Infrastructure Projects in Region III — Region III - Bulacan 2nd District Engineering Office, 2020
This page lists public infrastructure projects implemented by Region III - Bulacan 2nd District Engineering Office in Region III during 2020. All data are sourced from the Department of Public Works and Highways (DPWH) official database (as of 9/30/2025): https://www.dpwh.gov.ph/dpwh/projects/infrastructure
This information is shared to promote transparency and public awareness. We encourage visitors to validate project details using the official DPWH source. In case of discrepancies, please refer to the original records published by the DPWH.
| Contractor | Projects | Total Price |
|---|---|---|
| L.R. TIQUI BUILDERS, INC. (13810) | 10 | ₱469,740,746.00 |
| TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY) (10684) | 9 | ₱321,071,612.00 |
| EIRISH BUILDERS & SUPPLY INC. (33656) | 5 | ₱233,257,672.00 |
| ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958) | 6 | ₱215,121,976.25 |
| ST. TIMOTHY CONSTRUCTION CORPORATION (39196) | 5 | ₱146,261,424.00 |
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BULO RIVE R (BARDIAS SECTION), PHASE VIII, SAN MIGUEL, BULACAN
- Contractor: L.R. TIQUI BUILDERS, INC. (13810)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-08-27
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱55,294,180.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG SAN MIGUE L SIBUL ROAD AT SIBUL RIVER, SAN MIGUEL, BULACAN
- Contractor: MRRM TRADING & CONSTRUCTION (19657)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-08-16
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱30,967,988.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG SAN MIGUE L SIBUL ROAD AT TARTARO RIVER, SAN MIGUEL, BULACAN
- Contractor: MRRM TRADING & CONSTRUCTION (19657)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-07-20
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱16,854,316.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BULO RIVE R (BARDIAS SECTION) PHASE IX, SAN MIGUEL, BULACAN
- Contractor: L.R. TIQUI BUILDERS, INC. (13810)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-08-01
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱37,435,904.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BULO RIVE R (KING KABAYO SECTION) PHASE IX, SAN MIGUEL, BULACAN
- Contractor: HIGH STRENGTH DEV. CORPORATION (31976)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-08-19
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱36,644,392.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BULO RIVE R (KING KABAYO SECTION) PHASE VII, SAN MIGUEL, BULACAN
- Contractor: L.R. TIQUI BUILDERS, INC. (13810)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-08-04
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱44,301,660.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BULO RIVE R (BARDIAS SECTION) PHASE VII, SAN MIGUEL, BULACAN
- Contractor: ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-08-01
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱37,435,948.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES AT MAASIM RIVER , MAASIM, SAN RAFAEL, BULACAN
- Contractor: EIRISH BUILDERS & SUPPLY INC. (33656)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-08-05
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱46,794,760.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES AT MAASIM RIVER , MAASIM, SAN ILDEFONSO, BULACAN
- Contractor: ST. TIMOTHY CONSTRUCTION CORPORATION (39196)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-08-05
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱46,549,936.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES AT MAGUINAO, SA N ROQUE CREEK ALONG BY-PASS ROAD, MAGUINAO, SAN RAFAEL, BULACAN
- Contractor: EIRISH BUILDERS & SUPPLY INC. (33656)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-08-05
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱46,794,912.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BULO RIVE R (KING KABAYO SECTION) PHASE VIII, SAN MIGUEL, BULACAN
- Contractor: FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO (16916)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-07-24
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱29,948,764.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE / SLOPE PROTE CTION FOR MAASIM RIVER (SECTION I) AT DILIMAN I AND II, SAN RAFAEL, BULACAN
- Contractor: EIRISH BUILDERS & SUPPLY INC. (33656)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-08-01
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱37,435,840.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG ANGAT RIVER, ANGAT, BULACAN
- Contractor: FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO (16916)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-07-31
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱36,361,268.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG LINAWAN - DULONG BAYAN, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: WBX CONSTRUCTION, INC (FORMERLY WBX CONSTRUCTION) (28370)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-07-28
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱32,187,630.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG SAN JOSE RIVER DULONG BAYAN AND MUZON, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION) (20201)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-07-28
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱32,584,394.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES, DULONG BAYAN, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY) (10684)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-07-22
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱27,291,728.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES, KAYBANBAN, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY) (10684)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-07-28
