Infrastructure Projects in Region III — Region III - Zambales 1st District Engineering Office, 2019
This page lists public infrastructure projects implemented by Region III - Zambales 1st District Engineering Office in Region III during 2019. All data are sourced from the Department of Public Works and Highways (DPWH) official database (as of 9/30/2025): https://www.dpwh.gov.ph/dpwh/projects/infrastructure
This information is shared to promote transparency and public awareness. We encourage visitors to validate project details using the official DPWH source. In case of discrepancies, please refer to the original records published by the DPWH.
| Contractor | Projects | Total Price |
|---|---|---|
| STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096) | 14 | ₱499,306,772.50 |
| AQUINO-DELA CRUZ ENGINEERING & CONSTRUCTION (16751) | 4 | ₱257,969,640.00 |
| BIG BERTHA CONSTRUCTION & DEVELOPMENT (3191) | 4 | ₱237,019,572.00 |
| HIGH STRENGTH DEV. CORPORATION (31976) | 4 | ₱209,558,676.00 |
| L.M.G. CONSTRUCTION INCORPORATED (FORMERLY: LMG CONSTRUCTION) (5719) | 2 | ₱112,537,088.00 |
- CLUSTER I- 1. RETROFITTING/STRENGTHENING OF BRIDGE, ALU SIIS BR.(B01392LZ) ALONG OLONGAPO-BUGALLON ROAD 2. RETROFITTING/STRENGTHENI NG OF BRIDGE, BANGAR BR.(B01394LZ) ALONG OLONGAPO-BUGALLON ROAD 3. RETROFIT TING/STRENGTHENING OF BRIDGE, STO. TOMAS BR.
- Contractor: AQUINO-DELA CRUZ ENGINEERING & CONSTRUCTION (16751)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-07
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱43,567,468.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION/FLOOD CONTROL AT BAYTO RIVER, STA. CRUZ, ZAMBALES
- Contractor: GOLDRICH CONSTRUCTION & TRADING (16489)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-07
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱15,888,446.00
- Contract status: Completed Report
- RAISING OF GRADE OF SLOPE PROTECTION ALONG BUCAO RIVER, BOTOLAN, ZAMBALES
- Contractor: CDC CONSTRUCTION & SUPPLIES (28275)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-09
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱15,547,649.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), STA. CRUZ SOUTH CENTRAL ELEMENTARY SCHOOL, BARANGAY LIPAY,STA. CRUZ, ZAMBA LES
- Contractor: NEW MASINLOC HENRY'S CONSTRUCTION & SUPPLY (33744)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-25
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,950,200.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION WORKS, BRGY, CARAEL, B OTOLAN, ZAMBALES
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-01-02
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱41,636,500.00
- Contract status: Completed Report
- CLUSTER II- 1. RETROFITTING/STRENGTHENING OF BRIDGE, AP O-APO BR.(B01404LZ) ALONG OLONGAPO-BUGALLON ROADV2. RETROFITTING/STRENGTHEN ING OF BRIDGE, KILING BR.(B01405LZ) ALONG OLONGAPO-BUGALLON ROAD) 3.RETROFI TTING/STRENGTHENING OF BRIDGE, MALOMA BR.(B01398LZ
- Contractor: AQUINO-DELA CRUZ ENGINEERING & CONSTRUCTION (16751)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-06
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱80,871,008.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION/FLOOD CONTROL AT GABOR DIKE PHASE III, SAN FELIPE, ZAMBALES
- Contractor: MCB ZAMORA CONSTRUCTION & SUPPLY (32006)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-27
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱22,757,568.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION/FLOOD CONTROL AT GABOR RIVER UPSTREAM PHASE IV, SAN FELIPE, ZAMBALES
- Contractor: CDCC CONSTRUCTION AND SUPPLY (40963)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-27
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱27,929,320.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL FACILITIES, STO. TOMAS RI VER, SAN FELIPE, ZAMBALES
- Contractor: JAM-C BUILDERS (32870)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-27
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱23,765,032.00
- Contract status: Completed Report
- ROAD WIDENING SECONDARY ROADS, OLONGAPO-BUGALLON ROAD I NCLUDING DRAINAGE-K0262+000-K0263+000
- Contractor: ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY) (05349)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-31
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱31,376,684.00
- Contract status: Completed Report
- RETROFITTING/STRENGTHENING OF BRIDGE, GABOR BR. (B01395 LZ) ALONG OLONGAPO-BUGALLON ROAD, SAN FELIPE, ZAMBALES
- Contractor: ALPHATEC CHEMICAL CORPORATION (39938) / AQUINO-DELA CRUZ ENGINEERING & CONSTRUCTION (16751)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-04-08
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱77,910,240.00
- Contract status: Completed Report
- CLUSTER III- 1. RETROFITTING/STRENGTHENING OF BRIDGE, D AMPAY BR. (B01419LZ) ALONG OLONGAPO-BUGALLON ROAD 2. RETROFITTING/STREN GTHENING OF BRIDGE, PANAN BR. (B00023LZ) ALONG OLONGAPO-BUGALLON ROAD 3 . RETROFITTING/STRENGTHENING OF BRIDGE, BALILI BR.
