Infrastructure Projects in Region III — Region III - Pampanga 2nd District Engineering Office, 2020
This page lists public infrastructure projects implemented by Region III - Pampanga 2nd District Engineering Office in Region III during 2020. All data are sourced from the Department of Public Works and Highways (DPWH) official database (as of 9/30/2025): https://www.dpwh.gov.ph/dpwh/projects/infrastructure
This information is shared to promote transparency and public awareness. We encourage visitors to validate project details using the official DPWH source. In case of discrepancies, please refer to the original records published by the DPWH.
| Contractor | Projects | Total Price |
|---|---|---|
| OMICRON CONSTRUCTION INC.(FORMERLY: OMICRON CONSTRUCTION) (9575) | 6 | ₱215,458,248.00 |
| R.M. VITUG CONSTRUCTION (9227) | 5 | ₱147,113,464.00 |
| R.D. SADSAD CONSTRUCTION & TRADING (19240) | 4 | ₱126,488,050.00 |
| FERDSTAR BUILDERS INC. (4965) | 2 | ₱119,786,300.00 |
| ARROW CONSTRUCTION (32834) | 4 | ₱107,572,856.00 |
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILIT IES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SLOPE PROTECTION ALONG CAULAMAN RIVER, GUTAD, FLORIDABLANCA, PAMPANGA
- Contractor: TONKA CONSTRUCTION (4064)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-05-17
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱37,011,352.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF FLOOD CONTROL MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION O F SLOPE PROTECTION ALONG CAULAMAN RIVER, STO. ROSARIO SECTION, FLORIDABLANC A, PAMPANGA
- Contractor: OMICRON CONSTRUCTION INC.(FORMERLY: OMICRON CONSTRUCTION) (9575)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-05-29
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱38,624,320.00
- Contract status: Completed Report
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AND DRA INAGE SYSTEM - CONSTRUCTION OF DIKE AND REVETMENT ALONG CAULAMAN RIVER BODE GA, FLORIDABLANCA, PAMPANGA
- Contractor: R.D. SADSAD CONSTRUCTION & TRADING (19240)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-11-15
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱38,097,892.00
- Contract status: Completed Report
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION ALONG SAPANG MARAG UL DIVERSION CHANNEL, SAN JUAN NEPOMUCENO, GUAGUA, PAMPANGA
- Contractor: FERDSTAR BUILDERS INC. (4965)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-07-28
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱77,368,360.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM - FLOOD CONTROL AND DRAINA GE - DRAINAGE/PROTECTION WORKS - CONSTRUCTION OF SLOPE PROTECTION ALONG GPD C DIVERSION CHANNEL GUMI, LUBAO, PAMPANGA
- Contractor: ARROW CONSTRUCTION (32834)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-09-16
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱18,908,586.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM - FLOOD CONTROL AND DRAINA GE - FLOOD CONTROL STRUCTURES/FACILITIES - CONSTRUCTION OF SLOPE PROTECTION ALONG GUMI RIVER, STA. CATALINA, LUBAO, PAMPANGA
- Contractor: M.C. GERONIMO CONSTRUCTION AND TRADING (45916)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-06-18
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱18,769,394.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILIT IES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SLOPE PROTECTION ALONG PORAC RIVER, STA. 0+000 - STA. 0+343, BRGY. CALANTAS, FLOR IDABLANCA, FLORIDABLANCA, PAMPANGA
- Contractor: ARROW CONSTRUCTION (32834)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-05-02
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱29,884,602.00
- Contract status: Completed Report
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION ALONG PORAC RIVER, STO. CRISTO - SOLIB, FLORIDABLANCA, PAMPANGA
- Contractor: OMICRON CONSTRUCTION INC.(FORMERLY: OMICRON CONSTRUCTION) (9575)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-08-02
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱34,257,788.00
- Contract status: Completed Report
- ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCT ION/UPGRADING OF PAVED ROADS - PRIMARY ROADS - JOSE ABAD SANTOS AVENUE (JAS A) RD - K0076+669 - K0077+160, K0077+410 - K0077+775, K0078+678 - K0079+021 , GUAGUA, PAMPANGA
- Contractor: OMICRON CONSTRUCTION INC.(FORMERLY: OMICRON CONSTRUCTION) (9575)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-07-28
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱53,067,984.00
- Contract status: Completed Report
- NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - ANGELES-PORAC-FLORIDABLANCA-DINALUPIHAN RD, K0096+698 - K0097+679, K0106+065 - K0106+500, PORAC AND FLORIDABLANCA, PAMPANGA
- Contractor: PENTAGON INDUSTRIAL DEVELOPMENT & CONSTRUCTION CO. (12796)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-07-28
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱44,093,064.00
- Contract status: Completed Report
- NETWORK DEVELOPMENT PROGRAM - OFF-CARRIAGEWAY IMPROVEME NT - TERTIARY ROADS SN FERNANDO-LUBAO RD, K0078+000 - K0079+000, K0080+173 - K0081+187, K0081+560 - K0081+990, GUAGUA AND LUBAO, PAMPANGA
- Contractor: ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY) (05349)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-08-03
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱37,608,408.00
- Contract status: Completed Report
- VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - FLOOD CONTROL AND DRAINAGE - DRAINAGE/PROTECTION WORKS - CONSTRUCTION OF SLOPE P ROTECTION ALONG SANTOL CREEK, MALIGAYA SECTION, FLORIDABLANCA, PAMPANGA
- Contractor: ALL EML CONSTRUCTION CORPORATION (FORMERLY: E.M.L. CONSTRUCTION & TRADING) (10151)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-04-29
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱20,164,906.00
- Contract status: Completed Report
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION WITH RETAINING WAL L ALONG LABUAN RIVER, GUAGUA - SASMUAN, PAMPANGA, GUAGUA-SASMUAN, PAMPANGA< /span>
- Contractor: FERDSTAR BUILDERS INC. (4965)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-11-04
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱42,417,940.00
- Contract status: Completed Report
- CONSTRUCTION/MAINTENANCE OF FLOOD CONTROL MITIGATION ST RUCTURES AND DRAINAGE SYSTENS - REHABILITATION OF SLOPE PROTECTION ALONG PO RAC RIVER, MABICAL SECTION, FLORIDABLANCA, PAMPANGA
- Contractor: B.P. CRUZ BUILDERS AND TRADING (33272)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-10-05
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱32,545,872.00
- Contract status: Completed Report
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - IMPROVEMENT OF DIKE WITH SLOPE PROTECTION ALONG POR AC RIVER, STA. RITA SECTION, LUBAO, PAMPANGA
- Contractor: OMICRON CONSTRUCTION INC.(FORMERLY: OMICRON CONSTRUCTION) (9575)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-10-01
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱32,514,834.00
- Contract status: Completed Report
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION ALONG PORAC RIVER, PAGUIRUAN SECTION, FLORIDABLANCA, PAMPANGA
- Contractor: TONKA CONSTRUCTION (4064)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-06-16
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱34,257,716.00
- Contract status: Completed Report
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - IMPROVEMENT/REHABILITATION OF DIKE ALONG GPDC STA. CRUZ, LUBAO, PAMPANGA
- Contractor: 11-16 CONSTRUCTION (29646)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-06-19
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱47,754,960.00
- Contract status: Completed Report
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - REHABILITATION OF SLOPE PROTECTION ALONG PORAC RIVE R, VALDEZ SECTION, FLORIDABLANCA, PAMPANGA, FLORIDABLANCA, PAMPANGA< /li>
- Contractor: B.P. CRUZ BUILDERS AND TRADING (33272)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-10-05
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱32,572,062.00
- Contract status: Completed Report
- REHABILITATION OF MULTI-PURPOSE BUILDING, STO. NINO, GU AGUA, PAMPANGA
- Contractor: TONKA CONSTRUCTION (4064)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-09-16
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,796,202.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, LUBAO, PAMPANGA , LUBAO, PAMPANGA
- Contractor: 4.N.G. BUILDERS AND SUPPLY (45445)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-07-22
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱5,761,416.50
- Contract status: Completed Report
- REHABILITATION OF MULTI-PURPOSE BUILDING, SAN ANTONIO, GUAGUA, PAMPANGA
- Contractor: 4.N.G. BUILDERS AND SUPPLY (45445)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-03-24
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱486,899.47
- Contract status: Completed Report
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - SLOPE PROTECTION ALONG BALSIK RIVER PRADO SIONGCO S ECTION, LUBAO, PAMPANGA
- Contractor: MCB ZAMORA CONSTRUCTION & SUPPLY (32006)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-05-14
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱39,172,528.00
- Contract status: Completed Report