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱32,571,006.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES, KAYPIAN, SAN J OSE DEL MONTE CITY, BULACAN
- Contractor: TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY) (10684)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-08-05
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱46,549,424.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES, ALONG KAYTUTON G BRIDGE, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY) (10684)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-07-26
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱30,512,562.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION, BRGY. MUZON, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION) (20201)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-07-29
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱33,860,148.00
- Contract status: Completed Report
- REHABILITATION OF FLOOD CONTROL STRUCTURES ALONG SAN JOS E RIVER (MUZON SECTION), SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO (16916)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-07-23
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱27,926,688.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG STA. M ARIA RIVER (UPSTREAM), STA. MARIA, BULACAN
- Contractor: L.R. TIQUI BUILDERS, INC. (13810)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-07-30
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱35,655,156.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG STA. MARI A RIVER (SAN JOSE PATAG SECTION), STA. MARIA, BULACAN
- Contractor: AZUL BUILDERS (21870)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-09-01
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱61,429,876.00
- Contract status: Completed Report
- PREVENTIVE MAINTENANCE CONCRETING REBLOCKING STA. MARIA NORZAGARAY ROAD K0042+669 K0042+820
- Contractor: GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC. ([REVOKED] 45914)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-03-01
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱1,299,898.88
- Contract status: Completed Report
- ASSET PRESERVATION PREVENTIVE MAINTENANCE STA. MARIA NORZAGARAY ROAD K0041+1035 K0042+669
- Contractor: GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC. ([REVOKED] 45914)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-03-27
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱5,382,866.00
- Contract status: Completed Report
- ASSET PRESERVATION PREVENTIVE MAINTENANCE ASPHALT OVERL AY - STA. MARIA - NORZAGARAY ROAD K0037+126 - K0037+600 ; K0039+000 - K0 040+200; K0041+442 - K0041+1035
- Contractor: GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC. ([REVOKED] 45914)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-04-05
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱15,187,060.00
- Contract status: Completed Report
- PREVENTIVE MAINTENANCE CONCRETE REBLOCKING - MANILA NORT H ROAD K0018+623 - K0020+147, MARILAO, BULACAN
- Contractor: C & F CONSTRUCTION & DEVELOPMENT CORPORATION (3509)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-06-08
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱27,316,454.00
- Contract status: Completed Report
- ASSET PRESERVATION PREVENTIVE MAINTENANCE ASPHALT OVERLA Y - MEYCAUAYAN CAMALIG BAHAY PARI ROAD K0022+000 - K0022+500; K0023+461 - K0023+703; K0024+000 - K0024+360; K0024+1022 - K0025+000; K0024+360 - K0024 +645; K0025+000 - K0025+208
- Contractor: PACIFIC CONCRETE PRODUCTS, INC. (17150)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-03-27
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱11,494,648.00
- Contract status: Completed Report
- ASSET PRESERVATION - PREVENTIVE MAINTENANCE STA. MARIA - BYPASS ROAD K0030+514 - K0031+000 K0033+379 - K0033+642
- Contractor: M.S. RAMOS CONSTRUCTION INC. (FORMERLY: M.S. RAMOS (31684)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-04-25
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱18,912,070.00
- Contract status: Completed Report
- COMPLETION OF MULTI-PURPOSE BUILDING, CAMP TECSON TARTAR O, SAN MIGUEL, BULACAN
- Contractor: GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC. ([REVOKED] 45914)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-07-15
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱7,447,237.50
- Contract status: Completed Report
- CONSTRUCTION OF ADDITIONAL ADMINISTRATIVE/BATTALION LIAI SON OFFICE BUILDING, CAMP TECSON, SAN MIGUEL, BULACAN
- Contractor: YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC. (45002)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-09-13
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱18,619,538.00
- Contract status: Completed Report
- CONSTRUCTION OF ADDITIONAL MOTOR POOL/ PARKING BAYS AND VEHICLE/ AUTO REPAIR SHOP, CAMP TECSON, SAN MIGUEL, BULACAN
- Contractor: AYANA CONSTRUCTION AND TRADING (38623)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-09-13
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱9,306,665.00
- Contract status: Completed Report
- CONSTRUCTION OF ENLISTED WOMEN BARRACKS, CAMP TECSON, SA N MIGUEL, BULACAN
- Contractor: YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC. (45002)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-08-14
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱13,964,410.00
- Contract status: Completed Report
- ASSET PRESERVATION - PREVENTIVE MAINTENANCE ASPHALT OV ERLAY - GEN. ALEJO SANTOS HIGHWAY K0060+300 K0060+899
- Contractor: GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC. ([REVOKED] 45914)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-12-28
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱6,371,585.00
- Contract status: Completed Report
- ASSET PRESERVATION - PREVENTIVE MAINTENANCE ASPHALT OV ERLAY BOCAUE SAN JOSE ROAD K0040+000 - K0041+000; K0030+605 - K0031+812