- Contractor: L.M.G. CONSTRUCTION INCORPORATED (FORMERLY: LMG CONSTRUCTION) (5719)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-01-16
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱61,781,404.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION / FLOOD CONTROL AT SAL AZA RIVER, PALAUIG, ZAMBALES
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-06
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱33,192,940.00
- Contract status: Completed Report
- CLUSTER IV 1. RETROFITTING/STRENGTHENING OF BRIDGE, BAT O BR. (B01446LZ) ALONG AMUNGAN PALAUIG BANLOG ROAD 2. RETROFITTING/STRENGT HENING OF BRIDGE, MARANGLA BR. (B01420LZ) ALONG OLONGAPO-BUGALLON ROAD 3. R ETROFITTING/STRENGTHENING OF BRIDGE, STO. RO
- Contractor: AQUINO-DELA CRUZ ENGINEERING & CONSTRUCTION (16751)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-03-25
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱77,926,112.00
- Contract status: Completed Report
- CLUSTER V - 1. RETROFITTING/STRENGTHENING OF BRIDGE, BA YTO BR. (B01431LZ) ALONG OLONGAPO-BUGALLON ROAD 2. RETROFITTING/STRENGTHENI NG OF BRIDGE, GAMA BR. (B01434LZ) ALONG OLONGAPO-BUGALLON ROAD ,STA. CRUZ, ZAMBALES
- Contractor: L.M.G. CONSTRUCTION INCORPORATED (FORMERLY: LMG CONSTRUCTION) (5719)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-02-15
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱50,755,684.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION / FLOOD CONTROL (BANCA L RIVER DOWNSTREAM NORTH APPROACH), IBA, ZAMBALES, PHASE IV
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-01-16
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱44,469,120.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION/FLOOD CONTROL PROJECT AT BAYTO RIVER (UPSTREAM), STA. CRUZ, ZAMBALES
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-01-02
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱43,788,596.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION / FLOOD CONTROL STRUCT URE AT GABOR DIKE (PHASE II), DOWNSTREAM, SAN FELIPE, ZAMBALES
- Contractor: CDC CONSTRUCTION & SUPPLIES (28275)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-10
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱32,932,568.00
- Contract status: Completed Report
- CLUSTER VI-1. RETROFITTING/STRENGTHENING OF BRIDGE, LAW IS BR. (B01426LZ) ALONG OLONGAPO - BUGALLON ROAD, 2. RETROFITTING /STRENG THENING OF BRIDGE, BALOGANON BR. (B01425LZ) ALONG OLONGAPO-BUGALLON ROAD, 3. RETROFITTING /STRENGTHENING OF BRIDGE, UACON BR
- Contractor: AQUINO-DELA CRUZ ENGINEERING & CONSTRUCTION (16751)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-01-18
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱55,605,052.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION/FLOOD CONTROL AT BANCA L RIVER (DOWNSTREAM), IBA, ZAMBALES, PHASE V
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-01-15
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱46,381,440.00
- Contract status: Completed Report
- ROAD WIDENING SECONDARY ROADS, OLONGAPO-BUGALLON ROAD I NCLUDING DRAINAGE-K0163+097-K0163+807, K0 163+807-K0164+093,K0164+140-K0164 +200
- Contractor: HIGH STRENGTH DEV. CORPORATION (31976)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-03-30
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱42,556,412.00
- Contract status: Completed Report
- PREVENTIVE MAINTENANCE OF SECONDARY ROADS ALONG OLONGAP O-BUGALLON ROAD, K0 160+522 - K0 161+000, K0 161+750 - K0 162+000, K0 250 + 090 -K0 250+720, K0 250+834 - K0 251+667
- Contractor: ORIENTAL SALES CENTER AND CONTRACTOR (33630)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-18
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱23,093,162.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVE D ROADS ALONG SECONDARY ROADS, OLONGAPO-BUGALLON ROAD, K0 175+585 - K0 176+ 544, K0 177+818 - K0 178+705
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-01-16
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱23,519,962.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY CARAEL, BOTOLAN, ZAMBALES
- Contractor: CDCC CONSTRUCTION AND SUPPLY (40963)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-10-25
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,851,484.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) BARANGAY BALINCAGUING, SAN FELIPE, ZAMBALES
