This page lists public infrastructure projects implemented by Region III - Nueva Ecija 1st District Engineering Office in Region III during 2018. All data are sourced from the Department of Public Works and Highways (DPWH) official database (as of 9/30/2025): https://www.dpwh.gov.ph/dpwh/projects/infrastructure
This information is shared to promote transparency and public awareness. We encourage visitors to validate project details using the official DPWH source. In case of discrepancies, please refer to the original records published by the DPWH.
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, VILLA ROSENDA, TAL UGTUG, NUEVA ECIJA
- Contractor: 816 ALLEN CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY:ALLEN CONSTRUCTION) (12584)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-07-15
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,920,387.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, TANDOC, TALUGTUG, NUEVA ECIJA
- Contractor: ADROIT EJD CONSTRUCTION CORP. (FORMERLY: ADROIT CONSTRUCTION) (11169)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-07-15
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,920,193.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, STO. DOMINGO, TALU GTUG, NUEVA ECIJA
- Contractor: FRAMECON BUILDERS (22482)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-07-15
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,918,021.38
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, ROXAS, TALUGTUG, N UEVA ECIJA
- Contractor: ADROIT EJD CONSTRUCTION CORP. (FORMERLY: ADROIT CONSTRUCTION) (11169)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-07-15
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,920,193.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, QUIRINO, TALUGTUG, NUEVA ECIJA
- Contractor: FRAMECON BUILDERS (22482)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-07-15
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,918,021.38
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, MAASIN, TALUGTUG, NUEVA ECIJA
- Contractor: AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) (16574)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-07-15
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,920,119.38
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, FRONDA, TALUGTUG, NUEVA ECIJA
- Contractor: 816 ALLEN CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY:ALLEN CONSTRUCTION) (12584)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-07-15
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,920,387.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, GOMEZ, LLANERA, NU EVA ECIJA
- Contractor: R.C. PALLARCA CONSTRUCTION (35863)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-07-15
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,920,315.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, MABINI, LLANERA, N UEVA ECIJA
- Contractor: FNR BUILDERS AND SONS SUPPLY INC. (FORMERLY FNR BUILDERS) (34454)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-07-15
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,918,194.38
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, FLORIDA BLANCA, LL ANERA, NUEVA ECIJA
- Contractor: SOLFIO P. JACINTO CONSTRUCTION INC. (17799)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-07-15
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,920,609.25
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, CORDERO, LUPAO, N UEVA ECIJA
- Contractor: ADROIT EJD CONSTRUCTION CORP. (FORMERLY: ADROIT CONSTRUCTION) (11169)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-07-15
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,920,249.25
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, ALALAY GRANDE, LU PAO, NUEVA ECIJA
- Contractor: AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) (16574)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-07-15
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,920,119.38
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, AGUPALO WESTE, LU PAO, NUEVA ECIJA
- Contractor: AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) (16574)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-07-15
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,920,119.38
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, AGUPALO ESTE, LUP AO, NUEVA ECIJA
- Contractor: SOLFIO P. JACINTO CONSTRUCTION INC. (17799)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-07-15
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,920,609.25
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, VILLA LABRADOR, R IZAL, NUEVA ECIJA
- Contractor: SYMMETRICON BUILDERS CORP. (37555)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-07-15
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,920,329.75
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, CANAAN WEST, RIZA L, NUEVA ECIJA
- Contractor: SYMMETRICON BUILDERS CORP. (37555)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-07-15
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,920,329.75
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, STO. NI C3 91O 2N D, SAN JOSE CITY
- Contractor: AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) (16574)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-07-15
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,920,119.38
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, HABITAT, STO. NI C3 91O 3RD, SAN JOSE CITY
- Contractor: AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) (16574)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-07-15
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,920,119.38
- Contract status: Completed Report
- CONSTRUCTION OF CONCRETE SLOPE PROTECTION WITH STEEL SHEE T PILE ALONG BALIWAG RIVER, BRGY. SALVACION 2, LUPAO, NUEVA ECIJA
- Contractor: WIZARD CONCRETE SOLUTIONS AND CONSTRUCTION CORPORATION (FORMERLY: WIZARD TRADING & CONSTRUCTION) (21921) / SPECO BUILDERS INC. (FORMERLY VRF CONSTRUCTION) (15301)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-12-09
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱74,414,824.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF AGUPALO ESTE SLOPE PROTECT ION, BRGY. AGUPALO ESTE, LUPAO, NUEVA ECIJA
- Contractor: WIZARD CONCRETE SOLUTIONS AND CONSTRUCTION CORPORATION (FORMERLY: WIZARD TRADING & CONSTRUCTION) (21921) / AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) (16574)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-10-10
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱58,591,740.00
- Contract status: Completed Report
- CONSTRUCTION OF CONCRETE SLOPE PROTECTION WITH STEEL SHEE T PILE ALONG PAMPANGA RIVER, BRGY. SAN GREGORIO, RIZAL, NUEVA ECIJA< /li>
- Contractor: SPECO BUILDERS INC. (FORMERLY VRF CONSTRUCTION) (15301)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-11-09
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱65,093,160.00
- Contract status: Completed Report
- CONSTRUCTION OF CONCRETE SLOPE PROTECTION WITH STEEL SHEE T PILE ALONG BANCO RIVER, SAN ESTEBAN, RIZAL, NUEVA ECIJA
- Contractor: SPECO BUILDERS INC. (FORMERLY VRF CONSTRUCTION) (15301)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-10-10
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱55,797,664.00
- Contract status: Completed Report
- CONSTRUCTION OF REVETMENT, STA. 52+436 - STA.53+014, BRGY . TABULAC, SAN JOSE CITY, NUEVA ECIJA
