Infrastructure Projects in Region III — Region III - Zambales 2nd District Engineering Office, 2018
This page lists public infrastructure projects implemented by Region III - Zambales 2nd District Engineering Office in Region III during 2018. All data are sourced from the Department of Public Works and Highways (DPWH) official database (as of 9/30/2025): https://www.dpwh.gov.ph/dpwh/projects/infrastructure
This information is shared to promote transparency and public awareness. We encourage visitors to validate project details using the official DPWH source. In case of discrepancies, please refer to the original records published by the DPWH.
| Contractor | Projects | Total Price |
|---|---|---|
| REPOLMAN CONSTRUCTION CORP. (FORMERLY: REPOLMAN CONSTRUCTION) (32842) / THREE W BUILDERS, INC. (10722) | 11 | ₱698,745,668.00 |
| JAMJLE PROPERTIES (SUBIC) AND DEVELOPMENT CORPORAT (35039) | 20 | ₱404,335,601.00 |
| ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY) (05349) | 6 | ₱309,039,496.00 |
| HIGH STRENGTH DEV. CORPORATION (31976) | 5 | ₱209,766,258.00 |
| STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096) | 3 | ₱190,456,436.00 |
- CONST. OF MULTI-PURPOSE BLDG. (COVERED COURT), GORDON H EIGHTS NATL. HIGH SCHOOL, GORDON HEIGHTS, OLONGAPO CITY
- Contractor: JAMJLE PROPERTIES (SUBIC) AND DEVELOPMENT CORPORAT (35039)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-06-08
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱2,881,040.00
- Contract status: Completed Report
- CONST. OF MULTI-PURPOSE BLDG. (COVERED COURT), IRAM HIG H SCHOOL, NEW CABALAN, OLONGAPO CITY
- Contractor: JAMJLE PROPERTIES (SUBIC) AND DEVELOPMENT CORPORAT (35039)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-05-09
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,916,405.62
- Contract status: Completed Report
- CONST. OF MULTI-PURPOSE BLDG. (COVERED COURT), NEW CABA LAN NATIONAL HIGH SCHOOL, NEW CABALAN, OLONGAPO CITY
- Contractor: JAMJLE PROPERTIES (SUBIC) AND DEVELOPMENT CORPORAT (35039)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-05-09
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱3,355,185.00
- Contract status: Completed Report
- CONST. OF MULTI-PURPOSE BLDG. (COVERED COURT) SERGIA SO RIANO ESTEBAN INTEGRATED SCHOOL OF KALAKLAN, OLONGAPO CITY
- Contractor: JAMJLE PROPERTIES (SUBIC) AND DEVELOPMENT CORPORAT (35039)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-05-09
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,913,542.88
- Contract status: Completed Report
- CONST. OF MULTI-PURPOSE BLDG. KOLEHIYO NG SUBIC (COVERE D COURT), BARACA-CAMACHILE, SUBIC, ZAMBALES
- Contractor: CASUPANAN BUILDERS AND MERCHANDISE (41891)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-05-09
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱3,354,866.75
- Contract status: Completed Report
- CONST. OF MULTI-PURPOSE BLDG. MAPASIG-PASIG ELEM. SCHOO L (COVERED COURT), BATIAWAN, SUBIC, ZAMBALES
- Contractor: RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: RAIK CONSTRUCTION AND SUPPLY) (40660)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-05-09
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,916,405.62
- Contract status: Completed Report
- CONST. OF MULTI-PURPOSE BLDG. MUSLIM AREA (COVERED COUR T), CALAPACUAN, SUBIC, ZAMBALES
- Contractor: RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: RAIK CONSTRUCTION AND SUPPLY) (40660)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-05-09
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,920,691.12
- Contract status: Completed Report
- CONST. OF MULTI-PURPOSE BLDG. SAN ISIDRO HIGH SCHOOL (C OVERED COURT), SAN ISIDRO, SUBIC, ZAMBALES
- Contractor: RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: RAIK CONSTRUCTION AND SUPPLY) (40660)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-05-09
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,916,044.12
- Contract status: Completed Report