- Contractor: 729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.) (21923)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-01-09
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱13,651,012.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG OBANDO RI VER, PHASE III, OBANDO, BULACAN
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-02-02
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱83,888,440.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG MARILAO R IVER AND ITS TRIBUTARIES PHASE III, MARILAO, BULACAN
- Contractor: S.A. PLEYTO CONSTRUCTION CORPORATION (33269)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-11-08
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱45,812,896.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG MARILAO R IVER AND ITS TRIBUTARIES (CONSTANTINO SECTION), MARILAO, BULACAN
- Contractor: TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY) (10684)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-02-08
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱62,676,100.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG MEYCAUAYA N RIVER (VERTICAL WALL) PHASE II, LEFT SIDE, MEYCAUAYAN, BULACAN
- Contractor: ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-12-05
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱47,558,456.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG MEYCAUAYA N RIVER (VERTICAL WALL) PHASE I, RIGHT SIDE, MEYCAUAYAN, BULACAN
- Contractor: ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-12-17
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱63,331,520.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES, GUMAOC, SAN JO SE DEL MONTE CITY, BULACAN
- Contractor: C.T. LEONCIO CONSTRUCTION & TRADING (17371)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-07-29
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱33,869,528.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES, PARADISE III, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY) (10684)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-07-27
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱31,602,122.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES, POBLACION, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: 729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.) (21923)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-07-28
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱32,719,690.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION, TOWERVILLE, SAN JOSE D EL MONTE CITY, BULACAN
- Contractor: TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY) (10684)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-07-29
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱33,865,880.00
- Contract status: Completed Report
- REHABILITATION OF FLOOD CONTROL STRUCTURES ALONG SAN JOS E RIVER (TUNGKONG MANGGA SECTION), SAN JOSE DEL MONTE CITY, BULACAN< /li>
- Contractor: ST. TIMOTHY CONSTRUCTION CORPORATION (39196)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-07-24
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱28,676,836.00
- Contract status: Completed Report
- REHABILITATION/ IMPROVEMENT (ASPHALT OVERLAY) ALONG THE PERIMETER ROAD, CAMP TECSON, TARTARO, SAN MIGUEL, BULACAN
- Contractor: MAR-VEL CONSTRUCTION & SUPPLY (23722)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-04-12
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱18,616,000.00
- Contract status: Completed Report
- REHABILITATION/ IMPROVEMENT (ASPHALT OVERLAY) ALONG THE PERIMETER ROAD AT CAMP TECSON, TARTARO, SAN MIGUEL, BULACAN
- Contractor: GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC. ([REVOKED] 45914)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-03-23
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱9,308,984.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, LOMA DE GATO, MA RILAO, BULACAN
- Contractor: C.B. TAMPENGCO CONSTRUCTION & SUPPLY (18505)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-06-15
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,820,015.00
- Contract status: Completed Report
- CONSTRUCTION OF ROADS, HULO, MEYCAUAYAN CITY, BULACAN
- Contractor: FORTUNE RDC ENTERPRISES (41515)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-06-17
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,702,090.00
- Contract status: Completed Report
- CONSTRUCTION OF ROADS, PEREZ, MEYCAUAYAN CITY, BULACAN
- Contractor: C & F CONSTRUCTION & DEVELOPMENT CORPORATION (3509)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-05-26
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,702,120.00
- Contract status: Completed Report
- CONSTRUCTION OF ROADS, ZAMORA, MEYCAUAYAN CITY, BULACAN< /span>
- Contractor: C & F CONSTRUCTION & DEVELOPMENT CORPORATION (3509)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-06-16
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,701,697.00
- Contract status: Completed Report
- CONSTRUCTION OF ROADS WITH DRAINAGE CANAL, LIPUTAN, MEYC AUAYAN CITY, BULACAN
- Contractor: VERDAX BUILDERS (39274)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-06-27
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱5,638,178.00
- Contract status: Completed Report
- CONSTRUCTION OF ROADS, MASIPAG ST. IBAYO, MARILAO, BULAC AN
- Contractor: PJL BUILDERS (33343)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-06-17
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,702,150.50
- Contract status: Completed Report
- CONSTRUCTION OF ROADS, UBIHAN, MEYCAUAYAN CITY, BULACAN< /span>
- Contractor: EDCELCON CONSTRUCTION INC. (45251)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-05-26
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,702,208.50
- Contract status: Completed Report
- CONSTRUCTION OF ROADS, SALUYSOY, MEYCAUAYAN CITY, BULACA N