- Contractor: CDCC CONSTRUCTION AND SUPPLY (40963)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-10-25
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,851,481.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY GRULLO, SAN NARCISO, ZAMBALES
- Contractor: JOYNIELTIN CONSTRUCTION AND TRADING (41858)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-10-25
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,851,484.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION / FLOOD CONTROL (BANCA L RIVER UPSTREAM SOUTH APPROACH), BRGY. BANCAL, BOTOLAN, ZAMBALES
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-04-15
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱44,463,040.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION / FLOOD CONTROL AT NAY UM RIVER CONTROL STA. 0+100 - STA. 0+338.5, STA. CRUZ, ZAMBALES
- Contractor: JOYNIELTIN CONSTRUCTION AND TRADING (41858)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-01-20
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱14,185,485.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION/ FLOOD CONTROL STRUCTU RE AT LIPAY RIVER CONTROL (DOWNSTREAM) SOUTH APPROACH, STA. CRUZ, ZAMBALES< /span>
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-04-11
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱47,040,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) BARANGAY DIRITA, IBA, ZAMBALES
- Contractor: PAAC CONSTRUCTION AND MECHANICAL SERVICES (39692)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-04
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,851,481.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) BARANGAY PAMIBIAN, CANDELARIA, ZAMBALES
- Contractor: PAAC CONSTRUCTION AND MECHANICAL SERVICES (39692)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-10-25
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,851,477.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) BARANGAY LUCAPON SOUTH, STA. CRUZ, ZAMBALES
- Contractor: JECK CONSTRUCTION (24189)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-25
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,850,852.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (STAGE), BARANGA Y OMAYA, SAN NARCISO, ZAMBALES
- Contractor: NEW MASINLOC HENRY'S CONSTRUCTION & SUPPLY (33744)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-02
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,949,483.88
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY GUINABON, STA. CRUZ, ZAMBALES
- Contractor: MCB ZAMORA CONSTRUCTION & SUPPLY (32006)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-10-25
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,845,861.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION/FLOOD CONTROL AT NAYUM RIVER UPSTREAM, SOUTH APPROACH, STA. 0+338.5-STA. 0+760.5, STA. CRUZ, ZAMB ALES
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-04-09
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱31,675,794.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION/FLOOD CONTROL AT BALOG ANON RIVER, MASINLOC, ZAMBALES
- Contractor: HIGH STRENGTH DEV. CORPORATION (31976)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-19
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱27,930,000.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION / FLOOD CONTROL AT LIN ORON RIVER, SAN ANTONIO, ZAMBALES
- Contractor: R.J. IBARRA CONSTRUCTION (23538) / FERMIDA CONSTRUCTION SERVICES AND SUPPLIES (FORMERLY: FERMIDA CONSTRUCTION SERVICES) (25424)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-01-02
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱30,335,156.00
- Contract status: Completed Report
- CONSTRUCTION OF MALABON-MALIMANGA-SINABACAN FLOOD CONTR OL PHASE I, CANDELARIA, ZAMBALES
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-02-28
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱26,890,618.00
- Contract status: Completed Report
- CONSTRUCTION OF MALABON-MALIMANGA-SINABACAN FLOOD CONTR OL PHASE II, CANDELARIA, ZAMBALES
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-03-30
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱26,567,208.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY WEST POBLACION, PALAUIG, ZAMBALES
- Contractor: NEW MASINLOC HENRY'S CONSTRUCTION & SUPPLY (33744)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-12