- CONST. OF MULTI-PURPOSE BLDG. VISAYA AREA (COVERED COUR T), MATAIN, SUBIC, ZAMBALES
- Contractor: RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: RAIK CONSTRUCTION AND SUPPLY) (40660)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-05-09
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱3,358,975.50
- Contract status: Completed Report
- CONST. OF MULTI-PURPOSE BLDG., NAGBAYAN ELEM. SCHOOL (C OVERED COURT), NAGBAYAN, CASTILLEJOS, ZAMBALES
- Contractor: M.V.GUBALLA CONSTRUCTION CORPORATION (FORMERLY: M.V. GUBALLA CONSTRUCTION) (11722)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-05-09
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,916,044.12
- Contract status: Completed Report
- CONST. OF MULTI-PURPOSE BLDG., STA. MARIA ELEM. SCHOOL (COVERED COURT), STA. MARIA, CASTILLEJOS, ZAMBALES
- Contractor: M.V.GUBALLA CONSTRUCTION CORPORATION (FORMERLY: M.V. GUBALLA CONSTRUCTION) (11722)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-05-09
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱3,353,340.50
- Contract status: Completed Report
- CONST. OF MULTI-PURPOSE BLDG. V. GALLARDO ELEM. SCHOOL (COVERED COURT), NAGBUNGA, CASTILLEJOS, ZAMBALES
- Contractor: MICKAJETTE CONSTRUCTION AND TRADING (35239)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-05-09
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,912,833.25
- Contract status: Completed Report
- CONST. OF MULTI-PURPOSE BLDG. LINUSUNGAN ELEM. SCHOOL ( COVERED COURT), LINUSUNGAN, SAN MARCELINO, ZAMBALES
- Contractor: MICKAJETTE CONSTRUCTION AND TRADING (35239)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-05-09
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,916,044.12
- Contract status: Completed Report
- CONST. OF MULTI-PURPOSE BLDG. SAN RAFAEL ELEM. SCHOOL ( COVERED COURT), SAN RAFAEL, SAN MARCELINO, ZAMBALES
- Contractor: MICKAJETTE CONSTRUCTION AND TRADING (35239)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-05-09
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,916,044.12
- Contract status: Completed Report
- CONST. OF MULTI-PURPOSE BUILDING, KALALAKE ELEM. SCHOOL (COVERED COURT), BRGY. KALALAKE, OLONGAPO CITY
- Contractor: JAMJLE PROPERTIES (SUBIC) AND DEVELOPMENT CORPORAT (35039)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-05-09
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱3,354,866.75
- Contract status: Completed Report
- CONST. OF MULTI-PURPOSE BUILDING, ASINAN ELEM. SCHOOL ( COVERED COURT), BRGY. ASINAN, OLONGAPO CITY
- Contractor: JAMJLE PROPERTIES (SUBIC) AND DEVELOPMENT CORPORAT (35039)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-06-08
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱3,356,734.25
- Contract status: Completed Report
- CONST. OF MULTI-PURPOSE BUILDING, SAN ISIDRO ELEM. SCHO OL (COVERED COURT), SAN ISIDRO, SUBIC, ZAMBALES
- Contractor: RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: RAIK CONSTRUCTION AND SUPPLY) (40660)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-05-09
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,916,044.12
- Contract status: Completed Report
- EXTENSION OF MULTI-PURPOSE BUILDING, SUBIC CENTRAL SCHO OL (COVERED COURT), BARACA, SUBIC, ZAMBALES
- Contractor: RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: RAIK CONSTRUCTION AND SUPPLY) (40660)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-05-09
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,912,831.50
- Contract status: Completed Report
- COMPLETION OF MULTI-PURPOSE BUILDING, NAGBAYAN BARANGAY PLAZA SCHOOL (COVERED COURT), BRGY. NAGBAYAN, CASTILLEJOS, ZAMBALES
- Contractor: M.V.GUBALLA CONSTRUCTION CORPORATION (FORMERLY: M.V. GUBALLA CONSTRUCTION) (11722)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-05-09
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,917,053.38
- Contract status: Completed Report
- REHAB./RECONST./UPGRADING OF DAMAGED PAVED ROADS, APO R OTONDA ROAD - (S04203LZ) - CHAINAGE 0 - CHAINAGE 70, OLONGAPO CITY
