Infrastructure Projects in Region III — Region III - Bulacan 2nd District Engineering Office, 2019
This page lists public infrastructure projects implemented by Region III - Bulacan 2nd District Engineering Office in Region III during 2019. All data are sourced from the Department of Public Works and Highways (DPWH) official database (as of 9/30/2025): https://www.dpwh.gov.ph/dpwh/projects/infrastructure
This information is shared to promote transparency and public awareness. We encourage visitors to validate project details using the official DPWH source. In case of discrepancies, please refer to the original records published by the DPWH.
| Contractor | Projects | Total Price |
|---|---|---|
| FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO (16916) | 9 | ₱574,664,478.00 |
| L.R. TIQUI BUILDERS, INC. (13810) | 9 | ₱516,514,384.00 |
| TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY) (10684) | 8 | ₱455,583,730.00 |
| ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958) | 14 | ₱394,090,664.94 |
| ST. TIMOTHY CONSTRUCTION CORPORATION (39196) | 13 | ₱197,148,445.38 |
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES AT MAASIM RIVER , SAN ILDEFONSO, BULACAN PHASE I
- Contractor: FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO (16916)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-02-17
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱89,851,632.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BULO RIVE R (BARDIAS SECTION) PHASE II, SAN MIGUEL, BULACAN
- Contractor: EL-JAKE BUILDERS (38162)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-19
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱27,923,486.00
- Contract status: Completed Report
- RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES, C. DE LEON BR. 1 (B01679LZ) ALONG DAANG MAHARLIKA ROAD, SAN MIGUEL, BULACAN
- Contractor: CFC FIBER CONSTRUCTION CORPORATION (39860)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-08-04
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱4,356,589.50
- Contract status: Completed Report
- RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES, MARUG AY-RUGAY BR. 2 (B01676LZ) ALONG DAANG MAHARLIKA ROAD, SAN ILDEFONSO, BULACA N
- Contractor: CFC FIBER CONSTRUCTION CORPORATION (39860)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-08-04
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱7,093,167.00
- Contract status: Completed Report
- RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES, PANGA RAYUMAN BR. 2 (B01688LZ) ALONG SIBUL-BIAK NA BATO ROAD, SAN MIGUEL, BULACAN
- Contractor: CFC FIBER CONSTRUCTION CORPORATION (39860)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-08-04
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱4,654,200.50
- Contract status: Completed Report
- RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES, PANGA RAYUMAN BR. 3 (B01689LZ) ALONG SIBUL-BIAK NA BATO ROAD, SAN MIGUEL, BULACAN
- Contractor: CFC FIBER CONSTRUCTION CORPORATION (39860)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-08-04
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱2,792,075.75
- Contract status: Completed Report
- RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES, ILOG BAYAN BR. (B00519LZ) ALONG NCR/BULACAN BDRY.- BIGTE - IPO DAM ROAD, CITY OF SAN JOSE DEL MONTE, BULACAN
- Contractor: CFC FIBER CONSTRUCTION CORPORATION (39860)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-08-04
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱2,792,355.75
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BULO RIVE R KING KABAYO SECTION PHASE II, SAN MIGUEL, BULACAN
- Contractor: ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-10
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱37,231,164.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BULO RIVE R PHASE XVII, SAN MIGUEL, BULACAN
- Contractor: ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-02-10
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱82,669,552.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BULO RIVE R PHASE XVIII, SAN MIGUEL, BULACAN
- Contractor: ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-02-22
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱92,154,512.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BULO RIVE R PHASE XIX, SAN MIGUEL, BULACAN
- Contractor: E.M. CUERPO, INC. (30963)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-02-22
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱91,529,808.00
- Contract status: Completed Report
- CONCRETING OF ROAD, BARANGAY BANTOG, SAN MIGUEL, BULACAN
- Contractor: COSMAN BUILDERS (40161)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-07-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,910,602.75
- Contract status: Completed Report
- CONCRETING OF ROAD, BARANGAY BAYABAS, DO C3 91A REMEDIOS TRINIDAD, BULACAN
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-07-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,910,437.38
- Contract status: Completed Report
- CONCRETING OF ROAD, BARANGAY BULIRAN, SAN MIGUEL, BULACA N
- Contractor: EIRISH BUILDERS & SUPPLY INC. (33656)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-07-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,910,349.25
- Contract status: Completed Report
- CONCRETING OF ROAD, BARANGAY CALUMPANG, SAN MIGUEL, BULA CAN
- Contractor: EIRISH BUILDERS & SUPPLY INC. (33656)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-07-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,910,687.00
- Contract status: Completed Report
- CONCRETING OF ROAD, BARANGAY DILIMAN I, SAN RAFAEL, BULA CAN
- Contractor: EIRISH BUILDERS & SUPPLY INC. (33656)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-07-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,910,437.38
- Contract status: Completed Report
- REHABILITATION OF FLOOD CONTROL STRUCTURES ALONG PALASAN RIVER, OBANDO, BULACAN
- Contractor: M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION) (20201)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-10-21
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱23,274,846.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES (NAVARETTE ST.) OBANDO, BULACAN
- Contractor: S.A. PLEYTO CONSTRUCTION CORPORATION (33269)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-10-17
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱23,274,468.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG MEYCAUAYA N RIVER AND ITS TRIBUTARIES (PHASE II) (OBANDO SECTION), OBANDO, BULACAN
- Contractor: ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-04-23
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱52,071,000.00
- Contract status: Completed Report
- IMPROVEMENT OF MEYCAUAYAN RIVER SYSTEM (OBANDO SECTION), MEYCAUAYAN, BULACAN
- Contractor: G-CUBE CONSTRUCTION (17219)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-08-08
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱9,309,105.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG NCR/BULAC AN BDRY.-BIGTE- IPO DAM ROAD SAN JOSE RIVER, SAN JOSE DEL MONTE CITY, BULAC AN
- Contractor: FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO (16916)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-02-19
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱90,758,192.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG NCR/BULAC AN BDRY.-BIGTE- IPO DAM ROAD STO. CRISTO RIVER, SAN JOSE DEL MONTE CITY, BU LACAN
- Contractor: TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY) (10684)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-29
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱68,636,280.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES SAN JOSE RIVER, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO (16916)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-02-19
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱90,757,656.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES STO. CRISTO RIV ER, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY) (10684)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-02-19
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱90,710,312.00
- Contract status: Completed Report
- CONCRETING OF ROAD, BARANGAY MATAAS NA PARANG, SAN ILDEF ONSO, BULACAN
- Contractor: RIMJ CONSTRUCTION SUPPLIES AND SERVICES (FOR: ROMINA CONSTRUCTION) (32090)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-07-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,910,437.88
- Contract status: Completed Report
- CONCRETING OF ROAD, BARANGAY MATIMBUBONG, SAN ILDEFONSO, BULACAN
- Contractor: RIMJ CONSTRUCTION SUPPLIES AND SERVICES (FOR: ROMINA CONSTRUCTION) (32090)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-07-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,910,448.38
- Contract status: Completed Report
- CONCRETING OF ROAD, BARANGAY NABAONG GARLANG, SAN ILDEFO NSO, BULACAN
- Contractor: RIMJ CONSTRUCTION SUPPLIES AND SERVICES (FOR: ROMINA CONSTRUCTION) (32090)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-07-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,910,437.88
- Contract status: Completed Report
- CONCRETING OF ROAD, BARANGAY PARTIDA, NORZAGARAY, BULACA N
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-07-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,920,347.62
- Contract status: Completed Report
- CONCRETING OF ROAD, BARANGAY PASONG CALLOS, SAN RAFAEL, BULACAN
