Infrastructure Projects in Region III — Region III - Pampanga 3rd District Engineering Office, 2017
This page lists public infrastructure projects implemented by Region III - Pampanga 3rd District Engineering Office in Region III during 2017. All data are sourced from the Department of Public Works and Highways (DPWH) official database (as of 9/30/2025): https://www.dpwh.gov.ph/dpwh/projects/infrastructure
This information is shared to promote transparency and public awareness. We encourage visitors to validate project details using the official DPWH source. In case of discrepancies, please refer to the original records published by the DPWH.
| Contractor | Projects | Total Price |
|---|---|---|
| AL-B DEVELOPMENT CORPORATION (11740) | 8 | ₱101,123,208.25 |
| R.D. SADSAD CONSTRUCTION & TRADING (19240) | 2 | ₱52,122,652.00 |
| ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY) (05349) | 1 | ₱34,918,408.00 |
| STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096) | 1 | ₱34,302,480.00 |
| P.V.B. CONSTRUCTION & TRADING (13269) | 3 | ₱31,361,837.88 |
- CONST OF ADDITIONAL RAIN WATER COLLECTORS(RWCS) IN PUBL IC SCHOOLS/BUILDING/MARKET IN R-III, AC,MAB C
- Contractor: R.G. DIAZ BUILDERS & TRADING (23814)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-06-16
- Fund source: Regular Infra - GAA 2016 MFO-3
- Contract price: ₱2,993,478.75
- Contract status: Completed Report
- LIP-BUILDING AND OTHER STRUCTURES MULTI PURPOSE/FACILIT IES CONST OF SENIOR CITIZEN BLDG, BRGY BICAL,
- Contractor: R2K BUILDERS CONSTRUCTION AND TRADING (29708)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-05-12
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,920,096.00
- Contract status: Completed Report
- LIP-BUILDING AND OTHER STRUCTURES/SCHOOL BUILDING CONST OF SCHOOL BLDG, STO DOMINGO INTEG SCHOOL, PU
- Contractor: R2K BUILDERS CONSTRUCTION AND TRADING (29708)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-06-11
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,664,226.00
- Contract status: Completed Report
- NATL ROAD NETWORK SERVICES: ASSET PRESERVATION OF NATL ROADS, REHAB/RECONST/UPGRADING OF DAMAGED PAV
- Contractor: AL-B DEVELOPMENT CORPORATION (11740)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-05-27
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱11,244,645.00
- Contract status: Completed Report
- NATL ROAD NETWORK SERVICES: ASSET PRESERVATION OF NATL ROADS,PREVENTIVE MAINTENANCE BASED ON PA
- Contractor: PRIME PAVE CONSTRUCTION AND ASPHALT CORPORATION (36597)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-03-28
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱11,027,709.00
- Contract status: Completed Report
- LFP,LIP,DRAINAGE/PROTECTION WORKS,CONST OF RC SLOPE PRO TECTION WITH STEEL SHEET PILES FOUNDATION ALO
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-08-10
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱34,302,480.00
- Contract status: Completed Report
- FMS;CONST/MAINT OF FLOOD MITIGATION STRUCTURES & DR AINAGE SYSTEM, CONST OF FLOOD CONTROL FACILITIES
- Contractor: A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE (19278)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-07-11
- Fund source: Regular Infra - GAA 2017 MFO-2
- Contract price: ₱17,783,830.00
- Contract status: Completed Report
- NETWORK DEV'T-IMPROVEMENT/WIDENING OF NATL ROADS-SECOND ARY: FRIENDSHIP CIRCUMFERENTIAL ROAD(WEST CIR
- Contractor: AL-B DEVELOPMENT CORPORATION (11740)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-05-12
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱30,803,586.00
- Contract status: Completed Report
- FMS:CONST/MAINT OF FMSDS;CONST OF FLOOD CONTROL FACILIT IES @ ALASAS CREEK, BRGY STA CRUZ,MAG, PAMP
- Contractor: ALL EML CONSTRUCTION CORPORATION (FORMERLY: E.M.L. CONSTRUCTION & TRADING) (10151)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-08-10
- Fund source: Regular Infra - GAA 2017 MFO-2
- Contract price: ₱15,779,535.00
- Contract status: Completed Report
- FMS; CONST/MAINT OF FMSDS, CONST OF FLOOD CONTROL FACIL ITIES @ QUITANGIL CREEK, BRGY SAN ISIDRO, MAG
- Contractor: R.D. SADSAD CONSTRUCTION & TRADING (19240)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-07-11
- Fund source: Regular Infra - GAA 2017 MFO-2
- Contract price: ₱19,576,670.00
- Contract status: Completed Report
- PROPOSED REPLACEMENT OF QUITANGIL BRIDGE, SAN MIGUEL, M AGALANG, PAMP
- Contractor: ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY) (05349)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-04-14