- Contractor: WIZARD CONCRETE SOLUTIONS AND CONSTRUCTION CORPORATION (FORMERLY: WIZARD TRADING & CONSTRUCTION) (21921) / AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) (16574)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-02-09
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱46,501,200.00
- Contract status: Completed Report
- REHABILITATION OF FLOOD CONTROL ALONG BALIWAG RIVER, BRGY . MAPANGPANG, SCIENCE CITY OF MU C3 91OZ, NUEVA ECIJA
- Contractor: AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) (16574) / TIERRA DE FERRAND REALTY & DEVELOPMENT CORPORATION (41266)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-12-09
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱81,329,080.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURES A LONG TALAVERA RIVER, BRGY. STA. MONICA, ALIAGA, NUEVA ECIJA
- Contractor: DGSARM BUILDERS INC. (FORMERLY: D.G. SARMENTA CONSTRUCTION) (13024)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-08-11
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱27,924,886.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURES A LONG TALAVERA RIVER AT BRGY. SAN EUSTACIO, ALIAGA, NUEVA ECIJA
- Contractor: AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) (16574)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-08-11
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱27,932,764.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURES A LONG TALAVERA RIVER, BRGY. LA PURISIMA, ALIAGA, NUEVA ECIJA
- Contractor: AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) (16574)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-08-11
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱27,924,450.00
- Contract status: Completed Report
- IMPROVEMENT/REHABILITATION OF REVETMENT ALONG TALAVERA RI VER, BRGY. BASANG HAMOG, TALAVERA, NUEVA ECIJA
- Contractor: ROADMAX CONSTRUCTION CORPORATION (34397)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-09-10
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱27,924,630.00
- Contract status: Completed Report
- CONSTRUCTION OF CONCRETE SLOPE PROTECTION WITH STEEL SHEE T PILE ALONG TALAVERA RIVER, BRGY. MAESTRANG KIKAY, TALAVERA, NUEVA ECIJA
- Contractor: AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) (16574)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-09-10
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱27,926,898.00
- Contract status: Completed Report
- CONSTRUCTION OF CONCRETE SLOPE PROTECTION WITH STEEL SHEE T PILE ALONG TALAVERA RIVER, BRGY. MATIAS, TALAVERA, NUEVA ECIJA
- Contractor: DGSARM BUILDERS INC. (FORMERLY: D.G. SARMENTA CONSTRUCTION) (13024)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-09-10
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱27,925,724.00
- Contract status: Completed Report
- CONSTRUCTION OF CONCRETE SLOPE PROTECTION WITH STEEL SHEE T PILE ALONG TALAVERA RIVER, BRGY. PAGASA, TALAVERA, NUEVA ECIJA
- Contractor: AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) (16574)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-09-10
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱27,925,634.00
- Contract status: Completed Report
- REHABILITATION OF FLOOD CONTROL STRUCTURES ALONG TALAVERA RIVER AT BRGY. SICSICAN MATANDA, TALAVERA, NUEVA ECIJA
- Contractor: AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) (16574)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-09-10
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱27,925,330.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURES A LONG TALAVERA RIVER, BRGY. SAN AGUSTIN, STO. DOMINGO, NUEVA ECIJA
- Contractor: AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) (16574)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-08-11
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱27,924,032.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURES, BRGY. VILLAROSA, (PHASE 3), LICAB, NUEVA ECIJA
- Contractor: SPECO BUILDERS INC. (FORMERLY VRF CONSTRUCTION) (15301)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-10-10
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱37,197,060.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURES, BRGY. AQUINO, LICAB, NUEVA ECIJA
- Contractor: SPECO BUILDERS INC. (FORMERLY VRF CONSTRUCTION) (15301)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-08-11
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱27,899,586.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURES, BRGY. POBLACION SUR, LICAB, NUEVA ECIJA
- Contractor: F.L. REGUYAL CONSTRUCTION CORPORATION (3315)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-10-10
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱27,926,166.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURES, BRGY. SAN JUAN, LICAB, NUEVA ECIJA
- Contractor: SPECO BUILDERS INC. (FORMERLY VRF CONSTRUCTION) (15301)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-08-11
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱27,891,572.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (GYM), ALIAGA NATI ONAL HIGH SCHOOL, ALIAGA, NUEVA ECIJA
- Contractor: M.M. SERRANO CONSTRUCTION COMPANY (38549)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-06-15
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱3,360,781.75
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (GYM), NAMPICUAN N ATIONAL HIGH SCHOOL, NAMPICUAN, NUEVA ECIJA
- Contractor: M.M. SERRANO CONSTRUCTION COMPANY (38549)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-06-15
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱3,360,781.75
- Contract status: Completed Report
- CONSTRUCTION OF BARANGAY HALL SAN JUAN, LICAB, NUEVA ECIJ A
- Contractor: FNR BUILDERS AND SONS SUPPLY INC. (FORMERLY FNR BUILDERS) (34454)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-10-28
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱968,808.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, MUNICIPAL HALL GR OUNDS, STO. DOMINGO, NUEVA ECIJA
- Contractor: FNR BUILDERS AND SONS SUPPLY INC. (FORMERLY FNR BUILDERS) (34454)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-07-27
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,927,892.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (GYM) BIBICLAT, CU YAPO, NUEVA ECIJA
- Contractor: M.M. SERRANO CONSTRUCTION COMPANY (38549)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-06-15
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱3,360,781.75
- Contract status: Completed Report
- CONSTRUCTION OF BARANGAY HALL CALANCUASAN NORTE, CUYAPO, NUEVA ECIJA
- Contractor: IJK MAE CONSTRUCTION INC. (35272)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-07-15
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,920,594.88
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, MUNICIPAL HALL GR OUNDS, CUYAPO, NUEVA ECIJA
- Contractor: FNR BUILDERS AND SONS SUPPLY INC. (FORMERLY FNR BUILDERS) (34454)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-07-27
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,927,892.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (GYM) GALVAN ELEME NTARY SCHOOL, GUIMBA, NUEVA ECIJA
- Contractor: M.M. SERRANO CONSTRUCTION COMPANY (38549)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-05-16
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,921,256.25
- Contract status: Completed Report
- CONSTRUCTION OF BARANGAY HALL, PACAC, GUIMBA, NUEVA ECIJA
- Contractor: FNR BUILDERS AND SONS SUPPLY INC. (FORMERLY FNR BUILDERS) (34454)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-05-16