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION ALONG JALUNG SECTI ON, PORAC RIVER, PORAC, PAMPANGA
- Contractor: R.M. VITUG CONSTRUCTION (9227)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-10-01
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱33,129,782.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING BASA AIR BASE, F LORIDABLANCA, PAMPANGA
- Contractor: P.C. PANOPIO CONSTRUCTION AND TRADING (32824)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-06-14
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,955,759.75
- Contract status: Completed Report
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION ALONG PORAC RIVER, CANGATBA, PORAC, PAMPANGA
- Contractor: R.M. VITUG CONSTRUCTION (9227)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-05-14
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱35,449,272.00
- Contract status: Completed Report
- VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONSTRUCTION OF ANGELES-PORAC-BYPASS ROA D, PORAC, PAMPANGA
- Contractor: TONKA CONSTRUCTION (4064) / FERDSTAR BUILDERS INC. (4965)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-02-19
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱92,639,504.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM - FLOOD CONTROL AND DRAINA GE - FLOOD CONTROL STRUCTURES/FACILITIES - CONSTRUCTION OF RETAINING WALL, BANCAL PUGAD, LUBAO, PAMPANGA
- Contractor: M.C. GERONIMO CONSTRUCTION AND TRADING (45916)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-06-18
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,450,612.50
- Contract status: Completed Report
- BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - CAULAM AN BR. (B01529LZ) ALONG ANGELES-PORAC-FLORIDABLANCA-DINALUPIHAN RD, FLORIDA BLANCA, PAMPANGA
- Contractor: J.H. PAJARA CONSTRUCTION CORPORATION (1890) / OMICRON CONSTRUCTION INC.(FORMERLY: OMICRON CONSTRUCTION) (9575)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-03-21
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱94,535,080.00
- Contract status: Completed Report
- BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - SANTOL BR. (B01527LZ) ALONG ANGELES-PORAC-FLORIDABLANCA-DINALUPIHAN ROAD, FLORIDA BLANCA, PAMPANGA
- Contractor: ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY) (05349)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-03-27
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱25,947,094.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING SAN MIGUEL, GUAG UA, PAMPANGA
- Contractor: ITAMUNGAN BUILDERS (45022)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-07-22
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,698,339.50
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM - FLOOD CONTROL AND DRAINA GE - FLOOD CONTROL STRUCTURES/FACILITIES - CONSTRUCTION OF SLOPE PROTECTION ALONG PORAC RIVER, MABICAL SECTION, FLORIDABLANCA, PAMPANGA
- Contractor: DMDANAN CONSTRUCTION AND TRADING (41374)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-08-03
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱19,792,038.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM - FLOOD CONTROL AND DRAINA GE - FLOOD CONTROL STRUCTURES/FACILITIES - CONSTRUCTION OF SLOPE PROTECTION ALONG SAN JOSE CREEK, SAN JOSE SECTION, GUAGUA, PAMPANGA
- Contractor: OMICRON CONSTRUCTION INC.(FORMERLY: OMICRON CONSTRUCTION) (9575)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-06-19
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱19,793,970.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM - FLOOD CONTROL AND DRAINA GE - FLOOD CONTROL STRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD CONTROL AL ONG PORAC, RIVER, JALUNG PAMPANGA, PORAC, PAMPANGA
- Contractor: R.M. VITUG CONSTRUCTION (9227)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-04-29
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱19,792,668.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCA ROADS - CONSTRUCTION OF ROAD WITH FLUME TYPE CANAL, BRGY. CALZADANG BAYU, PORAC, PAMPANGA
- Contractor: TONKA CONSTRUCTION (4064)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-08-02
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱19,796,768.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM - FLOOD CONTROL AND DRAINA GE - DRAINAGE/PROTECTION WORKS - SLOPE PROTECTION ANGELES-PORAC-BY-PASS ROA D STA. 0+000 - STA. 306.44, PORAC, PAMPANGA
- Contractor: ALFEL CONSTRUCTION CORPORATION (40473)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-03-30
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱18,790,146.00
- Contract status: Completed Report
- CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIO US INFRASTRUCTURE INCLUDING LOCAL PROJECTS - FLOOD CONTROL AND DRAINAGE - D RAINAGE/PROTECTION WORKS - SLOPE PROTECTION ALONG LARA RIVER - RIO GRANDE R IVER, GUMI SECTION, LUBAO, PAMPANGA
- Contractor: R.M. VITUG CONSTRUCTION (9227)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-03-15
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱29,394,476.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS - IMPROVEMENT/CONCRETING OF BRGY. ROAD PULUNG MASLE, GUAGUA, PAMPANGA
- Contractor: TONKA CONSTRUCTION (4064)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-12-06
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,979,144.88
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONCRETING OF BRGY. ROAD, LOURDES, LUBAO, PAMPANGA
- Contractor: WILCU CONSTRUCTION (33992)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-11-14
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,977,599.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM - FLOOD CONTROL AND DRAINA GE - FLOOD CONTROL STRUCTURES/FACILITIES - CONSTRUCTION OF SLOPE PROTECTION (FLOOD CONTROL) ALONG PORAC RIVER, BRGY. VALDEZ, FLORIDABLANCA, PAMPANGA ( STATION 0+000 - STATION 0+164.53) FLORIDABLANCA, P
- Contractor: ITAMUNGAN BUILDERS (45022)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-11-22
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,965,658.25
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS - IMPROVEMENT/REHABILITATION OF BRGY. ROAD, CONCEPCION, LUBAO , PAMPANGA
- Contractor: JOYNIELTIN CONSTRUCTION AND TRADING (41858)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-12-06
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,979,226.88
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS - IMPROVEMENT/CONCRETING OF BRGY. ROAD, STA. CRUZ, LUBAO, PAM PANGA
- Contractor: M A M CONSTRUCTION & TRADING (FOR. MAM CONST.) (19915)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-11-22
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,900,769.88
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - CONSTRUCTION OF ROAD (CORE LOCAL ROAD) BRGY. SAN PEDRO, FLORIDABLANCA, PA MPANGA
- Contractor: V. TRILLANA BUILDERS & TRADING (34270)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-11-22
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,741,443.00
- Contract status: Completed Report
- CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIO US INFRASTRUCTURE INCLUDING LOCAL PROJECTS - LOCAL ROADS AND BRIDGES - LOCA L ROADS - CONCRETING OF ROAD, BRGY. BANCAL, GUAGUA, PAMPANGA
- Contractor: R.G. DIAZ BUILDERS & TRADING (23814)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-11-06
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,881,176.00
- Contract status: Completed Report
- CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIO US INFRASTRUCTURE INCLUDING LOCAL PROJECTS - FLOOD CONTROL AND DRAINAGE - D RAINAGE/PROTECTION WORKS - CONSTRUCTION OF DRAINAGE CANAL, BRGY. STA. CATAL INA, LUBAO, PAMPANGA
- Contractor: GRAY ONYX BUILDERS CO. (42761)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-12-22
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱3,913,771.75
- Contract status: Completed Report
- CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIO US INFRASTRUCTURE INCLUDING LOCAL PROJECTS - FLOOD CONTROL AND DRAINAGE - D RAINAGE/PROTECTION WORKS - CONSTRUCTION OF SLOPE PROTECTION ALONG SANTOL CR EEK, SAN JOSE SECTION, FLORIDABLANCA, PAMPANGA
- Contractor: ARROW CONSTRUCTION (32834)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-05-17
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱29,388,690.00
- Contract status: Completed Report
- CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIO US INFRASTRUCTURE INCLUDING LOCAL PROJECTS - FLOOD CONTROL AND DRAINAGE - D RAINAGE/PROTECTION WORKS - CONSTRUCTION OF SLOPE PROTECTION ALONG SAPANG MA TUA CREEK, STA. MONICA, LUBAO, PAMPANGA
- Contractor: OMICRON CONSTRUCTION INC.(FORMERLY: OMICRON CONSTRUCTION) (9575)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-05-15
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱37,199,352.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE COVERED COURT BASA AIR BA SE HIGH SCHOOL ANNEX, SAN NICOLAS, FLORIDABLANCA, PAMPANGA
- Contractor: V. TRILLANA BUILDERS & TRADING (34270)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-02-11
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,949,442.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRU CTURES-MULTI-PURPOSE/FACILITIES - CONSTRUCTION AND/OR REPAIR/REHABILITATION OF MULTI-PURPOSE BUILDING, GUAGUA COMMUNITY COLLEGE, GUAGUA, PAMPANGA
