Infrastructure Projects in Region III — Region III - Zambales 1st District Engineering Office, 2024
This page lists public infrastructure projects implemented by Region III - Zambales 1st District Engineering Office in Region III during 2024. All data are sourced from the Department of Public Works and Highways (DPWH) official database (as of 9/30/2025): https://www.dpwh.gov.ph/dpwh/projects/infrastructure
This information is shared to promote transparency and public awareness. We encourage visitors to validate project details using the official DPWH source. In case of discrepancies, please refer to the original records published by the DPWH.
| Contractor | Projects | Total Price |
|---|---|---|
| R.A. PAHATI CONST. & SUPPLY, INC. (35843) | 24 | ₱1,855,908,162.00 |
| AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP. ([REVOKED] 49129) | 7 | ₱667,014,176.00 |
| ORIENTAL SALES CENTER AND CONTRACTOR (33630) / CDC CONSTRUCTION & SUPPLIES (28275) | 7 | ₱577,383,840.00 |
| STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096) | 6 | ₱571,037,720.00 |
| RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: RAIK CONSTRUCTION AND SUPPLY) (40660) | 10 | ₱509,467,338.00 |
- FLOOD CONTROL WORKS ALONG BANCAL - SAN ISIDRO - MAMBOG RIVER (PHASE I), TOTUN LANUM, BARANGAY MAMBOG, BOTOLAN, ZAMBALES
- Contractor: R.A. PAHATI CONST. & SUPPLY, INC. (35843)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-01-09
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱95,447,512.00
- Contract status: Completed Report
- FLOOD CONTROL WORKS ALONG BANCAL - SAN ISIDRO - MAMBOG RIVER (PHASE I), TOTUN LANUM, BARANGAY SAN ISIDRO. BOTOLAN, ZAMBALES
- Contractor: R.A. PAHATI CONST. & SUPPLY, INC. (35843)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-01-09
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱96,013,232.00
- Contract status: Completed Report
- FLOOD CONTROL WORKS ALONG BANCAL - SAN ISIDRO - MAMBOG RIVER (PHASE II), TOTUN LANUM, BARANGAY MAMBOG, BOTOLAN, ZAMBALES
- Contractor: JTC CRUZ CONSTRUCTION CO., INC. (32479)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-01-24
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱96,498,104.00
- Contract status: Completed Report
- CONSTRUCTION OF MALOMA RIVER FLOOD CONTROL STRUCTURE, D OWNSTREAM, PACKAGE 1, SAN FELIPE, ZAMBALES
- Contractor: AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP. ([REVOKED] 49129)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-01-17
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱95,100,672.00
- Contract status: Completed Report
- CONSTRUCTION OF MALOMA RIVER FLOOD CONTROL STRUCTURE, D OWNSTREAM, PACKAGE 2, SAN FELIPE, ZAMBALES
- Contractor: AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP. ([REVOKED] 49129)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-01-17
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱95,100,624.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG KILING RIVER (PHASE 5), CADMANG SECTION, CABANGAN, ZAMBALES
- Contractor: CDC CONSTRUCTION & SUPPLIES (28275)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-01-09
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱96,499,424.00
- Contract status: Completed Report
- INSTALLATION OF SOLAR LED STREET LIGHTS ALONG SECONDARY ROADS, OLONGAPO - BUGALLON ROAD - K0155 + 280 - K0156 + 037, K0163 + 097 - K0163 + 547, K0164 + 149 - K0164 + 930, K0176 + 584 - K0179 + 006, K0180 + 000 - K0182 + 000, K0182 +823 - K0183 + 663, K018
- Contractor: R.A. PAHATI CONST. & SUPPLY, INC. (35843)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-08-12
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱59,477,640.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BA RANGAY LIPAY, STA. CRUZ, ZAMBALES
- Contractor: JOYNIELTIN CONSTRUCTION AND TRADING (41858)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-05-29
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱3,951,643.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, MARCIANO ABELA ELEMENTARY SCHOOL, SITIO TAMBAK, BARANGAY PALANGINAN, IBA, ZAMBALES< /li>
- Contractor: VM BUILDERS CONSTRUCTION CORPORATION (45475)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-11-07
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱16,496,024.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL, TAMBAK RIVER 1-A, PALANG INAN, IBA, ZAMBALES
- Contractor: PASCAL CONSTRUCTION (34168)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-01-13
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱96,290,888.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL TAUGTOG - MAMBOG - BANCAL RIVER PHASE 1-A, BOTOLAN, ZAMBALES
- Contractor: R.A. PAHATI CONST. & SUPPLY, INC. (35843)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-12-29
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱86,847,880.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL, TAMBAK RIVER 1-B, PALANG INAN, IBA, ZAMBALES
- Contractor: T2B3 BUILDERS AND SUPPLIES CORP. (45138)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-12-31
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱85,981,296.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD MITIGATION FACILITY OF BALILI-TAM BAK RIVER (PHASE I), PALANGINAN, IBA, ZAMBALES
- Contractor: R.A. PAHATI CONST. & SUPPLY, INC. (35843)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-01-15
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱95,438,248.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD MITIGATION FACILITY OF BALILI-TAM BAK RIVER (PHASE II), PALANGINAN, IBA, ZAMBALES
- Contractor: R.A. PAHATI CONST. & SUPPLY, INC. (35843)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-01-15
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱96,498,960.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TANGUA Y RIVER (PHASE 4), CABANGAN, ZAMBALES
- Contractor: CDC CONSTRUCTION & SUPPLIES (28275)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-01-15
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱96,493,320.00
- Contract status: Completed Report
- INSTALLATION/APPLICATION OF SIGNAGE AND PAVEMENT MARKIN GS ALONG OLONGGAPO-BUGALLON ROAD-K0202+700-K0203+100, IBA, ZAMBALES< /li>
- Contractor: JCOB CONSTRUCTION (55130)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-07-19
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱712,783.75
- Contract status: Completed Report
- INSTALLATION/APPLICATION OF SIGNAGE AND PAVEMENT MARKIN GS ALONG OLONGGAPO-BUGALLON ROAD-K0233+400-K0234+000, MASINLOC, ZAMBALES
- Contractor: JCOB CONSTRUCTION (55130)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-07-19
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱712,784.56
- Contract status: Completed Report
- INSTALLATION/APPLICATION OF SIGNAGE AND PAVEMENT MARKIN GS ALONG OLONGGAPO-BUGALLON ROAD-K0234+200-K0234+800, BALOGANON, MASINLOC, ZAMBALES
- Contractor: JCOB CONSTRUCTION (55130)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-07-19
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱910,799.06
- Contract status: Completed Report
- ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - S ECONDARY ROADS - OLONGAPO - BUGALLON RD - K0 173+315 - K0 174+292, SAN FELI PE, ZAMBALES
- Contractor: R.A. PAHATI CONST. & SUPPLY, INC. (35843)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-06-19
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱25,434,364.00
- Contract status: Completed Report
- ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-SECON DARY ROADS-OLONGAPO-BUGALLON RD-K0 262+000-K0262+800, STA. CRUZ, ZAMBALES
- Contractor: R.A. PAHATI CONST. & SUPPLY, INC. (35843)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-06-14
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱45,069,124.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, PUROK 6, BARANGAY BOLITOK, STA. C RUZ, ZAMBALES
- Contractor: GASAT BUILDERS AND SUPPLIES INC. (51666)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-08-06
