CONSTRUCTION (47273)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-01-30
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱47,024,648.00
- Contract status: Completed Report
- REHABILITATION OF P. HERRERA STREET, PATEROS
- Contractor: JAYMAR BUILDERS (7900)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-10-05
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,701,561.50
- Contract status: Completed Report
- REHABILITATION OF ROADS AT MAYA ST., BRGY. USUSAN, TAGUI G CITY
- Contractor: JAYMAR BUILDERS (7900)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-11-10
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,404,573.00
- Contract status: Completed Report
- REHABILITATION OF ROAD INCLUDING ALLEYS AND DRAINAGES AL ONG T SULIT STREET AND LATERALS (PASCUAL AREA, KALYE OTSO, SARAP BUHAY, AGU HO BOUNDARY, AND TANGCO AREA) BARANGAY AGUHO PATEROS
- Contractor: B. VALENCERINA TRADING & CONSTRUCTION (22147)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-01-03
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,403,979.00
- Contract status: Completed Report
- REHABILITATION OF ROAD INCLUDING ALLEYS AND DRAINAGES AL ONG G. DE BORJA STREET AND LATERALS (TILAOK, MENGUITO AREA, GUINGCANCO AREA , PATINDIG ARAW AND ENGR. CALINGO AREA) BARANGAY AGUHO, PATEROS
- Contractor: B. VALENCERINA TRADING & CONSTRUCTION (22147)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-10-19
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,403,772.00
- Contract status: Completed Report
- REHABILITATION OF ROADS AT BARANGAY MAHARLIKA, TAGUIG CI TY
- Contractor: B. VALENCERINA TRADING & CONSTRUCTION (22147)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-12-04
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,404,782.00
- Contract status: Completed Report
- REHABILITATION OF ROADS AT BARANGAY WESTERN BICUTAN, TAG UIG CITY
- Contractor: SPRING STAR CONSTRUCTION AND SUPPLY (20240)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-03-26
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,402,833.00
- Contract status: Completed Report
- CONSTRUCTION OF ROADS AT KABATAS COMPOUND (SPDHAI), TAGU IG CITY
- Contractor: IPM CONSTRUCTION & DEVELOPMENT CORPORATION (14699)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-01-09
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱14,408,925.00
- Contract status: Completed Report
- REHABILITATION OF ROADS AT BARANGAY NORTH SIGNAL, TAGUIG CITY
- Contractor: IPM CONSTRUCTION & DEVELOPMENT CORPORATION (14699)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-12-18
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱14,106,427.00
- Contract status: Completed Report
- REHABILITATION OF ROADS AT BARANGAY SIGNAL, TAGUIG CITY< /span>
- Contractor: IPM CONSTRUCTION & DEVELOPMENT CORPORATION (14699)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-12-18
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱14,106,385.00
- Contract status: Completed Report
- REHABILITATION OF ROADS AT BARANGAY WAWA, TAGUIG CITY
- Contractor: RED MATRIX BUILDERS AND TRADING (38828)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-12-12
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱14,106,576.00
- Contract status: Completed Report
- CONSTRUCTION OF BRIDGE ALONG C-6 OPEN CHANNEL BRGY. PALI NGON, TAGUIG CITY
- Contractor: WAY MAKER GENERAL CONTRACTOR OPC (52351)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-07-24
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱18,809,302.00
- Contract status: Completed Report
- CONSTRUCTION OF BRIDGE ALONG C-6 OPEN CHANNEL BRGY. NAPI NDAN, TAGUIG CITY
- Contractor: WAY MAKER GENERAL CONTRACTOR OPC (52351)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-07-24
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱18,799,550.00
- Contract status: Completed Report
- REHABILITATION OF ROAD AT BARANGAY IBAYO-TIPAS, TAGUIG C ITY (PHASE II)
- Contractor: HONY TRADING & CONSTRUCTION (26898)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-11-18
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱18,808,000.00
- Contract status: Completed Report
- CONSTRUCTION (IMPROVEMENT) OF ROADS AT BRGY. HAGONOY, TA GUIG CITY
- Contractor: YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC. (45002)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-11-18
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱19,604,204.00
- Contract status: Completed Report
- CONSTRUCTION (IMPROVEMENT) OF ROAD AT BRGY. SAN MIGUEL, TAGUIG CITY