- Contractor: JAMJLE PROPERTIES (SUBIC) AND DEVELOPMENT CORPORAT (35039)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-03-25
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱3,741,408.50
- Contract status: Completed Report
- REHAB./RECONST./UPGRADING OF DAMAGED PAVED ROADS, MAGSA YSAY DRIVE - (S01365LZ) - CHAINAGE 500 - CHAINAGE 611, OLONGAPO CITY
- Contractor: JAMJLE PROPERTIES (SUBIC) AND DEVELOPMENT CORPORAT (35039)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-06-08
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱5,896,578.50
- Contract status: Completed Report
- REHAB./RECONST./UPGRADING OF DAMAGED PAVED ROADS, JOSE ABAD SANTOS AVE. (JASA), K0118+524 - K0118+735, K0118+735 - K0118+756, OLON GAPO CITY
- Contractor: JAMJLE PROPERTIES (SUBIC) AND DEVELOPMENT CORPORAT (35039)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-05-09
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱10,733,310.00
- Contract status: Completed Report
- ROAD WIDENING, JOSE ABAD SANTOS AVE. (JASA) K0118+(-204 .65) - K0118+735, K0118+756 - K0119+235, OLONGAPO CITY
- Contractor: JAMJLE PROPERTIES (SUBIC) AND DEVELOPMENT CORPORAT (35039)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-08-07
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱23,205,946.00
- Contract status: Completed Report
- CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND D RAINAGE SYSTEMS, IMPROVEMENT OF TAMAYOK RIVER, SUBIC, ZAMBALES
- Contractor: ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY) (05349)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-10-21
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱47,025,532.00
- Contract status: Completed Report
- CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND D RAINAGE SYSTEMS, IMPROVEMENT OF PAMATAWAN RIVER (KANAYNAYAN SECTION), CASTI LLEJOS, ZAMBALES
- Contractor: REPOLMAN CONSTRUCTION CORP. (FORMERLY: REPOLMAN CONSTRUCTION) (32842) / THREE W BUILDERS, INC. (10722)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-08-27
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱46,796,624.00
- Contract status: Completed Report
- CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND D RAINAGE SYSTEMS, IMPROVEMENT OF PAMATAWAN RIVER (LOOC SECTION), CASTILLEJOS , ZAMBALES
- Contractor: REPOLMAN CONSTRUCTION CORP. (FORMERLY: REPOLMAN CONSTRUCTION) (32842) / THREE W BUILDERS, INC. (10722)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-09-29
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱47,056,524.00
- Contract status: Completed Report
- CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND D RAINAGE SYSTEMS, IMPROVEMENT OF CAMACHILE RIVER (UPSTREAM), CASTILLEJOS, ZA MBALES
- Contractor: HIGH STRENGTH DEV. CORPORATION (31976)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-10-06
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱47,061,224.00
- Contract status: Completed Report
- CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND D RAINAGE SYSTEMS, IMPROVEMENT OF CAMACHILE RIVER, SAN MARCELINO, ZAMBALES
- Contractor: HIGH STRENGTH DEV. CORPORATION (31976)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-09-06
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱37,651,116.00
- Contract status: Completed Report
- REHAB./RECONST. OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE SECONDARY ROADS, OLONGAPO-BUGALLON ROAD K0131+100 - K0131+438, K 0151+000 - K0151+262, OLONGAPO CITY AND SAN MARCELINO, ZAMBALES
- Contractor: JAMJLE PROPERTIES (SUBIC) AND DEVELOPMENT CORPORAT (35039)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-08-07
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱22,664,690.00
- Contract status: Completed Report
- CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND D RAINAGE SYSTEMS, IMPROVEMENT OF STA. RITA RIVER, OLONGAPO CITY
- Contractor: JAMJLE PROPERTIES (SUBIC) AND DEVELOPMENT CORPORAT (35039)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-09-06
