Infrastructure Projects in Region III — Region III - Bulacan 2nd District Engineering Office, 2017
This page lists public infrastructure projects implemented by Region III - Bulacan 2nd District Engineering Office in Region III during 2017. All data are sourced from the Department of Public Works and Highways (DPWH) official database (as of 9/30/2025): https://www.dpwh.gov.ph/dpwh/projects/infrastructure
This information is shared to promote transparency and public awareness. We encourage visitors to validate project details using the official DPWH source. In case of discrepancies, please refer to the original records published by the DPWH.
| Contractor | Projects | Total Price |
|---|---|---|
| ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762) | 22 | ₱669,024,193.00 |
| L.R. TIQUI BUILDERS, INC. (13810) | 5 | ₱267,720,530.00 |
| FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO (16916) | 6 | ₱260,394,560.00 |
| TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY) (10684) | 8 | ₱224,249,850.00 |
| HEXAMINDZ CORPORATION (FORMERLY:KILUSANG MAGKAIBIG (31666) | 6 | ₱183,172,619.00 |
- REPAIR/REHABILITATION/IMPROVEMENT OF DRAINAGE CANAL ALO NG DAANG MAHARLIKA (LZ) (MAASIM SECTION), K0062+300 - K0062+511, SAN ILDEFO NSO, BULACAN
- Contractor: AZUL BUILDERS (21870)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-05-21
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱1,833,154.88
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG NCR/BUL ACAN BDRY.-BIGTE - IPO DAM ROAD, ILOG BAYAN RIVER, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO (16916)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-08-29
- Fund source: Regular Infra - GAA 2017 MFO-2
- Contract price: ₱46,407,524.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG NCR/BUL ACAN BDRY.-BIGTE - IPO DAM ROAD, SAN JOSE RIVER, SAN JOSE DEL MONTE CITY, B ULACAN
- Contractor: FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO (16916)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-08-29
- Fund source: Regular Infra - GAA 2017 MFO-2
- Contract price: ₱46,481,876.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG NCR/BUL ACAN BDRY.-BIGTE - IPO DAM ROAD, STO CRISTO RIVER, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY) (10684)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-09-28
- Fund source: Regular Infra - GAA 2017 MFO-2
- Contract price: ₱46,429,544.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ILOG BAYAN RIV ER, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO (16916)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-08-29
- Fund source: Regular Infra - GAA 2017 MFO-2
- Contract price: ₱46,490,556.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES SAN JOSE RIVER , SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO (16916)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-08-29
- Fund source: Regular Infra - GAA 2017 MFO-2
- Contract price: ₱46,221,692.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES STO. CRISTO RI VER, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY) (10684)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-09-28
- Fund source: Regular Infra - GAA 2017 MFO-2
- Contract price: ₱46,420,268.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG MARILAO RIVER, MARILAO, BULACAN
- Contractor: TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY) (10684)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-08-30
- Fund source: Regular Infra - GAA 2017 MFO-2
- Contract price: ₱37,560,580.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG OBANDO R IVER, PHASE I, OBANDO, BULACAN
- Contractor: VICTORIA DEVELOPMENT AND VENTURES CORP. (FOR: VICTORIA DEV'T AND CONST. CORP.) (32638)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-09-29
- Fund source: Regular Infra - GAA 2017 MFO-2
- Contract price: ₱46,458,336.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG OBANDO R IVER, PHASE II, OBANDO, BULACAN
- Contractor: ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762) / N.M.E. CONSTRUCTION (22984)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-09-29
- Fund source: Regular Infra - GAA 2017 MFO-2
- Contract price: ₱46,458,336.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG DAANG MA HARLIKA ROAD AT BUGA CREEK PHASE II, SAN MIGUEL, BULACAN
- Contractor: ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-08-10
- Fund source: Regular Infra - GAA 2017 MFO-2
- Contract price: ₱32,543,836.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG DAANG MAH ARLIKA ROAD AT SAN MIGUEL RIVER PHASE II, SAN MIGUEL, BULACAN
- Contractor: ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-08-17
- Fund source: Regular Infra - GAA 2017 MFO-2
- Contract price: ₱41,377,164.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION SIBUL BRIDGE ALONG SAN MIGUEL SIBUL ROAD, SAN MIGUEL, BULACAN
- Contractor: ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-08-30
- Fund source: Regular Infra - GAA 2017 MFO-2
- Contract price: ₱27,905,860.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES/RETAINING WALL /SLOPE PROTECTION ALONG MAASIM RIVER PHASE II, SAN RAFAEL & SAN ILDEFON SO, BULACAN
- Contractor: ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-08-16
- Fund source: Regular Infra - GAA 2017 MFO-2
- Contract price: ₱40,920,532.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION, MATICTIC - PINAGTULAY AN, NORZAGARAY, BULACAN
- Contractor: ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-08-19
- Fund source: Regular Infra - GAA 2017 MFO-2
- Contract price: ₱41,845,788.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BULO RIV ER, SAN MIGUEL, BULACAN
- Contractor: C.T. LEONCIO CONSTRUCTION & TRADING (17371)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-10-03
- Fund source: Regular Infra - GAA 2017 MFO-2
- Contract price: ₱46,500,992.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES BULO RIVER PHA SE II, SAN MIGUEL, BULACAN
- Contractor: C.T. LEONCIO CONSTRUCTION & TRADING (17371)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-07-11
- Fund source: Regular Infra - GAA 2017 MFO-2
- Contract price: ₱31,527,676.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG STA. MARI A RIVER (PHASE I - RIGHT SIDE), STA. MARIA, BULACAN
- Contractor: HEXAMINDZ CORPORATION (FORMERLY:KILUSANG MAGKAIBIG (31666)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-09-29
- Fund source: Regular Infra - GAA 2017 MFO-2