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱968,808.50
- Contract status: Completed Report
- CONSTRUCTION OF BARANGAY HALL TAMPAC I, GUIMBA, NUEVA ECI JA
- Contractor: FNR BUILDERS AND SONS SUPPLY INC. (FORMERLY FNR BUILDERS) (34454)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-05-16
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱968,808.50
- Contract status: Completed Report
- CONSTRUCTION OF DAY CARE CENTER BANTUG HACIENDA, TALAVERA , NUEVA ECIJA
- Contractor: NERY'S CONSTRUCTION (40606)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-05-16
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱970,000.88
- Contract status: Completed Report
- CONSTRUCTION OF DAY CARE CENTER DIMASALANG SUR, TALAVERA, NUEVA ECIJA
- Contractor: NERY'S CONSTRUCTION (40606)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-05-16
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱970,000.88
- Contract status: Completed Report
- CONSTRUCTION OF DAY CARE CENTER LOMBOY, TALAVERA, NUEVA E CIJA
- Contractor: NERY'S CONSTRUCTION (40606)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-05-16
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱970,000.88
- Contract status: Completed Report
- CONSTRUCTION OF BARANGAY HALL, MABUHAY, TALAVERA, NUEVA E CIJA
- Contractor: 816 ALLEN CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY:ALLEN CONSTRUCTION) (12584)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-08-15
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱969,800.00
- Contract status: Completed Report
- CONSTRUCTION OF DAY CARE CENTER BRGY. PUROK MATIAS, TALAV ERA, NUEVA ECIJA
- Contractor: NERY'S CONSTRUCTION (40606)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-05-16
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱970,000.88
- Contract status: Completed Report
- CONSTRUCTION OF BARANGAY HALL SAMPALOC, TALAVERA, NUEVA E CIJA
- Contractor: NERY'S CONSTRUCTION (40606)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-05-16
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱969,999.88
- Contract status: Completed Report
- IMPROVEMENT/REHABILITATION OF REVETMENT OF THE RIVERBANK OF TALAVERA RIVER, BRGY. SAN PASCUAL, TALAVERA, NUEVA ECIJA
- Contractor: SPECO BUILDERS INC. (FORMERLY VRF CONSTRUCTION) (15301)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-10-10
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱37,195,228.00
- Contract status: Completed Report
- CONSTRUCTION OF CONCRETE SLOPE PROTECTION WITH STEEL SHEE T PILE AND BOX CULVERT, BRGY. CONCEPCION, STO. DOMINGO, NUEVA ECIJA< /li>
- Contractor: L.M.G. CONSTRUCTION INCORPORATED (FORMERLY: LMG CONSTRUCTION) (5719)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-07-03
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱19,144,044.00
- Contract status: Completed Report
- CONSTRUCTION OF MPB, FATIMA E/S, PANTABANGAN, NUEVA ECIJA
- Contractor: R.C. PALLARCA CONSTRUCTION (35863)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-05-16
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,920,225.62
- Contract status: Completed Report
- CONSTRUCTION OF MPB, FRANZA E/S, SCIENCE CITY OF MUNOZ, N UEVA ECIJA
- Contractor: R.C. PALLARCA CONSTRUCTION (35863)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-07-15
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,920,257.12
- Contract status: Completed Report
- CONSTRUCTION OF MPB, ALALAY CHICA, LUPAO, NUEVA ECIJA
- Contractor: R.C. PALLARCA CONSTRUCTION (35863)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-05-16
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,920,257.12
- Contract status: Completed Report
- CONSTRUCTION OF MPB, BANTUG, CARRANGLAN, NUEVA ECIJA
- Contractor: R.C. PALLARCA CONSTRUCTION (35863)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-06-15
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,920,225.62
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, DIAMOND PARK, TAY ABO, SAN JOSE CITY
- Contractor: WIZARD CONCRETE SOLUTIONS AND CONSTRUCTION CORPORATION (FORMERLY: WIZARD TRADING & CONSTRUCTION) (21921)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-08-14
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱3,601,378.50
- Contract status: Completed Report
- ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION/UPGRAD ING OF DAMAGED PAVED ROADS - TERTIARY ROADS - MU C3 91OZ - LUPAO RD - K0149 +000 - K0150+000
- Contractor: WIZARD CONCRETE SOLUTIONS AND CONSTRUCTION CORPORATION (FORMERLY: WIZARD TRADING & CONSTRUCTION) (21921)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-02-10
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱23,838,494.00
- Contract status: Completed Report
- ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY R OADS - NUEVA ECIJA - PANGASINAN RD - K0161+000 - K0162+000, K0163+000 - K01 63+952, K0170+000 - K0171+000
- Contractor: DGSARM BUILDERS INC. (FORMERLY: D.G. SARMENTA CONSTRUCTION) (13024)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-09-13
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱19,674,510.00
- Contract status: Completed Report
- ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY RO ADS - TARLAC - GUIMBA RD VIA VICTORIA - K0148+-184 - K0149+300, K0151+000 - K0153+329
- Contractor: DGSARM BUILDERS INC. (FORMERLY: D.G. SARMENTA CONSTRUCTION) (13024)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-07-15
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱25,079,332.00
- Contract status: Completed Report
- ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY RO ADS - JCT PINAGPANAAN - RIZAL - PANTABANGAN RD - K0126+000 - K0126+739.60
- Contractor: SPECO BUILDERS INC. (FORMERLY VRF CONSTRUCTION) (15301)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-04-16
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱5,221,761.00
- Contract status: Completed Report
- NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSI ON ROADS, GUIMBA - TALUGTUG - UMINGAN ROAD, NUEVA ECIJA
- Contractor: F.L. REGUYAL CONSTRUCTION CORPORATION (3315)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-12-12
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱46,551,752.00
- Contract status: Completed Report
- CONSTRUCTION OF ROADS, POBLACION WEST III, ALIAGA, NUEVA ECIJA
- Contractor: IJK MAE CONSTRUCTION INC. (35272)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-06-08
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,861,950.50
- Contract status: Completed Report
- CONSTRUCTION OF ROADS, ANDAL ALI C3 91O, TALAVERA, NUEVA ECIJA
- Contractor: DGSARM BUILDERS INC. (FORMERLY: D.G. SARMENTA CONSTRUCTION) (13024)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-06-08
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,862,202.88
- Contract status: Completed Report
- CONSTRUCTION OF ROADS, BAKAL I, TALAVERA, NUEVA ECIJA
- Contractor: NIC391AS CONSTRUCTION CORP. (FORMERLY: NINA'S CONSTRUCTION AND SUPPLIES) (40082)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-06-08
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,861,778.75
- Contract status: Completed Report
- CONSTRUCTION OF ROADS, COLLADO, TALAVERA, NUEVA ECIJA
- Contractor: NIC391AS CONSTRUCTION CORP. (FORMERLY: NINA'S CONSTRUCTION AND SUPPLIES) (40082)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-06-08
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,861,779.75
- Contract status: Completed Report