- Contractor: EIRISH BUILDERS & SUPPLY INC. (33656)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-07-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,865,964.50
- Contract status: Completed Report
- CONCRETING OF ROAD, BARANGAY PULONG TAMO, SAN ILDEFONSO, BULACAN
- Contractor: RIMJ CONSTRUCTION SUPPLIES AND SERVICES (FOR: ROMINA CONSTRUCTION) (32090)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-07-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,909,783.75
- Contract status: Completed Report
- CONCRETING OF ROAD, BARANGAY SAN ROQUE, ANGAT, BULACAN
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-07-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,920,347.62
- Contract status: Completed Report
- CONCRETING OF ROAD, BARANGAY SAPANG PUTOL, SAN ILDEFONSO , BULACAN
- Contractor: RIMJ CONSTRUCTION SUPPLIES AND SERVICES (FOR: ROMINA CONSTRUCTION) (32090)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-07-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,910,381.00
- Contract status: Completed Report
- CONCRETING OF ROAD, BARANGAY STO. CRISTO, ANGAT, BULACAN
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-07-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,910,697.88
- Contract status: Completed Report
- CONCRETING OF ROAD, BARANGAY SULUCAN, ANGAT, BULACAN
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-07-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,910,687.00
- Contract status: Completed Report
- CONCRETING OF ROAD, BARANGAY TIBAGAN, SAN MIGUEL, BULACA N
- Contractor: ST. TIMOTHY CONSTRUCTION CORPORATION (39196)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-07-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,909,991.75
- Contract status: Completed Report
- CONCRETING OF ROAD, BARANGAY TIGBE, NORZAGARAY, BULACAN< /span>
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-07-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,910,437.88
- Contract status: Completed Report
- CONCRETING OF ROAD, BARANGAY UMPUCAN, SAN ILDEFONSO, BUL ACAN
- Contractor: ST. TIMOTHY CONSTRUCTION CORPORATION (39196)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-07-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,910,436.75
- Contract status: Completed Report
- CONCRETING OF ROAD, BARANGAY DILIMAN II, SAN RAFAEL, BUL ACAN
- Contractor: EIRISH BUILDERS & SUPPLY INC. (33656)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-07-21
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,910,172.75
- Contract status: Completed Report
- CONCRETING OF ROAD, BARANGAY MAKAPILAPIL, SAN ILDEFONSO, BULACAN
- Contractor: ST. TIMOTHY CONSTRUCTION CORPORATION (39196)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-07-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,910,448.88
- Contract status: Completed Report
- CONCRETING OF ROAD, BARANGAY MALIGAYA, SAN MIGUEL, BULAC AN
- Contractor: ST. TIMOTHY CONSTRUCTION CORPORATION (39196)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-07-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,910,448.50
- Contract status: Completed Report
- CONCRETING OF ROAD, BARANGAY MALIPAMPANG, SAN ILDEFONSO, BULACAN
- Contractor: SANTIAGO-GALVAN CONSTRUCTION (34619)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-07-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,910,446.25
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG KAYTUTONG BRIDGE, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY) (10684)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-24
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱49,019,960.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ILOG BAYAN RIVE R, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: L.R. TIQUI BUILDERS, INC. (13810)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-02-19
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱90,757,944.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG NCR/BULAC AN BDRY.- BIGTE-IPO DAM ROAD, ILOG BAYAN RIVER, SAN JOSE DEL MONTE CITY, B ULACAN
- Contractor: L.R. TIQUI BUILDERS, INC. (13810)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-02-19
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱90,758,224.00
- Contract status: Completed Report
- CONSTRUCTION OF RIVERBANK PROTECTION, SANTO NI C3 91O I, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: FORTUNE RDC ENTERPRISES (41515)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-01-01
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱9,407,926.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION, MINUYAN V, SAN JOSE DE L MONTE CITY, BULACAN
- Contractor: EL-JAKE BUILDERS (38162)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-03-17
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱29,237,036.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION, SAN MARTIN DE PORRES, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-01-01
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱9,309,926.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF SLOPE PROTECTION, BRY. F RANCISCO HOMES - MULAWIN, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: ST. TIMOTHY CONSTRUCTION CORPORATION (39196)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-03-19
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱27,929,766.00
- Contract status: Completed Report
- RIPRAPPING OF CREEKBANK, BAGONG BUHAY I, SAN JOSE DEL MO NTE, BULACAN
- Contractor: D.L. MAGBITANG BUILDERS INC. (43476)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-03-19
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱27,929,336.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION, FATIMA V, SAN JOSE DEL MONTE, BULACAN
- Contractor: JEMN BUILDERS (32818)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-08-04
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱969,944.50
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION, GRACEVILLE NATIONAL HI GH SCHOOL, SAN JOSE DEL MONTE, BULACAN
- Contractor: JEMN BUILDERS (32818)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-08-04
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱969,763.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION, MINUYAN III, SAN JOSE DEL MONTE, BULACAN
- Contractor: JEMN BUILDERS (32818)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-08-04
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱969,944.50
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION, SAPANG PALAY PROPER, S AN JOSE DEL MONTE, BULACAN
- Contractor: JEMN BUILDERS (32818)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-08-04
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱969,779.75
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION, STO.NI C3 91O I, SAN J OSE DEL MONTE, BULACAN
- Contractor: FORTUNE RDC ENTERPRISES (41515)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-08-04
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱969,786.81
- Contract status: Completed Report
- REHABILITATION OF DRAINAGE CANAL, GUMAOK CENTRAL, SAN JO SE DEL MONTE, BULACAN
- Contractor: FORTUNE RDC ENTERPRISES (41515)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-08-04
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱969,273.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECL ARED TOURISM DESTINATIONS, ACCESS ROAD LEADING TO BIAK NA BATO NATIONAL PAR K (MADLUM CAVE), SAN MIGUEL, BULACAN
- Contractor: CALCON ENGINEERING (39961)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-02
- Fund source: Regular Infra - GAA 2019 CSSP
- Contract price: ₱18,619,692.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECL ARED TOURISM DESTINATIONS, ACCESS ROAD LEADING TO BULUSUKAN CAVE, SAN ILDEF ONSO, BULACAN
- Contractor: R2A CONSTRUCTION & TRADING CORPORATION (31922)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-02
- Fund source: Regular Infra - GAA 2019 CSSP
- Contract price: ₱18,619,292.00
- Contract status: Completed Report
- ASSET PRESERVATION REHABILITATION / RECONSTRUCTION / UP GRADING OF DAMAGED PAVED ROADS NORZAGARAY BIGTE ROAD K0071 + 173 K0071 + 629.50
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-01
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱6,818,875.00
- Contract status: Completed Report
- ASSET PRESERVATION CONSTRUCTION / UPGRADING / REHABILIT ATION OF DRAINAGE ALONG NATIONAL ROADS SAN MIGUEL SIBUL ROAD, K0087 + 217- K0087 + 465.40, SAN MIGUEL, BULACAN
- Contractor: ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-02-08
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱6,731,526.00
- Contract status: Completed Report
- ASSET PRESERVATION REHABILITATION / RECONSTRUCTION / UP GRADING OF DAMAGED PAVED ROADS EASTERN BULACAN ROAD K0070 + 000 - K0070 + 1 52
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-08-19
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱4,018,861.50
- Contract status: Completed Report
- ASSET PRESERVATION REHABILITATION / RECONSTRUCTION OF N ATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE NORZAGARAY BIGTE R OAD, K0073 + 700 - K0074 + 100, NORZAGARAY, BULACAN
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-19
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱18,580,074.00
- Contract status: Completed Report
- ASSET PRESERVATION CONSTRUCTION / UPGRADING / REHABILITA TION OF DRAINAGE ALONG NATIONAL ROADS SIBUL BIAK NA BATO ROAD K0090 + 100 - K0090 + 292; K0090 + 318 - K0090 + 420, K0090 + 700 - K0091 + 121, K00 91 + 135 - K0091 + 236.40, SAN MIGUEL, BULACAN