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱34,918,408.00
- Contract status: Completed Report
- FMS;CONST/MAINT OF FMSDS;CONST/CONC OF SLOPE PROT W/ ST EEL SHEET PILES FOUNDATION ALONG ABACAN RIVER
- Contractor: R.D. SADSAD CONSTRUCTION & TRADING (19240)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-08-12
- Fund source: Regular Infra - GAA 2017 MFO-2
- Contract price: ₱32,545,982.00
- Contract status: Completed Report
- NATL RD NETWORK SERVICES;ASSET PRESERVATION OF NATL RD; REHAB/RECONST/UPGRADING OF DAMAGED PAVED NATL
- Contractor: P.V.B. CONSTRUCTION & TRADING (13269)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-09-21
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱24,450,944.00
- Contract status: Completed Report
- MAINT & CONST SERVICES OF OTHER INFRASTRUCTURES:CON ST/IMPROVEMENT OF ACCESS RD LEADING TO AIRPORTS,S
- Contractor: ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP. (09036)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-05-24
- Fund source: Regular Infra - GAA 2017 MFO-3
- Contract price: ₱25,470,018.00
- Contract status: Completed Report
- MAINT AND CONST SERVICES OF OTHER INFRA:CONST/IMPROVEME NT OF ACCESS RD LEADING TO AIRPORTS,SEAPORTS
- Contractor: PRIME PAVE CONSTRUCTION AND ASPHALT CORPORATION (36597)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-06-21
- Fund source: Regular Infra - GAA 2017 MFO-3
- Contract price: ₱15,032,503.00
- Contract status: Completed Report
- FMS:CONST/MAINT OF FMSDS;CONST OF GROUNDSILL ALONG ABAC AN RIVER(D/S OF ABACAN BRIDGE) STA 0+000 TO
- Contractor: R.M. VITUG CONSTRUCTION (9227)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-10-14
- Fund source: Regular Infra - GAA 2017 MFO-2
- Contract price: ₱19,252,474.00
- Contract status: Completed Report
- FMS;CONST/MAINT OFFMSDS;REHAB OF QUITANGIL CREEK STA 1+ 889 TO STA 2+607 AND STA 3+000 TO STA 3+642(R
- Contractor: AL-B DEVELOPMENT CORPORATION (11740)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-10-19
- Fund source: Regular Infra - GAA 2017 MFO-2
- Contract price: ₱27,634,434.00
- Contract status: Completed Report
- LFP:CONST/REPAIR/REHAB/IMPRV'T. OF VILP;ROADS & BRI DGES,LOCAL ROADS,IMPRV'T/WIDENING OF ANGELES-PORA
- Contractor: MCB ZAMORA CONSTRUCTION & SUPPLY (32006)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-09-28
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱19,687,144.00
- Contract status: Completed Report
- CONST/REHAB OF WATER SUPPLY/SEPTAGE AND SEWAGE/RAIN WAT ER COLLECTOR SYSTEM CONST OF OF RAIN WATER CO
- Contractor: MJBZ BUILDERS AND TRADING (36055)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-06-16
- Fund source: Regular Infra - GAA 2017 MFO-3
- Contract price: ₱3,172,697.00
- Contract status: Completed Report
- LFP: LIP: CONCRETING OF ROAD AT BARANGAY MINING, ANGELE S CITY
- Contractor: AFRA CONSTRUCTION (39669)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-06-11
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱479,529.47
- Contract status: Completed Report
- LFP: LIP: CONCRETING OF ROAD, BARANGAY CUTCUT, ANGELES CITY, PAMPANGA
- Contractor: AL-B DEVELOPMENT CORPORATION (11740)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-06-11
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱968,444.12
- Contract status: Completed Report
- LFP: LIP: CONCRETING OF ROAD, BARANGAY CUTUD, ANGELES C ITY, PAMPANGA
- Contractor: A B N CONSTRUCTION CORPORATION (17194)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-06-11
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,410,532.00
- Contract status: Completed Report
- LFP: LIP: CONCRETING OF ROAD, BARANGAY MALABANAS, ANGEL ES CITY, PAMPANGA
- Contractor: R.G. DIAZ BUILDERS & TRADING (23814)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-06-17
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,918,256.38
- Contract status: Completed Report
- LFP: LIP: CONCRETING OF ROAD, BARANGAY STO DOMINGO, ANG ELES CITY, PAMPANGA
- Contractor: R.G. DIAZ BUILDERS & TRADING (23814)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-06-17
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,915,941.62
- Contract status: Completed Report
- LFP: LIP: CONCRETING OF ROAD, BARANGAY SAPALIBUTAD, ANG ELES CITY, PAMPANGA
- Contractor: GEOHEART CONSTRUCTION & TRADING (33316)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-06-17
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,919,992.38
- Contract status: Completed Report
- LFP: LIP: FLOOD CONTROL STRUCTURES/FACILITIES; REHAB OF DRAINAGE SYSTEM, BRGY CAPAYA II, AC, PAMP.