- Contractor: DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION) (8931)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-01-03
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱23,512,258.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT P UROK 2, BARANGAY UPPER BICUTAN, TAGUIG CITY
- Contractor: A.L. SALAZAR CONSTRUCTION, INC. (3899)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-12-29
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱47,520,048.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT S ITIO IMELDA, BARANGAY UPPER BICUTAN TAGUIG CITY (PHASE II)
- Contractor: JUSTBILT BUILDERS (39754)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-11-29
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱19,007,786.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (BAR ANGAY HALL) AT BARANGAY CALZADA, TAGUIG CITY (PHASE III)
- Contractor: HONY TRADING & CONSTRUCTION (26898)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-09-30
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱18,988,384.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT K OROKAN, BARANGAY WESTERN BICUTAN, TAGUIG CITY
- Contractor: ZYRE TRADING AND CONSTRUCTION (42364)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-11-29
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱14,255,927.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE FACILITY (PAT EROS SPORTS COMPLEX), BRGY. SAN PEDRO, PATEROS
- Contractor: J.M.L.R. CONSTRUCTION AND SUPPLY (51759)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-05-13
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱14,251,764.00
- Contract status: Completed Report
- CONSTRUCTION OF TESDA BUILDING, BARANGAY STO. ROSARIO SI LANGAN, PATEROS
- Contractor: ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958) / EBUILDERS CONSTRUCTION & DEVELOPMENT CORP. (36855)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-03-06
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱46,550,948.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (DIS ASTER RISK MANAGEMENT BUILDING), PATEROS (PHASE 3)
- Contractor: JUSTBILT BUILDERS (39754)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-03-11
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,505,999.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (RFU-NCR MEGA LAB ORATORY BUILDING) (WITH EQUIPMENT), 1ST QUADRANT OF CAMP BAGONG DIWA ALONG GEN. SANTOS AVE., BICUTAN, TAGUIG CITY
- Contractor: A.M. ORETA & CO., INC. (108)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-10-22
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱81,188,144.00
- Contract status: Completed Report
- BANK IMPROVEMENT/PROTECTION ALONG C-6 OPEN CHANNEL (PHAS E 5), TAGUIG CITY
- Contractor: TOPNOTCH CATALYST BUILDERS INC. (34061) / BLACK HARDHAT INC. (FORMERLY: JCHARDHAT INC.) (49520)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-11-16
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱82,463,672.00
- Contract status: Completed Report
- BANK IMPROVEMENT/PROTECTION ALONG C-6 OPEN CHANNEL (PHAS E 6), TAGUIG CITY
- Contractor: TOPNOTCH CATALYST BUILDERS INC. (34061) / BLACK HARDHAT INC. (FORMERLY: JCHARDHAT INC.) (49520)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-11-16
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱82,472,176.00
- Contract status: Completed Report
- BANK IMPROVEMENT/PROTECTION ALONG C-6 OPEN CHANNEL (PHAS E 7), TAGUIG CITY
- Contractor: TOPNOTCH CATALYST BUILDERS INC. (34061) / BLACK HARDHAT INC. (FORMERLY: JCHARDHAT INC.) (49520)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-11-16
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱82,507,104.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT THE NATIONAL C ENTER FOR MENTAL HEALTH (PACKAGE 3) DESIGNATED AS THE SENATE PRESIDENT NEPT ALI A. GONZALES GENERAL HOSPITAL, MANDALUYONG CITY
- Contractor: VIRAC NRC CONSTRUCTION (11396)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-07-04
- Fund source: Regular Infra - GAA 2023 LP
- Contract price: ₱71,258,248.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT THE NATIONAL C ENTER FOR MENTAL HEALTH (PACKAGE 4) DESIGNATED AS THE SENATE PRESIDENT NEPT ALI A. GONZALES GENERAL HOSPITAL, MANDALUYONG CITY
- Contractor: YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC. (45002)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-11-06
- Fund source: Regular Infra - GAA 2023 LP
- Contract price: ₱71,260,408.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT A YALA HOUSING, BARANGAY BARANGKA DRIVE, MANDALUYONG CITY
