Infrastructure Projects in Region III — Region III - Zambales 1st District Engineering Office, 2016
This page lists public infrastructure projects implemented by Region III - Zambales 1st District Engineering Office in Region III during 2016. All data are sourced from the Department of Public Works and Highways (DPWH) official database (as of 9/30/2025): https://www.dpwh.gov.ph/dpwh/projects/infrastructure
This information is shared to promote transparency and public awareness. We encourage visitors to validate project details using the official DPWH source. In case of discrepancies, please refer to the original records published by the DPWH.
| Contractor | Projects | Total Price |
|---|---|---|
| E.R. DELA CRUZ CONSTRUCTION & SUPPLY (32158) | 12 | ₱137,679,788.88 |
| STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096) | 7 | ₱107,349,675.00 |
| L.M.G. CONSTRUCTION INCORPORATED (FORMERLY: LMG CONSTRUCTION) (5719) | 3 | ₱55,880,790.00 |
| ROMA CONSTRUCTION & DEVELOPMENT CORPORATION (6514) | 4 | ₱52,387,569.00 |
| HIGH STRENGTH DEV. CORPORATION (31976) | 2 | ₱49,984,387.00 |
- REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES, KILIN G BRIDGE(B01405LZ) ALONG OBR, CABANGAN, ZAMB
- Contractor: GCLT CONSTRUCTION INCORPORATED (FORMERLY: GCLT CONSTRUCTION) (30657)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-03-20
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱1,939,984.75
- Contract status: Completed Report
- REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES, LUCAP ON BRIDGE (B01430LZ) ALONG OBR, STA. CRUZ, Z
- Contractor: GCLT CONSTRUCTION INCORPORATED (FORMERLY: GCLT CONSTRUCTION) (30657)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-03-10
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱1,551,368.75
- Contract status: Completed Report
- REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES, SALAZ A BRIDGE (B00029LZ) ALONG OBR, PALAUIG, ZAMB
- Contractor: 4NL CONSTRUCTION (32551)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-03-20
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱1,994,229.00
- Contract status: Completed Report
- REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES, STO. NI C3 91O BRIDGE (B00032LZ) ALONG OBR, CABANGAN,
- Contractor: GCLT CONSTRUCTION INCORPORATED (FORMERLY: GCLT CONSTRUCTION) (30657)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-03-05
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱2,329,361.75
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION/ FLOOD CONTROL AT BUCAO DIKE, BOTOLAN, ZAMBALES
- Contractor: ROMA CONSTRUCTION & DEVELOPMENT CORPORATION (6514)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-07-03
- Fund source: Regular Infra - GAA 2016 MFO-2
- Contract price: ₱11,483,739.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION/ FLOOD CONTROL AT SAGPA T DIKE, SAN FELIPE, ZAMBALES
- Contractor: E.R. DELA CRUZ CONSTRUCTION & SUPPLY (32158)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-07-03
- Fund source: Regular Infra - GAA 2016 MFO-2
- Contract price: ₱12,633,104.00
- Contract status: Completed Report
- CONTRUCTION OF SLOPE PROTECTION/ FLOOD CONTROL OF KILING DIKE, (UPSTREAM SECTION), CABANGAN, ZAMBALE
- Contractor: ROMA CONSTRUCTION & DEVELOPMENT CORPORATION (6514)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-07-13
- Fund source: Regular Infra - GAA 2016 MFO-2
- Contract price: ₱11,997,397.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION/ FLOOD CONTROL OF KILIN G DIKE, (DOWNSTREAM SECTION), CABANGAN, ZAMB
- Contractor: ROMA CONSTRUCTION & DEVELOPMENT CORPORATION (6514)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-08-05
- Fund source: Regular Infra - GAA 2016 MFO-2
- Contract price: ₱11,547,291.00
- Contract status: Completed Report
- RAISING OF GRADE ALONG VEGA- MACULCOL DIKE UPSTREAM, SAN NARCISO SIDE, SAN NARCISO, ZAMBALES STA. 2+
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-07-18
- Fund source: Regular Infra - GAA 2016 MFO-2
- Contract price: ₱14,855,873.00
- Contract status: Completed Report
- RAISING OF GRADE ALONG VEGA- MACULCOL DIKE DOWNSTREAM, S AN NARCISO SIDE, SAN NARCISO, ZAMBALES, STA.