- Contract price: ₱42,332,108.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG STA. MARI A RIVER (PHASE II - LEFT SIDE), STA. MARIA, BULACAN
- Contractor: L.R. TIQUI BUILDERS, INC. (13810)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-09-29
- Fund source: Regular Infra - GAA 2017 MFO-2
- Contract price: ₱48,508,692.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG STA. MARI A RIVER (PHASE II - RIGHT SIDE), STA. MARIA, BULACAN
- Contractor: HALREY CONSTRUCTION INC. (2267)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-09-29
- Fund source: Regular Infra - GAA 2017 MFO-2
- Contract price: ₱42,310,520.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG STA. MARI A RIVER (PHASE III - LEFT SIDE), STA. MARIA, BULACAN
- Contractor: J.D. LEGASPI CONSTRUCTION (9608) / S.A. PLEYTO CONSTRUCTION CORPORATION (33269)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-09-29
- Fund source: Regular Infra - GAA 2017 MFO-2
- Contract price: ₱38,013,064.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG EASTERN B ULACAN ROAD DRT - SAN MIGUEL, BULACAN
- Contractor: FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO (16916)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-09-01
- Fund source: Regular Infra - GAA 2017 MFO-2
- Contract price: ₱37,161,588.00
- Contract status: Completed Report
- CONSTRUCTION / IMPROVEMENT OF BARANGAY ROAD PULONG BUHAN GIN SILANGAN ROAD, STA. MARIA, BULACAN 4TH LD
- Contractor: WBX CONSTRUCTION, INC (FORMERLY WBX CONSTRUCTION) (28370)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-04-09
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,879,994.38
- Contract status: Completed Report
- CONSTRUCTION / IMPROVEMENT OF BARANGAY ROAD WITH CANAL S ILANGAN ROAD, SILANGAN, STA. MARIA, BULACAN 4TH LD
- Contractor: WBX CONSTRUCTION, INC (FORMERLY WBX CONSTRUCTION) (28370)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-04-08
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,879,630.62
- Contract status: Completed Report
- IMPROVEMENT/REHABILITATION OF BRGY. CAYSIO ROAD, STA. MA RIA, BULACAN
- Contractor: S.A. PLEYTO CONSTRUCTION CORPORATION (33269)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-04-24
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱4,699,832.50
- Contract status: Completed Report
- IMPROVEMENT/REHABILITATION OF CITYLAND, PULONG BUHANGIN, STA. MARIA, BULACAN
- Contractor: M.S. RAMOS CONSTRUCTION INC. (FORMERLY: M.S. RAMOS (31684)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-06-03
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱9,404,743.00
- Contract status: Completed Report
- IMPROVEMENT/REHABILITATION OF SAN JOSE PATAG - CATMON - BULAC ROAD, STA. MARIA, BULACAN
- Contractor: C & F CONSTRUCTION & DEVELOPMENT CORPORATION (3509)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-06-03
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱9,400,027.00
- Contract status: Completed Report
- IMPROVEMENT/REHABILITATION OF STA. CLARA - STA. CRUZ - M ANGGAHAN ROAD, STA. MARIA, BULACAN
- Contractor: 729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.) (21923)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-06-03
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱9,404,650.00
- Contract status: Completed Report
- CONSTRUCTION / REHABILITATION / IMPROVEMENT OF ROAD LEAD ING TO RELOCATION SITE, BRGY. MUZON, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: 729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.) (21923)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-07-28
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱18,789,374.00
- Contract status: Completed Report
- CONSTRUCTION / REHABILITATION / IMPROVEMENT OF ROAD LEAD ING TO RELOCATION SITE, BRGY. SAPANG PALAY PROPER, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: 729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.) (21923)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-08-27
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱18,788,426.00
- Contract status: Completed Report
- CONSTRUCTION / REHABILITATION / IMPROVEMENT OF ROAD, TUN GKONG MANGGA, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: L.R. TIQUI BUILDERS, INC. (13810)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-09-27
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱28,189,782.00
- Contract status: Completed Report
- IMPROVEMENT / REHABILITATION / REBLOCKING ALONG ERA C3 91O MANALO AVE., BRGY. SAPANG PALAY, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: MECA BUILDERS & TRADERS (10952)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-06-03
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱9,395,197.00
- Contract status: Completed Report
- IMPROVEMENT / REHABILITATION / REBLOCKING ALONG EVR AVE. , BRGY. SAPANG PALAY, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: KATHA BUILDERS & SUPPLIES INC. (34651)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-07-03
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱9,394,916.00
- Contract status: Completed Report
- IMPROVEMENT / REHABILITATION / REBLOCKING OF BRGY. FRANC ISCO HOMES ROAD, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: HEXAMINDZ CORPORATION (FORMERLY:KILUSANG MAGKAIBIG (31666)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-07-03
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱9,394,769.00
- Contract status: Completed Report
- REHABILITATION OF THE LONGOS - ZAMORA RIVERWALL ALONG TH E MEYCAUAYAN RIVER, MEYCAUAYAN, BULACAN
- Contractor: AZUL BUILDERS (21870)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-08-31
- Fund source: Regular Infra - GAA 2017 MFO-2
- Contract price: ₱16,089,013.00
- Contract status: Completed Report
- IMPROVEMENT /REHABILITATION WITH DRAINAGE CANAL OF STA. ROSA II ROAD, MARILAO, BULACAN
- Contractor: 729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.) (21923)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-05-19
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱9,396,890.00
- Contract status: Completed Report
- IMPROVEMENT /REHABILITATION WITH DRAINAGE OF PH3 CONSTAN TINO ROAD, POBLACION 2, MARILAO, BULACAN
- Contractor: ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-05-23
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱9,393,421.00
- Contract status: Completed Report
- UPGRADING/IMPROVEMENT OF ROAD (MANZANO STREET), BRGY. IB AYO, MARILAO, BULACAN
- Contractor: C & F CONSTRUCTION & DEVELOPMENT CORPORATION (3509)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-04-27