- Contractor: FRANZCOR TRADING & CONSTRUCTION (18082)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-06-02
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,677,726.50
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF PHILIPPINE NATIONAL POLICE BUILDING AT BARANGAY PLAINVIEW, MANDALUYONG CITY
- Contractor: NEWBIG FOUR J CONSTRUCTION INC. (FORMERLY: FOUR J CONSTRUCTION) (15104)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-10-01
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱46,802,000.00
- Contract status: Completed Report
- CONSTRUCTION/COMPLETION OF MULTI-PURPOSE BUILDING (PHILI PPINE NATIONAL POLICE AND BUREAU OF FIRE DEPARTMENT) PHASE 3, BARANGAY PLAI NVIEW, MANDALUYONG CITY
- Contractor: NEWBIG FOUR J CONSTRUCTION INC. (FORMERLY: FOUR J CONSTRUCTION) (15104)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-11-30
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱93,508,504.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT B ARANGAY WACK WACK PACKAGE 4, MANDALUYONG CITY
- Contractor: VIRAC NRC CONSTRUCTION (11396)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-05-29
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱93,594,560.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI PURPOSE BUILDING AT BARANGAY BAGON G SILANG, MANDALUYONG CITY, PHASE 1
- Contractor: VIRAC NRC CONSTRUCTION (11396)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-08-01
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱93,556,312.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY BAGON G SILANG, MANDALUYONG CITY, PHASE 2
- Contractor: VIRAC NRC CONSTRUCTION (11396)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2025-05-09
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱93,556,688.00
- Contract status: Completed Report
- CONSTRUCTION OF MARIKINA POLYTECHNIC COLLEGE AUDITORIUM PHASE 2, MARIKINA CITY
- Contractor: VICTORIA BUILDERS AND TRADING (37455) / VF CONSTRUCTION (10048)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-02-03
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱65,389,832.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING IN CLUDING SITE DEVELOPMENT, MARIKINA CITY
- Contractor: PRUDENT DIAMOND SQUARE CONSTRUCTION CO. (31726)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-05-24
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱56,126,612.00
- Contract status: Completed Report
- CONSTRUCTION OF DRAINAGE SYSTEM, BRGY. TUMANA, MARIKINA CITY
- Contractor: 729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.) (21923)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-12-16
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱46,727,916.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING IN MARIKINA YOUTH CAMP, MARIKINA CITY
- Contractor: ST. TIMOTHY CONSTRUCTION CORPORATION (39196)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-11-08
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱94,981,400.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING PHASE 1 - NATIONA L GOVERMENT OFFICES BLDG., MARIKINA CITY
- Contractor: BELL CONSTRUCTION (27851)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-11-05
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱95,052,112.00
- Contract status: Completed Report
- IMPROVEMENT MARIKINA RIVER AT STA. 15 + 450 TO STA. 16 + 470, MARIKINA CITY
- Contractor: L.R. TIQUI BUILDERS, INC. (13810) / M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION) (20201)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-02-09
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱92,990,384.00
- Contract status: Completed Report
- IMPROVEMENT MARIKINA RIVER AT STA. 16 + 470 TO STA. 17 + 490, MARIKINA CITY
- Contractor: L.R. TIQUI BUILDERS, INC. (13810) / 729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.) (21923)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-02-24
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱93,057,112.00
- Contract status: Completed Report
- IMPROVEMENT MARIKINA RIVER AT STA. 17 + 490 TO STA. 18 + 510, MARIKINA CITY
- Contractor: L.R. TIQUI BUILDERS, INC. (13810)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-02-03
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱93,035,952.00
- Contract status: Completed Report
- IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER AT STA. 15 + 700 TO STA. 15 + 850, RIGHT BANK, MARIKINA CITY
- Contractor: M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION) (20201)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-06-20
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱93,089,848.00