- Contractor: ST. TIMOTHY CONSTRUCTION CORPORATION (39196)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-03-16
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱16,423,658.00
- Contract status: Completed Report
- ASSET PRESERVATION CONSTRUCTION / UPGRADING / REHABILIT ATION OF DRAINAGE ALONG NATIONAL ROADS GENERAL ALEJO SANTOS HIGHWAY, K0061 + 080 - K0061 + 563.00, ANGAT, BULACAN
- Contractor: ST. TIMOTHY CONSTRUCTION CORPORATION (39196)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-13
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱10,096,721.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION /UPGRADING OF DAMAGED PAVE D ROADS DAANG MAHARLIKA (LZ) K0053+(-280) - K0053+(-266), K0053+(-250) K00 53+(-081), K0053+(-065 - K0054+000, K0059+500- K0060+634, K0061+050- K006 1+406, SAN RAFAEL, BULACAN
- Contractor: L.R. TIQUI BUILDERS, INC. (13810)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-06-17
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱91,578,496.00
- Contract status: Completed Report
- ASSET PRESERVATION PREVENTIVE MAINTENANCE ASPHALT OVERL AY - STA. RITA BIAK-NA-BATO VIA PULONG BAYABAS ROAD K0074+(-081) - K0078+ 000, K0080+000 - K0080+648
- Contractor: L.R. TIQUI BUILDERS, INC. (13810)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-05
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱55,242,476.00
- Contract status: Completed Report
- ASSET PRESERVATION PREVENTIVE MAINTENANCE ASPHALT OVERLA Y - NCR/BULACAN BDRY. BIGTE IPO DAM ROAD K0030+290 - K0030+605 SAN JOSE D EL MONTE CITY, BULACAN
- Contractor: 729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.) (21923)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-08-11
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱7,538,660.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS MANILA NORTH RD K0018+(-398) - K0018+414, K0022+188 -K0022+677
- Contractor: ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-06-17
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱85,139,648.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS MANILA NORTH RD K0020+833 K0022+034
- Contractor: C & F CONSTRUCTION & DEVELOPMENT CORPORATION (3509)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-06-17
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱78,627,288.00
- Contract status: Completed Report
- ASSET PRESERVATION PREVENTIVE MAINTENANCE MEYCAUAYAN - CAMALIG - BAHAY PARI ROAD K0021+344 - K0021+694; K0022+904 - K0023+304; K0 025+208 -K0025+574
- Contractor: 525 CONSTRUCTION (28532)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-09
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱9,836,230.00
- Contract status: Completed Report
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, GARLANG BR. (B01677LZ) ALONG DAANG MAHARLIKA (LZ), SAN MIGUEL, BULACAN
- Contractor: EARTHWORK BUILDERS, INC. (FORMERLY: EARTHWORK MOVERS) (33489)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-08-04
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱3,502,238.00
- Contract status: Completed Report
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, NEW NOR ZAGARAY BR. (LAWANG BR.) (B00139LZ) ALONG NORZAGARAY BIGTE ROAD, NORZAGARA Y, BULACAN
- Contractor: EARTHWORK BUILDERS, INC. (FORMERLY: EARTHWORK MOVERS) (33489)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-08-04
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱3,517,078.25
- Contract status: Completed Report
- RIPRAPPING/SLOPE PROTECTION, PRENZA 1, MARILAO, BULACAN< /span>
- Contractor: EARTHWORK BUILDERS, INC. (FORMERLY: EARTHWORK MOVERS) (33489)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-29
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,700,600.00
- Contract status: Completed Report
- RIPRAPPING/SLOPE PROTECTION, SITIO CAMANSI, PRENZA 1, MA RILAO, BULACAN
- Contractor: EARTHWORK BUILDERS, INC. (FORMERLY: EARTHWORK MOVERS) (33489)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-29
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,700,600.00
- Contract status: Completed Report
- CONSTRUCTION/UPGRADING OF ROAD INCLUDING DRAINAGE, MEYCA UAYAN, BULACAN
- Contractor: 747 BUILDERS & TRADERS,INC. (FORMERLY:747 BUILDERS &; TRADER) (16892)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-28
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱14,098,115.00
- Contract status: Completed Report
- CONSTRUCTION/UPGRADING OF ROAD INCLUDING DRAINAGE, OBAND O, BULACAN
- Contractor: KNOV BUILDERS AND SUPPLIES (41051)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-10-02
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,700,902.00
- Contract status: Completed Report
- UPGRADING OF ROAD INCLUDING DRAINAGE, T. MENDOZA ST., SA OG, MARILAO, BULACAN
- Contractor: M.S. RAMOS CONSTRUCTION INC. (FORMERLY: M.S. RAMOS (31684)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-10-15
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,700,460.00
- Contract status: Completed Report
- ROAD WIDENING ALONG STA. MARIA NORZAGARAY ROAD K0033+900 -K0034+158
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-13
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱5,106,312.00
- Contract status: Completed Report
- ROAD WIDENING STA. MARIA NORZAGARAY ROAD K0042+820 - K 0044+958
- Contractor: TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY) (10684)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-06-18
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱85,121,688.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG MARILAO R IVER PHASE II, MARILAO, BULACAN
- Contractor: ST. TIMOTHY CONSTRUCTION CORPORATION (39196)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-05-26
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱51,393,476.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG MARILAO R IVER AND ITS TRIBUTARIES PHASE II, MARILAO, BULACAN
- Contractor: M.S. RAMOS CONSTRUCTION INC. (FORMERLY: M.S. RAMOS (31684)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-04-16
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱46,549,788.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG MARILAO R IVER AND ITS TRIBUTARIES, MARILAO, BULACAN
- Contractor: ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-15
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱26,792,124.00
- Contract status: Completed Report
- IMPROVEMENT OF MARILAO RIVER SYSTEM, IBAYO CREEK, MARILA O, BULACAN
- Contractor: M.S. RAMOS CONSTRUCTION INC. (FORMERLY: M.S. RAMOS (31684)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-02-15
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱37,239,460.00
- Contract status: Completed Report
- REHABILITATION / MAJOR REPAIR OF FLOOD CONTROL STRUCTURE S ALONG MEYCAUAYAN RIVER (SALUYSOY SECTION), MEYCAUAYAN CITY, BULACAN
- Contractor: ST. TIMOTHY CONSTRUCTION CORPORATION (39196)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-02-22
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱37,435,600.00
- Contract status: Completed Report
- ROAD WIDENING MUZON - TUNGKONG MANGGA ROAD K0041 + (-779 ) - K0043 +585
- Contractor: TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY) (10684)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-02-09
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱54,944,424.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE EASTERN BULACAN ROAD K0087 + 800 K0088 +700< /li>
- Contractor: FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO (16916)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-08
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱43,708,660.00
- Contract status: Completed Report
- ASSET PRESERVATION - CONSTRUCTION/UPGRADING/REHABILITATI ON OF DRAINAGE ALONG NATIONAL ROADS EASTERN BULACAN ROAD K0086+650B - K008 7+194; K0087+250 -K0087+750
- Contractor: FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO (16916)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-08
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱18,615,542.00
- Contract status: Completed Report
- ASSET PRESERVATION PREVENTIVE MAINTENANCE SIBUL BIAK NA BATO ROAD ROAD K0088+(-470) -K0088+(-409); K0089+006 - K0089+711; K0091+4 80- K0092+139; K0093+066 K0093+534; K0094+465- K0095+116
- Contractor: E.R. MANAID CONSTRUCTION (39343)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-05
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱25,161,000.00
- Contract status: Completed Report
- ASSET PRESERVATION - CONSTRUCTION/UPGRADING/REHABILITATI ON OF DRAINAGE ALONG NATIONAL ROADS STA. RITA BIAK NA BATO VIA PULONG BAYA BAS ROAD K0074+(-081) - K0074+700, SAN MIGUEL, BULACAN
- Contractor: RODOLFO R. SANTIAGO CONSTRUCTION (32580)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-22
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱10,629,442.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (SAN RAFAEL GOVER NMENT CENTER ANNEX BUILDING, PHASE 2), BULACAN
- Contractor: EIRISH BUILDERS & SUPPLY INC. (33656)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-03
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱6,584,146.00
- Contract status: Completed Report
- CONSTRUCTION OF DRAINAGE, PHASE 2, BARANGAY SAN AGUSTIN, SAN RAFAEL, BULACAN
- Contractor: SANTIAGO-GALVAN CONSTRUCTION (34619)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-04
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱958,020.25
- Contract status: Completed Report