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱46,913,648.00
- Contract status: Completed Report
- CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND D RAINAGE SYSTEMS, IMPROVEMENT OF VEGA-MACULCUL DIKE, SAN MARCELINO, ZAMBALES
- Contractor: ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY) (05349)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-10-01
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱47,141,160.00
- Contract status: Completed Report
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, HEIGHTENING OF VEGA-LAWIN DIKE, SAN MARCELINO, ZAMBA LES
- Contractor: ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY) (05349)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-10-01
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱47,141,628.00
- Contract status: Completed Report
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, IMPROVEMENT OF MAQUINAYA RIVER, BO. BARRETTO, OLONGA PO CITY
- Contractor: JAMJLE PROPERTIES (SUBIC) AND DEVELOPMENT CORPORAT (35039)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-07-08
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱46,691,556.00
- Contract status: Completed Report
- NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS, OLONGAPO-BUGALLON ROAD, K0142+243 - K0142+554, K0142+562 - K0143+279, K0143 +287 - K0143+882, SUBIC, ZAMBALES
- Contractor: REPOLMAN CONSTRUCTION CORP. (FORMERLY: REPOLMAN CONSTRUCTION) (32842) / THREE W BUILDERS, INC. (10722)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-10-06
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱45,607,956.00
- Contract status: Completed Report
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, IMPROVEMENT OF MABAYUAN RIVER, OLONGAPO CITY< /li>
- Contractor: JAMJLE PROPERTIES (SUBIC) AND DEVELOPMENT CORPORAT (35039)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-08-07
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱28,246,458.00
- Contract status: Completed Report
- CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND D RAINAGE SYSTEMS, DREDGING OF MATAIN RIVER MOUTH, SUBIC, ZAMBALES
- Contractor: REPOLMAN CONSTRUCTION CORP. (FORMERLY: REPOLMAN CONSTRUCTION) (32842) / THREE W BUILDERS, INC. (10722)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-08-07
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱28,586,648.00
- Contract status: Completed Report
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, DREDGING OF CALAPANDAYAN RIVER MOUTH, SUBIC, ZAMBALE S
- Contractor: THREE W BUILDERS, INC. (10722)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-07-08
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱19,062,692.00
- Contract status: Completed Report
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS. DREDGING OF WAWANDUE RIVER MOUTH, SUBIC, ZAMBALES
- Contractor: THREE W BUILDERS, INC. (10722)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-07-08
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱19,059,478.00
- Contract status: Completed Report
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, IMPROVEMENT OF SACATIHAN RIVER, SUBIC, ZAMBALES
- Contractor: E.R. DELA CRUZ CONSTRUCTION & SUPPLY (32158)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-08-27
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱27,894,330.00
- Contract status: Completed Report
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, IMPROVEMENT OF STA. FE RIVER, SAN MARCELINO, ZAMBALE S
- Contractor: ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY) (05349)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-10-01
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱46,267,228.00
- Contract status: Completed Report
- NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-TERTIARY ROAD S, SUBIC-PHILSECO ROAD - K0141+(-462) - K0141+310, K0141+374 - K0141+940, K 0142+214 - K0142+500, SUBIC, ZAMBALES