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱4,228,962.50
- Contract status: Completed Report
- UPGRADING/IMPROVEMENT OF ROAD (LICAROS AVENUE), BRGY. SA LUYSOY, MEYCAUAYAN CITY, BULACAN
- Contractor: C & F CONSTRUCTION & DEVELOPMENT CORPORATION (3509)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-05-12
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱7,516,571.00
- Contract status: Completed Report
- UPGRADING/IMPROVEMENT OF ROAD, BRGY. HULO, MEYCAUAYAN CI TY, BULACAN
- Contractor: STAR WILLIAM CONSTRUCTION (35938)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-04-27
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱4,684,938.00
- Contract status: Completed Report
- REHABILITATION/IMPROVEMENT OF ROADS (SAINT FRANCIS SUBDI VISION), BRGY. PANDAYAN, MEYCAUAYAN CITY, BULACAN
- Contractor: TM ABAD CONSTRUCTION CORP. (FOR: TM ABAD CONST.) (9302)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-04-12
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,875,570.00
- Contract status: Completed Report
- REHABILITATION/IMPROVEMENT OF ROADS, BRGY. CAMALIG, MEYC AUAYAN CITY, BULACAN
- Contractor: C & F CONSTRUCTION & DEVELOPMENT CORPORATION (3509)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-04-13
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱2,824,221.75
- Contract status: Completed Report
- CONSTRUCTION/COMPLETION OF MULTI-PURPOSE BUILDING (LONGO S ELEMENTARY SCHOOL), BRGY. LONGOS, MEYCAUAYAN, BULACAN
- Contractor: C & F CONSTRUCTION & DEVELOPMENT CORPORATION (3509)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-05-12
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱941,483.94
- Contract status: Completed Report
- CONSTRUCTION OF DAY CARE CENTER BRGY. PRENZA I, MARILAO, BULACAN
- Contractor: TM ABAD CONSTRUCTION CORP. (FOR: TM ABAD CONST.) (9302)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-05-12
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,409,250.25
- Contract status: Completed Report
- CONSTRUCTION/COMPLETION OF HEALTH CENTER BRGY. LOMA DE G ATO, MARILAO, BULACAN
- Contractor: WBX CONSTRUCTION, INC (FORMERLY WBX CONSTRUCTION) (28370)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-05-12
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱940,040.00
- Contract status: Completed Report
- CONSTRUCTION/COMPLETION OF MULTI-PURPOSE BUILDING BRGY. BINUANGAN, OBANDO, BULACAN
- Contractor: AZUL BUILDERS (21870)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-06-11
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱2,818,571.25
- Contract status: Completed Report
- CONSTRUCTION/COMPLETION OF MULTI-PURPOSE BUILDING BRGY. HULO, OBANDO, BULACAN
- Contractor: EARTHWORK BUILDERS, INC. (FORMERLY: EARTHWORK MOVERS) (33489)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-06-11
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,877,670.00
- Contract status: Completed Report
- CONCRETING OF ACCESS ROAD LEADING TO PNP - PHILIPPINE AR MY, RESETTLEMENT AND HOUSING PROJECT, SAN MIGUEL, BULACAN
- Contractor: HEXAMINDZ CORPORATION (FORMERLY:KILUSANG MAGKAIBIG (31666)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-12-06
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱46,950,548.00
- Contract status: Completed Report
- ACCESS ROAD TO BIAK NA BATO BRGY. PINAOD - AKLE ROAD, SA N ILDEFONSO, BULACAN
- Contractor: TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY) (10684)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-07-07
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱18,800,818.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SAN GABRIE L, STA. MARIA, BULACAN
- Contractor: PJL BUILDERS (33343)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-05-12
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱2,818,509.00
- Contract status: Completed Report
- RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES, BALAO NG BR. (B01690LZ) ALONG SIBUL-BIAK-NA-BATO RD., SAN MIGUEL, BULACAN< /li>
- Contractor: EARTHWORK BUILDERS, INC. (FORMERLY: EARTHWORK MOVERS) (33489)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-05-12
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱2,633,618.25
- Contract status: Completed Report
- RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES, CAMAC HILE BR. 1 (B04460LZ) ALONG EASTERN BULACAN RD., DO C3 91A REMEDIOS TRINIDA D, BULACAN
- Contractor: EARTHWORK BUILDERS, INC. (FORMERLY: EARTHWORK MOVERS) (33489)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-05-12
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱2,651,115.50
- Contract status: Completed Report
- RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES, PANGA RAYUMAN BR. 1 (B01687LZ) ALONG SIBUL-BIAK-NA-BATO RD., SAN MIGUEL, BULACAN< /span>
- Contractor: EARTHWORK BUILDERS, INC. (FORMERLY: EARTHWORK MOVERS) (33489)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-05-12
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱2,497,736.50
- Contract status: Completed Report
- RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES, SABAN G BR. (B01667LZ) ALONG OLD CAGAYAN VALLEY RD., SAN RAFAEL, BULACAN
- Contractor: EARTHWORK BUILDERS, INC. (FORMERLY: EARTHWORK MOVERS) (33489)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-05-12
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱2,706,696.25
- Contract status: Completed Report
- RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES, SALCE RO BR. (B03204LZ) ALONG GEN. ALEJO SANTOS HIGHWAY, ANGAT, BULACAN
- Contractor: EARTHWORK BUILDERS, INC. (FORMERLY: EARTHWORK MOVERS) (33489)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-05-12
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱2,232,186.50
- Contract status: Completed Report
- ASSET PRESERVATION OF NATIONAL ROADS CONSTRUCTION/UPGRAD ING/REHABILITATION OF DRAINAGE ALONG BOCAUE - SAN JOSE ROAD K0041+263 - K00 41+407; K0041+410 - K 0042+017
- Contractor: ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-08-05
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱13,959,522.00
- Contract status: Completed Report
- ASSET PRESERVATION OF NATIONAL ROADS CONSTRUCTION/UPGRAD ING/REHABILITATION OF DRAINAGE ALONG MUZON - TUNGKONG MANGGA ROAD K0042+823 - K0044+350; K0043+256 - K0043+316
- Contractor: CDC CONSTRUCTION & SUPPLIES (28275)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-08-05
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱13,958,902.00
- Contract status: Completed Report