- Contractor: GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC. ([REVOKED] 45914)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-07-04
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,702,534.50
- Contract status: Completed Report
- CONSTRUCTION OF ROADS BAYUGO, MEYCAUAYAN CITY, BULACAN
- Contractor: C & F CONSTRUCTION & DEVELOPMENT CORPORATION (3509)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-06-17
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,698,081.00
- Contract status: Completed Report
- CONSTRUCTION OF ROADS, PANDAYAN, MEYCAUAYAN CITY, BULACA N
- Contractor: ARCINUE COMM'L CORPORATION (6746)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-07-05
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,701,650.50
- Contract status: Completed Report
- NETWORK DEVELOPMENT OFF CARRIAGEWAY IMPROVEMENT ALONG NC R/BULACAN BDRY. BIGTE-IPO DAM RD (S01381LZ) K0044+518 K0044+846
- Contractor: M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION) (20201)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-03-19
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱3,663,179.75
- Contract status: Completed Report
- ROAD WIDENING ALONG DAANG MAHARLIKA (LZ) K0065+000 - K0 067+713
- Contractor: G.D.L. CONSTRUCTION (22796)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-12-21
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱89,787,736.00
- Contract status: Completed Report
- ROAD WIDENING ALONG DAANG MAHARLIKA (LZ) K0069+300 - K0 069+887; K0071+997- K0073+000; K0073+718 - K0074+226; K0074+281 K0074+388
- Contractor: L.R. TIQUI BUILDERS, INC. (13810)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-12-21
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱75,906,592.00
- Contract status: Completed Report
- ROAD WIDENING ALONG DAANG MAHARLIKA (LZ) K0075+173 - K00 75+628; K0075+677 - K0076+076.69; K0076+893 - K0077+200, SAN MIGUEL, BULAC AN
- Contractor: B. BERNARDO CONST., INC. (6196)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-09-13
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱40,690,132.00
- Contract status: Completed Report
- CONCRETING OF ROAD P. YANTOK, ANGAT, BULACAN
- Contractor: EMICA BUILDERS AND SUPPLY (42099)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-05-01
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,880,397.75
- Contract status: Completed Report
- CONCRETING OF SENTINELA - P. YANTOK ROAD, P. YANTOK, ANG AT, BULACAN
- Contractor: EMICA BUILDERS AND SUPPLY (42099)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-07-09
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,701,934.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, STA. CRUZ, ANGAT , BULACAN
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-06-15
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,821,047.75
- Contract status: Completed Report
- CONSTRUCTION OF DRAINAGE, SAN AGUSTIN, SAN RAFAEL, BULAC AN
- Contractor: EMICA BUILDERS AND SUPPLY (42099)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-05-17
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,821,244.00
- Contract status: Completed Report
- NETWORK DEVELOPMENT OFF CARRIAGEWAY IMPROVEMENT NORZAGAR AY BIGTE ROAD K0076+843 -K0077+883
- Contractor: 729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.) (21923)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-04-28
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱12,165,823.00
- Contract status: Completed Report
- REHABILITATION / RECONSTRUCTION OF NATIONAL ROADS WITH S LIPS, SLOPE, COLLAPSE AND LANDSLIDE NCR/BULACAN BDRY. BIGTE-IPO DAM ROAD K0 043+795 K0043+845; K0043+950 K0044+000
- Contractor: 729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.) (21923)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-08-05
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱14,837,516.00
- Contract status: Completed Report
- NETWORK DEVELOPMENT ROAD WIDENING ALONG SAN MIGUEL - SIB UL ROAD K0078 + (-968)- K0078+018, SAN MIGUEL, BULACAN
- Contractor: ST. TIMOTHY CONSTRUCTION CORPORATION (39196)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-07-01
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱43,658,416.00
- Contract status: Completed Report
- NETWORK DEVELOPMENT ROAD WIDENING STA. RITA CAMIAS OLD R OAD K0073 + (-735) K0074+442, SAN MIGUEL, BULACAN
- Contractor: A.L. SALAZAR CONSTRUCTION, INC. (3899)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-08-22
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱74,983,680.00
- Contract status: Completed Report
- ASSET PRESERVATION PREVENTIVE MAINTENANCE NCR/BULACAN BD RY. BIGTE IPO DAM ROAD K0029 + (-17) K0029 + (-114) K0029 + (-149) K0029 + (-117) K0029 + (-195) K0029 + (-149) K0029 + (-836) K0029 + (-195) K0031+06 1 K0031+621 K0032 + 897 K0033+538
- Contractor: L.R. TIQUI BUILDERS, INC. (13810)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-06-27
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱85,406,472.00
- Contract status: Completed Report
- CONSTRUCTION ROADS SITIO LOOBAN, SAN VICENTE, STA. MARIA , BULACAN
- Contractor: FORTUNE RDC ENTERPRISES (41515)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-05-16
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,821,046.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BAGBAGUIN, STA. MARIA, BULACAN
- Contractor: RENZ CADORNIGA CONSTRUCTION (41375)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-03-13
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,702,272.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, IBA, MEYCAUAYAN CITY, BULACAN
- Contractor: ARCINUE COMM'L CORPORATION (6746)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-07-15
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,702,452.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, TUGATOG, MEYCAUA YAN CITY, BULACAN
- Contractor: WBX CONSTRUCTION, INC (FORMERLY WBX CONSTRUCTION) (28370)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-06-15