- Contractor: ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY) (05349)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-12-05
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱46,143,076.00
- Contract status: Completed Report
- NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-SECONDARY ROA DS, OLONGAPO-BUGALLON RD., K0131+580 - K0133+000, K0135+738 - K0137+012, K0 137+012 - K0137+295, SUBIC, ZAMBALES
- Contractor: REPOLMAN CONSTRUCTION CORP. (FORMERLY: REPOLMAN CONSTRUCTION) (32842) / THREE W BUILDERS, INC. (10722)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-03-11
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱90,107,432.00
- Contract status: Completed Report
- NETWORK DEVELOPMENT PROGRAM-BRIDGE PROGRAM, RETROFITTIN G/STRENGTHENING OF PERMANENT BRIDGES BAJAC-BAJAC BRIDGE (B01647LZ) ALONG RI ZAL AVE., OLONGAPO CITY
- Contractor: ECANGELES CONST. & CONST. SUPPLY (34420)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-04-12
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱5,088,752.00
- Contract status: Completed Report
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, IMPROVEMENT OF CABALAN RIVER, OLONGAPO CITY
- Contractor: JAMJLE PROPERTIES (SUBIC) AND DEVELOPMENT CORPORAT (35039)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-09-30
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱46,559,588.00
- Contract status: Completed Report
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, IMPROVEMENT OF JADJAD RIVER OLD CABALAN, OLONGAPO CI TY
- Contractor: JAMJLE PROPERTIES (SUBIC) AND DEVELOPMENT CORPORAT (35039)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-08-26
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱46,732,648.00
- Contract status: Completed Report
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, IMPROVEMENT OF BANICAIN RIVER, BARANGAY BANICAIN, OL ONGAPO CITY
- Contractor: E.R. DELA CRUZ CONSTRUCTION & SUPPLY (32158)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-11-02
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱46,764,252.00
- Contract status: Completed Report
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS SUBIC BY-PA SS INCLUDING SLOPE PROTECTION, SUBIC, ZAMBALES
- Contractor: REPOLMAN CONSTRUCTION CORP. (FORMERLY: REPOLMAN CONSTRUCTION) (32842) / THREE W BUILDERS, INC. (10722)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-01-08
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱112,087,104.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, SAN RAFAEL ELEM ENTARY SCHOOL (COVERED COURT), SAN RAFAEL, SAN MARCELINO, ZAMBALES
- Contractor: MICKAJETTE CONSTRUCTION AND TRADING (35239)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-06-12
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,916,044.12
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING BARANGAY MABAYUA N, OLONGAPO CITY
- Contractor: GVDPM CONSTRUCTION CORP. (FORMERLY: ZM CONSTRUCTIO (9052)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-07-11
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱4,792,772.50
- Contract status: Completed Report
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, IMPROVEMENT OF EAST BAJAC-BAJAC CHANNEL, OLONGAPO CI TY
- Contractor: JAMJLE PROPERTIES (SUBIC) AND DEVELOPMENT CORPORAT (35039)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-09-21
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱46,533,140.00
- Contract status: Completed Report
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, IMPROVEMENT OF MARELALEC RIVER, SUBIC, ZAMBALES
- Contractor: HIGH STRENGTH DEV. CORPORATION (31976)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-11-13
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱46,743,492.00
- Contract status: Completed Report
- REHAB./RECONST./UPGRADING OF DAMAGED PAVED ROADS, SECON DARY ROADS, OLONGAPO-BUGALLON RD. K0137+531 - K0139+000, SUBIC, ZAMBALES
- Contractor: REPOLMAN CONSTRUCTION CORP. (FORMERLY: REPOLMAN CONSTRUCTION) (32842) / THREE W BUILDERS, INC. (10722)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-10-01