- Contractor: E.R. DELA CRUZ CONSTRUCTION & SUPPLY (32158)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-09-01
- Fund source: Regular Infra - GAA 2016 MFO-2
- Contract price: ₱12,869,481.00
- Contract status: Completed Report
- RAISING OF GRADE ALONG PAITE- MACULCOL DIKE, SAN FELIPE SIDE, SAN FELIPE, ZAMBALES STA. 9+163- STA.
- Contractor: R.J. IBARRA CONSTRUCTION (23538)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-05-24
- Fund source: Regular Infra - GAA 2016 MFO-2
- Contract price: ₱6,987,124.50
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION AT BANCAL RIVER DOWNSTR EAM, SOUTH APPROACH, BANCAL, BOTOLAN, ZAMBAL
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-07-21
- Fund source: Regular Infra - GAA 2016 MFO-2
- Contract price: ₱14,770,916.00
- Contract status: Completed Report
- PREVENTIVE MAINTENANCE BASED ON PREVENTIVE MANAGEMENT SY STEM/ HIGHWAY, SAN MARCELINO- SAN ANTONIO-SA
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-04-12
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱11,112,715.00
- Contract status: Completed Report
- OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, OLONGAPO - BUGALLON ROAD, K0208+850- K0210+100 & K022
- Contractor: GVDPM CONSTRUCTION CORP. (FORMERLY: ZM CONSTRUCTIO (9052)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-05-28
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱13,975,384.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION/ FLOOD CONTROL AT MACUL COL DIKE, SAN NARCISO, ZAMBALES
- Contractor: GVDPM CONSTRUCTION CORP. (FORMERLY: ZM CONSTRUCTIO (9052)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-07-07
- Fund source: Regular Infra - GAA 2016 MFO-2
- Contract price: ₱12,708,047.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION AT MALOMA DIKE DOWNSTRE AM, LAOAG, SAN FELIPE, ZAMBALES, STA.0+759.5
- Contractor: E.R. DELA CRUZ CONSTRUCTION & SUPPLY (32158)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-07-07
- Fund source: Regular Infra - GAA 2016 MFO-2
- Contract price: ₱12,386,049.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION/ FLOOD CONTROL ALONG KI LING DIKE (NORTH APPROACH), CABANGAN, ZAMBAL
- Contractor: E.R. DELA CRUZ CONSTRUCTION & SUPPLY (32158)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-07-14
- Fund source: Regular Infra - GAA 2016 MFO-2
- Contract price: ₱15,524,448.00
- Contract status: Completed Report
- IMPROVEMENT/ REHABILITATION OF SLOPE PROTECTION/ FLOOD C ONTROL, GABOR DIKE, (UPSTREAM), SAN FELIPE,
- Contractor: E.R. DELA CRUZ CONSTRUCTION & SUPPLY (32158)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-06-19
- Fund source: Regular Infra - GAA 2016 MFO-2
- Contract price: ₱14,156,419.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION/ FLOOD CONTROL ALONG ST O. NI C3 91O RIVER, DOWNSTREAM, CABANGAN, ZAMBALE
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-10-13
- Fund source: Regular Infra - GAA 2016 MFO-2
- Contract price: ₱28,379,040.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION, MALOMA RIVER DOWNSTREA M, SAN FELIPE SIDE, SAN FELIPE, ZAMBALES
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-08-12
- Fund source: Regular Infra - GAA 2016 MFO-2
- Contract price: ₱18,021,020.00
- Contract status: Completed Report
- SLOPE PROTECTION WORKS ALONG PAMATAWAN RIVER IN SAN ANTO NIO, ZAMBALES
- Contractor: HIGH STRENGTH DEV. CORPORATION (31976)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-11-09
- Fund source: Regular Infra - GAA 2016 MFO-2
- Contract price: ₱33,387,926.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION, GABOR DIKE (UPSTREAM), SAN FELIPE, ZAMBALES STA.0+928- STA.1+284.5
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-09-14
- Fund source: Regular Infra - GAA 2016 MFO-2
