Infrastructure Projects in Negros Island Region — Negros Island Region - Negros Oriental 1st District Engineering Office, 2021
This page lists public infrastructure projects implemented by Negros Island Region - Negros Oriental 1st District Engineering Office in Negros Island Region during 2021. All data are sourced from the Department of Public Works and Highways (DPWH) official database (as of 9/30/2025): https://www.dpwh.gov.ph/dpwh/projects/infrastructure
This information is shared to promote transparency and public awareness. We encourage visitors to validate project details using the official DPWH source. In case of discrepancies, please refer to the original records published by the DPWH.
| Contractor | Projects | Total Price |
|---|---|---|
| JAIME B. CHING ENTERPRISES (4256) | 5 | ₱318,013,048.00 |
| ALMANA CONSTRUCTION AND DEV'T CORPORATION (38859) | 1 | ₱91,675,000.00 |
| TOP RAMP CONSTRUCTION CORPORATION (48680) / SYNDTITE CONSTRUCTION CORPORATION (FORMERLY: R.C. TAGALA CONSTRUCTION) (11597) | 1 | ₱71,535,448.00 |
| TRINITYCAD CORPORATION (FORMERLY:TRINITY CONSTRUCTION AND DEVELOPMENT) (27755) / NALE CONSTRUCTION (18552) | 1 | ₱65,108,552.00 |
| MIGHTY HOK SUMMIT CONSTRUCTION & DEVELOPMENT CORP. (43834) | 1 | ₱59,752,800.00 |
- CONSTRUCTION OF FLOOD CONTROL ALONG LA LIBERTAD RIVER, L A LIBERTAD, NEGROS ORIENTAL
- Contractor: JAIME B. CHING ENTERPRISES (4256)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-11-10
- Fund source: Regular Infra - GAA 2021 OO-2
- Contract price: ₱49,000,000.00
- Contract status: Completed Report
- CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRA DES, INDUSTRIES AND ECONOMIC ZONES - JCT. DUMAGUETE NORTH ROAD - BRGY. CAND ANA-AY ROAD IN SUPPORT OF MANGO GROWERS, AND SILICA MINING INDUSTRIES, AYUN GON, NEGROS ORIENTAL
- Contractor: ALOJA BUILDERS AND REALTY (39144)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-04-14
- Fund source: Regular Infra - GAA 2021 CSSP
- Contract price: ₱9,800,000.00
- Contract status: Completed Report
- CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRA DES, INDUSTRIES AND ECONOMIC ZONES - BRGY. VILLEGAS ROAD CONNECTING GUIHULN GAN TO BALOC TO ISABELA ROAD IN SUPPORT OF BANANA, MANGO AND BAMBOO PROCESS ORS OF GUIHULNGAN CITY, NEGROS ORIENTAL
- Contractor: R.A. FANGLAYAN (RAF) GENERAL CONSTRUCTION INC. (FORMERLY:RAF GENERAL CONSTRUCTION) (06699)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-04-09
- Fund source: Regular Infra - GAA 2021 CSSP
- Contract price: ₱9,800,000.00
- Contract status: Completed Report
- NETWORK DEVELOPMENT PROGRAM ROAD WIDENING - PRIMARY ROAD S DUMAGUETE NORTH RD (JCT BAIS-KABANKALAN-NEGROS OCC BDRY) K0079+500 - K008 0+473, K0080+541 - K0080+617
- Contractor: NALE CONSTRUCTION (18552)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-09-13
- Fund source: Regular Infra - GAA 2021 OO-1
- Contract price: ₱32,699,660.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL ALONG TALAPTAP RIVER AT BR GY. CABUGAN, BINDOY, NEGROS ORIENTAL
- Contractor: JAIME B. CHING ENTERPRISES (4256)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2022-03-17
- Fund source: Regular Infra - GAA 2021 OO-2
- Contract price: ₱72,375,000.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRAD ES, INDUSTRIES AND ECONOMIC ZONES - BRGY. SANDAYAO TO BRGY. TACPAO ROAD CON NECTING JCT. DUMAGUETE NORTH ROAD IN SUPPORT OF COFFEE, COCONUT, BANANA, BA MBOO, AND CACAO PROCESSORS, GUIHULNGAN, NEGROS OR
- Contractor: VALKYRIE CONSTRUCTION (24045)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-04-20
- Fund source: Regular Infra - GAA 2021 CSSP
- Contract price: ₱9,878,400.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRAD ES, INDUSTRIES AND ECONOMIC ZONES, BRGY. IMELDA TO BRGY. HINAKPAN ROAD CONN ECTING GUIHULNGAN TO BALOC ISABELA ROAD IN SUPPORT OF THE COFFEE AND BANANA PROCESSORS, GUIHULNGAN, NEGROS ORIENTAL
- Contractor: K.M. GOLONG CONSTRUCTION (39667)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-06-18
- Fund source: Regular Infra - GAA 2021 CSSP
- Contract price: ₱9,800,000.00
- Contract status: Completed Report
- CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRA DES, INDUSTRIES AND ECONOMIC ZONES - BRGY. MANTAHAW-MOLOGPOLOG-NALUNDAN-ATO TES-BULOD ROAD - JCT. DUMAGUETE NORTH ROAD IN SUPPORT OF BROOM REED MAKER, COCONUT, AND STONE CUTTING INDUSTRIES, BINDOY, NE
- Contractor: SOLIDCORE CONSTRUCTION (37295)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-06-06