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱19,321,202.00
- Contract status: Completed Report
- CONSTRUCTION OF ACCESS ROAD/DIVERSION ROAD DAANG KALIKA SAN TO UACON P1, STA. CRUZ, ZAMBALES
- Contractor: R.A. PAHATI CONST. & SUPPLY, INC. (35843)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-02-08
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱95,510,344.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, DAMPAY ES, BARA NGAY DAMPAY, PALAUIG, ZAMBALES
- Contractor: MARKBILT CONSTRUCTION TRADING & DEVELOPMENT CORP. (FORMERLY:MARKBILT CONSTRUCTION) (12522)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-10-02
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱9,748,231.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG GABOR-LIW LIWA RIVER (PHASE I), SAN FELIPE, ZAMBALES
- Contractor: T2B3 BUILDERS AND SUPPLIES CORP. (45138)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-01-15
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱95,052,184.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BANCAL DANA C BUNGA SECTION, BOTOLAN, ZAMBALES
- Contractor: NICLEDON CONSTRUCTION (36234) / GRACE CONSTRUCTION CORPORATION (3771)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-01-09
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱98,910,080.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION ALONG STO. TOMAS RIVER BRGY. ROSETE PHASE 2, SAN FELIPE, ZAMBALES
- Contractor: VM BUILDERS CONSTRUCTION CORPORATION (45475)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-10-18
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱28,515,722.00
- Contract status: Completed Report
- FLOOD CONTROL WORKS ALONG TAMBAK-BANCAL RIVER (PHASE II ), SITIO TAMBAK, BARANGAY PALANGINAN, IBA, ZAMBALES
- Contractor: PASCAL CONSTRUCTION (34168)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-01-13
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱96,492,776.00
- Contract status: Completed Report
- REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PA VED ROADS - SECONDARY ROADS OLONGAPO-BUGALLON RD - K0167+000 - K0167+175.50 , K0177+355 - K0177+924, K0224+000 - K0224+562, K0242+524 - K0243+900, SAN FELIPE, CABANGAN, PALAUIG, CANDELARIA, ZAMBALES
- Contractor: RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: RAIK CONSTRUCTION AND SUPPLY) (40660)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-12-31
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱58,355,824.00
- Contract status: Completed Report
- REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - OLONGAPO-BUGALLON RD - K0190 + 017 - K0191 + 000, K0193 + 718 - K0194 + 000, K0196 + 050 - K0197 + 000, BOTOLAN, ZAMB ALES
- Contractor: ORIENTAL SALES CENTER AND CONTRACTOR (33630) / CDC CONSTRUCTION & SUPPLIES (28275)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-07-23
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱69,888,752.00
- Contract status: Completed Report
- REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PA VED ROADS - SECONDARY ROADS OLONGAPO-BUGALLON RD K0203+013 - K0203+566, K02 04+000 - K0205+164, K0206+494 - K0207+000, IBA, ZAMBALES
- Contractor: ORIENTAL SALES CENTER AND CONTRACTOR (33630) / CDC CONSTRUCTION & SUPPLIES (28275)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-07-14
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱61,142,248.00
- Contract status: Completed Report
- REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS-OLONGAPO-BUGALLON RD K0209 + 000 - K0210 + 93 6, IBA, ZAMBALES
- Contractor: ORIENTAL SALES CENTER AND CONTRACTOR (33630) / CDC CONSTRUCTION & SUPPLIES (28275)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-07-05
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱61,345,360.00
- Contract status: Completed Report
- REHABILITATION OF MULTI-PURPOSE BUILDING, BARANGAY SAN RAFAEL, SAN NARCISO, ZAMBALES
- Contractor: JOYNIELTIN CONSTRUCTION AND TRADING (41858)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-06-28
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱11,645,741.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE 2), BARAN GAY SAN GREGORIO, SAN ANTONIO, ZAMBALES
- Contractor: JOYNIELTIN CONSTRUCTION AND TRADING (41858)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-07-11
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱10,889,330.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, SAN JUAN-CANDEL ARIA ES, BARANGAY CANDELARIA, SAN NARCISO, ZAMBALES
- Contractor: SMP-JADE CONSTRUCTION CORPORATION (48340)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-07-11
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱9,704,824.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE 2), BARAN GAY SAN NICOLAS, SAN ANTONIO, ZAMBALES
- Contractor: SMP-JADE CONSTRUCTION CORPORATION (48340)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-06-05
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱5,895,078.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE 2), BARAN GAY SAN RAFAEL, SAN NARCISO, ZAMBALES
- Contractor: VM BUILDERS CONSTRUCTION CORPORATION (45475)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-07-19
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱5,824,616.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE 2), BARAN GAY SINDOL, SAN FELIPE, ZAMBALES
- Contractor: VM BUILDERS CONSTRUCTION CORPORATION (45475)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-07-19
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱5,824,762.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (SENIOR CITIZEN BUILDING), BARANGAY UACON, CANDELARIA, ZAMBALES
- Contractor: SMP-JADE CONSTRUCTION CORPORATION (48340)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-08-28
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱6,836,087.50
- Contract status: Completed Report
- ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - T ERTIARY ROADS - SN MARCELINO-SN ANTONIO-SN NARCISO RD - K0157+046 -K0158+00 0, K0159+000 - K0160+000, SAN ANTONIO, ZAMBALES
- Contractor: ORIENTAL SALES CENTER AND CONTRACTOR (33630) / CDC CONSTRUCTION & SUPPLIES (28275)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-08-07
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱95,534,944.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL/SLOPE PROTECTION WORKS AL ONG STO. NI C3 91O CREEK, CAPAYAWAN, BOTOLAN, ZAMBALES
- Contractor: MARKBILT CONSTRUCTION TRADING & DEVELOPMENT CORP. (FORMERLY:MARKBILT CONSTRUCTION) (12522)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-11-07
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱29,334,682.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG SANTO TOMAS RIVER (PHASE 6), SAN FELIPE, ZAMBALES
- Contractor: CDC CONSTRUCTION & SUPPLIES (28275)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-01-15
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱96,493,104.00
- Contract status: Completed Report
- CONSTRUCTION OF MALOMA RIVER FLOOD CONTROL STRUCTURE, D OWNSTREAM, PACKAGE 3, SAN FELIPE, ZAMBALES
- Contractor: ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP. (49128)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-01-17
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱96,497,264.00
- Contract status: Completed Report
- CONSTRUCTION OF MALOMA RIVER FLOOD CONTROL STRUCTURE, D OWNSTREAM, PACKAGE 4, SAN FELIPE, ZAMBALES
- Contractor: HGG BUILDERS & SUPPLY (17824) / S-ANG CONSTRUCTION & GENERAL TRADING, INC. (37149)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-03-27
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱96,496,240.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BLDG., DONA LUISA OBIETA INTEGRATED SCHOOL, SITIO OLPOY, AMUNGAN, IBA, ZAMBALES
- Contractor: VM BUILDERS CONSTRUCTION CORPORATION (45475)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-06-15
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱6,836,367.00
- Contract status: Completed Report
- CONSTRUCTION OF MALOMA RIVER FLOOD CONTROL STRUCTURE, U PSTREAM, PACKAGE 1, SAGPAT SECTION, SAN FELIPE, ZAMBALES