- Contract status: Completed Report
- IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER AT STA. 15 + 850 TO STA. 16 + 000, RIGHT BANK, MARIKINA CITY
- Contractor: M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION) (20201)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-06-20
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱93,041,800.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTE R) AT BARANGAY BAMBANG, PASIG CITY
- Contractor: E.S. JOSEFA CONSTRUCTION (31179)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-03-18
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱65,514,640.00
- Contract status: Completed Report
- REHABILITATION OF DRAINAGE SYSTEM ALONG F. MANALO STREET , SAN JUAN CITY
- Contractor: KING EIGHT BUILDERS AND SUPPLY (37325) / WAWAO BUILDERS (46535)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-02-18
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱41,851,064.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT ERMITA C3 91O CREEK, BRGY. ADDITION HILLS, SAN JUAN CITY
- Contractor: DARCY & ANNA BUILDERS & TRADING (38559)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-01-24
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱44,096,996.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT ERMITA C3 91O CREEK, BRGY. LITTLE BAGUIO, SAN JUAN CITY
- Contractor: WAWAO BUILDERS (46535) / DRJY CONSTRUCTION (53814)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-01-15
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱91,675,968.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE VII-A) AT BARANGAY ST. JOSEPH, SAN JUAN CITY
- Contractor: DEVEX INCORPORATED (38684)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-05-30
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱106,544,784.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE VIII-A) AT BARANGAY ST. JOSEPH, SAN JUAN CITY
- Contractor: DEVEX INCORPORATED (38684)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-05-30
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱140,214,768.00
- Contract status: Completed Report
- CONSTRUCTION OF PPTA BYPASS ROAD TO CAYETANO BLVD., TAGU IG CITY
- Contractor: B. BERNARDO CONST., INC. (6196)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2025-05-03
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱94,560,208.00
- Contract status: Completed Report
- CONSTRUCTION OF PUP 4-STOREY BUILDING, GENERAL SANTOS AV E., BRGY LOWER BICUTAN, TAGUIG CITY
- Contractor: HONY TRADING & CONSTRUCTION (26898)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-11-06
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱96,499,688.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION AT TAGUIG RIVER LAGUNA LAKESHORE, TAGUIG CITY, PHASE I
- Contractor: DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION) (8931)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-12-14
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱91,578,160.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION AT TAGUIG RIVER LAGUNA LAKESHORE, TAGUIG CITY, PHASE II
- Contractor: DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION) (8931)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-12-14
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱91,674,424.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION AT TAGUIG RIVER LAGUNA LAKESHORE, TAGUIG CITY, PHASE III
- Contractor: A.J. LAVA BUILDERS CORP. (FORMERLY: A.J. LAVA BUIL (22265)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-12-14
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱91,616,672.00
- Contract status: Completed Report
- IMPROVEMENT OF LAWTON AVENUE, TAGUIG CITY
- Contractor: A.L. SALAZAR CONSTRUCTION, INC. (3899)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-02-29
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱93,099,384.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT T CU COMPOUND AT BARANGAY CENTRAL BICUTAN, TAGUIG CITY
- Contractor: NEWBIG FOUR J CONSTRUCTION INC. (FORMERLY: FOUR J CONSTRUCTION) (15104)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-12-07
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱93,604,944.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE FACILITY (LINEAR PARK) ALO NG TAGUIG RIVER (WEST BANK), TAGUIG CITY
- Contractor: B. BERNARDO CONST., INC. (6196)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-08-23
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱75,654,720.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION ALONG NAPINDAN RIVER, P ACKAGE 1, TAGUIG CITY