- Fund source: Regular Infra - GAA 2021 CSSP
- Contract price: ₱9,800,000.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRAD ES, INDUSTRIES AND ECONOMIC ZONES BRGY. GUBA TO BRGY. PINOCAUAN ROAD TO ULA Y ROAD CONNECTING VALLEHERMOSO - CANLAON CITY TO LA CASTELLANA ROAD IN SUPP ORT OF CACAO, BAMBOO, BANANA AND COFFEE GROWERS,
- Contractor: ETHAN PROPERTY DEVELOPER (36181)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-03-19
- Fund source: Regular Infra - GAA 2021 CSSP
- Contract price: ₱4,405,100.00
- Contract status: Completed Report
- NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING ALONG PRIMAR Y ROAD (DUMAGUETE NORTH ROAD) JCT. BAIS-KABANKALAN-NEGROS OCC BDRY. K0051+( -343)-K0051+756, K0064+632-K0066+000
- Contractor: TOP RAMP CONSTRUCTION CORPORATION (48680) / SYNDTITE CONSTRUCTION CORPORATION (FORMERLY: R.C. TAGALA CONSTRUCTION) (11597)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2022-05-11
- Fund source: Regular Infra - GAA 2021 OO-1
- Contract price: ₱71,535,448.00
- Contract status: Completed Report
- NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY RO ADS DUMAGUETE NORTH RD (JCT BAIS- KABANKALAN- NEGROS OCC BDRY), K0066+000- K0066+940, K0067+670-K0068+000, K0068+734-K0069+520
- Contractor: MIGHTY HOK SUMMIT CONSTRUCTION & DEVELOPMENT CORP. (43834)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-12-15
- Fund source: Regular Infra - GAA 2021 OO-1
- Contract price: ₱59,752,800.00
- Contract status: Completed Report
- NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY RO ADS DUMAGUETE NORTH RD (JCT BAIS- KABANKALAN- NEGROS OCC BDRY), K0069 + 548 - K0070 +870, K0070 + 896 - K0071 +000, K0073 + 200 - K0074 + 100
- Contractor: TRINITYCAD CORPORATION (FORMERLY:TRINITY CONSTRUCTION AND DEVELOPMENT) (27755) / NALE CONSTRUCTION (18552)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-12-18
- Fund source: Regular Infra - GAA 2021 OO-1
- Contract price: ₱65,108,552.00
- Contract status: Completed Report
- NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING-ALONG PRIMAR Y ROADS DUMAGUETE NORTH ROAD (JCT. BAIS-KABANKALAN - NEGROS OCC. BDRY. K007 4+100 - K0076+506
- Contractor: JAIME B. CHING ENTERPRISES (4256)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2022-05-13
- Fund source: Regular Infra - GAA 2021 OO-1
- Contract price: ₱72,375,000.00
- Contract status: Completed Report
- NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY RO ADS DUMAGUETE NORTH RD (JCT BAIS- KABANKALAN- NEGROS OCC BDRY), K0076 + 50 6 - K0076 + 710, K0076 + 740 - K0078 + 490
- Contractor: JAIME B. CHING ENTERPRISES (4256)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2022-03-19
- Fund source: Regular Infra - GAA 2021 OO-1
- Contract price: ₱56,713,048.00
- Contract status: Completed Report
- CONSTRUCTION/MAINTENANCE OF FLOOD CONTROL MITIGATION STR UCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL ALONG SAN JOSE RIVER, LA LIBERTAD, NEGROS ORIENTAL
- Contractor: KOUKEN CONSTRUCTION (26573)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-10-07
- Fund source: Regular Infra - GAA 2021 OO-2
- Contract price: ₱22,559,600.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY BAN-BAN, AYUNGON, NEGROS ORIENTAL
- Contractor: RCODE BUILDERS AND AGGREGATES SUPPLY (44166)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-06-13
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱3,960,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE FACILITY (COVERED COURT), IN BATANGAN, BINDOY, NEGROS ORIENTAL
- Contractor: DOLCI CONSTRUCTION & GENERAL MERCHANDISE (20153)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-05-24
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱2,772,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY CABCABAN, BINDOY, NEGROS ORIENTAL
- Contractor: J.F. BIASCA CONSTRUCTION & SUPPLIES (40233)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-06-13
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱3,960,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY CABULIHAN, VALLEHERMOSO, NEGROS ORIENTAL
- Contractor: ALOJA BUILDERS AND REALTY (39144)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-06-14
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱3,960,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY ELI, JIMALALUD, NEGROS ORIENTAL
- Contractor: DOLCI CONSTRUCTION & GENERAL MERCHANDISE (20153)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-06-17