- Contractor: AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP. ([REVOKED] 49129)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-01-17
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱95,158,344.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF POLYTECHNIC COLLEGE OF BOT OLAN, BATONLAPOC, BOTOLAN, ZAMBALES
- Contractor: R.A. PAHATI CONST. & SUPPLY, INC. (35843)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-09-09
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱17,428,090.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. NAMATACAN , SAN NARCISO, ZAMBALES
- Contractor: VM BUILDERS CONSTRUCTION CORPORATION (45475)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-06-29
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱9,750,063.00
- Contract status: Completed Report
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS IBA-BOTOLAN BYPASS ROAD, PHASE 2, BOTOLAN, ZAMBALES
- Contractor: R.A. PAHATI CONST. & SUPPLY, INC. (35843)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-02-15
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱95,455,456.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BA RANGAY PUNDAKIT, SAN ANTONIO, ZAMBALES
- Contractor: JOYNIELTIN CONSTRUCTION AND TRADING (41858)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-04-29
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱1,949,541.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY STO. TOMAS, PALAUIG, ZAMBALES
- Contractor: MARKBILT CONSTRUCTION TRADING & DEVELOPMENT CORP. (FORMERLY:MARKBILT CONSTRUCTION) (12522)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-09-12
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱9,749,240.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE 2), BARAN GAY BIAY, STA. CRUZ, ZAMBALES
- Contractor: JOYNIELTIN CONSTRUCTION AND TRADING (41858)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-07-22
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,876,390.00
- Contract status: Completed Report
- CONSTRUCTION OF MALOMA RIVER FLOOD CONTROL STRUCTURE, U PSTREAM, PACKAGE 2, SAGPAT SECTION, SAN FELIPE, ZAMBALES
- Contractor: C.T. LEONCIO CONSTRUCTION & TRADING (17371)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-01-09
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱95,196,904.00
- Contract status: Completed Report
- CONSTRUCTION OF MALOMA RIVER FLOOD CONTROL STRUCTURE, U PSTREAM, PACKAGE 3, SAGPAT SECTION, SAN FELIPE, ZAMBALES
- Contractor: C.T. LEONCIO CONSTRUCTION & TRADING (17371)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-01-17
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱95,196,888.00
- Contract status: Completed Report
- CONSTRUCTION OF MALOMA RIVER FLOOD CONTROL STRUCTURE, U PSTREAM, PACKAGE 4, SAGPAT SECTION, SAN FELIPE, ZAMBALES
- Contractor: C.T. LEONCIO CONSTRUCTION & TRADING (17371)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-01-02
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱95,293,496.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE 2), BARAN GAY PANGOLINGAN, PALAUIG, ZAMBALES
- Contractor: SMP-JADE CONSTRUCTION CORPORATION (48340)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-05-21
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,857,777.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING/FACILITIES AND G ROUND IMPROVEMENTS, BRGY. CARAEL, BOTOLAN, ZAMBALES
- Contractor: E.R. DELA CRUZ CONSTRUCTION & SUPPLY (32158)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-09-08
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱19,526,198.00
- Contract status: Completed Report
- CONSTRUCTION OF PUBLIC COVERED COURT INCLUDING GROUND I MPROVEMENTS, BRGY. FERIA, PHASE 2 SAN FELIPE, ZAMBALES
- Contractor: ROCK-WBL CONSTRUCTION CORP. (FOR: ROCK-WBL CONSTRUCTION TRADING & SERVICES) (44551)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-05-20
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱19,538,476.00
- Contract status: Completed Report
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS IBA-BOTOLAN BYPASS ROAD, IBA, ZAMBALES
- Contractor: RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: RAIK CONSTRUCTION AND SUPPLY) (40660)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-08-12
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱38,747,024.00
- Contract status: Completed Report
- CONSTRUCTION OF LUPANG PANGAKO ROAD, SAN AGUSTINE, IBA, ZAMBALES
- Contractor: GASAT BUILDERS AND SUPPLIES INC. (51666)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-07-20
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱14,526,450.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DEC LARED TOURISM (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) SAN NARCISO BYPA SS ROAD (SIMMINUBLAN-DALIPAWEN-GRULLO-NAMATACAN-ALUSIIS) , SAN NARCISO, ZAM BALES
- Contractor: VM BUILDERS CONSTRUCTION CORPORATION (45475)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-06-05
- Fund source: Regular Infra - GAA 2024 CP
- Contract price: ₱4,831,357.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (SENIOR CITIZENS BUILDING), BARANGAY SIMMINUBLAN, SAN NARCISO, ZAMBALES
- Contractor: SMP-JADE CONSTRUCTION CORPORATION (48340)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-09-05
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱7,810,970.50
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BA RANGAY FERIA, SAN FELIPE, ZAMBALES
- Contractor: G.M.R CONSTRUCTION & SUPPLY (34412)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-05-15
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱2,918,001.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, SAN ISIDRO INTE GRATED SCHOOL, BARANGAY SAN ISIDRO, CABANGAN, ZAMBALES
- Contractor: ARCEGA CONSTRUCTION SERVICES (46998)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-11-27
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱16,488,653.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (SENIOR CITIZENS BUILDING), SAN FELIPE, ZAMBALES
- Contractor: SMP-JADE CONSTRUCTION CORPORATION (48340)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-06-24
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,878,222.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY FERIA, SAN FELIPE, ZAMBALES
- Contractor: ROCK-WBL CONSTRUCTION CORP. (FOR: ROCK-WBL CONSTRUCTION TRADING & SERVICES) (44551)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-02-05
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱19,566,632.00
- Contract status: Completed Report
- CONCRETING OF ROAD SITIO NAMAAN, BRGY. LUNA, SAN ANTONI O, ZAMBALES
- Contractor: SMP-JADE CONSTRUCTION CORPORATION (48340)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-07-20
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱14,473,737.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. LONGOS, C ABANGAN, ZAMBALES
- Contractor: SMP-JADE CONSTRUCTION CORPORATION (48340)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-07-13
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱9,749,485.00
- Contract status: Completed Report
- CONCRETING OF ROADS AT SITIO OLPOY, AMUNGAN, IBA, ZAMBA LES
- Contractor: VM BUILDERS CONSTRUCTION CORPORATION (45475)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-04-29
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱6,724,310.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BLDG., PAMIBIAN INTEGRATE D SCHOOL, PAMIBIAN, CANDELARIA, ZAMBALES PHASE 2
- Contractor: KAEE CONSTRUCTION SERVICES (46367)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-07-20
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱5,854,358.00
- Contract status: Completed Report
- CONSTRUCTION/ RENOVATION OF MULTI-PURPOSE BUILDING, BRG Y. RIZAL, SAN ANTONIO, ZAMBALES
- Contractor: JOYNIELTIN CONSTRUCTION AND TRADING (41858)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-11-03
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱19,538,864.00
- Contract status: Completed Report