- Contractor: DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION) (8931)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-05-25
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱91,636,176.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION ALONG NAPINDAN RIVER, P ACKAGE 2, TAGUIG CITY
- Contractor: DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION) (8931)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-05-25
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱91,577,984.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAINWATER COLLECTOR SYSTEM
- Contractor: B. VALENCERINA TRADING & CONSTRUCTION (22147)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-11-07
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱2,246,551.50
- Contract status: Completed Report
- CONSTRUCTION OF QUARTERING BUILDING E, CAMP BAGONG DIWA, TAGUIG CITY, PHASE II
- Contractor: RVDP CONSTRUCTION (47273)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-04-18
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,884,079.00
- Contract status: Completed Report
- IMPROVEMENT OF ROAD OF PANTALEON STREET (CONORADO STREET TO EDSA), MANDALUYONG CITY
- Contractor: JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS (24748)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-07-17
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱87,530,136.00
- Contract status: On-Going Report
- REHABILITATION OF MULTI-PURPOSE BUILDING, STO. NI C3 91O NATIONAL HIGH SCHOOL, BARANGAY STO. NI C3 91O, MARIKINA CITY
- Contractor: BELL CONSTRUCTION (27851)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-06-18
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱19,003,846.00
- Contract status: On-Going Report
- CONSTRUCTION OF DRAINAGE SYSTEM AND SLOPE PROTECTION ALO NG USUSAN RIVER, TAGUIG CITY
- Contractor: TWENTYSIX CONSTRUCTION INC. (47228)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-08-10
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱27,929,610.00
- Contract status: On-Going Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (STP ) AT BARANGAY PLAINVIEW, MANDALUYONG CITY
- Contractor: DOUBLE 12 CONSTRUCTION & SUPPLY (13028)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-11-16
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱33,957,640.00
- Contract status: On-Going Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (CISTERN), MATAAS NA PAARALANG NEPTALI A. GONZALES, MANDALUYONG CITY
- Contractor: 121 CONSTRUCTION CORPORATION (FORMERLY 121 CONSTUC (21686)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-12-01
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱15,243,569.00
- Contract status: On-Going Report
- CONSTRUCTION OF FOUR (4) STOREY MULTI-PURPOSE BUILDING I NTENDED FOR MANDALUYONG CITY MEDICAL CENTER (MCMC) LOCATED AT MARTINEZ STRE ET, C3 ROAD, BARANGAY ADDITTION HILLS, MANDALUYONG CITY
- Contractor: TOPNOTCH CATALYST BUILDERS INC. (34061)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2025-05-19
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱38,612,004.00
- Contract status: On-Going Report
- CONSTRUCTION OF MULTIPURPOSE BUILDING PHASE 2 AT BARANGA Y TA C3 91ONG, MARIKINA CITY
- Contractor: BELL CONSTRUCTION (27851)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-02-02
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱23,737,588.00
- Contract status: On-Going Report
- REHABILITATION OF ROAD, ATENEOVILLE SUBDIVISION, BARANGA Y NANGKA, MARIKINA CITY
- Contractor: 729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.) (21923)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-04-20
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱13,952,908.00
- Contract status: On-Going Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY NANGKA, MARIKINA CITY
- Contractor: W. GOMEZ TRADING AND CONSTRUCTION (39250)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-02-05
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱14,244,922.00
- Contract status: On-Going Report
- CONSTRUCTION/REHABILITATION OF SUMMERHOMES MULTI-PURPOSE BUILDING INCLUDING SITE DEVELOPMENT, MARIKINA CITY
- Contractor: PASCAL CONSTRUCTION (34168)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-09-19
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,502,405.00
- Contract status: On-Going Report
- CONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING, B ARANGAY FORTUNE, MARIKINA CITY
- Contractor: WAY MAKER GENERAL CONTRACTOR OPC (52351)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-08-07