- Contractor: 3-SIDES BUILDERS & TRADING CORP. (40469)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-06-11
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱484,784.50
- Contract status: Completed Report
- LFP: LIP: FLOOD CONTROL STRUCTURES/FACILITIES; CONCRETI NG OF DRAINAGE AT BRGY VIRGEN DELOS REMEDIOS,
- Contractor: AL-B DEVELOPMENT CORPORATION (11740)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-06-11
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱968,254.50
- Contract status: Completed Report
- LFP: LIP: FLOOD CONTROL STRUCTURES/FACILITIES; CONCRETI NG OF DRAINAGE, BRGY PULUNGBULU, AC, PAMP.
- Contractor: GEOHEART CONSTRUCTION & TRADING (33316)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-07-10
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,919,047.75
- Contract status: Completed Report
- LFP: LIP: FLOOD CONTROL STRUCTURES/FACILITIES; CONST. O F DRAINAGE, BRGY STA TERESITA, ANGELES CITY,
- Contractor: 3-SIDES BUILDERS & TRADING CORP. (40469)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-06-11
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,920,474.12
- Contract status: Completed Report
- LFP:LIP: CONST OF LOCAL ROAD, BRGY ANUNAS-MARGOT-SAPANG BATO, ANGELES CITY
- Contractor: P.V.B. CONSTRUCTION & TRADING (13269)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-06-22
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,962,097.88
- Contract status: Completed Report
- LFP:LIP: BUILDING AND OTHER STRUCTURES: MULTI PURPOSE/F ACILITIES; CONST/REHAB OF MULTI PURPOSE(LADY
- Contractor: P.V.B. CONSTRUCTION & TRADING (13269)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-10-25
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱4,948,796.00
- Contract status: Completed Report
- LFP:LIP: CONCRETING OF ROAD, BRGY SAN PEDRO II, MAGALAN G, PAMPANGA
- Contractor: R.G. DIAZ BUILDERS & TRADING (23814)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-07-01
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,432,784.88
- Contract status: Completed Report
- LFP: LIP: CONCRETING OF ROAD, BRGY SAN PEDRO I, MAGALAN G, PAMPANGA
- Contractor: MICKAJETTE CONSTRUCTION AND TRADING (35239)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-07-07
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,429,059.88
- Contract status: Completed Report
- LFP:LIP: FLOOD CONTROL STRUCTURES/FACILITIES; CONST OF DRAINAGE SYSTEM, BRGY SAN ISIDRO, MAGALANG, P
- Contractor: MICKAJETTE CONSTRUCTION AND TRADING (35239)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-07-07
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,430,535.50
- Contract status: Completed Report
- LFP: LIP: CONCRETING OF ROAD, BRGY DAU, MABALACAT, PAMP ANGA
- Contractor: GERCEL CONSTRUCTION AND DEVELOPMENT GROUP INC. (FORMERLY: GERCEL CONSTRUCTION) (26541)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-06-30
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,432,515.00
- Contract status: Completed Report
- LFP: LIP: CONCRETING OF ROAD, BRGY STA INEZ, MABALACAT, PAMPANGA
- Contractor: R.G. DIAZ BUILDERS & TRADING (23814)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-07-01
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,671,219.88
- Contract status: Completed Report
- LFP: LIP: CONCRETING OF ROAD AT BRGY MACAPAGAL VILLAGE, MABALACAT, PAMPANGA
- Contractor: MJBZ BUILDERS AND TRADING (36055)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-07-01
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,906,676.50
- Contract status: Completed Report
- LFP: LIP: CONCRETING OF ROAD, BRGY DUQUIT, MABALACAT, P AMPANGA
- Contractor: R.G. DIAZ BUILDERS & TRADING (23814)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-07-01
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,909,761.12
- Contract status: Completed Report
