Infrastructure Projects in Region III — Region III - Zambales 1st District Engineering Office, 2020
This page lists public infrastructure projects implemented by Region III - Zambales 1st District Engineering Office in Region III during 2020. All data are sourced from the Department of Public Works and Highways (DPWH) official database (as of 9/30/2025): https://www.dpwh.gov.ph/dpwh/projects/infrastructure
This information is shared to promote transparency and public awareness. We encourage visitors to validate project details using the official DPWH source. In case of discrepancies, please refer to the original records published by the DPWH.
| Contractor | Projects | Total Price |
|---|---|---|
| STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096) | 7 | ₱258,823,522.50 |
| BIG BERTHA CONSTRUCTION & DEVELOPMENT (3191) | 3 | ₱143,076,196.50 |
| ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY) (05349) | 3 | ₱130,200,404.00 |
| ROMA CONSTRUCTION & DEVELOPMENT CORPORATION (6514) | 2 | ₱121,836,990.00 |
| HIGH STRENGTH DEV. CORPORATION (31976) | 2 | ₱82,569,962.00 |
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVE D ROADS- SECONDARY ROAD OLONGAPO-BUGALLON ROAD K0 181 + 000 - K0181+153.5- K0181+190 - K0181+207
- Contractor: 4B CONSTRUCTION CORPORATION (23445)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-10-01
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱1,814,726.75
- Contract status: Completed Report
- PREVENTIVE MAINTENANCE-SECONDARY ROADS OLONGAPO-BUGALLO N ROAD, K0 247+000-K0 247 + 814.7
- Contractor: JQM CONSTRUCTION AND TRADING (36354)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-10-20
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱13,770,493.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION/FLOOD CONTROL AT MARAN GLA, PALAUIG, ZAMBALES
- Contractor: CDC CONSTRUCTION & SUPPLIES (28275)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-08-24
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱31,516,800.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION/FLOOD CONTROL PROJECT (BANCAL RIVER UPSTREAM SOUTH APPROACH), BRGY. BANCAL, BOTOLAN, ZAMBALES
- Contractor: ROMA CONSTRUCTION & DEVELOPMENT CORPORATION (6514)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-09-01
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱26,341,022.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION/FLOOD CONTROL PROJECT AT BAYTO RIVER (UPSTREAM), STA. CRUZ, ZAMBALES
- Contractor: GOLDRICH CONSTRUCTION & TRADING (16489)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-09-17
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱32,151,840.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION/FLOOD CONTROL PROJECT AT TAMBAK RIVER PHASE 2, UPSTREAM, IBA, ZAMBALES
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-06-07
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱31,891,238.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION/FLOOD CONTROL ALONG BA NCAL RIVER (CABATUHAN PHASE 2), UPSTREAM, IBA, ZAMBALES
- Contractor: CDC CONSTRUCTION & SUPPLIES (28275)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-04-18
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱17,611,776.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION/FLOOD CONTROL PROJECT AT BANCAL RIVER (CABATUHAN PHASE 3) UPSTREAM, IBA, ZAMBALES
- Contractor: GCLT CONSTRUCTION INCORPORATED (FORMERLY: GCLT CONSTRUCTION) (30657)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-06-07
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱32,147,136.00
- Contract status: Completed Report
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGE, DALAYAP BR.2 (B01407LZ) ALONG OLONGAPO-BUGALLON ROAD
- Contractor: ALPHATEC CHEMICAL CORPORATION (39938)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-04-17
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱7,130,513.00
- Contract status: Completed Report
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGE, NAYUM B R. (B01435LZ) ALONG OLONGAPO-BUGALLON ROAD
- Contractor: ALPHATEC CHEMICAL CORPORATION (39938)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-10-10
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱54,278,368.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION/FLOOD CONTROL AT GABOR DIKE PHASE V, SAN FELIPE, ZAMBALES
- Contractor: RIMJ CONSTRUCTION SUPPLIES AND SERVICES (FOR: ROMINA CONSTRUCTION) (32090)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-05-18
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱29,399,996.00
- Contract status: Completed Report
- COMPLETION OF MULTI-PURPOSE BUILDING, SAN RAFAEL ELEMEN TARY SCHOOL, BRGY. SAN RAFAEL, SAN FELIPE, ZAMBALES
- Contractor: JORGZ KONZTRAK & SUPPLY (40727)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-04-27
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,950,487.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING(BARANGAY HALL) B RGY. ROSETE, SAN FELIPE, ZAMBALES
- Contractor: JORGZ KONZTRAK & SUPPLY (40727)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-07-01