- ASSET PRESERVATION OF NATIONAL ROADS CONSTRUCTION/UPGRAD ING/REHABILITATION OF DRAINAGE ALONG NCR / BULACAN BDRY.-BIGTE IPO DAM ROAD K0030+000 - K0032+115
- Contractor: M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION) (20201)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-09-12
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱18,598,540.00
- Contract status: Completed Report
- REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED P AVED NATIONAL ROAD INCLUDING DRAINAGE NCR/ BULACAN BDRY. - BIGTE - IPO DAM ROAD K0037+610 - K0037+994
- Contractor: 729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.) (21923)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-06-01
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱11,652,561.00
- Contract status: Completed Report
- REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED P AVED NATIONAL ROAD SAN MIGUEL - SIBUL ROAD K0083+894 - K0083+944 K0078+713 - K0078+829 K0078+906 - K0078+997 K0082+683 - K0082+800
- Contractor: 729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.) (21923)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-05-13
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱4,931,296.00
- Contract status: Completed Report
- REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED P AVED NATIONAL ROAD INCLUDING DRAINAGE ROAD TO PA CAMP CHAINAGE 305 - CHAINA GE 459
- Contractor: JMK BUILDERS CONSTRUCTION (36417)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-04-26
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱6,032,053.50
- Contract status: Completed Report
- REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED P AVED NATIONAL ROAD INCLUDING DRAINAGE SIBUL - BIAK NA BATO ROAD K0088+(-094 ) - K0089+006
- Contractor: ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-10-01
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱33,217,864.00
- Contract status: Completed Report
- REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED P AVED NATIONAL ROAD INCLUDING DRAINAGE STA. RITA - CAMIAS OLD ROAD K0075+198 - K0075+360 K0075+792 - K0075+992
- Contractor: HEXAMINDZ CORPORATION (FORMERLY:KILUSANG MAGKAIBIG (31666)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-07-09
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱18,560,014.00
- Contract status: Completed Report
- ASSET PRESERVATION OF NATIONAL ROADS CONSTRUCTION/UPGRAD ING/REHABILITATION OF DRAINAGE ALONG SIBUL-BIAK NA BATO ROAD K0089+000 - K0 090+066
- Contractor: HEXAMINDZ CORPORATION (FORMERLY:KILUSANG MAGKAIBIG (31666)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-08-13
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱18,559,228.00
- Contract status: Completed Report
- ASSET PRESERVATION OF NATIONAL ROADS CONSTRUCTION/UPGRAD ING/REHABILITATION OF DRAINAGE ALONG BOCAUE - SAN JOSE ROAD K0035+800 - K00 36+324
- Contractor: TM ABAD CONSTRUCTION CORP. (FOR: TM ABAD CONST.) (9302)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-05-29
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱9,294,928.00
- Contract status: Completed Report
- REHABILITATION/IMPROVEMENT OF DRAINAGE, SALUYSOY, MEYCAU AYAN, BULACAN
- Contractor: ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-09-09
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱13,920,076.00
- Contract status: Completed Report
- CONSTRUCTION/COMPLETION OF MULTI-PURPOSE BUILDING BARANG AY CAMALIG, MEYCAUAYAN CITY, BULACAN
- Contractor: EARTHWORK BUILDERS, INC. (FORMERLY: EARTHWORK MOVERS) (33489)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-05-13
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱2,348,758.75
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF SLOPE PROTECTION WITH DRAINA GE CANAL (MARIAN SUBDIVISION), STA. MARIA, BULACAN
- Contractor: S.A. PLEYTO CONSTRUCTION CORPORATION (33269)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-04-08
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,878,018.75
- Contract status: Completed Report
- CONSTRUCTION/COMPLETION OF MULTI-PURPOSE BUILDING BARANG AY BULAC, STA. MARIA, BULACAN
- Contractor: AZUL BUILDERS (21870)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-04-28
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,410,726.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROAD EASTERN BULACAN ROAD K0066+355 - K0066+448; K0067+912 - K007 0+244; K0071+005 - K0071+571; K0076+514 - K0076+688; K0088+329 - K0088+560; K0107+057 - K0107+178
- Contractor: ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-02-08
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱55,019,308.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION/UPGRADING OF NATIONAL ROAD S WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE EASTERN BULACAN ROAD K0066+600 - K0066+670; K0067+379 - K0067+520; K0067+422 - K0067+510; K0068+211 - K006 8+279; K0068+590 - K0069+001; K0069+370 - K0069+4
- Contractor: ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-10-01
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱43,410,896.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION/UPGRADING OF NATIONAL ROAD S WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE NCR/BULACAN BDRY. BIGTE-IPO DAM ROAD K0039+433 - K0039+500; K0040+000 - K0040+058; K0040+950 - K0040+986; K0041+140 - K0041+176; K0041+830 - K0041+884; K00
- Contractor: M.S. RAMOS CONSTRUCTION INC. (FORMERLY: M.S. RAMOS (31684)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-10-01
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱33,129,804.00
- Contract status: Completed Report
- ASSET PRESERVATION OF NATIONAL ROADS CONSTRUCTION/ UPGRA DING/ REHABILITATION OF DRAINAGE ALONG SAN MIGUEL - SIBUL ROAD - K0085+054 - K0086+743
- Contractor: C.T. LEONCIO CONSTRUCTION & TRADING (17371)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-07-04
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱14,864,164.00
- Contract status: Completed Report
- REHABILITATION/ RECONSTRUCTION/ UPGRADING OF NATIONAL RO ADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE NORZAGARAY - BIGTE ROAD - K007 4+440 - K0074+525
- Contractor: KATHA BUILDERS & SUPPLIES INC. (34651)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-06-12
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱2,499,053.00
- Contract status: Completed Report
- ASSET PRESERVATION OF NATIONAL ROADS CONSTRUCTION/ UPGRA DING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS NORZAGARAY - BIGTE RO AD, K0072+128 - K0073+216