- CONSTRUCTION OF BASKETBALL COURT FLOOR, PALMERA NORTHWIN DS PHASE 5A, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: FORTUNE RDC ENTERPRISES (41515)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-08-04
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱960,261.75
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, CITIVILLE, TUNGK ONG MANGGA, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-10-03
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,821,405.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, HEROESVILLE ELEM ENTARY SCHOOL, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: D.L. MAGBITANG BUILDERS INC. (43476)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-02
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱3,761,893.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, PHASE 3B, KAYPIA N, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: FORTUNE RDC ENTERPRISES (41515)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-10-03
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,821,405.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, SAN MANUEL ELEME NTARY SCHOOL, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-10-03
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,880,757.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, STO. CRISTO NATI ONAL HIGH SCHOOL, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-10-03
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,880,757.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, VERDE HEIGHTS, G AYA-GAYA, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: FORTUNE RDC ENTERPRISES (41515)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-10-03
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,821,360.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, VILLA SAN JOSE, GRACEVILLE, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: D.L. MAGBITANG BUILDERS INC. (43476)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-02
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱3,761,893.00
- Contract status: Completed Report
- REHABILITATION OF THE FLOOD CONTROL DIKES ALONG MAASIM R IVER, BRGY. MAASIM AND DILIMAN II, SAN RAFAEL, BULACAN
- Contractor: FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO (16916)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-17
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱18,717,476.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG ANGAT RIV ER, STO. CRISTO, ANGAT, BULACAN
- Contractor: FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO (16916)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-10-29
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱34,155,824.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BAGONG BUHAY A E LEMENTARY SCHOOL, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: D.L. MAGBITANG BUILDERS INC. (43476)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-10-18
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,821,350.25
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BAGONG BUHAY G E LEMENTARY SCHOOL, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: FORTUNE RDC ENTERPRISES (41515)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-10-18
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,900,767.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, SAPANG PALAY NAT IONAL HIGH SCHOOL, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-13
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,900,796.38
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, SAN MARTIN NATIO NAL HIGH SCHOOL, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: EARTHWORK BUILDERS, INC. (FORMERLY: EARTHWORK MOVERS) (33489)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-02
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱3,761,894.00
- Contract status: Completed Report
- CONSTRUCTION/COMPLETION OF MULTI-PURPOSE BUILDING, STA. CRUZ ELEMENTARY SCHOOL, STA. MARIA, BULACAN
- Contractor: FORTUNE RDC ENTERPRISES (41515)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-10-03
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,702,471.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BALASIN G, STA. MARIA, BULACAN
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-07
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,702,275.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, CAMANGYANAN, STA . MARIA, BULACAN
- Contractor: B. BERNARDO CONST., INC. (6196)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-02
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,702,327.00
- Contract status: Completed Report
- CONCRETING OF ROAD, BRGY. BULIRAN, SAN MIGUEL, BULACAN
- Contractor: RIMJ CONSTRUCTION SUPPLIES AND SERVICES (FOR: ROMINA CONSTRUCTION) (32090)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-07-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,880,963.62
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, BRGY. BICLAT, SAN MIGUEL, BULACAN< /span>
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-07-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,880,490.00
- Contract status: Completed Report
- CONCRETING OF ROAD, BRGY. SILANGAN, STA. MARIA, BULACAN< /span>
- Contractor: AZUL BUILDERS (21870)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-07-23
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,410,480.25
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. FATIMA II, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-07
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,920,280.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. FATIMA III , SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-07
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,919,815.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. FATIMA IV, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-07
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,919,656.75
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. FRANCISCO HOMES-YAKAL, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: B3 & R CONSTRUCTION CORPORATION (33006)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-07
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,880,615.12
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. FRANCISCO HOMES-GUIJO, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: S.A. PLEYTO CONSTRUCTION CORPORATION (33269)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-07
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,881,095.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. KAYBANBAN, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-07
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,880,558.25
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. MINUYAN IV , SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: ST. TIMOTHY CONSTRUCTION CORPORATION (39196)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-07
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,351,050.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. MINUYAN V, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-07
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,921,100.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. POBLACION I, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: S.A. PLEYTO CONSTRUCTION CORPORATION (33269)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-07
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,880,558.25
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SAN ISIDRO , SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-07
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,880,625.25
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SAN MARTIN DE PORRES, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-07
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,880,340.62
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SAN MARTIN IV, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: ST. TIMOTHY CONSTRUCTION CORPORATION (39196)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-07
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,351,050.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SAN PEDRO, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: M.S. RAMOS CONSTRUCTION INC. (FORMERLY: M.S. RAMOS (31684)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-01-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,654,427.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SAN RAFAEL I, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-07
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,920,323.12
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SAPANG PAL AY PROPER, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-07
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,880,622.88
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. STA. CRUZ II, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: M.S. RAMOS CONSTRUCTION INC. (FORMERLY: M.S. RAMOS (31684)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-07
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,880,623.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SAN RAFAEL V, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: B3 & R CONSTRUCTION CORPORATION (33006)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-07
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,880,626.75
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. STO. CRIST O, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-07