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱3,960,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), S. LUCAP, BARANGAY MABIGO, CANLAON CITY, NEGROS ORIENTAL
- Contractor: TRIMLUV BUILDERS AND SUPPLY (33467)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2022-01-20
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱3,960,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY MANDALUPANG, MANJUYOD, NEGROS ORIENTAL
- Contractor: SOLIDCORE CONSTRUCTION (37295)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-06-24
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱3,960,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY POBLACION, VALLEHERMOSO, NEGROS ORIENTAL
- Contractor: KENBE CONSTRUCTION & SUPPLY (34290)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-06-21
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱3,960,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY TAMPOCON II, AYUNGON, NEGROS ORIENTA
- Contractor: KOUKEN CONSTRUCTION (26573)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-07-18
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱4,950,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE FACILITY (COVERED COURT), IN TRINIDAD, GUIHULNGAN CITY, NEGROS ORIENTAL
- Contractor: DT&C CONSTRUCTION (36176)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-07-24
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱2,772,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY VILLEGAS, CITY OF GUIHULNGAN, NEGROS ORIENTAL
- Contractor: VALKYRIE CONSTRUCTION (24045)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-06-15
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱3,960,000.00
- Contract status: Completed Report
- ASSET PRESERVATION - REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS VALLEHERM OSO - CANLAON CITY - LA - CASTELLANA RD VALLEHERMOSO, NEGROS ORIENTAL
- Contractor: K.M. GOLONG CONSTRUCTION (39667)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-07-20
- Fund source: Regular Infra - GAA 2021 OO-1
- Contract price: ₱21,462,980.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE FACILITY (COVERED COURT), IN CANLAHAO, JIMALALUD, NEGROS ORIENTAL
- Contractor: RCODE BUILDERS AND AGGREGATES SUPPLY (44166)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-05-24
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱2,772,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY ELECIA, LA LIBERTAD, NEGROS ORIENTAL
- Contractor: FP ALONTO CONSTRUCTION SERVICES (46820)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-06-14
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱3,960,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), CABAL-ASAN ELEMENTARY SCHOOL, BARANGAY HIBAIYO, GUIHULNGAN CITY, NEGROS ORI ENTAL
- Contractor: BIG JOE'S ENTERPRISES (33601)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-06-14
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱3,960,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY PACUAN, JIMALALUD, NEGROS ORIENTAL
- Contractor: RCODE BUILDERS AND AGGREGATES SUPPLY (44166)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-06-13
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱3,960,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY PACUAN, LA LIBERTAD, NEGROS ORIENTAL
- Contractor: ALOJA BUILDERS AND REALTY (39144)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-06-14
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱3,960,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY MALAIBA, CANLAON CITY, NEGROS ORIENTAL
- Contractor: TRIMLUV BUILDERS AND SUPPLY (33467)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2022-03-21
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱3,960,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY TABON, VALLEHERMOSO, NEGROS ORIENTAL
- Contractor: ALOJA BUILDERS AND REALTY (39144)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-06-16
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱3,960,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (FIRE STATION) IN TAYASAN, NEGROS ORIENTAL
- Contractor: MAI CONSTRUCTION & SUPPLY (30839)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-08-16
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱4,950,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE FACILITY (COVERED COURT), BRGY. MABIGO, CANLAON CITY, NEGROS ORIENTAL