- Contractor: M.S. RAMOS CONSTRUCTION INC. (FORMERLY: M.S. RAMOS (31684)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-08-16
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱18,598,266.00
- Contract status: Completed Report
- IMPROVEMENT / REHABILITATION OF BAYAN - BAYANAN ROAD, BR GY. PRENZA 2, MARILAO, BULACAN
- Contractor: ROADWORKS, INC. (27265)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-05-21
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱7,046,070.50
- Contract status: Completed Report
- IMPROVEMENT / REHABILITATION OF LOOBAN 2 ROAD, LOMA DE G ATO, MARILAO, BULACAN
- Contractor: M.S. RAMOS CONSTRUCTION INC. (FORMERLY: M.S. RAMOS (31684)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-05-21
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱7,042,649.50
- Contract status: Completed Report
- REHABILITATION/ IMPROVEMENT OF FLOOD CONTROL WALL ALONG PALASAN RIVER, SAN PASCUAL - HULO - LAWA - PACO, OBANDO, BULACAN
- Contractor: L.R. TIQUI BUILDERS, INC. (13810)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-03-08
- Fund source: Regular Infra - GAA 2017 MFO-2
- Contract price: ₱96,374,504.00
- Contract status: Completed Report
- CONSTRUCTION/ REHABILITATION/ IMPROVEMENT OF ROAD LEADIN G TO RELOCATION SITE, SAPANG PALAY, SAN JOSE DEL MONTE, BULACAN
- Contractor: ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-10-05
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱27,871,974.00
- Contract status: Completed Report
- CONSTRUCTION/ REHABILITATION/ IMPROVEMENT OF ROAD LEADIN G TO RELOCATION SITE, BARANGAY GAYA-GAYA, SAN JOSE DEL MONTE, BULACAN
- Contractor: ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-08-05
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱13,964,420.00
- Contract status: Completed Report
- CONSTRUCTION/ REHABILITATION/ IMPROVEMENT OF ROAD LEADIN G TO RELOCATION SITE, BARANGAY SAN MANUEL, SAN JOSE DEL MONTE, BULACAN
- Contractor: ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-10-05
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱27,899,820.00
- Contract status: Completed Report
- CONSTRUCTION/ REHABILITATION/ IMPROVEMENT OF ROAD LEADIN G TO RELOCATION SITE, BARANGAY CITRUS, SAN JOSE DEL MONTE, BULACAN
- Contractor: IM CONSTRUCTION CORPORATION (20074)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-10-05
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱27,869,664.00
- Contract status: Completed Report
- IMPROVEMENT / REPAIR / REHABILITATION OF EXISTING MULTI - PURPOSE (PWD HALL), BARANGAY KAYPIAN, SAN JOSE DEL MONTE, BULACAN< /li>
- Contractor: EARTHWORK BUILDERS, INC. (FORMERLY: EARTHWORK MOVERS) (33489)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-06-20
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱2,821,412.00
- Contract status: Completed Report
- CONCRETING OF TAIWAN ROAD, BRGY. STA. LUCIA, ANGAT, BULA CAN
- Contractor: EARTHWORK BUILDERS, INC. (FORMERLY: EARTHWORK MOVERS) (33489)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-04-17
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,880,900.00
- Contract status: Completed Report
- CONCRETING OF ROAD, BRGY. BINAGBAG, ANGAT, BULACAN
- Contractor: EARTHWORK BUILDERS, INC. (FORMERLY: EARTHWORK MOVERS) (33489)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-04-17
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,880,900.00
- Contract status: Completed Report
- CONCRETING OF ROAD, BRGY. KALAWAKAN, D.R.T., BULACAN
- Contractor: ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-05-27
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱9,394,590.00
- Contract status: Completed Report
- REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED P AVED NATIONAL ROAD INCLUDING DRAINAGE NORZAGARAY - BIGTE ROAD, K0071+268 - K0071+506; K0076+000 - K0076+500; K0077+262 - K0077+883; K0078+271 - K0078+ 889
- Contractor: IM CONSTRUCTION CORPORATION (20074)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-06-04
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱10,967,740.00
- Contract status: Completed Report
- CONCRETING OF ROAD, BRGY. CAINGIN, SAN RAFAEL, BULACAN
- Contractor: EIRISH BUILDERS & SUPPLY INC. (33656)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-05-09
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱4,699,550.00
- Contract status: Completed Report
- CONCRETING OF ROAD, BRGY. UPIG, SAN ILDEFONSO, BULACAN
- Contractor: JMK BUILDERS CONSTRUCTION (36417)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-04-24
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,878,905.00
- Contract status: Completed Report
- CONCRETING OF ROAD, BRGY. CORAL NA BATO, SAN RAFAEL, BUL ACAN
- Contractor: M.S.C. CONSTRUCTION (3340)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-04-29
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱2,821,255.25
- Contract status: Completed Report
- CONCRETING OF ROAD, BRGY. SAN ROQUE, SAN RAFAEL, BULACAN
- Contractor: M.S.C. CONSTRUCTION (3340)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-04-24
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,879,730.00
- Contract status: Completed Report
- CONCRETING OF ROAD, BRGY. MAGUINAO, SAN RAFAEL, BULACAN< /span>
- Contractor: EIRISH BUILDERS & SUPPLY INC. (33656)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-04-24
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,880,680.00
- Contract status: Completed Report
- CONCRETING OF ROAD, BRGY. SALACOT, SAN MIGUEL, BULACAN
- Contractor: EIRISH BUILDERS & SUPPLY INC. (33656)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-04-24
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,878,903.00
- Contract status: Completed Report
- CONCRETING OF ROAD, BRGY. POBLACION, SAN MIGUEL, BULACAN
- Contractor: ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-04-24
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,880,638.50
- Contract status: Completed Report
- CONCRETING OF ROAD, BRGY. BASUIT, SAN ILDEFONSO, BULACAN
- Contractor: JMK BUILDERS CONSTRUCTION (36417)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-04-24
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,878,560.00
- Contract status: Completed Report
- CONSTRUCTION OF LOCAL ROAD, STA. LUCIA, SAN MIGUEL, BULA CAN
- Contractor: JMK BUILDERS CONSTRUCTION (36417)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-05-09
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱4,697,348.00
- Contract status: Completed Report