- Contract price: ₱15,284,934.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION/ FLOOD CONTROL, BANCAL RIVER (UPSTREAM), IBA, ZAMBALES
- Contractor: ROMA CONSTRUCTION & DEVELOPMENT CORPORATION (6514)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-09-08
- Fund source: Regular Infra - GAA 2016 MFO-2
- Contract price: ₱17,359,142.00
- Contract status: Completed Report
- CONCRETING OF ANULING- STA. BARBARA ROAD IN BRGY. STA. B ARBARA, IBA, ZAMBALES 2ND LD
- Contractor: G.A. PINEDA CONSTRUCTION (3428)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-04-08
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱4,599,839.00
- Contract status: Completed Report
- CONSTRUCTION OF ROADS AT BRGY. BATONLAPOC, BOTOLAN, ZAMB ALES
- Contractor: GVDPM CONSTRUCTION CORP. (FORMERLY: ZM CONSTRUCTIO (9052)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-03-25
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱1,898,153.38
- Contract status: Completed Report
- REHABILITATION OF MACULCOL DIKE (DOWNSTREAM), SAN NARCIS O SIDE, SAN NARCISO, ZAMBALES
- Contractor: L.M.G. CONSTRUCTION INCORPORATED (FORMERLY: LMG CONSTRUCTION) (5719)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-06-23
- Fund source: Regular Infra - GAA 2016 MFO-2
- Contract price: ₱13,490,190.00
- Contract status: Completed Report
- REHABILITATION/IMPROVEMENT OF SLOPE PROTECTION, KILING R IVER, CABANGAN, ZAMBALES, STA. 2+287-STA.3+0
- Contractor: E.R. DELA CRUZ CONSTRUCTION & SUPPLY (32158)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-09-14
- Fund source: Regular Infra - GAA 2016 MFO-2
- Contract price: ₱23,665,348.00
- Contract status: Completed Report
- CONSTRUCTION OF SCHOOL BUILDING OF RAMON MAGSAYSAY TECHN OLOGICAL UNIVERSITY (STA. CRUZ CAMPUS), BRGY
- Contractor: JECK CONSTRUCTION (24189)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-06-10
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱5,304,992.50
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF LAUIS MULTI-PURPOSE BUILDING , BARANGAY LAUIS, CANDELARIA, ZAMBALES 2ND L
- Contractor: G.A. PINEDA CONSTRUCTION (3428)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-04-11
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱1,959,689.25
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY PORAC, BOTOLAN, ZAMBALES 2ND LD
- Contractor: FERMIDA CONSTRUCTION SERVICES AND SUPPLIES (FORMERLY: FERMIDA CONSTRUCTION SERVICES) (25424)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-04-24
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱1,200,000.00
- Contract status: Completed Report
- CONSTRUCTION OF DAMPAY PLAZA, BARANGAY DAMPAY, CANDELARI A, ZAMBALES 2ND LD
- Contractor: G.A. PINEDA CONSTRUCTION (3428)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-04-28
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱1,960,516.62
- Contract status: Completed Report
- RAISING/UPGRADING OF SLOPE PROTECTION/FLOOD CONTROL AT V EGA MACULCOL DIKE (UPSTREAM) SAN NARCISO, ZA
- Contractor: E.R. DELA CRUZ CONSTRUCTION & SUPPLY (32158)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-07-16
- Fund source: Regular Infra - GAA 2016 MFO-2
- Contract price: ₱14,343,628.00
- Contract status: Completed Report
- RAISING/UPGRADING OF SLOPE PROTECTION/FLOOD CONTROL AT P AITE MACULCOL DIKE (UPSTREAM) SAN FELIPE, ZA
- Contractor: L.M.G. CONSTRUCTION INCORPORATED (FORMERLY: LMG CONSTRUCTION) (5719)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-09-04
- Fund source: Regular Infra - GAA 2016 MFO-2
- Contract price: ₱20,393,912.00
- Contract status: Completed Report
- RAISING/UPGRADING OF SLOPE PROTECTION/FLOOD CONTROL AT S TO. NI C3 91O RIVER (DOWNSTREAM) CABANGAN, ZAMBAL
- Contractor: L.M.G. CONSTRUCTION INCORPORATED (FORMERLY: LMG CONSTRUCTION) (5719)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-09-04