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,612,625.50
- Contract status: On-Going Report
- COMPLETION OF MULTI-PURPOSE BUILDING INCLUDING SITE DEVE LOPMENT, BARANGAY PARANG, MARIKINA CITY
- Contractor: MAVCON BUILDERS & SUPPLIES (42578)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-08-31
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,502,536.00
- Contract status: On-Going Report
- CONSTRUCTION OF MONTEREY PHASE 1 HOMEOWNERS ASSOCIATION MULTI-PURPOSE BUILDING INCLUDING SITE DEVELOPMENT, BARANGAY FORTUNE, MARIKI NA CITY
- Contractor: WAY MAKER GENERAL CONTRACTOR OPC (52351)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-04-04
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱17,092,640.00
- Contract status: On-Going Report
- CONSTRUCTION OF MULTI PURPOSE BUILDING (HEALTH CENTER) A T BARANGAY NAMAYAN, MANDALUYONG CITY
- Contractor: C.B. GARAY PHILWIDE BUILDERS (6004)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-07-28
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱33,275,748.00
- Contract status: On-Going Report
- CONSTRUCTION OF MULTI PURPOSE BUILDING (CISTERN) AT ADDI TION HILLS INTEGRATED SCHOOL, MANDALUYONG CITY
- Contractor: JJPR CONSTRUCTION SERVICES (53478)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-12-29
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱18,707,894.00
- Contract status: On-Going Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT PUROK 10, BARA NGAY SOUTH DAANG HARI, TAGUIG CITY
- Contractor: R.D. TALENS CONSTRUCTION AND TRADING (36817)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-09-23
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱48,268,168.00
- Contract status: On-Going Report
- REHABILITATION OF ROAD NETWORK, SECOND DISTRICT, MARIKIN A CITY
- Contractor: W. GOMEZ TRADING AND CONSTRUCTION (39250)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-11-18
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,401,361.00
- Contract status: On-Going Report
- CONSTRUCTION OF MULTIPURPOSE BUILDING AT STO. NI C3 91O NATIONAL HIGH SCHOOL PHASE 3, BARANGAY STO. NI C3 91O, MARIKINA CITY
- Contractor: BELL CONSTRUCTION (27851)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-06-18
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱28,510,422.00
- Contract status: On-Going Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. MANGGAHAN, PASIG CITY
- Contractor: CAMILO CONSTRUCTION & TRADING (29529)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-10-06
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱14,242,578.00
- Contract status: On-Going Report
- COMPLETION OF AGUHO MULTI-PURPOSE BUILDING, (BACK OF MUN ICIPAL HALL), BRGY. AGUHO, PATEROS, METRO MANILA
- Contractor: B. VALENCERINA TRADING & CONSTRUCTION (22147)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-11-21
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱24,500,000.00
- Contract status: On-Going Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BRGY. NEW LOWE R BICUTAN, TAGUIG CITY
- Contractor: 816 EMBER CONSTRUCTION CORPORATION (51107)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-06-09
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱24,132,412.00
- Contract status: On-Going Report
- CONSTRUCTION OF PUP MULTI-PURPOSE BUILDING, GENERAL SANT OS AVE., BRGY LOWER BICUTAN, TAGUIG CITY
- Contractor: A.L. SALAZAR CONSTRUCTION, INC. (3899)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-07-09
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱48,264,796.00
- Contract status: On-Going Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT PAMAYANANG DIE GO SILANG AT BARANGAY USUSAN, TAGUIG CITY
- Contractor: YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC. (45002)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-07-13
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱48,312,936.00
- Contract status: On-Going Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (HEALTH CENTER), PINAGSAMA, TAGUIG CITY
- Contractor: HONY TRADING & CONSTRUCTION (26898)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-07-24
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱19,306,064.00
- Contract status: On-Going Report
- COMPLETION OF AGUHO, MULTI-PURPOSE BUILDING, (BACK OF MU NICIPAL HALL), BRGY. AGUHO, PATEROS
- Contractor: WAY MAKER GENERAL CONTRACTOR OPC (52351)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-08-07
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱24,367,264.00