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱3,880,790.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, STO. NI C3 91O, PALAUIG, ZAMBALES
- Contractor: NEW MASINLOC HENRY'S CONSTRUCTION & SUPPLY (33744)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-07-01
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,851,000.00
- Contract status: Completed Report
- ROAD WIDENING-SECONDARY ROADS OLONGAPO-BUGALLON ROAD K0 155 + (-012) - K0 155 + 997, SAN NARCISO, ZAMBALES
- Contractor: HIGH STRENGTH DEV. CORPORATION (31976)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-05-18
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱32,928,018.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION AT BALILI RIVER, NORTH APPROACH, IBA, ZAMBALES
- Contractor: GCLT CONSTRUCTION INCORPORATED (FORMERLY: GCLT CONSTRUCTION) (30657)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-09-10
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱29,076,366.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) AT BRGY. ANGELES, SAN ANTONIO, ZAMBALES
- Contractor: RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: RAIK CONSTRUCTION AND SUPPLY) (40660)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-06-22
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,848,659.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) AT BRGY. PAITE, SAN NARCISO, ZAMBALES
- Contractor: RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: RAIK CONSTRUCTION AND SUPPLY) (40660)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-07-21
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,899,999.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) AT BRGY. SAN GREGORIO, SAN ANTONIO, ZAMBALES
- Contractor: RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: RAIK CONSTRUCTION AND SUPPLY) (40660)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-06-22
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,848,659.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) AT BRGY. SAN PASCUAL, SAN NARCISO, ZAMBALES
- Contractor: RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: RAIK CONSTRUCTION AND SUPPLY) (40660)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-06-22
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,850,999.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, DALLIPAWEN, SAN NARCISO, ZAMBALES
- Contractor: JOYNIELTIN CONSTRUCTION AND TRADING (41858)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-07-03
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,850,979.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, FERIA, SAN FELI PE, ZAMBALES
- Contractor: MICKAJETTE CONSTRUCTION AND TRADING (35239)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-07-03
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱3,900,585.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, NAMATACAN, SAN NARCISO, ZAMBALES
- Contractor: MICKAJETTE CONSTRUCTION AND TRADING (35239)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-07-03
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,850,989.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, SAN JUAN, PALAU IG, ZAMBALES
- Contractor: JORGZ KONZTRAK & SUPPLY (40727)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-05-07
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,950,299.38
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, NACOLCOL, BOTOL AN, ZAMBALES
- Contractor: NEW MASINLOC HENRY'S CONSTRUCTION & SUPPLY (33744)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-06-22
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,850,505.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, SAN JUAN, PALAU IG, ZAMBALES
- Contractor: LEO-J CONSTRUCTION SERVICES (27248)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-06-24
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,850,989.50
- Contract status: Completed Report
- CONSTRUCTION OF MALABON-MALIMANGA-SINABACAN FLOOD CONTR OL PHASE III, CANDELARIA, ZAMBALES
- Contractor: JOYNIELTIN CONSTRUCTION AND TRADING (41858)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-04-18
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱17,870,498.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DEC LARED TOURISM DESTINATIONS, ACCESS ROAD LEADING TO SAGRADA FAMILIA CAVE, S TA. CRUZ, ZAMBALES
- Contractor: MCB ZAMORA CONSTRUCTION & SUPPLY (32006)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-08-21
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱33,275,464.00
- Contract status: Completed Report
- COMPLETION OF MULTI-PURPOSE BUILDING, BARANGAY LAOAG, C ABANGAN, ZAMBALES
- Contractor: MICKAJETTE CONSTRUCTION AND TRADING (35239)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-04-27
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,940,196.38
- Contract status: Completed Report
- COMPLETION OF MULTI-PURPOSE BUILDING, BARANGAY AMUNGAN, IBA, ZAMBALES