- Contractor: R.G. DIAZ BUILDERS & TRADING (23814)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-11-27
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,880,486.25
- Contract status: Completed Report
- CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIO US INFRASTRUCTURE INCLUDING LOCAL PROJECTS - FLOOD CONTROL AND DRAINAGE - D RAINAGE/PROTECTION WORKS - CONSTRUCTION OF SLOPE PROTECTION ALONG BALANTACA N RIVER, BALANTACAN TO STA. CRUZ SECTION, LUBAO, P
- Contractor: R.M. VITUG CONSTRUCTION (9227)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-05-29
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱29,347,266.00
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM - FLOOD CONTROL AND DRAINA GE - FLOOD CONTRAL STRUCTURES/FACILITIES - CONSTRUCTION OF SLOPE PROTECTION ALONG SANTOL CREEK, SAN JOSE SECTION FLORIDABLANCA, PAMPANGA
- Contractor: R.D. SADSAD CONSTRUCTION & TRADING (19240)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-05-20
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱34,637,752.00
- Contract status: Completed Report
- CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIO US INFRASTRUCTURE INCLUDING LOCAL PROJECTS - FLOOD CONTROL AND DRAINAGE - D RAINAGE/PROTECTION WORKS - CONSTRUCTION OF SLOPE PROTECTION ALONG PORAC RIV ER, SOLIB, FLORIDABLANCA, PAMPANGA
- Contractor: R.D. SADSAD CONSTRUCTION & TRADING (19240)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-05-29
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱39,055,448.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (CULTURAL CENTER ), GUAGUA, PAMPANGA
- Contractor: WILCU CONSTRUCTION (33992)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-11-28
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,979,511.12
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING SAN JUAN 1ST, GU AGUA, PAMPANGA
- Contractor: P.C. PANOPIO CONSTRUCTION AND TRADING (32824)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-12-27
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,975,270.38
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (BAHAY PAGBABAGO ) BRGY. SAN RAFAEL, GUAGUA, PAMPANGA
- Contractor: TONKA CONSTRUCTION (4064)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-04-11
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,966,999.25
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING BENEDICTO, FLORI DABLANCA, PAMPANGA
- Contractor: KPS CONSTRUCTION (42086)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-11-28
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,920,012.62
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING/COVERED COURT BR GY, CARMENCITA, FLORIDABLANCA, PAMPANGA
- Contractor: M.C. GERONIMO CONSTRUCTION AND TRADING (45916)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-11-27
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,880,739.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), HOLY FAMILY VILLAGE ELEMENTARY SCHOOL, BRGY. DILA-DILA, STA. RITA, PAMPANG A
- Contractor: WILCU CONSTRUCTION (33992)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-11-28
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,866,372.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING COVERED COURT AR EA WITH REINFORCED CONCRETE SLAB, BANCAL SINUBLI, LUBAO, PAMPANGA
- Contractor: V. TRILLANA BUILDERS & TRADING (34270)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-12-28
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,977,867.88
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, SAN PEDRO, GUAG UA, PAMPANGA
- Contractor: JOYNIELTIN CONSTRUCTION AND TRADING (41858)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-12-28
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,979,457.75
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING STA. MONICA, LUB AO, PAMPANGA
- Contractor: MC SAMPANG CONSTRUCTION (36824)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-12-28
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,979,646.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING BRGY. NATIVIDAD, GUAGUA, PAMPANGA
- Contractor: ITAMUNGAN BUILDERS (45022)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-05-05
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱5,839,376.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING SAN NICOLAS 1ST, SASMUAN, PAMPANGA
- Contractor: MCB ZAMORA CONSTRUCTION & SUPPLY (32006)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-01-27
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,969,895.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING STO. DOMINGO ELE MENTARY SCHOOL, BRGY. STO. DOMINGO, LUBAO, PAMPANGA