- CONSTRUCTION OF ROADS, TAGAYTAY, TALAVERA, NUEVA ECIJA
- Contractor: NIC391AS CONSTRUCTION CORP. (FORMERLY: NINA'S CONSTRUCTION AND SUPPLIES) (40082)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-06-08
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,861,938.50
- Contract status: Completed Report
- CONSTRUCTION OF ROADS, BURGOS, STO. DOMINGO, NUEVA ECIJA
- Contractor: NIC391AS CONSTRUCTION CORP. (FORMERLY: NINA'S CONSTRUCTION AND SUPPLIES) (40082)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-06-08
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,861,972.00
- Contract status: Completed Report
- CONSTRUCTION OF ROADS, CASULUCAN, STO. DOMINGO, NUEVA EC IJA
- Contractor: NIC391AS CONSTRUCTION CORP. (FORMERLY: NINA'S CONSTRUCTION AND SUPPLIES) (40082)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-06-08
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,861,650.25
- Contract status: Completed Report
- CONSTRUCTION OF ROADS, COMITANG, STO. DOMINGO, NUEVA ECI JA
- Contractor: NIC391AS CONSTRUCTION CORP. (FORMERLY: NINA'S CONSTRUCTION AND SUPPLIES) (40082)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-06-08
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,862,034.38
- Contract status: Completed Report
- CONSTRUCTION OF ROADS, SITIO ILOG BALIWAG, BRGY. STO. RO SARIO, STO. DOMINGO, NUEVA ECIJA
- Contractor: NIC391AS CONSTRUCTION CORP. (FORMERLY: NINA'S CONSTRUCTION AND SUPPLIES) (40082)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-06-08
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,861,678.62
- Contract status: Completed Report
- CONSTRUCTION OF ROADS, CAINGIN TABING ILOG, GUIMBA, NUEV A ECIJA
- Contractor: NIC391AS CONSTRUCTION CORP. (FORMERLY: NINA'S CONSTRUCTION AND SUPPLIES) (40082)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-06-08
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,861,786.62
- Contract status: Completed Report
- CONSTRUCTION OF ROADS, SAN AGUSTIN, GUIMBA, NUEVA ECIJA< /span>
- Contractor: NIC391AS CONSTRUCTION CORP. (FORMERLY: NINA'S CONSTRUCTION AND SUPPLIES) (40082)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-06-08
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,861,678.62
- Contract status: Completed Report
- CONSTRUCTION OF ROADS, SAN ANDRES, GUIMBA, NUEVA ECIJA
- Contractor: NIC391AS CONSTRUCTION CORP. (FORMERLY: NINA'S CONSTRUCTION AND SUPPLIES) (40082)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-06-08
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,861,793.75
- Contract status: Completed Report
- CONSTRUCTION OF ROADS, BONIFACIO, CUYAPO, NUEVA ECIJA
- Contractor: NIC391AS CONSTRUCTION CORP. (FORMERLY: NINA'S CONSTRUCTION AND SUPPLIES) (40082)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-06-08
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,861,793.00
- Contract status: Completed Report
- CONSTRUCTION OF ROADS, STA. CRUZ, CUYAPO, NUEVA ECIJA
- Contractor: NIC391AS CONSTRUCTION CORP. (FORMERLY: NINA'S CONSTRUCTION AND SUPPLIES) (40082)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-06-08
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,861,786.62
- Contract status: Completed Report
- CONSTRUCTION OF CLASSROOM, DINARAYAT ELEMENTARY SCHOOL, TALAVERA, NUEVA ECIJA
- Contractor: NIC391AS CONSTRUCTION CORP. (FORMERLY: NINA'S CONSTRUCTION AND SUPPLIES) (40082)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-06-08
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,440,184.88
- Contract status: Completed Report
- CONSTRUCTION OF MPB, SAVERONA E/S, TALUGTUG, NUEVA ECIJA
- Contractor: WIZARD CONCRETE SOLUTIONS AND CONSTRUCTION CORPORATION (FORMERLY: WIZARD TRADING & CONSTRUCTION) (21921)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-06-01
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,920,288.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, D. L. MAGLANOC, CARRANGLAN, NUEVA ECIJA
- Contractor: R.C. PALLARCA CONSTRUCTION (35863)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-07-01
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱3,600,572.25
- Contract status: Completed Report
- CONSTRUCTION OF MPB, CABISUCULAN, SCIENCE CITY OF MU C3 91OZ, NUEVA ECIJA
- Contractor: WIZARD CONCRETE SOLUTIONS AND CONSTRUCTION CORPORATION (FORMERLY: WIZARD TRADING & CONSTRUCTION) (21921)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-06-16
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,920,559.00
- Contract status: Completed Report
- CONSTRUCTION OF MPB, ESTRELLA, RIZAL, NUEVA ECIJA
- Contractor: F.C. MARTINEZ CONSTRUCTION DEVELOPMENT AND SUPPLY CORPORATION (FORMERLY:F.C. MARTINEZ CONSTRUCTION) (31243)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-06-16
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,920,747.62
- Contract status: Completed Report
- CONSTRUCTION OF MPB, PACO ROMAN E/S, RIZAL, NUEVA ECIJA< /span>
- Contractor: F.C. MARTINEZ CONSTRUCTION DEVELOPMENT AND SUPPLY CORPORATION (FORMERLY:F.C. MARTINEZ CONSTRUCTION) (31243)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-06-16
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,920,806.38
- Contract status: Completed Report
- CONSTRUCTION OF MPB, LIGAYA, LLANERA, NUEVA ECIJA
- Contractor: F.C. MARTINEZ CONSTRUCTION DEVELOPMENT AND SUPPLY CORPORATION (FORMERLY:F.C. MARTINEZ CONSTRUCTION) (31243)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-07-31
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,920,589.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURES, BRGY. BACAYAO, GUIMBA, NUEVA ECIJA
- Contractor: L.S.D. CONSTRUCTION & SUPPLIES (8980)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-12-04
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱18,617,042.00
- Contract status: Completed Report
- NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT - PRIM ARY ROADS, SN JOSE - LUPAO RD K0160+000 - K0160+870, K0160+913 - K0161+000, K0161+000 - K162+000, K0162+070 - K0162+400, K0171+591 - K0172+083, K0175+ 760 - K0176+380
- Contractor: ADROIT EJD CONSTRUCTION CORP. (FORMERLY: ADROIT CONSTRUCTION) (11169)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-11-22
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱25,235,768.00
- Contract status: Completed Report
- NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT - TERT IARY ROADS, JCT PINAGPANAAN - RIZAL - PANTABANGAN RD. K0134+375 - K135+000, K0135+000 - K0135+305
- Contractor: ADROIT EJD CONSTRUCTION CORP. (FORMERLY: ADROIT CONSTRUCTION) (11169)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-09-17
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱8,453,381.00
- Contract status: Completed Report
- ASSET PRESERVATION - CONSTRUCTION/UPGRADING/ REHABILITAT ION OF DRAINAGE ALONG NATIONAL ROADS TERTIARY ROADS, JCT PINAGPANAAN - RIZA L - PANTABANGAN RD - K0150+729 - K0151+492
- Contractor: NERY'S CONSTRUCTION (40606)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-08-30
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱6,451,318.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE HALL, STO. ROSARIO OLD, ZA RAGOZA, NUEVA ECIJA
- Contractor: FNR BUILDERS AND SONS SUPPLY INC. (FORMERLY FNR BUILDERS) (34454)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-06-08
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱969,798.38
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE HALL, NARVACAN I, GUIMBA, NUEVA ECIJA