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱3,761,433.50
- Contract status: Completed Report
- REHABILITATION OF MULTI-PURPOSE BUILDING, CATANGHALAN ELEMENTARY SCHOOL, OBANDO, BULACAN
- Contractor: EXCELSIUS ENGINEERING SERVICES (35269)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-04-16
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱949,873.56
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, STA. MARIA, BULA CAN
- Contractor: YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC. (45002)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-05-24
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱5,641,700.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (HEALTH CENTER), STA. MARIA, BULACAN
- Contractor: GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC. ([REVOKED] 45914)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-09-21
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱9,403,860.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, SIBUL, SAN MIGUE L, BULACAN
- Contractor: RIMJ CONSTRUCTION SUPPLIES AND SERVICES (FOR: ROMINA CONSTRUCTION) (32090)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-05-16
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,375,005.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, SAN JUAN, SAN MI GUEL, BULACAN
- Contractor: M.R. SANTIAGO CONSTRUCTION (27329)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-07-15
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,701,891.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, STA. RITA MATAND A, SAN MIGUEL, BULACAN
- Contractor: M.R. SANTIAGO CONSTRUCTION (27329)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-05-16
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,350,954.25
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, SAMPALOC, SAN RA FAEL, BULACAN
- Contractor: EMICA BUILDERS AND SUPPLY (42099)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-12-12
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱9,403,266.00
- Contract status: Completed Report
- CONCRETING OF ROAD LABNE, SAN MIGUEL, BULACAN
- Contractor: M.R. SANTIAGO CONSTRUCTION (27329)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-05-16
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,820,950.00
- Contract status: Completed Report
- REHABILITATION OF SAN ROQUE-MAGUINAO ROAD, SAN ROQUE AND MAGUINAO, SAN RAFAEL, BULACAN
- Contractor: EMICA BUILDERS AND SUPPLY (42099)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-06-12
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱9,401,570.00
- Contract status: Completed Report
- REHABILITATION OF DR. GUIZANO ST. - CAPIHAN ROAD, CAPIHA N, SAN RAFAEL, BULACAN
- Contractor: EMICA BUILDERS AND SUPPLY (42099)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-04-13
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,701,940.50
- Contract status: Completed Report
- CONCRETING OF ROAD, SALANGAN, SAN MIGUEL, BULACAN
- Contractor: M.R. SANTIAGO CONSTRUCTION (27329)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-04-16
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,350,945.25
- Contract status: Completed Report
- REHABILITATION OF SAN ILDEFONSO NATIONAL HIGH SCHOOL-BUL ACAN AGRICULTURAL STATE COLLEGE ROAD, POBLACION & PINAOD, SAN ILDEFONSO , BULACAN
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-05-16
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,231,425.50
- Contract status: Completed Report
- REHABILITATION / IMPROVEMENT AZUNCION DIAZ / ABELLA ROAD , SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO (16916)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-07-15
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱37,239,900.00
- Contract status: Completed Report
- ROAD WIDENING / REHABILITATION OF CONCRETE ROAD (KAYPIAN ROAD), SAN JOSE DEL MONTE CITY, BULACAN (PHASE 1)
- Contractor: TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY) (10684)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-10-13
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱46,500,068.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. DULONG BAY AN, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY) (10684)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-12-27
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱9,502,722.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. MINUYAN PR OPER, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: ST. TIMOTHY CONSTRUCTION CORPORATION (39196)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-06-25
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱18,820,836.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. MINUYAN, S AN JOSE DEL MONTE CITY, BULACAN
- Contractor: C.T. LEONCIO CONSTRUCTION & TRADING (17371)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-01-26
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱14,255,364.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. MUZON, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: EXCELSIUS ENGINEERING SERVICES (35269)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-10-28
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,751,362.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. POBLACION, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: C.T. LEONCIO CONSTRUCTION & TRADING (17371)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-12-27
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱9,502,908.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SAPANG PAL AY PROPER, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-12-27
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱9,502,850.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SAPANG PAL AY PROPER, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-09-21