- CONSTRUCTION/RENOVATION OF MULTI-PURPOSE BUILDING, BRGY . LIBERTAD, SAN NARCISO, ZAMBALES
- Contractor: A.M. CANETE CONSTRUCTION AND TRADING (42540)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-10-08
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱19,524,472.00
- Contract status: Completed Report
- ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - S ECONDARY ROADS - OLONGAPO-BUGALLON RD - K0 180+000 - K0181+153, CABANGAN, Z AMBALES
- Contractor: R.A. PAHATI CONST. & SUPPLY, INC. (35843)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-06-20
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱48,272,848.00
- Contract status: Completed Report
- INSTALLATION OF SOLAR LIGHTS ALONG OLONGAPO-BUGALLON RO AD - K0170 + 359 - K0172 + 025, SAN FELIPE , ZAMBALES
- Contractor: AKPSN BUILDERS AND SUPPLY (44517)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-05-19
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱5,765,923.50
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG LAUIS RIVER MASINLOC SIDE INCLUDING ROAD DIKE UPSTREAM, (PHASE 1), MASINLOC, ZAMB ALES
- Contractor: TRICHES CONSTRUCTION & TRADING (33876)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-12-16
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱42,825,548.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (CONVENTION CENT ER), BRGY. POBLACION SOUTH, STA. CRUZ, ZAMBALES
- Contractor: THREE KCS BUILDERS AND SUPPLY (38544)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-04-07
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱19,571,710.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, CENTRAL ES, BRG Y. WEST POBLACION, PALAUIG, ZAMBALES
- Contractor: MARKBILT CONSTRUCTION TRADING & DEVELOPMENT CORP. (FORMERLY:MARKBILT CONSTRUCTION) (12522)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-11-16
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱19,538,640.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BLDG. DIRITA ES, BRGY. EA ST DIRITA, SAN ANTONIO, ZAMBALES
- Contractor: KAEE CONSTRUCTION SERVICES (46367)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-07-28
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱15,586,107.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BLDG., T.R. YANGCO ES, BR GY. BURGOS, SAN ANTONIO, ZAMBALES
- Contractor: SMP-JADE CONSTRUCTION CORPORATION (48340)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-07-20
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱15,570,422.00
- Contract status: Completed Report
- CONSTRUCTION OF ACADEMIC BLDG. FOR COLLEGE OF MARINE EN GINEERING PMMA, SAN NARCISO, ZAMBALES
- Contractor: RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: RAIK CONSTRUCTION AND SUPPLY) (40660)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-10-27
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱28,981,208.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BR GY. CATOL, CANDELARIA, ZAMBALES, (PHASE 1)
- Contractor: KAEE CONSTRUCTION SERVICES (46367)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-11-17
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱19,520,022.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING/FACILITIES INCLU DING GROUND IMPROVEMENTS, CALIGUET, BRGY. DIRITA, IBA, ZAMBALES
- Contractor: THREE KCS BUILDERS AND SUPPLY (38544)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-01-05
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱19,591,858.00
- Contract status: Completed Report
- REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PA VED ROADS - SECONDARY ROADS OLONGAPO-BUGALLON - K0233+000, K0234+026, MASIN LOC, ZAMBALES
- Contractor: JOYNIELTIN CONSTRUCTION AND TRADING (41858)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-12-06
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱28,961,492.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. DOLORES, CABANGAN, ZAMBALES
- Contractor: ZAMBA CONCRETE BUILDERS INC. (52299)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-10-31
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱19,538,498.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, LITTLE BAGUIO E LEMENTARY SCHOOL, BARANGAY BANGANTALINGA, IBA, ZAMBALES (PHASE 2)
- Contractor: VM BUILDERS CONSTRUCTION CORPORATION (45475)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-08-17
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱5,849,559.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BLDG., LOOB BUNGA HS (INC LUDING ACCESS RD., & SITE DEVELOPMENT) LOOB BUNGA, BOTOLAN, ZAMBALES PH ASE 2
- Contractor: SMP-JADE CONSTRUCTION CORPORATION (48340)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-09-08
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱9,899,330.00
- Contract status: Completed Report
- INSTALLATION/APPLICATION OF SIGNAGE AND PAVEMENT MARKIN GS ALONG SAN MARCELINO - SAN ANTONIO - SAN NARCISO ROAD - K0162+400 - K0163 +382, ANTIPOLO, POBLACION, SAN ANTONIO, ZAMBALES
- Contractor: JCOB CONSTRUCTION (55130)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-07-19
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱712,796.31
- Contract status: Completed Report
- INSTALLATION OF ROAD SAFETY DEVICES AND FACILITIES ALON G OLONGAPO - BUGALLON RD (S01086LZ) - K0162 + 462 - K0163 + 422, BARANGAY L IBERTAD (POBLACION), SAN NARCISO, ZAMBALES
- Contractor: JCOB CONSTRUCTION (55130)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-05-25
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱11,232,104.00
- Contract status: Completed Report
- CONSTRUCTION OF GUISGUIS FLOOD CONTROL AT NAYUM RIVER, BRGY. GUISGUIS, STA. CRUZ, ZAMBALES
- Contractor: E.R. DELA CRUZ CONSTRUCTION & SUPPLY (32158)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-09-11
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱47,670,296.00
- Contract status: Completed Report
- CONSTRUCTION OF GUINABON FLOOD CONTROL AT NAYUM RIVER, BRGY. GUINABON, STA. CRUZ, ZAMBALES
- Contractor: E.R. DELA CRUZ CONSTRUCTION & SUPPLY (32158)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-09-11
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱47,669,192.00
- Contract status: Completed Report
- CONSTRUCTION OF GAMA RIVER SLOPE PROTECTION/FLOOD CONTR OL STRUCTURE PHASE 2, STA. CRUZ, ZAMBALES
- Contractor: E.R. DELA CRUZ CONSTRUCTION & SUPPLY (32158)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-09-11
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱47,695,116.00
- Contract status: Completed Report
- CONSTRUCTION OF GAMA RIVER SLOPE PROTECTION/FLOOD CONTR OL STRUCTURE PHASE 3, STA. CRUZ, ZAMBALES
- Contractor: E.R. DELA CRUZ CONSTRUCTION & SUPPLY (32158)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-09-11
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱47,694,696.00
- Contract status: Completed Report
- ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE - SEC ONDARY ROADS OLONGAPO-BUGALLON RD - K0181+190 - K0182+360, K0194+000 - K019 5+000, CABANGAN & BOTOLAN, ZAMBALES
- Contractor: R.A. PAHATI CONST. & SUPPLY, INC. (35843)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-06-20
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱47,767,496.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BANCAL-SA N ISIDRO-MAMBOG RIVER (TOTUN LANUM) PHASE 1, SITIO TAMBAK, (NORTH SIDE), BA RANGAY PALANGINAN, IBA, ZAMBALES
- Contractor: 816 ALLEN CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY:ALLEN CONSTRUCTION) (12584) / RF CONSTRUCTION AND DEVELOPMENT CORPORATION (47199)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-11-17
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱47,579,280.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BANCAL-SA N ISIDRO-MAMBOG RIVER (TOTUN LANUM) PHASE 2, SITIO TAMBAK, (NORTH SIDE), BA RANGAY PALANGINAN, IBA, ZAMBALES
- Contractor: RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: RAIK CONSTRUCTION AND SUPPLY) (40660)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-11-17