- Fund source: Regular Infra - GAA 2016 MFO-2
- Contract price: ₱21,996,688.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION AT BANCAL RIVER (DOWNST REAM) NORTH APPROACH, BOTOLAN, ZAMBALES
- Contractor: GVDPM CONSTRUCTION CORP. (FORMERLY: ZM CONSTRUCTIO (9052)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-06-26
- Fund source: Regular Infra - GAA 2016 MFO-2
- Contract price: ₱9,381,680.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION AT CUYACOY RIVER, SIMMI NUBLAN SECTION, SAN NARCISO, ZAMBALES
- Contractor: R.J. IBARRA CONSTRUCTION (23538)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-07-15
- Fund source: Regular Infra - GAA 2016 MFO-2
- Contract price: ₱9,078,313.00
- Contract status: Completed Report
- IMPROVEMENT/WIDENING OF NATIONAL ROADS, TERTIARY ROADS, AMUNGAN-PALAUIG-BANLOG ROAD (INCLUDING DRAIN
- Contractor: HIGH STRENGTH DEV. CORPORATION (31976)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-08-11
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱16,596,461.00
- Contract status: Completed Report
- COMPLETION OF APOSTOL ROAD (BURGOS-SAN JUAN-SANTIAGO-SAN NICOLAS SECTION), BARANGAY BURGOS-SAN JUAN,
- Contractor: FERMIDA CONSTRUCTION SERVICES AND SUPPLIES (FORMERLY: FERMIDA CONSTRUCTION SERVICES) (25424)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-06-01
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱2,879,445.00
- Contract status: Completed Report
- CONCRETING OF CLAVEL ST., BARANGAY PANAYUNAN, CANDELARIA , ZAMBALES 2ND LD
- Contractor: E.R. DELA CRUZ CONSTRUCTION & SUPPLY (32158)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-04-26
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱1,940,000.00
- Contract status: Completed Report
- CONSTRUCTION OF BANGAN MULTI-PURPOSE BUILDING, BARANGAY BANGAN, BOTOLAN, ZAMBALES 2ND LD
- Contractor: GCLT CONSTRUCTION INCORPORATED (FORMERLY: GCLT CONSTRUCTION) (30657)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-05-18
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱2,939,999.00
- Contract status: Completed Report
- COMPLETION OF SCHOOL BUILDING, BOTOLAN NORTH CENTRAL EL EMENTARY SCHOOL, BOTOLAN, ZAMBALES 2ND LD
- Contractor: E.R. DELA CRUZ CONSTRUCTION & SUPPLY (32158)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-08-16
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱7,456,039.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI- PURPOSE BUILDING, BRGY. STO. ROS ARIO, MASINLOC, ZAMBALES 2ND LD
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-07-17
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱4,925,177.00
- Contract status: Completed Report
- CONSTRUCTION OF MPB (SENIOR CITIZEN BLG.), BRGY. GARRET A, PALAUIG, ZAMBALES 2ND LD
- Contractor: A.M AYUNAN CONSTRUCTION (13983)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-05-26
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱735,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MPB (SENIOR CITIZEN BLDG.), BRGY. BABAN CAL, CANDELARIA, ZAMBALES 2ND LD
- Contractor: A.M AYUNAN CONSTRUCTION (13983)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-05-26
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱735,000.00
- Contract status: Completed Report
- CONSTRUCTION/ IMPROVEMENT OF BRGY. TANOD OUTPOST, BRGY. ALUSIIS, SAN NARCISO, ZAMBALES
- Contractor: G.A. PINEDA CONSTRUCTION (3428)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-05-26
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱693,002.25
- Contract status: Completed Report
- CONCRETING OF ROAD, BARANGAY PAGATPAT, MUNICIPALITY OF STA. CRUZ, ZAMBALES 2ND LD
- Contractor: JECK CONSTRUCTION (24189)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-05-18