- Contractor: FNR BUILDERS AND SONS SUPPLY INC. (FORMERLY FNR BUILDERS) (34454)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-06-08
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱969,798.38
- Contract status: Completed Report
- COMPLETION OF HANGING BRIDGE, BRGY. PANTOC, ALIAGA, NUEV A ECIJA
- Contractor: CCF EARTHMOVING CORP. (36572)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-07-01
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,396,244.38
- Contract status: Completed Report
- CONSTRUCTION OF DRAINAGE, POBLACION WEST IV, ALIAGA, NUE VA ECIJA
- Contractor: M.M. SERRANO CONSTRUCTION COMPANY (38549)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-06-08
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,396,841.25
- Contract status: Completed Report
- CONSTRUCTION OF DRAINAGE, DISTRICT V, CUYAPO, NUEVA ECIJ A
- Contractor: ADROIT EJD CONSTRUCTION CORP. (FORMERLY: ADROIT CONSTRUCTION) (11169)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-06-01
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,396,728.50
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION/UPGADING OF DAMAGED PAVED - SECONDARY ROADS, NUEVA ECIJA - PANGASINAN RD K0169+890.40 - K0170+000
- Contractor: DGSARM BUILDERS INC. (FORMERLY: D.G. SARMENTA CONSTRUCTION) (13024)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-07-08
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱2,936,719.50
- Contract status: Completed Report
- CONSTRUCTION AND REHABILITATION OF VALERIANA - MAYAMOT - MACARSE ROAD, ZARAGOZA, NUEVA ECIJA
- Contractor: ADROIT EJD CONSTRUCTION CORP. (FORMERLY: ADROIT CONSTRUCTION) (11169)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-10-06
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱9,309,147.00
- Contract status: Completed Report
- NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERS ION ROADS, ALIAGA-GUIMBA DIVERSION ROAD, NUEVA ECIJA
- Contractor: IRC CONSTRUCTION & SUPPLIES (29943)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-02-15
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱54,213,988.00
- Contract status: Completed Report
- ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION/UPGRA DING OF DAMAGED PAVED ROADS - TERTIARY ROADS - JCT PINAGPANAAN - RIZAL - PA NTABANGAN RD K0166+779 - K0167+000
- Contractor: WIZARD CONCRETE SOLUTIONS AND CONSTRUCTION CORPORATION (FORMERLY: WIZARD TRADING & CONSTRUCTION) (21921)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-12-05
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱5,758,442.50
- Contract status: Completed Report
- CONSTRUCTION OF BRIDGE, BURGOS, LUPAO, NUEVA ECIJA
- Contractor: WIZARD CONCRETE SOLUTIONS AND CONSTRUCTION CORPORATION (FORMERLY: WIZARD TRADING & CONSTRUCTION) (21921)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-07-01
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱2,376,418.50
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, DIGDIG NATIONAL HIGH SCHOOL, CARRANGLAN, NUEVA ECIJA
- Contractor: WIZARD CONCRETE SOLUTIONS AND CONSTRUCTION CORPORATION (FORMERLY: WIZARD TRADING & CONSTRUCTION) (21921)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-06-01
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,901,193.12
- Contract status: Completed Report
- CONSTRUCTION OF ROADS, BRGY. SAN ISIDRO - STA. CRUZ, ZAR AGOZA, NUEVA ECIJA
- Contractor: R.D. TALENS CONSTRUCTION AND TRADING (36817)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-09-25
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱9,309,799.00
- Contract status: Completed Report
- RECONSTRUCTION/REHABILITATION/UPGRADING OF LANDIG - VILL AFLORES ROAD, CUYAPO, NUEVA ECIJA
- Contractor: KAIRO KONSTRAK, INC. (35985)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-03-05
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱64,165,044.00
- Contract status: Completed Report
- NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT - SECO NDARY ROADS - NUEVA ECIJA - PANGASINAN RD K0161+000 - K0162+000, K0163+000 - K0163+952, K0169+313 - K0169+597, K0170+459 - K0171+256
- Contractor: MIVICO BUILDERS & DEVELOPERS (20551)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-11-22
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱33,323,400.00
- Contract status: Completed Report
- CONCRETING OF ROAD FROM BARANGAY 1 TO BARANGAY PULONGBAH AY, QUEZON, NUEVA ECIJA
- Contractor: R.G. DELA CRUZ CONSTRUCTION (35498)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-10-20
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱4,701,016.50
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS, BONGABON - RIZAL - AURORA ROAD K0152+560 - K0152+740, K0152+740 - K 0153+197
- Contractor: AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) (16574)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-12-13
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱12,452,310.00
- Contract status: Completed Report
- REHABILITATION/IMPROVEMENT OF PAMPANGA RIVER CONTROL, BR GY. POBLACION NORTE, RIZAL, NUEVA ECIJA
- Contractor: R.D. TALENS CONSTRUCTION AND TRADING (36817)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-02-02
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱43,758,480.00
- Contract status: Completed Report
- REHABILITATION OF SAN JOSE CITY - LLANERA ROAD, NUEVA EC IJA
- Contractor: WIZARD CONCRETE SOLUTIONS AND CONSTRUCTION CORPORATION (FORMERLY: WIZARD TRADING & CONSTRUCTION) (21921) / F.C. MARTINEZ CONSTRUCTION DEVELOPMENT AND SUPPLY CORPORATION (FORMERLY:F.C. MARTINEZ CONSTRUCTION) (31243)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-03-24
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱48,659,004.00
- Contract status: Completed Report
- REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES LINACTA GAN BR. (B01283LZ) ALONG SN JOSE - LUPAO RD
- Contractor: WIZARD CONCRETE SOLUTIONS AND CONSTRUCTION CORPORATION (FORMERLY: WIZARD TRADING & CONSTRUCTION) (21921)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-09-25
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱10,101,946.00
- Contract status: Completed Report
- REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES GEN. RI CARTE BR. (B01296LZ) ALONG JCT. PINAGPANAAN - RIZAL - PANTABANGAN RD
- Contractor: WIZARD CONCRETE SOLUTIONS AND CONSTRUCTION CORPORATION (FORMERLY: WIZARD TRADING & CONSTRUCTION) (21921)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-06-27
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱3,888,495.50
- Contract status: Completed Report
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LICAB - VIC TORIA RD, NUEVA ECIJA
- Contractor: AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) (16574) / M.M. SERRANO CONSTRUCTION COMPANY (38549)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-02-03
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱50,406,484.00
- Contract status: Completed Report
- ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS - BONGABON - RIZAL - AURORA RD K0148+(-335) - K0149+000, K0149+000 - K0149+230, K0150+521 - K0151+540
- Contractor: SPECO BUILDERS INC. (FORMERLY VRF CONSTRUCTION) (15301)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-08-03
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱33,997,944.00
- Contract status: Completed Report
- ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY R OADS - JCT PINAGPANAAN - RIZAL - PANTABANGAN RD K0134+375 - K0135+000, K015 2+279 - K0152+872, K0160+000 - K0161+000, K0162+000 - K0163+000, K0166+662 - K0166+779, K0167+000 - K0167+224, K0173+000 - K