- CONSTRUCTION OF LOCAL ROAD, BAYAN NG SAN ILDEFONSO, TANG GAPAN NG PUNONG BAYAN, SAN ILDEFONSO, BULACAN
- Contractor: JMK BUILDERS CONSTRUCTION (36417)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-05-04
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱3,757,405.00
- Contract status: Completed Report
- CONSTRUCTION OF BARANGAY HALL, BALITE, SAN MIGUEL, BULAC AN
- Contractor: EIRISH BUILDERS & SUPPLY INC. (33656)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-05-13
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱940,135.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SAN AGUSTI N, SAN MIGUEL, BULACAN
- Contractor: EIRISH BUILDERS & SUPPLY INC. (33656)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-06-22
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,880,992.62
- Contract status: Completed Report
- IMPROVEMENT/REPAIR/REHABILITATION OF EXISTING MULTI-PURP OSE BUILDING (HEALTH CENTER), BARANGAY PULONG YANTOK, ANGAT, BULACAN
- Contractor: GEJOMEB CONSTRUCTION (40039)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-06-22
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,880,785.50
- Contract status: Completed Report
- IMPROVEMENT/REPAIR/REHABILITATION OF EXISTING MULTI-PURP OSE BUILDING, BARAKA, NORZAGARAY, BULACAN
- Contractor: EIRISH BUILDERS & SUPPLY INC. (33656)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-06-22
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,880,992.00
- Contract status: Completed Report
- IMPROVEMENT/REPAIR/REHABILITATION OF EXISTING MULTI-PURP OSE BUILDING, SAN LORENZO, NORZAGARAY, BULACAN
- Contractor: EIRISH BUILDERS & SUPPLY INC. (33656)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-06-22
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,880,992.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION, SAPANG PALAY RESETTLEM ENT AREA, SAN JOSE DEL MONTE, BULACAN
- Contractor: TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY) (10684)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-09-18
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱23,237,668.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION, BARANGAY POBLACION, SA N JOSE DEL MONTE, BULACAN
- Contractor: TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY) (10684)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-09-18
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱18,590,426.00
- Contract status: Completed Report
- RIPRAPPING / CONSTRUCTION OF RIVERWALL, UBIHAN, MEYCAUAY AN CITY, BULACAN
- Contractor: C.L. MORALES CONSTRUCTION AND TRADING (38367)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-06-27
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,925,260.75
- Contract status: Completed Report
- COMPLETION OF MULTI-PURPOSE BUILDING (COVERED COURT), BA RANGAY LOMA DE GATO, MARILAO, BULACAN
- Contractor: 747 BUILDERS & TRADERS,INC. (FORMERLY:747 BUILDERS &; TRADER) (16892)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-05-28
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱2,820,000.00
- Contract status: Completed Report
- COMPLETION OF MULTI-PURPOSE BUILDING (GYMNASIUM), BARANG AY ABANGAN NORTE, MARILAO, BULACAN
- Contractor: STAR WILLIAM CONSTRUCTION (35938)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-05-28
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱2,818,291.50
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, ABANGAN NORTE, MARILAO, BULACAN
- Contractor: EARTHWORK BUILDERS, INC. (FORMERLY: EARTHWORK MOVERS) (33489)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-04-24
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,880,700.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MARILAO RI VER (SALUYSOY SIDE) MARILAO, BULACAN PHASE 1
- Contractor: S.A. PLEYTO CONSTRUCTION CORPORATION (33269)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-09-16
- Fund source: Regular Infra - GAA 2017 MFO-2
- Contract price: ₱20,425,202.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MARILAO RI VER (IBAYO SIDE) MARILAO, BULACAN PHASE 2
- Contractor: 747 BUILDERS & TRADERS,INC. (FORMERLY:747 BUILDERS &; TRADER) (16892)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-09-16
- Fund source: Regular Infra - GAA 2017 MFO-2
- Contract price: ₱11,697,749.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PALIWAS RI VER, STA. 0+379 TO STA. 0+539, BRGY. PANGHULO, OBANDO, BULACAN
- Contractor: EL-JAKE BUILDERS (38162)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-10-16
- Fund source: Regular Infra - GAA 2017 MFO-2
- Contract price: ₱23,220,110.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT IBAYO CREEK, BRGY. IBAYO, MARILAO, BULACAN
- Contractor: TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY) (10684)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-09-16
- Fund source: Regular Infra - GAA 2017 MFO-2
- Contract price: ₱16,359,644.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG MAASIM RI VER, SAN RAFAEL, BULACAN
- Contractor: ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-01-18
- Fund source: Regular Infra - GAA 2017 MFO-2
- Contract price: ₱18,583,948.00
- Contract status: Completed Report
- SLOPE PROTECTION ALONG MARUGAY RUGAY, SAN ILDEFONSO, BUL ACAN
- Contractor: L.R. TIQUI BUILDERS, INC. (13810)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-10-29
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱46,450,888.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING BRGY. FH - NARRA, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: C.T. LEONCIO CONSTRUCTION & TRADING (17371)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-09-08
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱4,697,542.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, MUZON, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: C.T. LEONCIO CONSTRUCTION & TRADING (17371)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-07-10
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,880,599.38
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, TUNGKONG MANGGA, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: HALREY CONSTRUCTION INC. (2267)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-07-10
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,880,115.25
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, GAYA-GAYA, SAN J OSE DEL MONTE CITY, BULACAN
- Contractor: EARTHWORK BUILDERS, INC. (FORMERLY: EARTHWORK MOVERS) (33489)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-07-10