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,920,240.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. STO. NI C3 91O II, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: EXCELSIUS ENGINEERING SERVICES (35269)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-08
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱949,930.56
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, SAN JOSE DEL MON TE CENTRAL ELEMENTARY SCHOOL, SAN JOSE DEL MONTE, BULACAN
- Contractor: GRANDCONST BUILDERS CORP. (32280)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-27
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱9,404,601.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING, K AYBANBAN, SAN JOSE DEL MONTE, BULACAN
- Contractor: ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-08
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱948,805.69
- Contract status: Completed Report
- REHABILITATION OF MULTI-PURPOSE BUILDING, MAHARLIKA, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-08
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱949,931.38
- Contract status: Completed Report
- REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. POBLACIO N, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: S.A. PLEYTO CONSTRUCTION CORPORATION (33269)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-07
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,880,351.38
- Contract status: Completed Report
- REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. SAN MART IN III, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: B3 & R CONSTRUCTION CORPORATION (33006)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-08
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱949,765.12
- Contract status: Completed Report
- REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. SAN RAFA EL I, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-08
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱970,000.00
- Contract status: Completed Report
- REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. SAN ROQU E, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: B3 & R CONSTRUCTION CORPORATION (33006)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-08
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱950,047.38
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BULUSUK AN, SAN ILDEFONSO, BULACAN
- Contractor: SANTIAGO-GALVAN CONSTRUCTION (34619)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-21
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱940,239.19
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, ANGAT, BULACAN
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-10-08
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,920,571.25
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SAN JUA N, SAN ILDEFONSO, BULACAN
- Contractor: SANTIAGO-GALVAN CONSTRUCTION (34619)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-10-08
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,880,971.88
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SAN VIC ENTE, SAN MIGUEL, BULACAN
- Contractor: RODOLFO R. SANTIAGO CONSTRUCTION (32580)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-10-08
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,880,973.75
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY TARTARO , SAN MIGUEL, BULACAN
- Contractor: RODOLFO R. SANTIAGO CONSTRUCTION (32580)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-10-08
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,880,973.75
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, PHASE 2, BARANGA Y BARITAN, SAN MIGUEL, BULACAN
- Contractor: RODOLFO R. SANTIAGO CONSTRUCTION (32580)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-08-22
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱940,163.75
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, PHASE 2, BARANGA Y SACDALAN, SAN MIGUEL, BULACAN
- Contractor: RODOLFO R. SANTIAGO CONSTRUCTION (32580)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-08-22
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱940,163.75
- Contract status: Completed Report
- REHABILITATION OF MULTI-PURPOSE BUILDING, BULACAN STATE UNIVERSITY, SAN JOSE DEL MONTE, BULACAN
- Contractor: ST. TIMOTHY CONSTRUCTION CORPORATION (39196)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-10-23
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,792,297.50
- Contract status: Completed Report
- REHABILITATION OF MULTI-PURPOSE BUILDING, TUNGKONG MANGG A, SAN JOSE DEL MONTE, BULACAN
- Contractor: GRANDCONST BUILDERS CORP. (32280)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-02-20
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱14,107,450.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BRGY. BULAC, STA. MARIA, BULACAN
- Contractor: C & F CONSTRUCTION & DEVELOPMENT CORPORATION (3509)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-07
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,702,460.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) F OR THE TUMANA ELEMENTARY SCHOOL, BRGY. TUMANA, STA. MARIA, BULACAN
- Contractor: EARTHWORK BUILDERS, INC. (FORMERLY: EARTHWORK MOVERS) (33489)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-07
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,702,325.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (DAY CARE CENTER BUILDING), BRGY. GUYONG, STA. MARIA, BULACAN
- Contractor: EARTHWORK BUILDERS, INC. (FORMERLY: EARTHWORK MOVERS) (33489)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-07
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,702,040.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (SPED BUILDING), BRGY. PULONG BUHANGIN, STA. MARIA, BULACAN
- Contractor: M.S. RAMOS CONSTRUCTION INC. (FORMERLY: M.S. RAMOS (31684)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-18
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱949,857.12
- Contract status: Completed Report
- REHABILITATION OF MULTI-PURPOSE BUILDING (COVERED COURT) , BRGY. TAWIRAN, OBANDO, BULACAN
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-10-08
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,863,507.50
- Contract status: Completed Report
- CONSTRUCTION (CONCRETING) OF ROAD IN ST. MICHAEL HOMES I II, BRGY. IBAYO, MARILAO, BULACAN
- Contractor: C & F CONSTRUCTION & DEVELOPMENT CORPORATION (3509)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-08-12
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,957,561.00
- Contract status: Completed Report
- CONSTRUCTION AND UPGRADING OF ROAD, MATIYAGA ST., BRGY. IBAYO, MARILAO, BULACAN
- Contractor: PJL BUILDERS (33343)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-09
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,819,525.00
- Contract status: Completed Report
- REHABILITATION OF SITIO LOOBAN ROAD, BRGY. SAN VICENTE, STA. MARIA, BULACAN
- Contractor: EARTHWORK BUILDERS, INC. (FORMERLY: EARTHWORK MOVERS) (33489)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-11
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,821,836.25
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. PARADISE I II, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: KNOV BUILDERS AND SUPPLIES (41051)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-01-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,653,890.50
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES, STA. MARIA RIV ER (LEFT SIDE), STA. MARIA, BULACAN
- Contractor: AZUL BUILDERS (21870)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-28
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱46,491,748.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES, STA. MARIA RIV ER (RIGHT SIDE), STA. MARIA, BULACAN
- Contractor: TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY) (10684)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-28
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱46,491,168.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES, STA. MARIA RIV ER SYSTEM, STA. MARIA, BULACAN
- Contractor: ARCINUE COMM'L CORPORATION (6746)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-06
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱13,949,668.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL SRUCTURES, STA. MARIA RIVE R (TUMANA - PARADA - KAYBANBAN SECTION), STA. MARIA, BULACAN
- Contractor: ST. TIMOTHY CONSTRUCTION CORPORATION (39196)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-12
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱38,733,500.00
- Contract status: Completed Report
- CONSTRUCTION OF PUMPING STATION, HULO, MEYCAUAYAN, BULAC AN
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-17
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱11,178,161.00
- Contract status: Completed Report
- CONSTRUCTION OF PUMPING STATION, SALUYSOY, MEYCAUAYAN, B ULACAN
- Contractor: CHRIZMARIE BUILDERS AND CONSTRUCTION SUPPLY (45526)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-10-18
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱13,973,055.00
- Contract status: Completed Report
- REHABILITATION OF FLOOD CONTROL STRUCTURES ALONG MEYCAUA YAN RIVER, MEYCAUAYAN, BULACAN
- Contractor: JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY) (42531)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-09
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱11,368,000.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF PUMPING STATION BISITA - SAL UYSOY, MEYCAUAYAN RIVER