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱47,579,272.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BANCAL-SA N ISIDRO-MAMBOG RIVER (TOTUN LANUM) PHASE 3, SITIO TAMBAK, (NORTH SIDE), BA RANGAY PALANGINAN, IBA, ZAMBALES
- Contractor: RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: RAIK CONSTRUCTION AND SUPPLY) (40660)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-11-17
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱47,579,212.00
- Contract status: Completed Report
- ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE - SEC ONDARY ROADS OLONGAPO-BUGALLON RD - K0175 + 000 - K0175 + 449, K0175 + 584 - K0176 + 533, K0177 + 924 - K0178 + 806, SAN FELIPE & CABANGAN, ZAMBAL ES
- Contractor: R.A. PAHATI CONST. & SUPPLY, INC. (35843)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-08-14
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱95,535,000.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MARANGLA RIVER IBA SIDE, BARANGAY SAN AGUSTIN, IBA, ZAMBALES
- Contractor: R.A. PAHATI CONST. & SUPPLY, INC. (35843)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-02-12
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱143,186,624.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG GABOR RIVER, BALINCAGUING SECTION (PHASE I), SAN FELIPE, ZAMBALES
- Contractor: RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: RAIK CONSTRUCTION AND SUPPLY) (40660)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-04-15
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱95,244,832.00
- Contract status: Completed Report
- CONSTRUCTION/COMPLETION OF MULTIPURPOSE BLDG. AT ZNHS, ZONE 6, IBA, ZAMBALES
- Contractor: SMP-JADE CONSTRUCTION CORPORATION (48340)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-05-07
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱3,914,841.25
- Contract status: Completed Report
- CONSTRUCTION OF BANK PROTECTION/FLOOD CONTROL WORKS ALO NG MARANGLA RIVER, BARANGAY SAN AGUSTIN, IBA, ZAMBALES
- Contractor: ADSL CONSTRUCTION & TRADING (48245)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-01-16
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱96,499,936.00
- Contract status: Completed Report
- CONSTRUCTION/COMPLETION OF STO. ROSARIO COVERED COURT, BRGY. STO. ROSARIO, IBA, ZAMBALES, PHASE 2
- Contractor: SMP-JADE CONSTRUCTION CORPORATION (48340)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-05-06
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱2,931,077.75
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. CATOL, CA NDELARIA, ZAMBALES
- Contractor: KAEE CONSTRUCTION SERVICES (46367)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-09-18
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱19,525,882.00
- Contract status: Completed Report
- IMPROVEMENT OF ROAD, AMUNGAN - BANLOG, BARANGAY BATO - BARANGAY BANLOG, PALAUIG, ZAMBALES
- Contractor: R.A. PAHATI CONST. & SUPPLY, INC. (35843)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-07-20
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱47,766,512.00
- Contract status: Completed Report
- BANK IMPROVEMENT ALONG LAWIS RIVER, CANDELARIA, ZAMBALE S (PHASE 1)
- Contractor: DMLC BUILDERS (36650)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-01-31
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱95,534,920.00
- Contract status: Completed Report
- IMPROVEMENT OF ROAD, AMUNGAN - BANLOG, BARANGAY SAN AGU STIN - BARANGAY LIOZON, PALAUIG, ZAMBALES
- Contractor: R.A. PAHATI CONST. & SUPPLY, INC. (35843)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-07-20
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱47,767,044.00
- Contract status: Completed Report
- ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE - SEC ONDARY ROADS OLANGAPO - BUGALLON RD.- K0170+178 - K0170+339, K0170+359 - K0 172+025, K0174+649- K0175+000, SAN FELIPE, ZAMBALES
- Contractor: R.A. PAHATI CONST. & SUPPLY, INC. (35843)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-08-26
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱96,153,216.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, SITIO CALIGUIT, BARANGAYU DIRITA, IBA, ZAMBALES
- Contractor: GASAT BUILDERS AND SUPPLIES INC. (51666)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-08-10
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱14,483,796.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION PACKAGE 17 AT BOTOLAN- CAPAZ RD., BOTOLAN, ZAMBALES
- Contractor: E.R. DELA CRUZ CONSTRUCTION & SUPPLY (32158)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-02-17
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱96,493,520.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION PACKAGE 18 AT BOTOLAN- CAPAZ RD., BOTOLAN, ZAMBALES
- Contractor: RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: RAIK CONSTRUCTION AND SUPPLY) (40660)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-05-27
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱96,495,832.00
- Contract status: Completed Report
- FLOOD CONTROL WORKS/FLOOD MITIGATION STRUCTURE ALONG GA BOR RIVER, PACKAGE 1, SAN FELIPE, ZAMBALES
- Contractor: RAAMDC CONSTRUCTION (53780)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-02-05
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱28,544,588.00
- Contract status: Completed Report
- FLOOD CONTROL WORKS/FLOOD MITIGATION STRUCTURE ALONG GA BOR RIVER, PACKAGE 2, SAN FELIPE, ZAMBALES
- Contractor: RAAMDC CONSTRUCTION (53780)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-02-05
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱28,544,602.00
- Contract status: Completed Report
- CONSTRUCTION/COMPLETION OF MULTIPURPOSE BLDG. AT LOCLOC NATIONAL HIGHSCHOO, BRGY. LOCLOC, PALAUIG, ZAMBALES
- Contractor: SMP-JADE CONSTRUCTION CORPORATION (48340)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-05-26
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱2,930,786.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, BRGY. BANCAL- BRGY. SAN ISIDRO, B OTOLAN, ZAMBALES
- Contractor: GASAT BUILDERS AND SUPPLIES INC. (51666)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-08-11
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱24,163,686.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, CABANGAN CENTRA L ELEMENTARY SCHOOL, CABANGAN, ZAMBALES
- Contractor: KAEE CONSTRUCTION SERVICES (46367)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-07-26
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱5,851,870.50
- Contract status: Completed Report
- ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE - TER TIARY ROADS AMUNGAN-PALAUIG-BANLOG RD - K0213+878 - K0215+551, K0216+532 - K0217+077, K0223+000 - K0223+550, PALAUIG, ZAMBALES
- Contractor: ORIENTAL SALES CENTER AND CONTRACTOR (33630) / CDC CONSTRUCTION & SUPPLIES (28275)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-10-30
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱96,498,360.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, CABANGAN NATION AL HIGH SCHOOL, BRGY. STA. RITA, CABANGAN, ZAMBALES
- Contractor: VM BUILDERS CONSTRUCTION CORPORATION (45475)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-07-25
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱9,766,240.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING INCLUDING FACILI TIES, BARANGAY CARAEL, BOTOLAN, ZAMBALES
- Contractor: E.R. DELA CRUZ CONSTRUCTION & SUPPLY (32158)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-11-16
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱19,520,784.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY CATOL, CANDELARIA, ZAMBALES
- Contractor: KAEE CONSTRUCTION SERVICES (46367)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-08-23
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱9,657,561.00
- Contract status: Completed Report
- ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE - SEC ONDARY ROADS OLANGAPO-BUGALLON RD - K0163+809- K0164+106, K0168+450-K0169+0 00, K0169+538-K0169+921, SAN NARCISO & SAN FELIPE, ZAMBALES