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,880,535.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, SAN MANUEL, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: EARTHWORK BUILDERS, INC. (FORMERLY: EARTHWORK MOVERS) (33489)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-07-10
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,880,864.62
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BAGONG BUHAY, SA N JOSE DEL MONTE CITY, BULACAN
- Contractor: C & F CONSTRUCTION & DEVELOPMENT CORPORATION (3509)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-07-10
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,880,859.75
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, POBLACION, SAN J OSE DEL MONTE CITY, BULACAN
- Contractor: C.T. LEONCIO CONSTRUCTION & TRADING (17371)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-10-08
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱5,639,799.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING FOR BARANGAY HEAL TH CENTER, BARANGAY MUZON, CSJDM, BULACAN
- Contractor: KATHA BUILDERS & SUPPLIES INC. (34651)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-07-10
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,880,458.25
- Contract status: Completed Report
- CONCRETING OF ROAD BRY. SACDALAN, SAN MIGUEL, BULACAN
- Contractor: JMK BUILDERS CONSTRUCTION (36417)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-05-07
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,878,560.50
- Contract status: Completed Report
- IMPROVEMENT/REPAIR/REHABILITATION OF EXISTING FLOOD CONT ROL OF ZAMORA PUMPING STATION AND ITS TRIBUTARIES, BARANGAY ZAMORA, MEYCAUA YAN, BULACAN
- Contractor: M.S. RAMOS CONSTRUCTION INC. (FORMERLY: M.S. RAMOS (31684)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-10-08
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱9,390,296.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION/DRAINAGE, SITIO IBAYO, PULONG BUHANGIN, STA. MARIA, BULACAN
- Contractor: EARTHWORK BUILDERS, INC. (FORMERLY: EARTHWORK MOVERS) (33489)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-05-25
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,880,968.88
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, STA. MARIA, BULA CAN
- Contractor: AZUL BUILDERS (21870)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-06-24
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,880,840.00
- Contract status: Completed Report
- IMPROVEMENT/REPAIR/REHABILITATION OF EXISTING MULTI-PURP OSE BUILDING, TABING BAKOD, STA. MARIA, BULACAN
- Contractor: M.S. RAMOS CONSTRUCTION INC. (FORMERLY: M.S. RAMOS (31684)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-07-24
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱2,764,090.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION, SAOG, MARILAO, BULACAN
- Contractor: TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY) (10684)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-11-08
- Fund source: Regular Infra - GAA 2017 MFO-2
- Contract price: ₱16,850,902.00
- Contract status: Completed Report
- CONSTRUCTION/COMPLETION OF MULTI-PURPOSE BUILDING, BRGY. SALUYSOY, MEYCAUAYAN CITY, BULACAN
- Contractor: AZUL BUILDERS (21870)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-09-22
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱8,274,992.00
- Contract status: Completed Report
- WIDENING OF PERMANENT BRIDGE, MAASIM BR. (B01670LZ) ALON G DAANG MAHARLIKA (LZ), SAN ILDEFONSO, BULACAN
- Contractor: ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-11-01
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱22,168,464.00
- Contract status: Completed Report
- WIDENING OF PERMANENT BRIDGE, SALAKOT BR. (B01683LZ) ALO NG DAANG MAHARLIKA (LZ), SAN MIGUEL, BULACAN
- Contractor: ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-12-21
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱31,062,132.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. BAGONG PAG -ASA, SAN MIGUEL, BULACAN
- Contractor: EIRISH BUILDERS & SUPPLY INC. (33656)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-06-24
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,880,965.38
- Contract status: Completed Report
- CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTUR ES AND DRAINAGE SYSTEMS, VALENZUELA-OBANDO-MEYCAUAYAN FLOOD CONTROL PROJECT , MEYCAUAYAN CITY, BULACAN
- Contractor: R.U. AQUINO CONSTRUCTION AND DEVELOPMENT CORP. (FO (23507)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-04-19
- Fund source: Regular Infra - GAA 2017 MFO-2
- Contract price: ₱144,744,288.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG STA. MARI A RIVER (PHASE 1), STA. MARIA, BULACAN
- Contractor: PERSAN CONSTRUCTION, INC. (FORMERLY: PERSAN CONST. (2852)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-10-26
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱46,319,556.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG STA. MARI A RIVER (PHASE 2), STA. MARIA, BULACAN
- Contractor: SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC. (25226) / EL-JAKE BUILDERS (38162)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-10-26
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱46,343,684.00
- Contract status: Completed Report
- CONSTRUCTION OF SAN RAFAEL GOVERNMENT CENTER ANNEX BUILD ING, SAN RAFAEL, BULACAN
- Contractor: HEXAMINDZ CORPORATION (FORMERLY:KILUSANG MAGKAIBIG (31666)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-03-04
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱47,375,952.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. TIGPALAS, SAN MIGUEL, BULACAN
- Contractor: EIRISH BUILDERS & SUPPLY INC. (33656)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-08-01
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,880,992.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, (LEARNING CENTER ) FOR DURAN FARM, 124 LUCIANO ST., BRGY. BASUIT, SAN ILDEFONSO, BULACAN
- Contractor: JMK BUILDERS CONSTRUCTION (36417)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-08-06
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱2,355,970.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SAN JUAN, SAN MIGUEL, BULACAN
- Contractor: EIRISH BUILDERS & SUPPLY INC. (33656)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-08-01
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,880,990.00
- Contract status: Completed Report
- REPLACEMENT OF BRIDGE, CAMACHILE BR. 2 (B04461LZ) ALONG EASTERN BULACAN RD.