- Contract status: On-Going Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (HEALTH CENTER), G. DE BORJA ST. AGUHO, PATEROS
- Contractor: ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-10-06
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱48,513,156.00
- Contract status: On-Going Report
- CONSTRUCTION OF MULTI PURPOSE BUILDING AT BARANGAY PLAIN VIEW, MANDALUYONG CITY
- Contractor: C.B. GARAY PHILWIDE BUILDERS (6004)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-05-29
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱65,489,468.00
- Contract status: On-Going Report
- CONSTRUCTION OF MULTI-PURPOSE BLDG. (VARIOUS OFFICES) IN BARANGAY MAUWAY, MANDALUYONG CITY (PHASE 1)
- Contractor: VIRAC NRC CONSTRUCTION (11396)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2025-06-11
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱70,195,744.00
- Contract status: On-Going Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. MAUWAY, MA NDALUYONG CITY (PHASE 2)
- Contractor: VIRAC NRC CONSTRUCTION (11396)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2025-06-11
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱70,189,840.00
- Contract status: On-Going Report
- CONSTRUCTION OF MULTI PURPOSE BUILDING (COVERED COURT) A T BARANGAY HULO, PACKAGE 1, MANDALUYONG CITY
- Contractor: VIRAC NRC CONSTRUCTION (11396)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-08-31
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱80,759,336.00
- Contract status: On-Going Report
- CONSTRUCTION OF MULTI PURPOSE BUILDING (COVERED COURT) A T BARANGAY HULO, PACKAGE 2, MANDALUYONG CITY
- Contractor: VIRAC NRC CONSTRUCTION (11396)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-08-31
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱80,759,344.00
- Contract status: On-Going Report
- REHABILITATION OF MULTI-PURPOSE BUILDING, PARK 23 HOA, B ARANGAY MARIKINA HEIGHTS, MARIKINA CITY
- Contractor: MAVCON BUILDERS & SUPPLIES (42578)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2023-07-02
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,749,232.50
- Contract status: On-Going Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING A ALONG LAGUNA LA KE HIGHWAY (C-6 ROAD), BRGY LOWER BICUTAN & BRGY. HAGONOY, TAGUIG CITY, PHASE I
- Contractor: HAWK KEY CONSTRUCTION AND GENERAL MERCHANDISE CORPORATION (41810)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-10-07
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱96,499,936.00
- Contract status: On-Going Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING B ALONG LAGUNA LA KE HIGHWAY (C-6 ROAD), BRGY LOWER BICUTAN & BRGY. HAGONOY, TAGUIG CITY, PHASE I
- Contractor: RGDG CONSTRUCTION (37950) / AYLAN CONSTRUCTION & TRADING (11884)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2025-07-02
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱96,490,656.00
- Contract status: On-Going Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. LOWER BICU TAN, TAGUIG CITY
- Contractor: ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2025-09-08
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱94,102,224.00
- Contract status: On-Going Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT PAMPANGA ROAD CORNER ZAMBALES ST., BARANGAY PINAGSAMA, TAGUIG CITY
- Contractor: ZYRE TRADING AND CONSTRUCTION (42364) / RVDP CONSTRUCTION (47273)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-03-18
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱66,535,528.00
- Contract status: On-Going Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT TCU COMPOUND A T BARANGAY CENTRAL BICUTAN, TAGUIG CITY
- Contractor: NEWBIG FOUR J CONSTRUCTION INC. (FORMERLY: FOUR J CONSTRUCTION) (15104)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-12-21
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱95,051,392.00
- Contract status: On-Going Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT K OROKAN, BRGY. WESTERN BICUTAN, TAGUIG CITY
- Contractor: HONY TRADING & CONSTRUCTION (26898)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-05-10
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱11,582,225.00
- Contract status: On-Going Report
- CONSTRUCTION OF ROTONDA AT CORNER CAYETANO BLVD. AND BAG ONG CALZADA, TAGUIG CITY
- Contractor: J.M.L.R. CONSTRUCTION AND SUPPLY (51759)
- Implementing Agency: National Capital Region - Metro Manila 1st District Engineering Office
- Region: National Capital Region
- Contract effectivity:
- Contract expiry: 2024-07-25
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱0.00
- Contract status: Terminated Report