- Contractor: R.A. PAHATI CONST. & SUPPLY, INC. (35843)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-09-04
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱95,534,568.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SOUTH POB LACION, STA. CRUZ, ZAMBALES
- Contractor: KTE CONSTRUCTION AND SUPPLY (51958)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-09-01
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱9,753,464.00
- Contract status: Completed Report
- CONSTRUCTION OF CANIAN ROAD, BRGY. DOLORES, CABANGAN, Z AMBALES
- Contractor: CDC CONSTRUCTION & SUPPLIES (28275)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-07-01
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱9,701,970.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION PACKAGE 15 AT BOTOLAN- CAPAZ RD., BOTOLAN, ZAMBALES
- Contractor: GCLT CONSTRUCTION INCORPORATED (FORMERLY: GCLT CONSTRUCTION) (30657)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-02-04
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱96,312,712.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION PACKAGE 16 AT BOTOLAN- CAPAZ RD., BOTOLAN, ZAMBALES
- Contractor: ADSL CONSTRUCTION & TRADING (48245)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-02-28
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱96,499,488.00
- Contract status: Completed Report
- REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PA VED ROADS - SECONDARY ROADS OLONGAPO- BUGALLON RD - K0233 + 000 - K0233 + 530, K0243 + 900 - K0244 + 619, K0245 + 619 - K0246 + 950, MASINLOC & C ANDELARIA, ZAMBALES
- Contractor: ORIENTAL SALES CENTER AND CONTRACTOR (33630) / CDC CONSTRUCTION & SUPPLIES (28275)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-10-30
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱96,499,656.00
- Contract status: Completed Report
- CONSTRUCTION OF LAUIS RIVER-MASINLOC SIDE FLOOD MITIGAT ION STRUCTURE INCLUDING ROAD DIKE DOWNSTREAM, MASINLOC, ZAMBALES (PHASE 3)< /span>
- Contractor: DMLC BUILDERS (36650)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-02-28
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱95,273,816.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, BARANGAY PINAGREALAN, CANDELARIA, ZAMBALES
- Contractor: VM BUILDERS CONSTRUCTION CORPORATION (45475)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-08-11
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱14,499,993.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG OMAYA RIVER, SAN NARCISO, ZAMBALES (PHASE 2)
- Contractor: ROAD EDGE TRADING & DEVELOPMENT SERVICES (33140)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-03-28
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱48,792,156.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, BARANGAY SAN LORENZO, MASINLOC, Z AMBALES
- Contractor: SALDANIA CONSTRUCTION (44744)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-09-17
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱18,433,662.00
- Contract status: Completed Report
- CONSTRUCTION OF (COMPLETION) OF MULTI-PURPOSE BUILDING (GOVERNMENT MUNICIPAL COMPLEX AND COMPLETION OF EVACUATION CENTER), BARANGA Y TAUGTOG, BOTOLAN, ZAMBALES
- Contractor: SMP-JADE CONSTRUCTION CORPORATION (48340)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-09-16
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱29,402,618.00
- Contract status: Completed Report
- REHABILITATION OF MULTI-PURPOSE BUILDINGS INCLUDING FAC ILITIES, IBA, ZAMBALES
- Contractor: SMP-JADE CONSTRUCTION CORPORATION (48340)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-09-08
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱9,047,645.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION PACKAGE 14 AT BOTOLAN- CAPAZ RD., BOTOLAN, ZAMBALES
- Contractor: T2B3 BUILDERS AND SUPPLIES CORP. (45138) / LMAX CONSTRUCTION (56039)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-04-15
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱95,380,512.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, BARANGAY BALOGANON, MASINLOC, ZAM BALES
- Contractor: VM BUILDERS CONSTRUCTION CORPORATION (45475)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-10-18
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱14,498,483.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TAPUAC-STA MAR IA RIVER, MASINLOC, ZAMBALES (PHASE 1)
- Contractor: RAAMDC CONSTRUCTION (53780)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-09-03
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱9,763,323.00
- Contract status: Completed Report
- REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. DOLORES , CABANGAN, ZAMBALES
- Contractor: ZAMBA CONCRETE BUILDERS INC. (52299)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-12-02
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱19,556,374.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, PUROK 2, BARANGAY LIPAY, STA. CRU Z, ZAMBALES
- Contractor: GASAT BUILDERS AND SUPPLIES INC. (51666)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-10-18
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱14,498,540.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, BARANGAY NATIVIDAD, SAN NARCISO, ZAMBALES
- Contractor: ARCEGA CONSTRUCTION SERVICES (46998)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-12-27
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱14,511,667.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, BARANGAY BURGOS, SAN ANTONIO, ZAM BALES
- Contractor: RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: RAIK CONSTRUCTION AND SUPPLY) (40660)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-10-18
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱14,513,098.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (SPORTS GYMNASIU M COMPLEX), BRGY. CARAEL, BOTOLAN, ZAMBALES
- Contractor: E.R. DELA CRUZ CONSTRUCTION & SUPPLY (32158)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-01-05
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱19,604,910.00
- Contract status: Completed Report
- IMPROVEMENT OF LONGOS ROAD (PAMALENGPENGAN), CABANGAN, ZAMBALES (PHASE 2)
- Contractor: GASAT BUILDERS AND SUPPLIES INC. (51666)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-08-13
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,887,431.00
- Contract status: Completed Report
- CONSTRUCTION OF EVACUATION CENTER / MULTI-PURPOSE BUILD ING, BRGY. LIBERTADOR, CANDELARIA, ZAMBALES
- Contractor: KAEE CONSTRUCTION SERVICES (46367)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-12-28
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,885,439.50
- Contract status: Completed Report
- CONSTRUCTION OF SINDOL - TEKTEK ROAD, BARANGAY SINDOL, SAN FELIPE, ZAMBALES
- Contractor: GASAT BUILDERS AND SUPPLIES INC. (51666)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-12-06
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱14,513,427.00
- Contract status: Completed Report
- RAINWATER COLLECTORS IN PUBLIC FACILITIES
- Contractor: KAEE CONSTRUCTION SERVICES (46367)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-09-16
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱2,861,502.25
- Contract status: Completed Report
- CONSTRUCTION OF TANGUAY RIVER FLOOD MITIGATION STRUCTUR E, PHASE 3, CABANGAN, ZAMBALES
- Contractor: GCLT CONSTRUCTION INCORPORATED (FORMERLY: GCLT CONSTRUCTION) (30657)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-01-15
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱95,051,000.00
- Contract status: On-Going Report
- INSTALLATION OF ROAD SAFETY DEVICES ALONG OLONGAPO - BU GALION ROAD - K0202 + 290 - K0203 + 003, K0203 + 013 - K0205 + 165, K0206 + 033 - K0206 + 900, K0208 + 000 - K0210 + 000, K0211 +107 - K0212 + 711, K0 212 + 803 - K0214 + 000, K0217 + 230 - K0217 + 762
- Contractor: R.A. PAHATI CONST. & SUPPLY, INC. (35843)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-10-01