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,846,523.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI PURPOSE BUILDING (COVERED COURT), BARANGAY STO. TOMAS, PALAUIG, ZAMBALES
- Contractor: NEW MASINLOC HENRY'S CONSTRUCTION & SUPPLY (33744)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-10-25
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,851,564.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), SITIO LONGOS, BARANGAY BOLITOC, STA. CRUZ, ZAMBALES
- Contractor: MICKAJETTE CONSTRUCTION AND TRADING (35239)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-10-25
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,851,481.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY LUCAPON NORTH, STA. CRUZ, ZAMBALES
- Contractor: MONTEONE CONSTRUCTION CORPORATION (32353)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-12
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,850,992.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY CASABAAN, CABANGAN, ZAMBALE
- Contractor: NEW MASINLOC HENRY'S CONSTRUCTION & SUPPLY (33744)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-10-23
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱3,429,750.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) BRGY. BENEG, BOTOLAN, ZAMBALES
- Contractor: JECK CONSTRUCTION (24189)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-10-13
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,455,444.50
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION/FLOOD CONTROL AT SAN L ORENZO RIVER, MASINLOC, ZAMBALES
- Contractor: A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE (19278)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-03-12
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱32,579,644.00
- Contract status: Completed Report
- CONSTRUCTION OF LIPAY SEAPORT, LIPAY, PALAUIG, ZAMBALES
- Contractor: BIG BERTHA CONSTRUCTION & DEVELOPMENT (3191)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-04-02
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱55,004,860.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEA PORTS OF SAN MIGUEL PORT BOULEVARD, SAN ANTONIO, ZAMBALES
- Contractor: BIG BERTHA CONSTRUCTION & DEVELOPMENT (3191)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-06-08
- Fund source: Regular Infra - GAA 2019 CSSP
- Contract price: ₱92,637,320.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION/FLOOD CONTROL STRUCTUR E AT LIPAY RIVER CONTROL (UPSTREAM) NORTH AND SOUTH APPROACH, STA. CRUZ, ZA MBALES
- Contractor: E.R. DELA CRUZ CONSTRUCTION & SUPPLY (32158)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-04-11
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱46,550,000.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DEC LARED TOURISM DESTINATION ACCESS ROADS LEADING TO SAGRADA FAMILIA CAVE, STA . CRUZ, ZAMBALES
- Contractor: BIG BERTHA CONSTRUCTION & DEVELOPMENT (3191)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-03-05
- Fund source: Regular Infra - GAA 2019 CSSP
- Contract price: ₱42,335,964.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DEC LARED TOURISM DESTINATIONS ACCESS ROAD LEADING TO PRAWN FRY HATCHERIES AND RESORTS AND SURFING AREA, SAN FELIPE, ZAMBALES
- Contractor: BIG BERTHA CONSTRUCTION & DEVELOPMENT (3191) / E.R. DELA CRUZ CONSTRUCTION & SUPPLY (32158)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-04-15
- Fund source: Regular Infra - GAA 2019 CSSP
- Contract price: ₱92,639,712.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DEC LARED TOURISM DESTINATIONS ACCESS ROAD LEADING TO BALIN BUWAYA CAVE, SITIO DALIG, BRGY. TAPOSO, CANDELARIA, ZAMBALES
- Contractor: NEW MASINLOC HENRY'S CONSTRUCTION & SUPPLY (33744)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-17
- Fund source: Regular Infra - GAA 2019 CSSP
- Contract price: ₱18,816,000.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DEC LARED TOURISM DESTINATIONS ACCESS ROAD LEADING TO BUNGA WATERFALLS, SITIO B UNGA, BRGY. STA. RITA, MASINLOC, ZAMBALES
- Contractor: CDC CONSTRUCTION & SUPPLIES (28275)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-04
- Fund source: Regular Infra - GAA 2019 CSSP
- Contract price: ₱23,520,000.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DEC LARED TOURISM DESTINATIONS LIPAY-DINGIN-PANIBUATAN BOULEVARD, IBA, ZAMBALES