- Contractor: TRIMLUV BUILDERS AND SUPPLY (33467)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-06-04
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱2,970,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY GUBA, VALLEHERMOSO, NEGROS ORIENTAL
- Contractor: J.A. CONST. AND TRADING CORP. (FOR: J.A. CONSTRUCTION) (35189)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-06-16
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱3,960,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY PANUBIGAN, CANLAON CITY, NEGROS ORIENTAL
- Contractor: TRIMLUV BUILDERS AND SUPPLY (33467)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-08-13
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱3,960,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), PUROK RESEVOIR, BARANGAY MABIGO, CANLAON CITY, NEGROS ORIENTAL
- Contractor: KENBE CONSTRUCTION & SUPPLY (34290)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-06-27
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱3,960,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BLDG, VALLEHERMOSO MUNICIP AL HALL ANNEX, BRGY POBLACION, VALLEHERMOSO, NEGROS ORIENTAL
- Contractor: DOLCI CONSTRUCTION & GENERAL MERCHANDISE (20153)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-07-19
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱2,970,000.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM - WATER MANAGEMENT FACILIT IES - CONSTRUCTION OF WATERWORKS SYSTEMS, BARANGAYS TRINIDAD AND CALAMBA, G UIHULNGAN CITY, NEGROS ORIENTAL
- Contractor: DT&C CONSTRUCTION (36176)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-04-30
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱1,980,000.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECL ARED TOURISM DESTINATIONS - ACCESS ROAD FROM BRGY. POBLACION TO PACUAN PROV INCIAL ROAD LEADING TO PACUAN CAVES, LA LIBERTAD, NEGROS ORIENTAL, PACKAGE II
- Contractor: KOUKEN CONSTRUCTION (26573)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-05-21
- Fund source: Regular Infra - GAA 2021 CSSP
- Contract price: ₱4,900,000.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM - LOCAL BRIDGES - CONSTRUCT ION OF FOOTBRIDGES, BARANGAYS LAG-IT AND DALAUPON, TAYASAN, NEGROS ORIENTAL
- Contractor: RCODE BUILDERS AND AGGREGATES SUPPLY (44166)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-06-28
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱1,980,000.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM - WATER MANAGEMENT FACILIT IES - CONSTRUCTION OF WATERWORKS SYSTEMS, BARANGAYS P.ZAMORA, VILLEGAS, T-H ILL, MANI-AK AND BUENAVISTA, GUIHULNGAN CITY, NEGROS ORIENTAL
- Contractor: DT&C CONSTRUCTION (36176)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-05-01
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱1,980,000.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECL ARED TOURISM DESTINATIONS - TABON -GUBA BARANGAY ROAD LEADING TO BINAKAYAN CAVES, VALLEHERMOSO, NEGROS ORIENTAL
- Contractor: ETHAN PROPERTY DEVELOPER (36181)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-06-05
- Fund source: Regular Infra - GAA 2021 CSSP
- Contract price: ₱4,900,000.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM - LOCAL BRIDGES - CONSTRUCT ION OF FOOTBRIDGES, BARANGAYS LAMOGONG AND CONCEPCION MANJUYOD, NEGROS ORIE NTAL
- Contractor: DOUBLE MM BUILDERS (33758)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-06-28
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱1,980,000.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM - WATER MANAGEMENT FACILIT IES - CONSTRUCTION OF WATERWORKS SYSTEMS, BARANGAYS LAMOGONG AND BUTONG, MA NJUYOD, NEGROS ORIENTAL
- Contractor: NAKKA CONSTRUCTION (20448)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-05-02
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱1,980,000.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM - LOCAL BRIDGES - CONSTRUCT ION OF FOOTBRIDGES, BARANGAYS NAGSAHA, VILLEGAS, AND MANIAK, GUIHULNGAN CIT Y, NEGROS ORIENTAL
- Contractor: DT&C CONSTRUCTION (36176)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-08-28
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱1,980,000.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM - WATER MANAGEMENT FACILIT IES - CONSTRUCTION OF WATERWORKS SYSTEMS, BARANGAYS APANANGON AND CANGHARAY , JIMALALUD, NEGROS ORIENTAL
- Contractor: NAKKA CONSTRUCTION (20448)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-04-29