- Contractor: SPECO BUILDERS INC. (FORMERLY VRF CONSTRUCTION) (15301)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-09-07
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱32,248,462.00
- Contract status: Completed Report
- ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY R OADS - JCT PINAGPANAAN - RIZAL - PANTABANGAN RD K0135+000 - K0135+545, K013 8+000 - K0138+350, K0141+000 - K0141+529, K0142+179 - K0142+315
- Contractor: WIZARD CONCRETE SOLUTIONS AND CONSTRUCTION CORPORATION (FORMERLY: WIZARD TRADING & CONSTRUCTION) (21921)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-09-08
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱11,662,568.00
- Contract status: Completed Report
- ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY R OADS - MU C3 91OZ - LUPAO RD K0156+769 - K0158+115, K0158+335 - K0158+486
- Contractor: WIZARD CONCRETE SOLUTIONS AND CONSTRUCTION CORPORATION (FORMERLY: WIZARD TRADING & CONSTRUCTION) (21921)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-09-26
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱10,553,052.00
- Contract status: Completed Report
- CONSTRUCTION OF FOUR - CLASSROOM SCHOOL BUILDING IN MALI GAYA ELEMENTARY SCHOOL, SCIENCE CITY OF MU C3 91OZ, NUEVA ECIJA
- Contractor: ADROIT EJD CONSTRUCTION CORP. (FORMERLY: ADROIT CONSTRUCTION) (11169)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-09-25
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱5,775,072.50
- Contract status: Completed Report
- REHABILITATION OF HANGING BRIDGE, BRGY. STA. LUCIA (OLD) , ZARAGOZA, NUEVA ECIJA
- Contractor: IJK MAE CONSTRUCTION INC. (35272)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-10-24
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱968,644.94
- Contract status: Completed Report
- ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION/ UPGR ADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - CABANATUAN CITY - CARMEN RD K0129+000 - K0130+196, K0131+000 - K0131+050, K0131+128 - K0132+126
- Contractor: LISA CONSTRUCTION (24134)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-03-24
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱55,824,284.00
- Contract status: Completed Report
- ROAD CONCRETING AND CONSTRUCTION OF DRAINAGE AT BRGY. SA N RICARDO, TALAVERA, NUEVA ECIJA
- Contractor: NERY'S CONSTRUCTION (40606)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-06-27
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,861,424.50
- Contract status: Completed Report
- CONSTRUCTION OF ROADS, SAN FRANCISCO, STO. DOMINGO, NUEV A ECIJA
- Contractor: NIC391AS CONSTRUCTION CORP. (FORMERLY: NINA'S CONSTRUCTION AND SUPPLIES) (40082)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-08-18
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,860,536.50
- Contract status: Completed Report
- ASSET PRESERVATION - PREVENTIVE MAINTENANCE TERTIARY ROA DS JCT PINAGPANAAN - RIZAL - PANTABANGAN RD K0126+739.60 - K0127+642, K0129 +485 - K0132+458
- Contractor: SPECO BUILDERS INC. (FORMERLY VRF CONSTRUCTION) (15301)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-08-26
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱24,723,204.00
- Contract status: Completed Report
- ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS SAN JOSE CITY - RIZAL RD VIA PINILI-PORAIS-VILLA JOSON (PALARILLA) RD
- Contractor: WIZARD CONCRETE SOLUTIONS AND CONSTRUCTION CORPORATION (FORMERLY: WIZARD TRADING & CONSTRUCTION) (21921)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-09-08
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱19,726,220.00
- Contract status: Completed Report
- REHABILITATION OF SCIENCE CITY OF MU C3 91OZ - TALUGTUG ROAD SCIENCE CITY OF MU C3 91OZ AND TALUGTUG, NUEVA ECIJA
- Contractor: WIZARD CONCRETE SOLUTIONS AND CONSTRUCTION CORPORATION (FORMERLY: WIZARD TRADING & CONSTRUCTION) (21921) / ADROIT EJD CONSTRUCTION CORP. (FORMERLY: ADROIT CONSTRUCTION) (11169)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-04-01
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱48,998,516.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, BRGY. SAVERONA - BRGY. VILLA ROSEN DA, TALUGTOG, NUEVA ECIJA
- Contractor: ADROIT EJD CONSTRUCTION CORP. (FORMERLY: ADROIT CONSTRUCTION) (11169)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-11-18
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱9,798,123.00
- Contract status: Completed Report
- ROAD CONSTRUCTION, SITIO TALATALAN, BARANGAY SAN AGUSTIN , CARRANGLAN, NUEVA ECIJA
- Contractor: F.C. MARTINEZ CONSTRUCTION DEVELOPMENT AND SUPPLY CORPORATION (FORMERLY:F.C. MARTINEZ CONSTRUCTION) (31243)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-09-17
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱5,586,464.50
- Contract status: Completed Report
- CONSTRUCTION OF MPB, MUNICIPAL COMPOUND, LLANERA, NUEVA ECIJA
- Contractor: IJK MAE CONSTRUCTION INC. (35272)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-09-14
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,929,845.75
- Contract status: Completed Report
- ASSET PRESERVATION - PREVENTIVE MAINTENANCE SECONDARY RO ADS - SAN JOSE CITY - RIZAL RD VIA PINILI - PORAIS - VILLA JOSON (PALARILLA ) RD K0160+(-141.10) - K0160+000, K0160+100 - K0161+000, K0161+000 - K0161+ 104, K0161+309 - K0161+506.70, K0161+905 - K0163+
- Contractor: WIZARD CONCRETE SOLUTIONS AND CONSTRUCTION CORPORATION (FORMERLY: WIZARD TRADING & CONSTRUCTION) (21921)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-09-26
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱40,815,316.00
- Contract status: Completed Report
- CONSTRUCTION OF GEN. LUNA, CARRANGLAN - CONVERSION, PANT ABANGAN ROAD, NUEVA ECIJA
- Contractor: G.T.Y. CONSTRUCTION (24448) / SPECO BUILDERS INC. (FORMERLY VRF CONSTRUCTION) (15301)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-02-14
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱48,999,284.00
- Contract status: Completed Report
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, DIGDIG BRIDGE (B00121LZ) ALONG DAANG MAHARLIKA ROAD
- Contractor: L.M.G. CONSTRUCTION INCORPORATED (FORMERLY: LMG CONSTRUCTION) (5719)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-09-25
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱19,795,810.00
- Contract status: Completed Report
- IMPROVEMENT OF BRIDGE AND SLOPE PROTECTION, GEN. LUNA, R IZAL, NUEVA ECIJA
- Contractor: WIZARD CONCRETE SOLUTIONS AND CONSTRUCTION CORPORATION (FORMERLY: WIZARD TRADING & CONSTRUCTION) (21921)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-09-25
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱13,957,618.00
- Contract status: Completed Report
- CONSTRUCTION OF A MULTI-PURPOSE BUILDING (STAFF HOUSE), CAPINTALAN HS, CARRANGLAN, NUEVA ECIJA
- Contractor: ATLAS GEN. CONST. & ENTERPRISES CORP. (FORMERLY: A (4953)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-08-26
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,919,828.38
- Contract status: Completed Report
- CONSTRUCTION OF A MULTI-PURPOSE BUILDING (STAFF HOUSE), GEN. LUNA IS, CARRANGLAN, NUEVA ECIJA
- Contractor: ATLAS GEN. CONST. & ENTERPRISES CORP. (FORMERLY: A (4953)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-08-26
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,920,109.50
- Contract status: Completed Report
- CONSTRUCTION OF A MULTI-PURPOSE BUILDING (STAFF HOUSE), CONVERSION IS, PANTABANGAN, NUEVA ECIJA