- Contractor: E.R. DELA CRUZ CONSTRUCTION & SUPPLY (32158)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-17
- Fund source: Regular Infra - GAA 2019 CSSP
- Contract price: ₱26,860,750.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DEC LARED TOURISM DESTINATIONS, IBA BYPASS ROAD (GOVIC HIGHWAY) IBA, ZAMBALES
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-02-25
- Fund source: Regular Infra - GAA 2019 CSSP
- Contract price: ₱79,979,560.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DEC LARED TOURISM DESTINATIONS SAN NARCISO BYPASS ROAD (LUCERO-DALIPAWEN-NAMATA CAN-GRULLO-LIBERTAD), SAN NARCISO, ZAMBALES
- Contractor: BIG BERTHA CONSTRUCTION & DEVELOPMENT (3191)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-01-06
- Fund source: Regular Infra - GAA 2019 CSSP
- Contract price: ₱47,041,428.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (ZAMBALES PROVIN CIAL POLICE OFFICE), BRGY.LIPAY-DINGIN-PANIBUATAN, MUNICIPALITY OF IBA, ZAM BALES
- Contractor: NEW MASINLOC HENRY'S CONSTRUCTION & SUPPLY (33744)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-10-25
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,850,993.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. CADMANG-R ESERVA, MUNICIPALITY OF CABANGAN, PROVINCE OF ZAMBALES
- Contractor: NEW MASINLOC HENRY'S CONSTRUCTION & SUPPLY (33744)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-10-25
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,851,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. CAPAYAWAN , MUNICIPALITY OF BOTOLAN, ZAMBALES
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-12
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,850,999.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SANTIAGO, MUNICIPALITY OF SAN ANTONIO, PROVINCE OF ZAMBALES
- Contractor: JOYNIELTIN CONSTRUCTION AND TRADING (41858)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-10-25
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,850,751.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. STO.NI C3 91O, MUNICIPALITY OF CABANGAN, PROVINCE OF ZAMBALES
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-10-25
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,850,995.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. TUBO-TUBO NORTH, MUNICIPALITY OF SANTA CRUZ, PROVINCE OF ZAMBALES
- Contractor: CDC CONSTRUCTION & SUPPLIES (28275)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-10-25
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,850,961.50
- Contract status: Completed Report
- CONSTRUCTION OF MISSING LINKS/NEW ROADS MANGATAREM STA. CRUZ ROAD PACKAGE 3, ZAMBALES
- Contractor: HIGH STRENGTH DEV. CORPORATION (31976)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-05-18
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱69,592,760.00
- Contract status: Completed Report
- CONSTRUCTION OF MISSING LINKS/NEW ROADS MANGATAREM STA. CRUZ ROAD PACKAGE 4, ZAMBALES
- Contractor: HIGH STRENGTH DEV. CORPORATION (31976)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-06-16
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱69,479,504.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BRGY. OMAYA, SAN NARCISO, ZAMBALES
- Contractor: JOYNIELTIN CONSTRUCTION AND TRADING (41858)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-18
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,940,389.12
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BRGY. TAUGTOG , BOTOLAN, ZAMBALES
- Contractor: G.A. PINEDA CONSTRUCTION (3428)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-01-09
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱9,701,843.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (SENIOR CITIZENS BUILDING EXTENSION), BRGY. BATONLAPOC, MUNICIPALITY OF BOTOLAN, ZAMBALES
- Contractor: NEW MASINLOC HENRY'S CONSTRUCTION & SUPPLY (33744)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-10
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱979,997.25
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (SENIOR CITIZENS BUILDING EXTENSION), BRGY. MALIMANGA, MUNICIPALITY OF CANDELARIA, ZAMBALES
- Contractor: NEW MASINLOC HENRY'S CONSTRUCTION & SUPPLY (33744)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-10
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱979,806.94
- Contract status: Completed Report