- Contractor: M.S. RAMOS CONSTRUCTION INC. (FORMERLY: M.S. RAMOS (31684)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-01
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱4,898,040.50
- Contract status: Completed Report
- CONSTRUCTION OF DRAINAGE CANAL AT M. VALERA ST. & VE LORIA ST., BRGY. POBLACION, SAN RAFAEL, BULACAN
- Contractor: SANTIAGO-GALVAN CONSTRUCTION (34619)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-10-09
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,880,802.00
- Contract status: Completed Report
- CONSTRUCTION OF DRAINAGE, PHASE 3, BARANGAY SAN AGUSTIN, SAN RAFAEL, BULACAN
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-10-09
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱939,573.56
- Contract status: Completed Report
- CONSTRUCTION OF FIRST SCOUT RANGER REGIMENT (FSRR) CLUBH OUSE, SAN MIGUEL, BULACAN
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-20
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱13,963,418.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, CAMP TECSON, TAR TARO, SAN MIGUEL, BULACAN
- Contractor: JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY) (42531)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-08-22
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,652,241.00
- Contract status: Completed Report
- CONSTRUCTION OF TWO (2) STOREY- TWENTY (20) DOOR TRANSIE NT QUARTERS, FIRST SCOUT RANGER REGIMENT (FSRR) PHILIPPINE ARMY, SAN MIGUEL , BULACAN
- Contractor: JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY) (42531)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-03-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱18,617,948.00
- Contract status: Completed Report
- ASSET PRESERVATION REHABILITATION / RECONSTRUCTION / UPG RADING OF DAMAGED PAVED ROADS STA. MARIA-BYPASS ROAD K0032+568 K0033+078, STA. MARIA, BULACAN
- Contractor: TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY) (10684)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-01-31
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱34,766,932.00
- Contract status: Completed Report
- ASSET PRESERVATION CONSTRUCTION / UPGRADING /REHABILITA TION OF DRAINAGE ALONG NATIONAL ROADS NCR/BULACAN BDRY.-BIGTE-IPO DAM ROAD K0039+000 K0039+453
- Contractor: 729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.) (21923)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-14
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱8,072,307.00
- Contract status: Completed Report
- IMPROVEMENT / CONCRETING OF KALAWAKAN, DRT, BULACAN
- Contractor: FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO (16916)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-09-28
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱94,049,816.00
- Contract status: Completed Report
- IMPROVEMENT / CONCRETING OF ROADS SITIO DURUMUGAN, BRGY. KALAWAKAN, DRT, BULACAN
- Contractor: FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO (16916)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-08-16
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱94,049,680.00
- Contract status: Completed Report
- REHABILITATION OF BARDIAS - LAMBAKIN BRIDGE CONNECTING B ARANGAYS LAMBAKIN AND BARDIAS IN SAN MIGUEL, BULACAN
- Contractor: L.R. TIQUI BUILDERS, INC. (13810)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-07-20
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱51,283,728.00
- Contract status: Completed Report
- ASPHALT OVERLAY ALONG EASTERN BULACAN ROAD, K0066 + (-06 8) K0066+719, K0083+413 K0085+000 ANGAT & D.R.T., BULACAN
- Contractor: M.S. RAMOS CONSTRUCTION INC. (FORMERLY: M.S. RAMOS (31684)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-29
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱27,899,662.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BULO RIVER (BUGA SECTION), PHASE VI, SAN MIGUEL, BULACAN
- Contractor: 729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.) (21923)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-27
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱18,619,554.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, ANYATAM (PHASE I LEFT SIDE), SAN ILDEFONSO, BULACAN
- Contractor: 729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.) (21923)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-27
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱18,619,582.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BULO RIVER , BARDIAS SECTION, PHASE X, SAN MIGUEL, BULACAN
- Contractor: L.R. TIQUI BUILDERS, INC. (13810)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-14
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱45,599,552.00
- Contract status: Completed Report
- REHABILITATION OF ROAD, RICAFORT, MUZON TUNGKONG MANGGA LEADING TO MRT 7 DEPOT, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: L.R. TIQUI BUILDERS, INC. (13810)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-05-05
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱27,929,878.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, SAN RAFAEL, BULA CAN
- Contractor: EIRISH BUILDERS & SUPPLY INC. (33656)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-01-26
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱28,327,648.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, PAMBAYANG DALUBH ASAAN NG MARILAO, ABANGAN NORTE, MARILAO, BULACAN
- Contractor: N.M.E. CONSTRUCTION (22984)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-03-28
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱18,900,930.00
- Contract status: Completed Report
- WIDENING OF PERMANENT BRIDGES, PULONG BUHANGIN BR. (B044 06LZ) ALONG STA. MARIA NORZAGARAY ROAD
- Contractor: L.R. TIQUI BUILDERS, INC. (13810)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-03-06
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱27,900,546.00
- Contract status: Completed Report
- CONCRETING OF ROAD MALANDAY ST., BRGY. ENCANTO, ANGAT, B ULACAN
- Contractor: M.S. RAMOS CONSTRUCTION INC. (FORMERLY: M.S. RAMOS (31684)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-05-01
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱18,809,866.00
- Contract status: Completed Report
- CONCRETING OF ROAD AT BGRY. SAN JUAN, SAN MIGUEL, BULACA N
- Contractor: M.S. RAMOS CONSTRUCTION INC. (FORMERLY: M.S. RAMOS (31684)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-10-08
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱9,305,090.00
- Contract status: Completed Report
- REHABILITATION/IMPROVEMENT (ASPHALT OVERLAY) ALONG THE P ERIMETER ROAD AT CAMP TECSON, TARTARO, SAN MIGUEL, BULACAN
- Contractor: JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY) (42531)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-10
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱19,729,188.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG STA. MARI A RIVER (GUYONG SECTION) PHASE I, STA. MARIA, BULACAN
- Contractor: HALREY CONSTRUCTION INC. (2267)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-10-27
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱28,499,902.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG STA. MARI A RIVER (GUYONG SECTION) PHASE II, STA. MARIA, BULACAN
- Contractor: HALREY CONSTRUCTION INC. (2267)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-27
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱37,999,088.00
- Contract status: Completed Report
- COMPLETION OF SAN JOSE DEL MONTE CONVENTION CENTER, BARA NGAY SAPANG PALAY PROPER, BULACAN
- Contractor: GRANDCONST BUILDERS CORP. (32280)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-07-04
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱46,542,100.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SAN RAFAEL II, CITY OF SAN JOSE DEL MONTE, BULACAN
- Contractor: KNOV BUILDERS AND SUPPLIES (41051)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-01-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,654,426.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. STA. CRUZ V, CITY OF SAN JOSE DEL MONTE, BULACAN
- Contractor: D.L. MAGBITANG BUILDERS INC. (43476)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-07
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,792,224.75
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING LOCATED AT CAPITO L VILLE BRGY. STO. CRISTO, CITY OF SAN JOSE DEL MONTE, BULACAN
- Contractor: EXCELSIUS ENGINEERING SERVICES (35269)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-07
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱3,258,267.25
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. STO. NI C3 91O II, CITY OF SAN JOSE DEL MONTE, BULACAN
- Contractor: ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-07
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,880,259.62
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. STA. CRUZ V, CITY OF SAN JOSE DEL MONTE, BULACAN
- Contractor: EARTHWORK BUILDERS, INC. (FORMERLY: EARTHWORK MOVERS) (33489)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-07
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,879,891.25
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. MINUYAN PR OPER, CITY OF SAN JOSE DEL MONTE, BULACAN
- Contractor: EXCELSIUS ENGINEERING SERVICES (35269)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-07
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱3,258,267.25