- Contractor: ATLAS GEN. CONST. & ENTERPRISES CORP. (FORMERLY: A (4953)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-07-27
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,920,109.50
- Contract status: Completed Report
- CONSTRUCTION OF A MULTI-PURPOSE BUILDING (STAFF HOUSE), CADACLAN HS, PANTABANGAN, NUEVA ECIJA
- Contractor: ATLAS GEN. CONST. & ENTERPRISES CORP. (FORMERLY: A (4953)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-07-27
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,920,109.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, RIZAL, SCIENCE C ITY OF MU C3 91OZ, NUEVA ECIJA
- Contractor: R.C. PALLARCA CONSTRUCTION (35863)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-09-17
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,920,063.12
- Contract status: Completed Report
- CONSTRUCTION OF A MULTI-PURPOSE BUILDING (STAFF HOUSE), PAITAN SUR HS, CUYAPO, NUEVA ECIJA
- Contractor: ATLAS GEN. CONST. & ENTERPRISES CORP. (FORMERLY: A (4953)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-07-27
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,920,109.50
- Contract status: Completed Report
- ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF RO ADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - JCT PINAGP ANAAN - RIZAL - PANTABANGAN RD K0159+630.00 - K0159+740.00, K0160+099.00 - K0160+302.50, K0161+087.40 - K0161+149.00, K0161+
- Contractor: WIZARD CONCRETE SOLUTIONS AND CONSTRUCTION CORPORATION (FORMERLY: WIZARD TRADING & CONSTRUCTION) (21921) / AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) (16574)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-05-15
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱91,627,704.00
- Contract status: Completed Report
- ACCESS ROAD LEADING TO PANTABANGAN LAKE SPORT AREA, BRGY . LIBERTY, PANTABANGAN, NUEVA ECIJA
- Contractor: WIZARD CONCRETE SOLUTIONS AND CONSTRUCTION CORPORATION (FORMERLY: WIZARD TRADING & CONSTRUCTION) (21921)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-03-24
- Fund source: Regular Infra - GAA 2018 Other Infrastructure (CSSP)
- Contract price: ₱46,511,304.00
- Contract status: Completed Report
- RECHANELLING/DESILTING OF TALAVERA RIVER (SAN CARLOS ALI AGA SECTION), SAN CARLOS, ALIAGA, NUEVA ECIJA
- Contractor: AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) (16574)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-08-15
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱4,701,057.00
- Contract status: Completed Report
- ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION/UPGRA DING OF DAMAGED PAVED ROADS - PRIMARY ROADS - SN JOSE - LUPAO RD K0164+885 - K0165+000, K166+000 - K0166+604, K0169+343 - K0169+782, K0169+822.60 - K0 169+990.60 (K0170+000), K0173+716.40 - K0175+394,
- Contractor: WIZARD CONCRETE SOLUTIONS AND CONSTRUCTION CORPORATION (FORMERLY: WIZARD TRADING & CONSTRUCTION) (21921)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-05-18
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱73,011,776.00
- Contract status: Completed Report
- ASSET PRESERVATION - PREVENTIVE MAINTENANCE PRIMARY ROAD S - SN JOSE - LUPAO RD K0160+000 - K0160+778, K0172+299.40 - K0172+565, K01 72+592.20 - K0173+716.40
- Contractor: WIZARD CONCRETE SOLUTIONS AND CONSTRUCTION CORPORATION (FORMERLY: WIZARD TRADING & CONSTRUCTION) (21921)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-12-06
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱21,873,646.00
- Contract status: Completed Report
- CONSTRUCTION OF MPB, POBLACION SOUTH, SCIENCE CITY OF MU C3 91OZ, NUEVA ECIJA
- Contractor: ADROIT EJD CONSTRUCTION CORP. (FORMERLY: ADROIT CONSTRUCTION) (11169)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-08-26
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,925,560.50
- Contract status: Completed Report
- CONSTRUCTION OF BARANGAY HALL, MABINI, STO. DOMINGO, NUE VA ECIJA
- Contractor: IJK MAE CONSTRUCTION INC. (35272)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-08-30
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,440,223.50
- Contract status: Completed Report
- ACCESS ROAD LEADING TO DITABUYAN FALLS, BRGY. CADACLAN, PANTABANGAN, NUEVA ECIJA
- Contractor: IRC CONSTRUCTION & SUPPLIES (29943) / SYMMETRICON BUILDERS CORP. (37555)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-07-14
- Fund source: Regular Infra - GAA 2018 Other Infrastructure (CSSP)
- Contract price: ₱67,191,328.00
- Contract status: Completed Report
- COMPLETION OF MULTI-PURPOSE BUILDING AT BRGY. SAN CRISTO BAL, LICAB, NUEVA ECIJA
- Contractor: ADROIT EJD CONSTRUCTION CORP. (FORMERLY: ADROIT CONSTRUCTION) (11169)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-08-03
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱969,999.62
- Contract status: Completed Report
- CONSTRUCTION OF OPEN COURT AT BRGY. SAGABA, STO. DOMINGO , NUEVA ECIJA
- Contractor: E.D. LIBUNAO CONSTRUCTION & TRADING (36525)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-08-18
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,440,151.25
- Contract status: Completed Report
- CONSTRUCTION OF OPEN COURT AT BRGY. SAN JUAN, LICAB, NUE VA ECIJA
- Contractor: ADROIT EJD CONSTRUCTION CORP. (FORMERLY: ADROIT CONSTRUCTION) (11169)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-08-18
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,440,450.00
- Contract status: Completed Report
- CONSTRUCTION OF COVERED COURT, BRGY. LA PURISIMA, ALIAGA , NUEVA ECIJA
- Contractor: IJK MAE CONSTRUCTION INC. (35272)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-09-17
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱2,895,394.50
- Contract status: Completed Report
- RECONSTRUCTION/REHABILITATION/UPGRADING OF STA. LUCIA OL D ROAD, ZARAGOZA, NUEVA ECIJA
- Contractor: SPECO BUILDERS INC. (FORMERLY VRF CONSTRUCTION) (15301)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-05-15
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱96,000,264.00
- Contract status: Completed Report
- WIDENING OF PERMANENT BRIDGES SAN FELIPE BR. (B01280LZ) ALONG CABANATUAN CITY - CARMEN ROAD
- Contractor: SPECO BUILDERS INC. (FORMERLY VRF CONSTRUCTION) (15301)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-04-03
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱13,618,225.00
- Contract status: Completed Report
- WIDENING OF PERMANENT BRIDGES PINAGPANAAN BR. (B01292LZ) ALONG JCT PINAGPANAAN - RIZAL - PANTABANGAN RD
- Contractor: SPECO BUILDERS INC. (FORMERLY VRF CONSTRUCTION) (15301)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-04-18
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱36,224,788.00
- Contract status: Completed Report
- CONSTRUCTION OF BRIDGE ALONG LICAB - SICSICAN ROAD, LICA B, NUEVA ECIJA
- Contractor: L.M.G. CONSTRUCTION INCORPORATED (FORMERLY: LMG CONSTRUCTION) (5719)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-01-15
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱17,567,970.00
- Contract status: Completed Report
- CONSTRUCTION OF RAIN WATER COLLECTION SYSTEM (RWCS) PROV INCE OF NUEVA ECIJA
- Contractor: IJK MAE CONSTRUCTION INC. (35272)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-10-17
- Fund source: Regular Infra - GAA 2018 Other Infrastructure (CSSP)
- Contract price: ₱3,182,625.00
- Contract status: Completed Report
- WIDENING OF PERMANENT BRIDGES MALINENG BR. (B01279LZ) AL ONG NUEVA ECIJA - PANGASINAN RD.