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱51,399,956.00
- Contract status: Completed Report
- NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS A ND DIVERSION ROAD, SUBIC BY-PASS ROAD EXTENSION (NAUGSOL - TIPO - DINALUPIH AN), ZAMBALES
- Contractor: REPOLMAN CONSTRUCTION CORP. (FORMERLY: REPOLMAN CONSTRUCTION) (32842) / THREE W BUILDERS, INC. (10722)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-03-12
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱55,991,476.00
- Contract status: Completed Report
- FLOOD MITIGATION PROGRAM - CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONST. OF SLOPE PROTECTION/CHAN NEL EXCAVATION OF ANINGWAY CREEK, SUBIC, ZAMBALES
- Contractor: REPOLMAN CONSTRUCTION CORP. (FORMERLY: REPOLMAN CONSTRUCTION) (32842) / THREE W BUILDERS, INC. (10722)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-01-13
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱65,309,520.00
- Contract status: Completed Report
- FLOOD MITIGATION PROGRAM - CONST./REHAB. OF FLOOD MITIG ATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, IMPVT. OF KALAKLAN RIVER DRAINAGE OUTFALL (EAST AND WEST BAJAC-BAJAC SECTION), OLONGA PO CITY, ZAMBALES
- Contractor: HIGH STRENGTH DEV. CORPORATION (31976)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-12-19
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱46,382,736.00
- Contract status: Completed Report
- CONST. OF BARANGAY ROAD PUROK 2, SAN ISIDRO, SUBIC, ZAM BALES
- Contractor: MICKAJETTE CONSTRUCTION AND TRADING (35239)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-05-23
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,864,785.12
- Contract status: Completed Report
- CONST. OF BARANGAY ROAD PUROK 4, SAN ISIDRO, SUBIC, ZAM BALES
- Contractor: MICKAJETTE CONSTRUCTION AND TRADING (35239)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-06-07
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱2,794,275.75
- Contract status: Completed Report
- IMPROVEMENT OF KANAYNAYAN ROAD IN SITIO KANAYNAYAN, BRG Y. SAN PABLO, CASTILLEJOS, ZAMBALES
- Contractor: MICKAJETTE CONSTRUCTION AND TRADING (35239)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-06-07
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,863,559.50
- Contract status: Completed Report
- CONST. OF LOCAL ROADS, BARANGAY SAN GUILLERMO SAN MARCE LINO, ZAMBALES
- Contractor: GCLT CONSTRUCTION INCORPORATED (FORMERLY: GCLT CONSTRUCTION) (30657)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-06-07
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱2,782,281.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING BARANGAY BARRETT O, OLONGAPO CITY
- Contractor: THREE KCS BUILDERS AND SUPPLY (38544)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-09-19
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,912,242.88
- Contract status: Completed Report
- NETWORK DEVT. PROGRAM - BRIDGE PROGRAM RETROFITTING/STR ENGTHENING OF PERMANENT BRIDGES CABALAN BRIDGE (B01633LZ) ALONG JOSE ABAD S ANTOS AVE. (JASA), OLONGAPO CITY
- Contractor: ECANGELES CONST. & CONST. SUPPLY (34420)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-09-04
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱5,165,004.00
- Contract status: Completed Report
- NETWORK DEVT. PROGRAM - BRIDGE PROGRAM RETROFITTING/STR ENGTHENING OF PERMANENT BRIDGES MATAIN BRIDGE I (B01636LZ) ALONG OLONGAPO-B UGALLON ROAD, SUBIC, ZAMBALES
- Contractor: REPOLMAN CONSTRUCTION CORP. (FORMERLY: REPOLMAN CONSTRUCTION) (32842)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-10-04
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱6,552,794.00
- Contract status: Completed Report
- CONSTRUCTION OF ROADS, BRGY. KALAKLAN, OLONGAPO CITY
- Contractor: THREE KCS BUILDERS AND SUPPLY (38544)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-08-05
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱2,802,996.75