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱9,502,495.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. STA. CRUZ IV, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-05-16
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,375,725.25
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. STA. CRUZ V, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: EXCELSIUS ENGINEERING SERVICES (35269)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-05-16
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,375,716.75
- Contract status: Completed Report
- ASSET PRESERVATION REHABILITATION/RECONSTRUCTION/UPGRADI NG OF DAMAGED PAVED ROADS STA. MARIA BY-PASS ROAD K0033+642 K0033+900
- Contractor: ARCINUE COMM'L CORPORATION (6746)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-03-24
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱8,935,684.00
- Contract status: Completed Report
- NETWORK DEVELOPMENT - ROAD WIDENING EASTERN BULACAN RD - K0080+664 K0081+350
- Contractor: P.T. LIMJOCO CONSTRUCTION COMPANY, INCORPORATED (2724)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2022-01-26
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱24,115,808.00
- Contract status: Completed Report
- NETWORK DEVELOPMENT - ROAD WIDENING GEN. ALEJO SANTOS H IGHWAY - K0065+000 - K0065+848
- Contractor: R2A CONSTRUCTION & TRADING CORPORATION (31922)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-04-25
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱16,227,597.00
- Contract status: Completed Report
- CONSTRUCTION OF BYPASS/ ALTERNATE ROAD ALONG BRGY. GAYA- GAYA PHASE I, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP. (09036)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-04-27
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱46,549,244.00
- Contract status: Completed Report
- CONSTRUCTION OF BYPASS/ ALTERNATE ROAD ALONG BRGY. GRACE VILLE PHASE I, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP. (09036)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-04-27
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱46,549,144.00
- Contract status: Completed Report
- CONSTRUCTION OF BYPASS/ ALTERNATE ROAD ALONG BRGY. MUZON PHASE I, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP. (09036)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-04-27
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱46,549,048.00
- Contract status: Completed Report
- CONSTRUCTION OF BRIDGE, BRGY. MANDILE, SAN MIGUEL, BULAC AN
- Contractor: L.R. TIQUI BUILDERS, INC. (13810)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-07-24
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱28,214,766.00
- Contract status: Completed Report
- CONSTRUCTION OF BRIDGE, BRGY. SAPANG DAYAP, SAN ILDEFONS O, BULACAN
- Contractor: L.R. TIQUI BUILDERS, INC. (13810)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-07-11
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱18,809,208.00
- Contract status: Completed Report
- REHABILITATION OF PINAMBARAN BRIDGE, PINAMBARAN, SAN MIG UEL, BULACAN
- Contractor: M.R. SANTIAGO CONSTRUCTION (27329)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-04-16
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,821,415.75
- Contract status: Completed Report
- CONSTRUCTION OF FOOT BRIDGE, CAMIAS, SAN MIGUEL, BULACAN
- Contractor: M.R. SANTIAGO CONSTRUCTION (27329)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-05-16
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,877,756.00
- Contract status: Completed Report
- CONSTRUCTION OF WATER SUPPLY SYSTEM, TUKOD, SAN RAFAEL, BULACAN
- Contractor: EMICA BUILDERS AND SUPPLY (42099)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-08-14
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱6,576,448.00
- Contract status: Completed Report
- NETWORK DEVELOPMENT OFF - CARRIAGEWAY IMPROVEMENT NCR/BU LACAN BDRY.-BIGTE-IPO DAM RD - K0036+539 - K0037+664
- Contractor: L.R. TIQUI BUILDERS, INC. (13810)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-12-29
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱37,379,584.00
- Contract status: Completed Report
- CONSTRUCTION OF PERMANENT BRIDGE, SITIO QUARRY, BRGY. MI NUYAN PROPER, SAN JOSE DEL MONTE, BULACAN
- Contractor: L.R. TIQUI BUILDERS, INC. (13810)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-09-17
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱51,337,224.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BULO RIVER , BARDIAS SECTION, PHASE X, SAN MIGUEL, BULACAN
- Contractor: ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY) (05349)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-05-28
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱43,424,748.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BULO RIVER , STA. LUCIA SECTION, PHASE I, SAN MIGUEL, BULACAN
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-07-27
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱57,320,400.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BULO RIVER , BARDIAS SECTION, PHASE XI, SAN MIGUEL, BULACAN
- Contractor: ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY) (05349)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-05-28
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱43,424,748.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BULO RIVER , KING KABAYO SECTION, PHASE X, SAN MIGUEL, BULACAN
- Contractor: EIRISH BUILDERS & SUPPLY INC. (33656)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-07-27
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱54,946,780.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BULO RIVER , KING KABAYO SECTION, PHASE XI, SAN MIGUEL, BULACAN
- Contractor: ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-07-27
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱54,917,832.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING (S PORTS COMPLEX), BRGY. MINUYAN, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: GRANDCONST BUILDERS CORP. (32280)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-06-23