- Contractor: SPECO BUILDERS INC. (FORMERLY VRF CONSTRUCTION) (15301)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-02-14
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱25,645,666.00
- Contract status: Completed Report
- ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF ROAD S WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-PRIMARY ROAD, DAANG MAHARLIKA ( LZ), NUEVA ECIJA K0169+1216 - K0170+000; K0170+044 - K0170+070; K0170+231 - K170+252; K0170+290 - K0170+415; K0171+150 - K01
- Contractor: 816 ALLEN CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY:ALLEN CONSTRUCTION) (12584)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-07-25
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱27,923,460.00
- Contract status: Completed Report
- NETWORK DEVELOPMENT- ROAD WIDENING - PRIMARY ROADS, DAAN G MAHARLIKA (LZ) K0129+378.65 - K0129+419.50, K0129+738.50 - K0130+000.00, K0131+926.00 - K0132+467.70, K0132+914.00 - K0133+000.00, K0134+169.00 - K0 134+180.00, K0143+584.00 - K0145+790.00
- Contractor: AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) (16574) / SOLFIO P. JACINTO CONSTRUCTION INC. (17799)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-05-31
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱91,655,712.00
- Contract status: Completed Report
- CONSTRUCTION OF SENIOR CITIZEN BUILDING, BRGY. POBLACION EAST, ALIAGA, NUEVA ECIJA
- Contractor: POWER K CONSTRUCTION SUPPLY & SERVICES (31574)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-12-04
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱9,602,016.00
- Contract status: Completed Report
- REPLACEMENT OF PERMANENT WEAK BRIDGES, LOMBOY BR. 1 (B01 964LZ) ALONG DAANG MAHARLIKA (LZ)
- Contractor: REBCOR CONSTRUCTION AND TRADING CORPORATION (18427) / CHRISTIAN IAN CONSTRUCTION CORPORATION (8191)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-07-02
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱41,921,484.00
- Contract status: Completed Report
- WIDENING OF PERMANENT BRIDGES - SAN ROQUE BR. (B00112LZ ) ALONG SN JOSE - LUPAO RD
- Contractor: WIZARD CONCRETE SOLUTIONS AND CONSTRUCTION CORPORATION (FORMERLY: WIZARD TRADING & CONSTRUCTION) (21921) / HALREY CONSTRUCTION INC. (2267)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-04-03
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱40,475,808.00
- Contract status: Completed Report
- WIDENING OF PERMANENT BRIDGES LINAMUYAC BR. (B01284LZ) A LONG SN JOSE - LUPAO RD
- Contractor: L.M.G. CONSTRUCTION INCORPORATED (FORMERLY: LMG CONSTRUCTION) (5719)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-04-01
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱15,575,694.00
- Contract status: Completed Report
- CONSTRUCTION OF WATER SUPPLY SYSTEM AT BRGY. MACAPSING, RIZAL, NUEVA ECIJA
- Contractor: IJK MAE CONSTRUCTION INC. (35272)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-08-06
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,938,055.50
- Contract status: Completed Report
- ACCESS ROAD LEADING TO PINSAL FALLS ECOTOURISM PARK, NUE VA ECIJA
- Contractor: AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) (16574) / TIERRA DE FERRAND REALTY & DEVELOPMENT CORPORATION (41266)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-05-03
- Fund source: Regular Infra - GAA 2018 Other Infrastructure (CSSP)
- Contract price: ₱86,110,544.00
- Contract status: Completed Report
- WIDENING OF PERMANENT BRIDGES, TUBOY BR. (B00110LZ) ALON G SN JOSE - LUPAO RD
- Contractor: WIZARD CONCRETE SOLUTIONS AND CONSTRUCTION CORPORATION (FORMERLY: WIZARD TRADING & CONSTRUCTION) (21921)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-08-08
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱48,423,688.00
- Contract status: Completed Report
- WIDENING OF PERMANENT BRIDGES, PANLASIAN BR. (B00108LZ) ALONG SN JOSE - LUPAO RD
- Contractor: L.M.G. CONSTRUCTION INCORPORATED (FORMERLY: LMG CONSTRUCTION) (5719)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-06-08
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱44,099,896.00
- Contract status: Completed Report
- WIDENING OF PERMANENT BRIDGES, SAN RICARDO BR. (B001293L Z) ALONG JCT PINAGPANAAN-RIZAL-PANTABANGAN RD
- Contractor: SPECO BUILDERS INC. (FORMERLY VRF CONSTRUCTION) (15301)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-07-29
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱42,528,032.00
- Contract status: Completed Report
- COMPLETION OF HANGING BRIDGE, ALIAGA, NUEVA ECIJA
- Contractor: IJK MAE CONSTRUCTION INC. (35272)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-11-22
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,920,610.88
- Contract status: Completed Report
- CONSTRUCTION OF SAN ROQUE - BACAYAO ROAD GUIMBA BYPASS S TA. 0+000 - STA. 3+000
- Contractor: KYRO BUILDERS, INC. (19567)
- Implementing Agency: Region III - Nueva Ecija 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-05-22
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱72,672,744.00
- Contract status: Completed Report