- CONSTRUCTION OF LOCAL ROAD, BRGY. CAUYAN, MUNICIPALITY OF PALAUIG, ZAMBALES
- Contractor: NEW MASINLOC HENRY'S CONSTRUCTION & SUPPLY (33744)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-02
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,751,614.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION/FLOOD CONTROL STRUCTUR E AT BALILI RIVER, BARANGAY PALANGINAN, IBA, ZAMBALES
- Contractor: GCLT CONSTRUCTION INCORPORATED (FORMERLY: GCLT CONSTRUCTION) (30657)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-01-17
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱28,223,954.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY PAUD POD, BOTOLAN, ZAMBALES
- Contractor: CDC CONSTRUCTION & SUPPLIES (28275)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-10-25
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,851,476.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY BELB EL, BOTOLAN, ZAMBALES
- Contractor: CDC CONSTRUCTION & SUPPLIES (28275)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-10-25
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,850,966.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BRGY. CASABAA N, CABANGAN, ZAMBALES
- Contractor: THREE KCS BUILDERS AND SUPPLY (38544)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-21
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,950,240.75
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVE D NATIONAL ROAD (STA. CRUZ SECTION), STA. CRUZ, ZAMBALES
- Contractor: JECK CONSTRUCTION (24189)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-18
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱9,408,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), TAUGTOG NATIONAL HIGH SCHOOL, BARANGAY TAUGTOG, BOTOLAN, ZAMBALES
- Contractor: JECK CONSTRUCTION (24189)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-10-13
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,910,891.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (DORMITORY/STUDE NT CENTER/COVERED COURT) PRMSU, BARANGAY NAULO, STA. CRUZ, ZAMBALES< /li>
- Contractor: PAAC CONSTRUCTION AND MECHANICAL SERVICES (39692)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-24
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱14,531,038.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD AT BRGY. PUNDAQUIT, SAN ANTONIO, Z AMBALES
- Contractor: A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE (19278)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-01-11
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱39,007,608.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY INHOBOL, MASINLOC, ZAMBALES
- Contractor: NEW MASINLOC HENRY'S CONSTRUCTION & SUPPLY (33744)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-12
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,850,984.50
- Contract status: Completed Report
- REHABILITATION OF BABON-ONGOT STEEL BRIDGE, BABON ONGOT , BABANCAL, CANDELARIA, ZAMBALES
- Contractor: JECK CONSTRUCTION (24189)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-12
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱6,018,167.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DEC LARED TOURISM DESTINATIONS SAN ANTONIO-SUBIC ROAD, SAN ANTONIO, ZAMBALES
- Contractor: HEXAMINDZ CORPORATION (FORMERLY:KILUSANG MAGKAIBIG (31666)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-07-01
- Fund source: Regular Infra - GAA 2019 CSSP
- Contract price: ₱47,031,852.00
- Contract status: Completed Report
- REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. YAMOT, MUNICIPALITY OF CANDELARIA, ZAMBALES
- Contractor: JECK CONSTRUCTION (24189)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-13
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱987,054.75
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION/FLOOD CONTROL AT BANGA N SEAWALL, STA.0+365 - STA. 0+455, BOTOLAN, ZAMBALES
- Contractor: JQM CONSTRUCTION AND TRADING (36354)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-04-11
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱18,816,000.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTOR SYSTEMS-RAIN WATER COLLECTORS IN PUBLIC FACI LITIES
- Contractor: JORGZ KONZTRAK & SUPPLY (40727)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-16
- Fund source: Regular Infra - GAA 2019 CSSP
- Contract price: ₱3,640,942.25
- Contract status: Completed Report