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱21,682,012.00
- Contract status: On-Going Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, SANTIAGO INTEGR ATED SCHOOL, BARANGAY SANTIAGO, BOTOLAN, ZAMBALES
- Contractor: THREE CM BUILDERS (43015)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-11-19
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱16,822,026.00
- Contract status: On-Going Report
- CONSTRUCTION OF TAMBAK BRIDGE, BARANGAY PALANGINAN, IBA , ZAMBALES (PHASE 2)
- Contractor: R.A. PAHATI CONST. & SUPPLY, INC. (35843)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-12-26
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱50,939,344.00
- Contract status: On-Going Report
- CONSTRUCTION OF SLOPE PROTECTION ALONG BUCAO RIVER, DOW NSTREAM, NORTH APPROACH, BOTOLAN, ZAMBALES, PHASE I
- Contractor: ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP. (49128)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-04-10
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱96,497,928.00
- Contract status: On-Going Report
- CONSTRUCTION OF SLOPE PROTECTION ALONG BUCAO RIVER, DOW NSTREAM, NORTH APPROACH, BOTOLAN, ZAMBALES, PHASE II
- Contractor: ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP. (49128)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-04-10
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱96,497,920.00
- Contract status: On-Going Report
- CONSTRUCTION OF SLOPE PROTECTION ALONG BUCAO RIVER, DOW NSTREAM, NORTH APPROACH, BOTOLAN, ZAMBALES, PHASE III
- Contractor: AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP. ([REVOKED] 49129)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-01-10
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱96,497,248.00
- Contract status: On-Going Report
- CONSTRUCTION OF SLOPE PROTECTION ALONG BUCAO RIVER, DOW NSTREAM, NORTH APPROACH, BOTOLAN, ZAMBALES, PHASE IV
- Contractor: ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP. (49128)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-01-09
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱96,498,272.00
- Contract status: On-Going Report
- CONSTRUCTION OF SLOPE PROTECTION ALONG BUCAO RIVER, DOW NSTREAM, NORTH APPROACH, BOTOLAN, ZAMBALES, PHASE V
- Contractor: YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC. (45002)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-01-10
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱96,498,296.00
- Contract status: On-Going Report
- REPLACEMENT OF PERMANENT WEAK BRIDGES CARAEL BR. ALONG OLONGAPO-BUGALLON ROAD INCLUDING APPROACHES
- Contractor: R.A. PAHATI CONST. & SUPPLY, INC. (35843)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-01-06
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱66,773,336.00
- Contract status: On-Going Report
- FLOOD CONTROL WORKS ALONG TAMBAK-BANCAL RIVER (PHASE I) , SITIO TAMBAK, BARANGAY PALANGINAN, IBA, ZAMBALES
- Contractor: PASCAL CONSTRUCTION (34168)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-01-13
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱95,999,152.00
- Contract status: On-Going Report
- CONSTRUCTION OF SANTO TOMAS RIVER FLOOD CONTROL STRUCTU RE, UPSTREAM, PACKAGE 5, SAN NARCISO, ZAMBALES
- Contractor: YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC. (45002)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-05-10
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱96,484,080.00
- Contract status: On-Going Report
- CONSTRUCTION OF SANTO TOMAS RIVER FLOOD CONTROL STRUCTU RE, UPSTREAM, PACKAGE 6, SAN NARCISO, ZAMBALES
- Contractor: YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC. (45002)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-05-10
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱95,730,472.00
- Contract status: On-Going Report
- CONSTRUCTION OF SANTO TOMAS RIVER FLOOD CONTROL STRUCTU RE, UPSTREAM, PACKAGE 7, SAN NARCISO, ZAMBALES
- Contractor: GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC. ([REVOKED] 45914)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-01-10
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱95,216,304.00
- Contract status: On-Going Report
- CONSTRUCTION OF SANTO TOMAS RIVER FLOOD CONTROL STRUCTU RE, UPSTREAM, PACKAGE 8, SAN NARCISO, ZAMBALES
- Contractor: GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC. ([REVOKED] 45914)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-01-10
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱95,206,472.00
- Contract status: On-Going Report
- CONSTRUCTION OF SANTO TOMAS RIVER FLOOD CONTROL STRUCTU RE, UPSTREAM, PACKAGE 9, SAN NARCISO, ZAMBALES
- Contractor: ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP. (49128)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-01-10
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱95,535,424.00
- Contract status: On-Going Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAUIS RIV ER, PHASE IX, CANDELARIA, ZAMBALES
- Contractor: AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP. ([REVOKED] 49129)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-03-18
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱95,052,408.00
- Contract status: On-Going Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAUIS RIV ER, PHASE VI, CANDELARIA, ZAMBALES
- Contractor: AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP. ([REVOKED] 49129)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-03-18
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱95,052,432.00
- Contract status: On-Going Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAUIS RIV ER, PHASE VII, CANDELARIA, ZAMBALES
- Contractor: AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP. ([REVOKED] 49129)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-03-18
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱95,052,448.00
- Contract status: On-Going Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAUIS RIV ER, PHASE VIII, CANDELARIA, ZAMBALES
- Contractor: YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC. (45002)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-03-18
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱96,499,992.00
- Contract status: On-Going Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAUIS RIV ER, PHASE X, CANDELARIA, ZAMBALES
- Contractor: YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC. (45002)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-03-18
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱96,500,000.00
- Contract status: On-Going Report
- CONSTRUCTION OF BAYTO RIVER FLOOD CONTROL STRUCTURE INC LUDING ROAD DIKE PHASE 1, STA. CRUZ, ZAMBALES
- Contractor: ROAD EDGE TRADING & DEVELOPMENT SERVICES (33140)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-01-15
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱28,636,030.00
- Contract status: On-Going Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, ZAMBALES NATION AL HIGH SCHOOL, ZONE 6, IBA, ZAMBALES
- Contractor: E.R. DELA CRUZ CONSTRUCTION & SUPPLY (32158)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-01-06
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱30,182,784.00
- Contract status: On-Going Report
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TAKAR RIVER, BARANGAY LIPAY DINGIN, PANIBUTAN, PHASE 1, IBA, ZAMBALES
- Contractor: GLOBALCRETE BUILDERS INC. (40796)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-01-02
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱86,849,744.00
- Contract status: On-Going Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BANAWEN ES, SIT IO BANAWEN, BARANGAY MALOMA, SAN FELIPE, ZAMBALES
- Contractor: THREE KCS BUILDERS AND SUPPLY (38544)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-03-03
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱15,625,869.00
- Contract status: On-Going Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, ZNHS, ZONE 6, I BA, ZAMBALES