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱18,809,386.00
- Contract status: Completed Report
- CONSTRUCTION OF COVERED COURT, ESTRELLA HOMES, BRGY. GAY A-GAYA, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC. ([REVOKED] 45914)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-02-11
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,819,691.50
- Contract status: Completed Report
- CONSTRUCTION OF ST. BERNADETTE CHILDRENS HOSPITAL CITY O F SAN JOSE DEL MONTE, BULACAN
- Contractor: GRANDCONST BUILDERS CORP. (32280)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-04-12
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,701,982.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING, B RGY. KAYPIAN, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: C & F CONSTRUCTION & DEVELOPMENT CORPORATION (3509)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-04-12
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,701,249.50
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING, S AN JOSE DEL MONTE CITY, BULACAN
- Contractor: C.T. LEONCIO CONSTRUCTION & TRADING (17371)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-02-11
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,820,940.00
- Contract status: Completed Report
- CONSTRUCTION AND/OR REPAIR/REHABILITATION MULTI-PURPOSE BUILDING, HEIGHTS ELEM SCHOOL, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: C.T. LEONCIO CONSTRUCTION & TRADING (17371)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-02-11
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,701,681.50
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF LOCAL ROADS, BRGY. SAN IS IDRO, SAN JOSE DEL MONTE, BULACAN
- Contractor: YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC. (45002)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-08-22
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱11,756,105.00
- Contract status: Completed Report
- CONSTRUCTION/EXPANSION OF SAN MIGUEL DISTRICT HOSPITAL, STA. RITA MATANDA, SAN MIGUEL, BULACAN
- Contractor: EIRISH BUILDERS & SUPPLY INC. (33656)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-11-20
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱47,285,380.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, BRGY. BAGONG SILANG, SAN MIGUEL, B ULACAN
- Contractor: C & F CONSTRUCTION & DEVELOPMENT CORPORATION (3509)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-01-12
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,820,669.50
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, BRGY. UPIG, SAN ILDEFONSO, BULACAN
- Contractor: M.S. RAMOS CONSTRUCTION INC. (FORMERLY: M.S. RAMOS (31684)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-12-23
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,821,130.75
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, BRGY. CORAL NA BATO, SAN RAFAEL, B ULACAN
- Contractor: M.S. RAMOS CONSTRUCTION INC. (FORMERLY: M.S. RAMOS (31684)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-11-25
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,878,932.25
- Contract status: Completed Report
- CONCRETING OF ROAD AT BRGY. BICLAT, SAN MIGUEL, BULACAN< /span>
- Contractor: GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC. ([REVOKED] 45914)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-01-22
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,701,650.00
- Contract status: Completed Report
- CONCRETING OF ROAD BRGY. BULIRAN, SAN MIGUEL, BULACAN
- Contractor: C & F CONSTRUCTION & DEVELOPMENT CORPORATION (3509)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-03-25
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱9,404,873.00
- Contract status: Completed Report
- CONSTRUCTION OF VIOLA HIGHWAY - PASONG CALLOS ROAD, SAN RAFAEL, BULACAN
- Contractor: C & F CONSTRUCTION & DEVELOPMENT CORPORATION (3509)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-12-16
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,701,674.50
- Contract status: Completed Report
- CONSTRUCTION AND/OR REPAIR/REHABILITATION OF MULTI-PURPO SE BRGY. CAINGIN, SAN RAFAEL, BULACAN
- Contractor: YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC. (45002)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-02-11
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,820,720.75
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE COVERED COURT PHASE 4 HERI TAGE HOMES, LOMA DE GATO, MARILAO, BULACAN
- Contractor: C & F CONSTRUCTION & DEVELOPMENT CORPORATION (3509)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-01-12
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,878,973.88
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE COVERED COURT BRGY. PATUBI G, MARILAO, BULACAN
- Contractor: YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC. (45002)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-01-12
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,879,840.75
- Contract status: Completed Report
- CONSTRUCTION OF COVERED COURT, BRGY. CATMON, STA. MARIA, BULACAN
- Contractor: FORTUNE RDC ENTERPRISES (41515)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-03-13
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,751,320.50
- Contract status: Completed Report
- CONSTRUCTION AND/OR REPAIR/REHABILITATION OF MULTI-PURPO SE BUILDING, BRGY. HULO, OBANDO, BULACAN
- Contractor: YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC. (45002)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-02-11
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,820,811.50
- Contract status: Completed Report
- CONSTRUCTION AND/OR REPAIR/REHABILITATION OF MULTI-PURPO SE BUILDING, BRGY. PULONG BUHANGIN, SANTA MARIA, BULACAN