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱1,940,000.00
- Contract status: Completed Report
- CONCRETING OF SITIO BANGAN ROAD, BARANGAY MALABAGO, STA . CRUZ, ZAMBALES 2ND LD
- Contractor: JECK CONSTRUCTION (24189)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-05-18
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱1,940,000.00
- Contract status: Completed Report
- CONCRETING OF ROAD, BARANGAY UACON, CANDELARIA, ZAMBALE S 2ND LD
- Contractor: G.A. PINEDA CONSTRUCTION (3428)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-05-18
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱1,970,000.00
- Contract status: Completed Report
- CONSTRUCTION OF ROADS AT BRGY. BEDDENG, SAN NARCISO, ZA MBALES
- Contractor: GVDPM CONSTRUCTION CORP. (FORMERLY: ZM CONSTRUCTIO (9052)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-05-18
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱1,949,717.62
- Contract status: Completed Report
- CONCRETING OF ROAD PHASE 3, KAWAYAN- KILING ROAD, BARAN GAY AMUNGAN, IBA, ZAMBALES 2ND LD
- Contractor: CDC CONSTRUCTION & SUPPLIES (28275)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-07-15
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱9,414,583.00
- Contract status: Completed Report
- REHABILITATION OF DRAINAGE CANAL AT REAL ST., POBLACION , CANDELARIA, ZAMBALES
- Contractor: G.A. PINEDA CONSTRUCTION (3428)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-06-18
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱4,875,000.00
- Contract status: Completed Report
- COMPLETION OF SCHOOL BUILDING, BATO ELEMENTARY SCHOOL, BRGY. BATO, MUNICIPALITY OF PALAUIG, ZAMBALES
- Contractor: A.M AYUNAN CONSTRUCTION (13983)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-07-10
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱1,939,963.50
- Contract status: Completed Report
- CONCRETING OF F. CONCEPTION ROAD, BARANGAY BURGOS, SAN ANTONIO, ZAMBALES 2ND LD
- Contractor: A.M AYUNAN CONSTRUCTION (13983)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-05-26
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱1,960,007.00
- Contract status: Completed Report
- CONSTRUCTION OF BARANGAY ROAD, BARANGAY AMUNGAN, IBA, Z AMBALES
- Contractor: E.R. DELA CRUZ CONSTRUCTION & SUPPLY (32158)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-06-03
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱1,959,243.38
- Contract status: Completed Report
- IMPLEMENTATION OF RAINWATER COLLECTOR SYSTEM (RWCS 2016 )
- Contractor: FERMIDA CONSTRUCTION SERVICES AND SUPPLIES (FORMERLY: FERMIDA CONSTRUCTION SERVICES) (25424)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2016-12-12
- Fund source: Regular Infra - GAA 2016 MFO-3
- Contract price: ₱3,046,823.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD MITIGATION FACILITIES ALONG PRINC IPAL RIVERS, GABOR-STO. TOMAS RIVER, SAN FELI
- Contractor: E.R. DELA CRUZ CONSTRUCTION & SUPPLY (32158)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-02-11
- Fund source: Regular Infra - GAA 2016 MFO-2
- Contract price: ₱6,996,594.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD MITIGATION FACILITIES ALONG PRINC IPAL RIVERS, NAYUM RIVER, STA. CRUZ, ZAMBALES
- Contractor: GCLT CONSTRUCTION INCORPORATED (FORMERLY: GCLT CONSTRUCTION) (30657)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-02-01
- Fund source: Regular Infra - GAA 2016 MFO-2
- Contract price: ₱4,363,730.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD MITIGATION FACILITIES ALONG PRINC IPAL RIVERS, BUCAO RIVER, BOTOLAN, ZAMBALES,
- Contractor: E.R. DELA CRUZ CONSTRUCTION & SUPPLY (32158)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2017-03-14
- Fund source: Regular Infra - GAA 2016 MFO-2
- Contract price: ₱13,749,435.00
- Contract status: Completed Report