- LFP: LIP: FLOOD CONTROL STRUCTURES/FACILITIES; CONST OF DRAINAGE SYSTEM, BRGY SAN FRANCISCO, MABALAC
- Contractor: AFRA CONSTRUCTION (39669)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-07-01
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱965,825.75
- Contract status: Completed Report
- LFP:LIP: BUILDING AND OTHER STRUCTURES: MULTI PURPOSE/F ACILITIES; CONST/REPAIR/REHAB OF MPB(COVERED
- Contractor: E.L. GOMEZ CONSTRUCTION (31522)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-12-04
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱4,776,422.50
- Contract status: Completed Report
- LFP:LIP: BUILDING AND OTHER STRUCTURES: SB: CONST OF SB , BRGY BUCANAN, MAGALANG, PAMPANGA
- Contractor: E.L. GOMEZ CONSTRUCTION (31522)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-10-05
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,571,100.88
- Contract status: Completed Report
- LFP: LIP: BUILDING AND OTHER STRUCTURES: MULTI PURPOSE/ FACILITIES; CONST OF MULTI PURPOSE BUILDING(B
- Contractor: MICKAJETTE CONSTRUCTION AND TRADING (35239)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-09-05
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,907,595.00
- Contract status: Completed Report
- CONST OF MULTI PURPOSE BUILDING(BRGY HALL), BRGY TURU, MAGALANG, PAMPANGA
- Contractor: A B N CONSTRUCTION CORPORATION (17194)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-09-04
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,911,117.75
- Contract status: Completed Report
- CONST. OF MULTI PURPOSE HALL, BRGY AYALA, MAGALANG, PAM PANGA
- Contractor: T.G. OCAMPO CONSTRUCTION & SURVEYING SERVICES (29435)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-11-04
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱2,865,472.75
- Contract status: Completed Report
- LFP:LIP: BUILDING AND OTHER STRUCTURES: MULTI PURPOSE/F ACILITIES;CONST OF MPB, BRGY MANGATIT, MABALA
- Contractor: GERCEL CONSTRUCTION AND DEVELOPMENT GROUP INC. (FORMERLY: GERCEL CONSTRUCTION) (26541)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-11-01
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,471,289.25
- Contract status: Completed Report
- LFP:LIP: BUILDING AND OTHER STRUCTURES; MULTI PURPOSE/F ACILITIES; CONST OF MPB,BRGY ESCALER,MAG.PAMP
- Contractor: R.G. DIAZ BUILDERS & TRADING (23814)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-10-24
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,425,368.00
- Contract status: Completed Report
- LFP:LIP: BUILDING AND OTHER STRUCTURES/FACILITIES;CONST OF MPB,BRGY STA LUCIA,MAG.PAMP
- Contractor: A B N CONSTRUCTION CORPORATION (17194)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-10-23
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,425,969.00
- Contract status: Completed Report
- LFP:LIP: BUILDING AND OTHER STRUCTURES MULTI PURPOSE/FA CILITIES; CONST OF MPB(BRGY HALL),BRGY NAVALI
- Contractor: R.G. DIAZ BUILDERS & TRADING (23814)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-10-24
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,967,278.62
- Contract status: Completed Report
- LFP:LIP: BUILDING AND OTHER STRUCTURES;MULTI PURPOSE/FA CILITIES;CONST OF MPB(BRGY HALL),BRGY DOLORES
- Contractor: A B N CONSTRUCTION CORPORATION (17194)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-11-01
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,964,457.75
- Contract status: Completed Report
- LFP;LIP;FLOOD CONTROL STRUCTURES/FACILITIES;CONST OF CO NCRETE PAVEMENT AND LINE CANAL,BRGY MALABANAS
- Contractor: WNR CONSTRUCTION AND TRADING (41055)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-09-02
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,941,087.38
- Contract status: Completed Report
- LFP;LIP;BUILDING AND OTHER STRUCTURES,SCHOOL BUILDING,C ONST OF CLASSROOM STO DOMINGO INTEGRATED SCHO