- Contractor: MICKAJETTE CONSTRUCTION AND TRADING (35239)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-05-03
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,940,400.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, CANAYNAYAN, STA .CRUZ, ZAMBALES
- Contractor: JECK CONSTRUCTION (24189)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-06-24
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,946,407.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, ST A. CRUZ SOUTH CENTRAL SCHOOL, BARANGAY LIPAY, STA. CRUZ, ZAMBALES
- Contractor: NEW MASINLOC HENRY'S CONSTRUCTION & SUPPLY (33744)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-05-11
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱984,937.44
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SAN VICEN TE, PALAUIG, ZAMBALES
- Contractor: NEW MASINLOC HENRY'S CONSTRUCTION & SUPPLY (33744)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-06-10
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,425,500.00
- Contract status: Completed Report
- WIDENING OF PERMANENT BRIDGES, ALUSIIS BR. (B01392LZ) A LONG OLONGAPO-BUGALLON ROAD, SAN NARCISO, ZAMBALES
- Contractor: JQM CONSTRUCTION AND TRADING (36354)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-01-29
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱7,103,124.00
- Contract status: Completed Report
- WIDENING OF PERMANENT BRIDGES, LONGOS BR. (B01400LZ) OL ONGAPO-BUGALLON ROAD, CABANGAN, ZAMBALES
- Contractor: JQM CONSTRUCTION AND TRADING (36354)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-08-21
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱15,428,966.00
- Contract status: Completed Report
- WIDENING OF PERMANENT BRIDGES, SAN LORENZO BR. (B01423L Z) ALONG OLONGAPO-BUGALLON ROAD, MASINLOC, ZAMBALES
- Contractor: JQM CONSTRUCTION AND TRADING (36354)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-08-18
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱18,447,930.00
- Contract status: Completed Report
- WIDENING OF PERMANENT BRIDGES, STO. ROSARIO BR.(B01424L Z) ALONG OLONGAPO-BUGALLON ROAD, MASINLOC, ZAMBALES
- Contractor: PHOLBENJ CONSTRUCTION AND SUPPLY (40196)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-08-06
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱15,497,347.00
- Contract status: Completed Report
- CONSTRUCTION OF MISSING LINK/NEW ROADS, STA. CRUZ - MAN GATAREM ROAD, PACKAGE 5, ZAMBALES STA. CRUZ, ZAMBALES
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-02-02
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱91,674,912.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO BALI N BUWAYA CAVE, SITIO DALIG, BRGY. TAPOSO, CANDELARIA, ZAMBALES
- Contractor: HIGH STRENGTH DEV. CORPORATION (31976)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-02-14
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱49,641,944.00
- Contract status: Completed Report
- CONSTRUCTION OF PUNDAQUIT BRIDGE, SAN ANTONIO, ZAMBALES
- Contractor: ROMA CONSTRUCTION & DEVELOPMENT CORPORATION (6514)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-08-16
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱95,495,968.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, MALOMBOY, BOTOL AN, ZAMBALES
- Contractor: JORGZ KONZTRAK & SUPPLY (40727)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-04-13
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,910,605.25
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, NATIVIDAD, SAN NARCISO, ZAMBALES
- Contractor: NEW MASINLOC HENRY'S CONSTRUCTION & SUPPLY (33744)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-07-06
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,850,994.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, SAN RAFAEL, SAN FELIPE, ZAMBALES
- Contractor: JORGZ KONZTRAK & SUPPLY (40727)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-07-06
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱3,880,422.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, NAVSOG, NAVAL E DUCATIONAL TRAINING COMMAND (NETC), SAN MIGUEL, SAN ANTONIO, ZAMBALES
- Contractor: RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: RAIK CONSTRUCTION AND SUPPLY) (40660)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-06-22
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,850,936.50
- Contract status: Completed Report
- WIDENING OF PERMANENT BRIDGES, PALANGINAN BR.(B01416LZ) ALONG OLONGAPO-BUGALLON ROAD, IBA, ZAMBALES
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-08-06
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱7,903,188.50
- Contract status: Completed Report
- CONSTRUCTION OF HARVARD TYPE CLASSROOM BUILDING, NAVAL STATION LEOVIGILDO GANTIOQUI, SAN ANTONIO, ZAMBALES
- Contractor: ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY) (05349)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-11-19
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱36,122,856.00
- Contract status: Completed Report
- CONSTRUCTION OF SATELLITE MATERIALS LABORATORY BUILDING , ZAMBALES 1ST DISTRICT ENGINEERING OFFICE, IBA, ZAMBALES