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱1,980,000.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL ALONG MANJUYOD RIVER, NEGR OS ORIENTAL
- Contractor: JAIME B. CHING ENTERPRISES (4256)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2022-03-07
- Fund source: Regular Infra - GAA 2021 OO-2
- Contract price: ₱67,550,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE FACILITY (COVERED COURT), IN BANOG , JIMALALUD, NEGROS ORIENTAL
- Contractor: DOLCI CONSTRUCTION & GENERAL MERCHANDISE (20153)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-05-27
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱2,772,000.00
- Contract status: Completed Report
- ONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADE S, INDUSTRIES AND ECONOMIC ZONES, JCT. DUMAGUETE NORTH ROAD, BRGY. KAGAWASA N TO BRGY. TINAYUNAN ROAD IN SUPPORT OF PANDAN WEAVER, GUIHULNGAN CITY, NEG ROS ORIENTAL
- Contractor: BIG JOE'S ENTERPRISES (33601)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-06-12
- Fund source: Regular Infra - GAA 2021 CSSP
- Contract price: ₱9,800,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY ANIBONG, AYUNGON, NEGROS ORIENTAL
- Contractor: MG CONSTRUCTION (41069)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-06-14
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱3,922,444.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY ATOTES, BINDOY, NEGROS ORIENTAL
- Contractor: RCODE BUILDERS AND AGGREGATES SUPPLY (44166)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-06-13
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱3,960,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY BANTOLINAO, MANJUYOD, NEGROS ORIENTAL
- Contractor: SOLIDCORE CONSTRUCTION (37295)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-06-16
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱3,960,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY BUTONG, MANJUYOD, NEGROS ORIENTAL
- Contractor: SOLIDCORE CONSTRUCTION (37295)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-07-03
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱3,960,000.00
- Contract status: Completed Report
- REHABILITATION/IMPROVEMENT OF CABCABAN-NALUNDAN ROAD, MU NICIPALITY OF BINDOY, NEGROS ORIENTAL
- Contractor: ALMANA CONSTRUCTION AND DEV'T CORPORATION (38859)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-12-27
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱91,675,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY CALAGCALAG, AYUNGON, NEGROS ORIENTAL
- Contractor: SOLIDCORE CONSTRUCTION (37295)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-06-13
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱3,960,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY CAROL-AN, AYUNGON, NEGROS ORIENTAL
- Contractor: RCODE BUILDERS AND AGGREGATES SUPPLY (44166)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-06-13
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱3,960,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY GUIHOB, LA LIBERTAD, NEGROS ORIENTAL
- Contractor: NAKKA CONSTRUCTION (20448)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-06-14
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱3,960,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY INIBAN, AYUNGON, NEGROS ORIENTAL
- Contractor: KOUKEN CONSTRUCTION (26573)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-06-13
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱3,960,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY KANSUMANDIG, LA LIBERTAD, NEGROS ORIENTAL
- Contractor: ALOJA BUILDERS AND REALTY (39144)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-06-16
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱3,960,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE FACILITY (COVERED COURT) I N KILABAN, AYUNGON, NEGROS ORIENTAL
- Contractor: NAKKA CONSTRUCTION (20448)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-05-24
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱2,772,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY LAG-IT, TAYASAN, NEGROS ORIENTAL
- Contractor: SSG ENGINEERING SERVICES AND CONSTRUCTION SUPPLY (46324)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-06-13
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱3,960,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY MANDAPATON, LA LIBERTAD, NEGROS ORIENTAL