- Contractor: M.C. GERONIMO CONSTRUCTION AND TRADING (45916)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-12-27
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,910,588.25
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING BRGY. MANIBAUG L IBUTAD, PORAC, PAMPANGA
- Contractor: TONKA CONSTRUCTION (4064)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-12-27
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,907,435.25
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING BRGY. SAN BASILI O, STA. RITA, PAMPANGA
- Contractor: 4.N.G. BUILDERS AND SUPPLY (45445)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-12-27
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,875,485.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING BESIDE THE DIOSD ADO MACAPAGAL BUILDING, SAN JOSE, STA. RITA, PAMPANGA
- Contractor: ITAMUNGAN BUILDERS (45022)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-12-28
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,913,302.00
- Contract status: Completed Report
- REHABILITATION OF MULTI-PURPOSE BUILDING BRGY. SAN MATI AS, STA. RITA, PAMPANGA
- Contractor: V. TRILLANA BUILDERS & TRADING (34270)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-11-28
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,921,862.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING BODEGA, FLORIDAB LANCA, PAMPANGA
- Contractor: KPS CONSTRUCTION (42086)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-11-28
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,949,769.50
- Contract status: Completed Report
- CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIO US INFRASTRUCTURE INCLUDING LOCAL PROJECTS - FLOOD CONTROL AND DRAINAGE - D RAINAGE/PROTECTION WORKS - CONSTRUCTION OF SLOPE PROTECTION ALONG CAULAMAN RIVE, GUTAD SECTION, FLORIDABLANCA, PAMPANGA
- Contractor: ARROW CONSTRUCTION (32834)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-06-11
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱29,390,978.00
- Contract status: Completed Report
- CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIO US INFRASTRUCTURE INCLUDING LOCAL PROJECTS FLOOD CONTROL AND DRAINAGE - FLO OD CONTROL STRUCTURES FACILITIES - REHABILITATION OF BERDE CREEK, BRGY. SAN VICENTE
- Contractor: KPS CONSTRUCTION (42086)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-11-28
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,895,596.50
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - RAIN WATER COLLECTORS IN PUBLIC FACILITIE S, 2ND DISTRICT OF PAMPANGA
- Contractor: A.M. CANETE CONSTRUCTION AND TRADING (42540)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-12-21
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱4,016,769.50
- Contract status: Completed Report
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION ALONG PORAC RIVER (UPSTREAM), VALDEZ, FLORIDABLANCA, PAMPANGA, FLORIDABLANCA, PAMPANGA
- Contractor: R.D. SADSAD CONSTRUCTION & TRADING (19240)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-12-07
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱14,696,958.00
- Contract status: Completed Report
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION ALONG PORAC RIVER (UPSTREAM) VALDEZ, FLORIDABLANCA, PAMPANGA, FLORIDABLANCA, PAMPANGA< /li>
- Contractor: DMDANAN CONSTRUCTION AND TRADING (41374)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-03-16
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱14,696,721.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF LUBAO HEALTH CENTER INCL UDING SITE DEVELOPMENT IN STA. CATALINA, LUBAO, PAMPANGA
- Contractor: EDDMARI CONSTRUCTION & TRADING (20301)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-07-04
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱18,992,100.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF THE PAMPANGA PROVINCIAL DIALYSIS CENTER INCLDING SITE DEVELOPMENT IN SAN MATIAS, GUAGUA, PAMPANGA
- Contractor: EDDMARI CONSTRUCTION & TRADING (20301)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-07-04
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱28,515,940.00
- Contract status: Completed Report
- REHABILITATION OF FLOOD MITIGATION STRUCTURES ALONG PAS IG - POTRERO RIVER UPSTREAM OF SCTEX BRIDGE (PHASE 1), STA. 0+000 - STA. 0+ 275.95, PORAC, PAMPANGA
- Contractor: 11-16 CONSTRUCTION (29646)
- Implementing Agency: Region III - Pampanga 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-05-06
- Fund source: Regular Infra - GAA 2019 CSSP
- Contract price: ₱47,002,468.00
- Contract status: Completed Report