- Contractor: JORGZ KONZTRAK & SUPPLY (40727)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-07-02
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱6,825,863.00
- Contract status: Completed Report
- REPAIR/IMPROVEMENT OF MULTI-PURPOSE BUILDING, BRGY. SAN TIAGO, BOTOLAN, ZAMBALES
- Contractor: JOYNIELTIN CONSTRUCTION AND TRADING (41858)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-01-03
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,925,450.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. CAUYAN, P ALAUIG, ZAMBALES
- Contractor: NEW MASINLOC HENRY'S CONSTRUCTION & SUPPLY (33744)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-02-02
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,851,005.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BOTOLAN NORTH C ENTRAL ES, BRGY. TAMPO, BOTOLAN, ZAMBALES
- Contractor: BIG BERTHA CONSTRUCTION & DEVELOPMENT (3191)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-02-02
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,850,968.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BRGY. OWAOG-N EBLOC, BOTOLAN, ZAMBALES
- Contractor: JOYNIELTIN CONSTRUCTION AND TRADING (41858)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-02-02
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,850,892.00
- Contract status: Completed Report
- CONCRETING OF ROAD- INCLUDING CONSTRUCTION OF DRAINAGE, BRGY. PINAGREALAN, CANDELARIA, ZAMBALES
- Contractor: AG MORALES CONSTRUCTION AND TRADING (40703)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-03-16
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱28,803,828.00
- Contract status: Completed Report
- ROAD WIDENING OF SECONDARY ROAD OLONGAPO-BUGALLON ROAD, BINOCLUTAN-PANAS SECTION, BOTOLAN, ZAMBALES
- Contractor: MICKAJETTE CONSTRUCTION AND TRADING (35239)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-02-19
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱18,914,090.00
- Contract status: Completed Report
- CONCRETING OF ROAD, BRGY. STO.NI C3 91O, PALAUIG, ZAMBA LES
- Contractor: RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: RAIK CONSTRUCTION AND SUPPLY) (40660)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-01-30
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,801,437.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, DO N BRIGIDO MIRAFLOR INTEGRATED SCHOOL, BRGY. LUCAPON NORTH, STA. CRUZ, ZAMBA LES
- Contractor: JECK CONSTRUCTION (24189)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-01-21
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,925,774.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (SENIOR CITIZENS BUILDING) BARANGAY CARAEL, BOTOLAN, ZAMBALES
- Contractor: CDCC CONSTRUCTION AND SUPPLY (40963)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-12-07
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,950,299.38
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, PUROK 2, BARANG AY CARAEL, BOTOLAN, ZAMBALES
- Contractor: CDCC CONSTRUCTION AND SUPPLY (40963)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-12-04
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,950,285.62
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING A T BRGY. LOMBOY, CABANGAN, ZAMBALES
- Contractor: MICKAJETTE CONSTRUCTION AND TRADING (35239)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-12-07
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,950,286.00
- Contract status: Completed Report
- CONCRETING OF BANGCOL TO ALMASIN ROAD (WITH SLOPE PROTE CTION), BRGY. BANGCOL, STA. CRUZ,ZAMBALES
- Contractor: RIMJ CONSTRUCTION SUPPLIES AND SERVICES (FOR: ROMINA CONSTRUCTION) (32090)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-04-08
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱18,815,838.00
- Contract status: Completed Report
- CONCRETING OF JOSUE GONZALES STREET IN BRGY. AMUNGAN, I BA, ZAMBALES
- Contractor: JOYNIELTIN CONSTRUCTION AND TRADING (41858)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-03-19
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱9,456,511.00
- Contract status: Completed Report
- CONCRETING OF ROAD, CAMP CONRADO YAP, BRGY. LIPAY-DINGI N-PANIBUATAN, IBA, ZAMBALES
- Contractor: RIMJ CONSTRUCTION SUPPLIES AND SERVICES (FOR: ROMINA CONSTRUCTION) (32090)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-04-18
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱14,111,994.00
- Contract status: Completed Report
- CONSTRUCTION OF LOCAL ROAD, BRGY. PAMONORAN, STA. CRUZ, ZAMBALES
- Contractor: RIMJ CONSTRUCTION SUPPLIES AND SERVICES (FOR: ROMINA CONSTRUCTION) (32090)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-03-19
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱9,456,803.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ROAD, BRGY. PACO-CARAEL, BO TOLAN, ZAMBALES
- Contractor: GVDPM CONSTRUCTION CORP. (FORMERLY: ZM CONSTRUCTIO (9052)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-04-18