- Contractor: R.G. DIAZ BUILDERS & TRADING (23814)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-11-16
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱4,751,384.50
- Contract status: Completed Report
- LFP;CONST/REPAIR/REHAB/IMPROVEMENT OF VILP: ROADS AND B RIDGES,LOCAL ROADS,IMPROVEMENT/REHAB OF AYALA
- Contractor: AL-B DEVELOPMENT CORPORATION (11740)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-12-21
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱27,574,186.00
- Contract status: Completed Report
- NAT'L ROAD NETWORK SERVICES;CONST & MAINT OF BRIDGE S ALONG NAT'L ROADS, REPLACEMENT OF PERMANENT WEA
- Contractor: GEOHEART CONSTRUCTION & TRADING (33316)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-06-05
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱14,633,720.00
- Contract status: Completed Report
- LFP;LIP; BUILDINGS & OTHER STRUCTURES: MULTIPURPOSE /FACILITIES,IMPROVEMENT OF MPB,BRGY PANDAN,AC
- Contractor: AFRA CONSTRUCTION (39669)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-08-31
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱969,377.62
- Contract status: Completed Report
- LFP;LIP;BUILDINGS & OTHER STRUCTURES;MULTIPURPOSE/F ACILITIES;IMPROVEMENT OF MPB,BRGY STO DOMINGO,AC
- Contractor: E.L. GOMEZ CONSTRUCTION (31522)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-08-11
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱484,949.97
- Contract status: Completed Report
- LFP:FLOOD CONTROL STRUCTURES/FACILITIES;CONST OF CONCRE TE PAVEMENT AND LINED CANAL AT PUROK 10 BIGLA
- Contractor: 3-SIDES BUILDERS & TRADING CORP. (40469)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-08-09
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,410,037.38
- Contract status: Completed Report
- LFP;LIP; PROGRAM AND OTHER STRUCTURE;MULTI PURPOSE-FACI LITIES;IMPROVEMENT OF MULTI PURPOSE FACILITIE
- Contractor: AL-B DEVELOPMENT CORPORATION (11740)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-08-16
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱959,822.50
- Contract status: Completed Report
- LFP;LIP;BUILDING AND OTHER STRUCTURES, MULTI PURPOSE/FA CILITIES, IMPROVEMENT OF MPB, BRGY CAMACHILES
- Contractor: THREE-IN-ONE CONSTRUCTION & TRADING (14695)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-11-30
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,440,016.88
- Contract status: Completed Report
- LFP;LIP;BUILDNG AND OTHER STRUCTURES;MULTI PURPOSE/FACI LITIES;IMPROVEMENT OF BRGY HALL,BRGY SAN FRAN
- Contractor: GERCEL CONSTRUCTION AND DEVELOPMENT GROUP INC. (FORMERLY: GERCEL CONSTRUCTION) (26541)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-12-15
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,680,345.12
- Contract status: Completed Report
- LFP;LIP;BUILDING AND OTHER STRUCTURES;SCHOOL BUILDNGS;C ONST OF 2 CL SCHOOL BLDNG, SAN MIGUEL ES,BRGY
- Contractor: E.L. GOMEZ CONSTRUCTION (31522)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-01-14
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱2,968,713.00
- Contract status: Completed Report
- LFP;LIP;BLDNG AND OTHER STRUCTURES;MULTI PURPOSE/FACILI TIES;CONST OF MPB,BRGY VIRGEN DELOS REMEDIOS,
- Contractor: AL-B DEVELOPMENT CORPORATION (11740)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-11-15
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱969,836.12
- Contract status: Completed Report
- LFP;ROADS AND BRIDGES;LOCAL ROADS;ROAD CONCRETING/CONST OF INARARO-SAPANGBATO,AC ROAD, STA 0+000 TO
- Contractor: MJBZ BUILDERS AND TRADING (36055)
- Implementing Agency: Region III - Pampanga 3rd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-10-16
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,899,818.25
- Contract status: Completed Report