- Contractor: ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-11-22
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱25,110,290.00
- Contract status: Completed Report
- CONSTRUCTION OF BRIDGE, SITIO BROWN, BARANGAY SIBUL, SAN MIGUEL, BULACAN
- Contractor: ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-03-17
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱46,499,292.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, SANTO CRISTO, SA N JOSE DEL MONTE CITY, BULACAN
- Contractor: HALREY CONSTRUCTION INC. (2267)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-08-29
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,880,908.25
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, MINUYAN, SAN JOS E DEL MONTE CITY, BULACAN
- Contractor: C.T. LEONCIO CONSTRUCTION & TRADING (17371)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-08-19
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,880,868.25
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, MINUYAN PROPER, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: C.T. LEONCIO CONSTRUCTION & TRADING (17371)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-08-29
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,880,850.75
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SALUYSO Y, MEYCAUAYAN CITY, BULACAN
- Contractor: AZUL BUILDERS (21870)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-08-19
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,881,400.75
- Contract status: Completed Report
- CONSTRUCTION OF BY-PASSES /DIVERSION ROADS, INCLUDING RO W, WESTERN BULACAN CONNECTOR, BULACAN
- Contractor: ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-01-06
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱33,868,496.00
- Contract status: Completed Report
- IMPROVEMENT/REHABILITATION OF MINUYAN SPORTS COMPLEX, SA PANG PALAY, CITY OF SAN JOSE DEL MONTE, BULACAN
- Contractor: ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-11-16
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱17,819,754.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (DAY CARE/SENIOR CITIZEN CENTER), ABANGAN SUR, MARILAO, BULACAN
- Contractor: EARTHWORK BUILDERS, INC. (FORMERLY: EARTHWORK MOVERS) (33489)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-09-17
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,878,268.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. MALHACAN, MEYCAUAYAN CITY, BULACAN
- Contractor: EARTHWORK BUILDERS, INC. (FORMERLY: EARTHWORK MOVERS) (33489)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-09-17
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,883,880.00
- Contract status: Completed Report
- SLOPE PROTECTION ALONG STA. MARIA RIVER, BAGBAGUIN, STA. MARIA, BULACAN
- Contractor: L.R. TIQUI BUILDERS, INC. (13810)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-12-07
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱48,196,664.00
- Contract status: Completed Report
- CONSTRUCTION OF TUKOD - CASALAT BRIDGE, SAN RAFAEL AND S AN ILDEFONSO, BULACAN
- Contractor: ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-01-23
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱47,015,492.00
- Contract status: Completed Report
- CONSTRUCTION OF BY-PASSES / DIVERSION ROADS INCLUDING RO W, CANDABA - SAN MIGUEL BYPASS ROAD, BULACAN
- Contractor: LEGAZPI PREMIUM DEVELOPMENT CORPORATION (20701)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-04-23
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱65,496,604.00
- Contract status: Completed Report
- CONSTRUCTION OF DIKE ALONG ANGAT RIVER AT MATICTIC, NORZ AGARAY, BULACAN
- Contractor: FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO (16916)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-11-18
- Fund source: Regular Infra - GAA 2017 MFO-2
- Contract price: ₱37,631,324.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. LAMBAKIN, SAN MIGUEL, BULACAN
- Contractor: SANTIAGO-GALVAN CONSTRUCTION (34619)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-09-20
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,896,832.12
- Contract status: Completed Report
- CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS) IN RE GION III
- Contractor: ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-12-07
- Fund source: Regular Infra - GAA 2017 MFO-3
- Contract price: ₱3,214,887.00
- Contract status: Completed Report
- CONCRETING OF ROAD BRGY. STA. RITA MATANDA, SAN MIGUEL, BULACAN
- Contractor: EIRISH BUILDERS & SUPPLY INC. (33656)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-10-09
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,880,710.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. LOMA DE GA TO, MARILAO, BULACAN
- Contractor: EARTHWORK BUILDERS, INC. (FORMERLY: EARTHWORK MOVERS) (33489)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-12-12
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱2,820,870.50
- Contract status: Completed Report
- COMPLETION OF MULTI PURPOSE BUILDING, POBLACION, SAN JOS E DEL MONTE CITY, BULACAN
- Contractor: C.T. LEONCIO CONSTRUCTION & TRADING (17371)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-04-13
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱7,522,079.50
- Contract status: Completed Report
- CONSTRUCTION OF THE SAN JOSE DEL MONTE CONVENTION CENTER , SAN JOSE DEL MONTE, BULACAN
- Contractor: GRANDCONST BUILDERS CORP. (32280)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-06-29
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱23,505,030.00
- Contract status: Completed Report
- CONSTRUCTION OF WATER SUPPLY, BRGY. BIAK-NA-BATO, SAN MI GUEL, BULACAN
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-12-31
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,878,950.00
- Contract status: Completed Report
- IMPROVEMENT/WIDENING OF NATIONAL ROADS NORZAGARAY-BIGTE ROAD, K0073+225 - K0073+757; K0077+500 - K0078+375; K0078+400 - K0078+763, NORZAGARAY, BULACAN
- Contractor: ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-06-24
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱45,939,504.00
- Contract status: Completed Report