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱14,112,048.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING(MUNICIPAL HALL), PHASE 1, IBA, ZAMBALES
- Contractor: KAEE CONSTRUCTION SERVICES (46367)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-12-22
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,925,447.25
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE COVERED COURT, BRGY. COLL AT, MASINLOC, ZAMBALES
- Contractor: RIMJ CONSTRUCTION SUPPLIES AND SERVICES (FOR: ROMINA CONSTRUCTION) (32090)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-02-12
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,850,964.00
- Contract status: Completed Report
- REHABILITATION OF MULTI-PURPOSE BUILDING, TR YANGCO ELE MENTARY SCHOOL, BARANGAY BURGOS, SAN ANTONIO, ZAMBALES
- Contractor: KAEE CONSTRUCTION SERVICES (46367)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-12-14
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,950,299.50
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION AT LIPAY RIVER CONTROL (UPSTREAM) SOUTH APPROACH, STA. CRUZ, ZAMBALES
- Contractor: ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY) (05349)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-06-17
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱51,742,832.00
- Contract status: Completed Report
- CONCRETING OF MAYAMAN ROAD, MASINLOC, ZAMBALES
- Contractor: RIMJ CONSTRUCTION SUPPLIES AND SERVICES (FOR: ROMINA CONSTRUCTION) (32090)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-12-22
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,881,078.25
- Contract status: Completed Report
- IMPROVEMENT OF NAMNEL ROAD IN BRGY. SAN JUAN, CABANGAN, ZAMBALES
- Contractor: CDC CONSTRUCTION & SUPPLIES (28275)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-03-19
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱9,442,951.00
- Contract status: Completed Report
- PROPOSED IMPROVEMENT /RENOVATION OF KAINOMAYAN PRIMARY HOSPITAL (PHASE 1) IN THE BOTOLAN, ZAMBALES
- Contractor: GVDPM CONSTRUCTION CORP. (FORMERLY: ZM CONSTRUCTIO (9052)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-04-18
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱9,603,760.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION OF ROAD LEADING TO MT. TAPULAO STA. 009+145.70-STA.00 9+420, ZAMBALES
- Contractor: ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY) (05349)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-07-07
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱42,334,716.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION ALONG OLONGAPO BUGALLO N ROAD SALAZA SECTION K0 223+800 - K0223+844.5, ZAMBALES
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-07-07
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱37,631,860.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION ALONG OLONGAPO BUGALLO N ROAD, BOTOLAN SECTION K0 189 + 000 - K0 189+776, ZAMBALES
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-07-07
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱42,335,588.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (ADMINISTRATIVE BUILDING) ZAMBALES NATIONAL HIGH SCHOOL, BRGY. ZONE 6, IBA, ZAMBALES
- Contractor: JORGZ KONZTRAK & SUPPLY (40727)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-07-23
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱14,552,973.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS
- Contractor: JOYNIELTIN CONSTRUCTION AND TRADING (41858)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-11-30
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱4,045,904.50
- Contract status: Completed Report
- ROAD WIDENING-TERTIARY ROADS, SAN MARCELINO- SAN ANTONI O-SAN NARCISO ROAD K0 165+745 K0 166+269, SAN NARCISO, ZAMBALES
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-06-29
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱14,212,434.00
- Contract status: On-Going Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEA PORTS, SAN MIGUEL PORT BOULEVARD, SAN ANTONIO, ZAMBALES
- Contractor: BIG BERTHA CONSTRUCTION & DEVELOPMENT (3191)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-09-17
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱46,549,932.00
- Contract status: On-Going Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DEC LARED TOURISM DESTINATIONS, ACCESS ROAD LEADING TO PRAWN FRY HATCHERIES AND RESORTS AND SURFING AREA, SAN ANTONIO, ZAMBALES
- Contractor: BIG BERTHA CONSTRUCTION & DEVELOPMENT (3191)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2021-01-18
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱91,675,296.00
- Contract status: On-Going Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DEC LARED TOURISM DESTINATIONS, SAN NARCISO BYPASS ROAD (LUCERO-DALIPAWEN-NAMAT ACAN-GRULLO-LIBERTAD), SAN NARCISO, ZAMBALES
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Zambales 1st District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-09-07
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱33,174,302.00
- Contract status: On-Going Report