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. GUMAOK CEN TRAL, CITY OF SAN JOSE DEL MONTE, BULACAN
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-07
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,879,959.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. GUMAOK EAS T, CITY OF SAN JOSE DEL MONTE, BULACAN
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-07
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,879,753.75
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. GUMAOK WES T, CITY OF SAN JOSE DEL MONTE, BULACAN
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-07
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,880,480.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. LAWANG PAR I, CITY OF SAN JOSE DEL MONTE, BULACAN
- Contractor: EARTHWORK BUILDERS, INC. (FORMERLY: EARTHWORK MOVERS) (33489)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-07
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,880,208.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SAN RAFAEL I, CITY OF SAN JOSE DEL MONTE, BULACAN
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-07
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,920,323.12
- Contract status: Completed Report
- REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. BAGONG B UHAY III, CITY OF SAN JOSE DEL MONTE, BULACAN
- Contractor: EARTHWORK BUILDERS, INC. (FORMERLY: EARTHWORK MOVERS) (33489)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-08
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱949,930.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. ASSUMPTION , CITY OF SAN JOSE DEL MONTE, BULACAN
- Contractor: FORTUNE RDC ENTERPRISES (41515)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-07
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,880,003.38
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. BAGONG BUH AY II, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: EARTHWORK BUILDERS, INC. (FORMERLY: EARTHWORK MOVERS) (33489)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-07
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,880,625.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. CIUDAD REA L, CITY OF SAN JOSE DEL MONTE, BULACAN
- Contractor: EXCELSIUS ENGINEERING SERVICES (35269)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-07
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,880,101.88
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, CAMACHILE, BRGY. DULONG BAYAN, CITY OF SAN JOSE DEL MONTE, BULACAN
- Contractor: ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-07
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,880,618.12
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, LOCATED AT SAN R AFAEL NATIONAL HIGH SCHOOL, CITY OF SAN JOSE DEL MONTE, BULACAN
- Contractor: KNOV BUILDERS AND SUPPLIES (41051)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-01-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,654,426.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. GAYA-GAYA, CITY OF SAN JOSE DEL MONTE, BULACAN (INNOVATION CENTER)
- Contractor: D.L. MAGBITANG BUILDERS INC. (43476)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-07
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,792,224.75
- Contract status: Completed Report
- CONSTRUCTION/UPGRADING OF ROAD, BRGY. CATANGHALAN, OBAND O, BULACAN
- Contractor: 525 CONSTRUCTION (28532)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-09
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,880,505.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), PHASE I HERITAGE HOMES, BRGY. LOMA DE GATO, MARILAO, BULACAN
- Contractor: EARTHWORK BUILDERS, INC. (FORMERLY: EARTHWORK MOVERS) (33489)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-28
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,880,970.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF ROAD, BARANGAY KAYPIAN, S AN JOSE DEL MONTE CITY, BULACAN
- Contractor: D.L. MAGBITANG BUILDERS INC. (43476)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-05-05
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱18,619,800.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT/REHABILITATION OF SLOPE PROTECT ION LEADING TO RELOCATION SITES, BRGY. BAGONG BUHAY, SAN PEDRO AND CITRUS, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: EARTHWORK BUILDERS, INC. (FORMERLY: EARTHWORK MOVERS) (33489)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-07
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱9,309,102.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. STO. NI C3 91O I, CITY OF SAN JOSE DEL MONTE, BULACAN
- Contractor: EXCELSIUS ENGINEERING SERVICES (35269)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-07
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,880,101.88
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BRGY. PATUBIG, MARILAO, BULACAN
- Contractor: EARTHWORK BUILDERS, INC. (FORMERLY: EARTHWORK MOVERS) (33489)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-07
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,702,465.00
- Contract status: Completed Report
- CONCRETING OF ROAD, BARANGAY BALAGTAS BMA, SAN RAFAEL, B ULACAN
- Contractor: EIRISH BUILDERS & SUPPLY INC. (33656)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-08-12
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,702,269.00
- Contract status: Completed Report
- CONCRETING OF ROAD, BARANGAY PALTOK, ANGAT, BULACAN
- Contractor: TM ABAD CONSTRUCTION CORP. (FOR: TM ABAD CONST.) (9302)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-08-12
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,702,183.50
- Contract status: Completed Report
- CONCRETING OF CRUZ NA DAAN DILIMAN ROAD WITH DRAINAGE, S AN RAFAEL, BULACAN
- Contractor: EIRISH BUILDERS & SUPPLY INC. (33656)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-08-12
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,880,450.88
- Contract status: Completed Report
- CONCRETING OF ROAD, BARANGAY MARUNGKO, ANGAT, BULACAN
- Contractor: CRUZ-ESGUERRA CONSTRUCTION (17007)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-08-12
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,701,728.00
- Contract status: Completed Report
- CONCRETING OF SALAPUNGAN - UPIG ROAD, SAN RAFAEL, BULACA N
- Contractor: EIRISH BUILDERS & SUPPLY INC. (33656)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-08-12
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,821,774.25
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF MARUNGKO ROAD, ANGAT, BULACA N
- Contractor: CRUZ-ESGUERRA CONSTRUCTION (17007)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-08-12
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,701,600.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (DAY CARE CENTER) , BRGY. LALAKHAN, STA. MARIA, BULACAN
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-07
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,820,750.00
- Contract status: Completed Report
- ROAD WIDENING OF BOCAUE - SAN JOSE ROAD K0040+220 - K004 0+795
- Contractor: TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY) (10684)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-01-01
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱25,892,966.00
- Contract status: Completed Report
- CONSTRUCTION OF DRAINAGE CANAL 600 METERS AT SEA, BRGY. PRENZA I, MARILAO, BULACAN
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-03
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,880,680.38
- Contract status: Completed Report
- REHABILITATION OF ROAD, ST. FRANCIS, PANDAYAN, MEYCAUAYA N BULACAN
- Contractor: JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY) (42531)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-10-31
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,513,530.50
- Contract status: Completed Report
- REHABILITATION OF ROAD, CAMIA ST., BRGY. PALIWAS, OBANDO , BULACAN
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-04
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,880,470.62
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, SAN MIGUEL, BU LACAN
- Contractor: M.S. RAMOS CONSTRUCTION INC. (FORMERLY: M.S. RAMOS (31684)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-03-31
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱18,999,976.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, (BARANGAY HALL ), BARANGAY BITUNGOL, NORZAGARAY, BULACAN
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-02
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,400,290.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, (BARANGAY HALL ), BARANGAY PASONG BANGKAL, SAN ILDEFONSO, BULACAN
- Contractor: RIMJ CONSTRUCTION SUPPLIES AND SERVICES (FOR: ROMINA CONSTRUCTION) (32090)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-02
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,348,328.75
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, (BARANGAY HALL ), BARANGAY PULONG TAMO, SAN ILDEFONSO, BULACAN
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-02
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,350,802.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, (BARANGAY HALL ), BARANGAY SAPANG PUTIK, SAN ILDEFONSO, BULACAN
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-02
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,375,548.75
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, (BARANGAY HALL ), BARANGAY UMPUCAN, SAN ILDEFONSO, BULACAN
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-02