- Contractor: KOUKEN CONSTRUCTION (26573)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-06-14
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱3,960,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY MANGHULYAWON, LA LIBERTAD NEGROS ORIENTAL
- Contractor: KOUKEN CONSTRUCTION (26573)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-06-16
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱3,960,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY, MANOGTONG, AYUNGON, NEGROS ORIENTAL
- Contractor: BIG JOE'S ENTERPRISES (33601)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-06-13
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱3,960,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY, MATOBATO, BINDOY, NEGROS ORIENTAL
- Contractor: BIG JOE'S ENTERPRISES (33601)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-06-13
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱3,960,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY STA. CRUZ, TAYASAN, NEGROS ORIENTAL
- Contractor: NAKKA CONSTRUCTION (20448)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2022-01-19
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱3,960,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), SITIO NABILOG, BARANGAY TAMBULAN, TAYASAN, NEGROS ORIENTAL
- Contractor: MAI CONSTRUCTION & SUPPLY (30839)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-07-22
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱4,950,000.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM - WATER MANAGEMENT FACILITE S - CONSTRUCTION OF WATERWORKS SYSTEMS, LA LIBERTAD, NEGROS ORIENTAL
- Contractor: KOUKEN CONSTRUCTION (26573)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-05-31
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱6,930,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY BUDLASAN, CANLAON CITY, NEGROS ORIENTAL
- Contractor: VALKYRIE CONSTRUCTION (24045)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-06-14
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱3,960,000.00
- Contract status: Completed Report
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL ALONG ALANGILANAN RIVE R, MANJUYOD, NEGROS ORIENTAL
- Contractor: MAI CONSTRUCTION & SUPPLY (30839)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2022-03-26
- Fund source: Regular Infra - GAA 2021 OO-2
- Contract price: ₱4,900,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY BUCALAN, CANLAON CITY, NEGROS ORIENTAL
- Contractor: TRIMLUV BUILDERS AND SUPPLY (33467)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2022-01-20
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱3,960,000.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECL ARED TOURISM DESTINATIONS - ACCESS ROAD LEADING TO MARBLE CAVE, LA LIBERTAD , NEGROS ORIENTAL
- Contractor: KOUKEN CONSTRUCTION (26573)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-05-26
- Fund source: Regular Infra - GAA 2021 CSSP
- Contract price: ₱4,900,000.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM - LOCAL BRIDGES - CONSTRUCT ION OF FOOTBRIDGES, S. PASTO, BRGY. PANUBIGAN TO S. CANOQUE, BRGY. PANUBIG AN AND S. OYANGAN, BRGY. BUDLASAN, CANLAON CITY, NEGROS ORIENTAL
- Contractor: KOUKEN CONSTRUCTION (26573)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2022-04-05
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱2,970,000.00
- Contract status: Completed Report
- CONSTRUCTION/ REHABILITATION OF MULTI-PURPOSE BUILDING I N BARANGAY SUNDO-AN, MANJUYOD, NEGROS ORIENTAL
- Contractor: DOLCI CONSTRUCTION & GENERAL MERCHANDISE (20153)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2022-01-19
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱2,940,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. CALAMBA, G UIHULNGAN CITY, NEGROS ORIENTAL
- Contractor: BIG JOE'S ENTERPRISES (33601)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-06-15
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱2,970,000.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD FROM BRGY. CAMPU YO ROAD LEADING TO WHARF AND TO WHITE SAND BAR, MANJUYOD, NEGROS ORIENTAL< /span>
- Contractor: RCODE BUILDERS AND AGGREGATES SUPPLY (44166)
- Implementing Agency: Negros Island Region - Negros Oriental 1st District Engineering Office
- Region: Negros Island Region
- Contract effectivity:
- Contract expiry: 2021-04-02
- Fund source: Regular Infra - GAA 2021 CSSP
- Contract price: ₱0.00
- Contract status: Terminated Report