- Contractor: RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: RAIK CONSTRUCTION AND SUPPLY) (40660)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-04-15
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱42,910,936.00
- Contract status: On-Going Report
- ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-TERTI ARY ROADS-SN MARCELINO-SN ANTONIO-SN NARCISO RD-K0162+407.72-K0163+000,K016 4+000-K0164+404,K0165+000-K0165+705, K0166+286-K0166+639, SAN ANTONIO & SAN NARCISO, ZAMBALES
- Contractor: ORIENTAL SALES CENTER AND CONTRACTOR (33630) / CDC CONSTRUCTION & SUPPLIES (28275)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2024-08-07
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱96,474,520.00
- Contract status: On-Going Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (BAHAY KALINGA), IBA, ZAMBALES
- Contractor: E.R. DELA CRUZ CONSTRUCTION & SUPPLY (32158)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-05-01
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱39,043,368.00
- Contract status: On-Going Report
- BANK IMPROVEMENT ALONG LAWIS RIVER, CANDELARIA, ZAMBALE S (PHASE 2)
- Contractor: DMLC BUILDERS (36650)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-01-31
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱95,534,800.00
- Contract status: On-Going Report
- FLOOD MITIGATION FACILITIES/FLOOD CONTROL WORKS ALONG L AWIS RIVER DOWNSTREAM, PHASE 2, MASINLOC, ZAMBALES
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-05-26
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱95,139,120.00
- Contract status: On-Going Report
- CONSTRUCTION OF SLOPE PROTECTION/FLOOD MITIGATION STRUC TURE ALONG BUCAO RIVER DOWNSTREAM, BOTOLAN, ZAMBALES (PHASE 5)
- Contractor: GCLT CONSTRUCTION INCORPORATED (FORMERLY: GCLT CONSTRUCTION) (30657)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-02-04
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱92,912,112.00
- Contract status: On-Going Report
- FLOOD MITIGATION FACILITIES/FLOOD CONTROL WORKS ALONG L AWIS RIVER DOWNSTREAM, PHASE 4, MASINLOC, ZAMBALES
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-05-26
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱95,168,088.00
- Contract status: On-Going Report
- FLOOD MITIGATION FACILITIES/FLOOD CONTROL WORKS ALONG L AWIS RIVER DOWNSTREAM, PHASE 5, MASINLOC, ZAMBALES
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-05-26
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱95,168,232.00
- Contract status: On-Going Report
- FLOOD MITIGATION FACILITIES/FLOOD CONTROL WORKS ALONG L AWIS RIVER DOWNSTREAM, PHASE 6, MASINLOC, ZAMBALES
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-05-26
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱95,168,160.00
- Contract status: On-Going Report
- CONSTRUCTION OF SANTO TOMAS RIVER FLOOD CONTROL STRUCTU RE, UPSTREAM, PACKAGE 10, SAN NARCISO, ZAMBALES
- Contractor: HGG BUILDERS & SUPPLY (17824) / S-ANG CONSTRUCTION & GENERAL TRADING, INC. (37149)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-02-18
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱94,075,648.00
- Contract status: On-Going Report
- FLOOD MITIGATION FACILITIES/FLOOD CONTROL WORKS ALONG L AWIS RIVER DOWNSTREAM, PHASE 1, MASINLOC, ZAMBALES
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-05-26
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱95,197,064.00
- Contract status: On-Going Report
- FLOOD MITIGATION FACILITIES/FLOOD CONTROL WORKS ALONG L AWIS RIVER DOWNSTREAM, PHASE 3, MASINLOC, ZAMBALES
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-05-26
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱95,197,056.00
- Contract status: On-Going Report
- CONSTRUCTION OF SLOPE PROTECTION/FLOOD MITIGATION STRUC TURE ALONG BUCAO RIVER DOWNSTREAM, BOTOLAN, ZAMBALES (PHASE 6)
- Contractor: GCLT CONSTRUCTION INCORPORATED (FORMERLY: GCLT CONSTRUCTION) (30657)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-03-13
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱138,594,048.00
- Contract status: On-Going Report
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG OMAYA RIVER, SAN NARCISO, ZAMBALES (PHASE 1)
- Contractor: RIMJ CONSTRUCTION SUPPLIES AND SERVICES (FOR: ROMINA CONSTRUCTION) (32090)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-07-18
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱48,797,096.00
- Contract status: On-Going Report
- CONSTRUCTION OF ACCESS ROAD/DIVERSION ROAD, DAANG KALIK ASAN TO YAMOT, PHASE 1, STA. CRUZ, ZAMBALES
- Contractor: R.A. PAHATI CONST. & SUPPLY, INC. (35843)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-03-30
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱143,229,984.00
- Contract status: On-Going Report
- CONSTRUCTION OF ROAD, DAANG KALIKASAN TO DAMPAY - BINAB ALIAN SECTION, PHASE 1, CANDELARIA, ZAMBALES
- Contractor: PASCAL CONSTRUCTION (34168)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-03-30
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱95,389,904.00
- Contract status: On-Going Report
- CONSTRUCTION OF LAUIS RIVER-MASINLOC SIDE FLOOD MITIGAT ION STRUCTURE DOWNSTREAM, MASINLOC, ZAMBALES (PHASE 5)
- Contractor: JTC CRUZ CONSTRUCTION CO., INC. (32479)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-02-28
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱99,000,000.00
- Contract status: On-Going Report
- CONSTRUCTION OF ROAD, DAANG KALIKASAN TO DAMPAY - BINAB ALIAN SECTION, PHASE 2, CANDELARIA, ZAMBALES
- Contractor: PASCAL CONSTRUCTION (34168)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-03-30
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱95,438,160.00
- Contract status: On-Going Report
- CONSTRUCTION OF NEW PRESIDENT RAMON MAGSAYSAY MEMORIAL HOSPITAL (PRMMH) BUILDING, IBA, ZAMBALES
- Contractor: KAEE CONSTRUCTION SERVICES (46367)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-08-17
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱39,045,464.00
- Contract status: On-Going Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING FOR CADETS, PHIL IPPINE MERCHANT MARINE ACADEMY, SAN NARCISO, ZAMBALES
- Contractor: WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP. (FOR:WAYCON BUILDERS & CONSTRUCTION SUPPLY) (34778)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-03-11
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱68,330,144.00
- Contract status: On-Going Report
- CONSTRUCTION OF BAYTO RIVER CAPACITY ENHANCEMENT STRUCT URE UPSTREAM, STA. CRUZ, ZAMBALES (PHASE 3)
- Contractor: GLOBALCRETE BUILDERS INC. (40796)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-04-15
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱97,702,568.00
- Contract status: On-Going Report
- CONSTRUCTION OF UACON RIVER CAPACITY ENHANCEMENT STRUCT URE, STA. CRUZ, ZAMBALES (PHASE 2)
- Contractor: GLOBALCRETE BUILDERS INC. (40796)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-04-15
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱97,633,744.00
- Contract status: On-Going Report
- CONSTRUCTION OF MULTI-PURPOSE FACILITY, CALIGUIT, BARAN GAY DIRITA, IBA, ZAMBALES
- Contractor: RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: RAIK CONSTRUCTION AND SUPPLY) (40660)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-05-02
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱39,060,100.00
- Contract status: On-Going Report
- CONSTRUCTION OF ACCESS ROAD/DIVERSION ROAD, DAANG KALIK ASAN TO LUCAPON SOUTH (ACOJE SECTION), BRGY. LUCAPON SOUTH, STA. CRUZ, ZAMB ALES
- Contractor: R.A. PAHATI CONST. & SUPPLY, INC. (35843)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-07-23
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱142,679,328.00
- Contract status: On-Going Report
- CONSTRUCTION OF BRIDGE, BARANGAY STA. RITA, MASINLOC, Z AMBALES
- Contractor: A.M. CANETE CONSTRUCTION AND TRADING (42540)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2025-03-08
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱29,047,082.00
- Contract status: On-Going Report