- Contractor: FORTUNE RDC ENTERPRISES (41515)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-01-12
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,821,150.75
- Contract status: Completed Report
- CONSTRUCTION OF PUMPING STATION AT REGOSO ST., BRGY. SAL UYSOY, MEYCAUAYAN CITY, BULACAN
- Contractor: GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC. ([REVOKED] 45914)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-05-03
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱22,918,816.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURES, PAN DAYAN - SALUYSOY CREEK, MEYCAUAYAN CITY, BULACAN
- Contractor: ARCINUE COMM'L CORPORATION (6746)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-04-11
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱22,917,972.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, ST. BERNADETTE C HILDREN'S HOSPITAL, BRGY. MUZON, SAN JOSE DEL MONTE CITY, BULACAN
- Contractor: GRANDCONST BUILDERS CORP. (32280)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-08-22
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱28,199,920.00
- Contract status: Completed Report
- CONSTRUCTION AND REHABILITATION OF SAN JOSE DEL MONTE SP ORTS COMPLEX, BRGY. MINUYAN, SAN JOSE DEL MONTE, BULACAN
- Contractor: GRANDCONST BUILDERS CORP. (32280)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-08-22
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱14,106,670.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SAN JOSE P ATAG, STA. MARIA, BULACAN
- Contractor: FORTUNE RDC ENTERPRISES (41515)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-02-11
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,349,756.75
- Contract status: Completed Report
- CONSTRUCTION OF HEALTH CENTER, SITIO KALAYAKAN, BRGY. KA LAWAKAN, DO C3 91A REMEDIOS TRINIDAD, BULACAN
- Contractor: GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC. ([REVOKED] 45914)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-02-11
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,880,272.38
- Contract status: Completed Report
- REHABILITATION OF ROAD SITIO GULOD, HERNANDEZ ST., PULON G BUHANGIN, STA. MARIA, BULACAN
- Contractor: YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC. (45002)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-12-13
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,878,932.25
- Contract status: Completed Report
- REPAIR/REHABILITATION OF MULTI-PURPOSE GYM AT SAN JOSE P ATAG ELEMENTARY SCHOOL IN BRGY. SAN JOSE PATAG, STA. MARIA, BULACAN< /li>
- Contractor: EARTHWORK BUILDERS, INC. (FORMERLY: EARTHWORK MOVERS) (33489)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-02-11
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,820,882.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) B RGY. SALAMBAO, OBANDO, BULACAN
- Contractor: C.B. TAMPENGCO CONSTRUCTION & SUPPLY (18505)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-02-11
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,350,589.00
- Contract status: Completed Report
- UPGRADING AND CONCRETING OF ROAD, SITIO DAUNGAN PARE, PA G-ASA, OBANDO, BULACAN
- Contractor: GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC. ([REVOKED] 45914)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-01-12
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,409,239.00
- Contract status: Completed Report
- CONCRETING OF ROAD, STO. TOMAS, STA. MARIA, BULACAN
- Contractor: M.S. RAMOS CONSTRUCTION INC. (FORMERLY: M.S. RAMOS (31684)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-04-24
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱9,403,967.00
- Contract status: Completed Report
- REPAIR/REHABILITATION OF ROAD WITH DRAINAGE AND RIPRAP A T BRGY. SILANGAN, STA. MARIA, BULACAN
- Contractor: FORTUNE RDC ENTERPRISES (41515)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-01-12
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,820,919.25
- Contract status: Completed Report
- CONSTRUCTION OF OF MULTI-PURPOSE BUILDING, BRGY. PATUBIG , MARILAO, BULACAN
- Contractor: FORTUNE RDC ENTERPRISES (41515)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-06-23
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱9,404,989.00
- Contract status: Completed Report
- CONSTRUCTION AND / OR REPAIR / REHABILITATION OF MULTI-P URPOSE BUILDING, BRGY. LAMBAKIN, MARILAO, BULACAN
- Contractor: MILES TRADING AND CONSTRUCTION (44017)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-02-11
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,702,286.50
- Contract status: Completed Report
- CONSTRUCTION AND/OR REPAIR/REHABILITATION OF MULTI-PURPO SE BUILDING, BRGY. ZAMORA, MEYCAUAYAN, BULACAN
- Contractor: MILES TRADING AND CONSTRUCTION (44017)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-02-11
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,820,709.00
- Contract status: Completed Report
- CONSTRUCTION / REHABILITATION OF MULTI-PURPOSE BUILDING INCLUDING ACCESSIBILITY FACILITIES FOR PHYSICALLY CHALLENGED PERSONS BRGY. STO. TOMAS, STA. MARIA, BULACAN
- Contractor: YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC. (45002)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-01-30
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,701,693.50
- Contract status: Completed Report
- RAIN WATER COLLECTORS IN PUBLIC FACILITIES REGION III
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-08-30
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱3,923,278.75
- Contract status: Completed Report
- NETWORK DEVELOPMENT - ROAD WIDENING ALONG STA. MARIA - N ORZAGARAY ROAD K0034+300 -K0034+768; K0036+435 K0037+600, STA. MARIA, BULAC AN
- Contractor: ST. TIMOTHY CONSTRUCTION CORPORATION (39196)
- Implementing Agency: Region III - Bulacan 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2022-01-04
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱8,555,400.00
- Contract status: Terminated Report