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,300,800.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, (BARANGAY HALL ), PHASE 2, BARANGAY BULUSUKAN, SAN ILDEFONSO, BULACAN
- Contractor: EIGHT J'S CONSTRUCTION SERVICES (41912)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-08
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,446,392.75
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, (HEALTH CENTER ), BARANGAY GABIHAN, SAN ILDEFONSO, BULACAN
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-02
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,880,625.88
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, (MINI - COVERE D COURT), BARANGAY SAPANG PUTOL, SAN ILDEFONSO, BULACAN
- Contractor: RIMJ CONSTRUCTION SUPPLIES AND SERVICES (FOR: ROMINA CONSTRUCTION) (32090)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-02
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,880,590.75
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, PASONG BANGKAL ELEMENTARY SCHOOL, SAN ILDEFONSO, BULACAN
- Contractor: C.T. LEONCIO CONSTRUCTION & TRADING (17371)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-27
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱6,427,659.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, SAN MIGUEL, BU LACAN
- Contractor: C.T. LEONCIO CONSTRUCTION & TRADING (17371)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-01-31
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱10,157,397.00
- Contract status: Completed Report
- REHABILITATION OF MULTI-PURPOSE BUILDING (BARANGAY HALL) , BARANGAY KALAWAKAN, D.R.T., BULACAN
- Contractor: EIGHT J'S CONSTRUCTION SERVICES (41912)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-08
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱965,197.38
- Contract status: Completed Report
- CONCRETING OF PARTIDA - BULIRAN ROAD, SAN MIGUEL, BULACA N
- Contractor: RIMJ CONSTRUCTION SUPPLIES AND SERVICES (FOR: ROMINA CONSTRUCTION) (32090)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,811,675.00
- Contract status: Completed Report
- CONCRETING OF ROAD, BARANGAY BAYBAY, ANGAT, BULACAN
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,820,950.25
- Contract status: Completed Report
- CONCRETING OF ROAD, BARANGAY CASALAT, SAN ILDEFONSO, BUL ACAN
- Contractor: E.R. MANAID CONSTRUCTION (39343)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,811,666.50
- Contract status: Completed Report
- CONCRETING OF ROAD, BARANGAY LAMBAKIN, SAN MIGUEL, BULAC AN
- Contractor: JEMN BUILDERS (32818)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,821,275.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, BARANGAY PULON G TAMO, SAN ILDEFOSO, BULACAN
- Contractor: 525 CONSTRUCTION (28532)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-02
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,410,430.62
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, BRGY. BAGONG SILANG, SAN MIGUEL, B ULACAN
- Contractor: RIMJ CONSTRUCTION SUPPLIES AND SERVICES (FOR: ROMINA CONSTRUCTION) (32090)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,880,600.88
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, BRGY. BANTOG, SAN MIGUEL, BULACAN< /span>
- Contractor: RIMJ CONSTRUCTION SUPPLIES AND SERVICES (FOR: ROMINA CONSTRUCTION) (32090)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,879,472.88
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, BRGY. BARITAN, SAN MIGUEL, BULACAN
- Contractor: RIMJ CONSTRUCTION SUPPLIES AND SERVICES (FOR: ROMINA CONSTRUCTION) (32090)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,878,973.88
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, BRGY. BATASAN BATA, SAN MIGUEL, BU LACAN
- Contractor: JEMN BUILDERS (32818)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,880,207.50
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, BRGY. SAPANG, SAN MIGUEL, BULACAN< /span>
- Contractor: RIMJ CONSTRUCTION SUPPLIES AND SERVICES (FOR: ROMINA CONSTRUCTION) (32090)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,879,943.25
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, BRGY. BUGA, SAN MIGUEL, BULACAN
- Contractor: RIMJ CONSTRUCTION SUPPLIES AND SERVICES (FOR: ROMINA CONSTRUCTION) (32090)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,879,909.38
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, BRGY. BULUALTO, SAN MIGUEL, BULACA N
- Contractor: RIMJ CONSTRUCTION SUPPLIES AND SERVICES (FOR: ROMINA CONSTRUCTION) (32090)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,879,668.12
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, BRGY. LAMBAKIN, SAN MIGUEL, BULACA N
- Contractor: JEMN BUILDERS (32818)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,821,277.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, BRGY. MALIBAY, SAN MIGUEL, BULACAN
- Contractor: RIMJ CONSTRUCTION SUPPLIES AND SERVICES (FOR: ROMINA CONSTRUCTION) (32090)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,880,934.25
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, BRGY. PINAMBARAN, SAN MIGUEL, BULA CAN
- Contractor: RIMJ CONSTRUCTION SUPPLIES AND SERVICES (FOR: ROMINA CONSTRUCTION) (32090)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,821,143.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, BRGY. SAN JUAN, SAN MIGUEL, BULACA N
- Contractor: RIMJ CONSTRUCTION SUPPLIES AND SERVICES (FOR: ROMINA CONSTRUCTION) (32090)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,821,109.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, BRGY. STA. INES, SAN MIGUEL, BULAC AN
- Contractor: RIMJ CONSTRUCTION SUPPLIES AND SERVICES (FOR: ROMINA CONSTRUCTION) (32090)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,820,910.75
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, STA. LUCIA, SAN MIGUEL, BULACAN
- Contractor: RIMJ CONSTRUCTION SUPPLIES AND SERVICES (FOR: ROMINA CONSTRUCTION) (32090)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,821,277.75
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, BRGY. TIBAGAN, SAN MIGUEL, BULACAN
- Contractor: RIMJ CONSTRUCTION SUPPLIES AND SERVICES (FOR: ROMINA CONSTRUCTION) (32090)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,821,278.50
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, ZONE 6, BARANGAY MASALIPIT, SAN MI GUEL, BULACAN
- Contractor: RIMJ CONSTRUCTION SUPPLIES AND SERVICES (FOR: ROMINA CONSTRUCTION) (32090)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,820,652.50
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, ZONE 7, BRGY. SALACOT, SAN MIGUEL, BULACAN
- Contractor: RIMJ CONSTRUCTION SUPPLIES AND SERVICES (FOR: ROMINA CONSTRUCTION) (32090)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,880,937.00
- Contract status: Completed Report
- CONSTRUCTION / REHABILITATION OF MULTI PURPOSE BUILDING BRGY. STO. TOMAS, STA. MARIA, BULACAN
- Contractor: M.S. RAMOS CONSTRUCTION INC. (FORMERLY: M.S. RAMOS (31684)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-05-27
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱9,216,250.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI PURPOSE BUILDING BRGY. GUYONG, STA . MARIA, BULACAN
- Contractor: C.T. LEONCIO CONSTRUCTION & TRADING (17371)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-01-31
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱8,276,257.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD WITH DRAINAGE SYSTEM/CANAL, BRGY. S TA. ROSA 2, MARILAO, BULACAN
- Contractor: WBX CONSTRUCTION, INC (FORMERLY WBX CONSTRUCTION) (28370)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-04
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,880,755.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE FACILITIES (HALLWAY SHED), BRGY. TABING ILOG, MARILAO, BULACAN
- Contractor: C.B. TAMPENGCO CONSTRUCTION & SUPPLY (18505)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-29
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,880,760.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, BRGY. BATASAN MATANDA, SAN MIGUEL, BULACAN
- Contractor: JEMN BUILDERS (32818)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,820,570.00
- Contract status: Completed Report
- CONCRETING OF ROAD, BARANGAY PACALAG, SAN MIGUEL, BULACA N
- Contractor: FORTUNE RDC ENTERPRISES (41515)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-28
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,880,309.25
- Contract status: Completed Report
- REPLACEMENT OF DULONG BAYAN BRIDGE, CITY OF SAN JOSE DEL MONTE, BULACAN
- Contractor: ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-03-24
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱34,814,400.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF WATER SUPPLY / RAINWATER COLLECTORS IN REGION III
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-01-16
- Fund source: Regular Infra - GAA 2019 CSSP
- Contract price: ₱3,529,400.25
- Contract status: Completed Report
- ROAD WIDENING OF MEYCAUAYAN CAMALIG BAHAY PARI RD K0025+ 805 K0028+323
- Contractor: L.R. TIQUI BUILDERS, INC. (13810)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-05-19
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱35,463,540.00
- Contract status: Terminated Report
- REPLACEMENT OF PERMANENT WEAK BRIDGES ANYATAM BR. 1 (B01 673LZ) ALONG DAANG MAHARLIKA (LZ)
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-01-06
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱0.00
- Contract status: Terminated Report