- Contract status: Completed Report
- CONST./REHAB. OF DRAINAGE, BACON ST. AND DONOR ST. UP T O EAST TAPINAC COVERED COURT, EAST TAPINAC, OLONGAPO CITY
- Contractor: JAMJLE PROPERTIES (SUBIC) AND DEVELOPMENT CORPORAT (35039)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-09-09
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱1,854,639.50
- Contract status: Completed Report
- REHAB./RECONST./UPGRADING OF DAMAGED PAVED ROADS - SECO NDARY ROADS, OLONGAPO-BUGALLON ROAD, K0126+(-038) - K0126+220, OLONGAPO CIT Y
- Contractor: JAMJLE PROPERTIES (SUBIC) AND DEVELOPMENT CORPORAT (35039)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-12-18
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱11,477,376.00
- Contract status: Completed Report
- REHAB./RECONST./UPGRADING OF DAMAGED PAVED ROADS - SECO NDARY ROADS, OLONGAPO-BUGALLON ROAD, K0143+930 - K0146+180, K0148+000 - K01 48+747, CASTILLEJOS, ZAMBALES
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-12-18
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱46,707,452.00
- Contract status: Completed Report
- CONST./UPGRADING/REHAB. OF DRAINAGE ALONG NATIONAL ROAD S - TERTIARY ROADS, SAN MARCELINO - NAGBAYTO ROAD, K0151+(-999) - K0152+346 , SAN MARCELINO, ZAMBALES
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-03-29
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱60,592,288.00
- Contract status: Completed Report
- ROAD WIDENING - SECONDARY ROADS, OLONGAPO-BUGALLON ROAD , K0148+500 - K0148+747, K0148+767.2 - K0148+940, K0149+002 - K0150+090, SA N MARCELINO, ZAMBALES
- Contractor: REPOLMAN CONSTRUCTION CORP. (FORMERLY: REPOLMAN CONSTRUCTION) (32842) / THREE W BUILDERS, INC. (10722)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-03-18
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱93,325,112.00
- Contract status: Completed Report
- BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES, CAMACHI LE BR. (B01645LZ) ALONG OLONGAPO - BUGALLON ROAD, CASTILLEJOS, ZAMBALES
- Contractor: REPOLMAN CONSTRUCTION CORP. (FORMERLY: REPOLMAN CONSTRUCTION) (32842) / THREE W BUILDERS, INC. (10722)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-06-27
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱62,477,316.00
- Contract status: Completed Report
- NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS A ND DIVERSION ROADS - CAWAG - PHILSECO BYPASS ROAD, SUBIC, ZAMBALES
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-07-10
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱83,156,696.00
- Contract status: Completed Report
- CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINA GE SYSTEMS, CONST./EXTENSION OF JETTY, KALAKLAN MOUTH, OLONGAPO CITY
- Contractor: JAMJLE PROPERTIES (SUBIC) AND DEVELOPMENT CORPORAT (35039)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-01-15
- Fund source: Regular Infra - GAA 2018 OO-2
- Contract price: ₱46,306,840.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. BANICAIN, OLONGAPO CITY
- Contractor: THREE KCS BUILDERS AND SUPPLY (38544)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-10-17
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱2,873,182.75
- Contract status: Completed Report
- RAINWATER COLLECTOR SYSTEM, CONST. OF RAINWATER COLLECT ION SYSTEM (RWCS) FOR VARIOUS SCHOOLS IN OLONGAPO CITY, SUBIC AND SAN MARCE LINO, ZAMBALES
- Contractor: CDCC CONSTRUCTION AND SUPPLY (40963)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2018-10-17
- Fund source: Regular Infra - GAA 2018 Other Infrastructure (CSSP)
- Contract price: ₱3,230,719.00
- Contract status: Completed Report
- CONST. OF LYING-IN AND BIRTHING FACILITY BARANGAY BALAY BAY, CASTILLEJOS, ZAMBALES
- Contractor: MICKAJETTE CONSTRUCTION AND TRADING (35239)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-01-15
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱5,799,049.50
- Contract status: Completed Report
- CONST. OF BRIDGE, STA. FE BRIDGE, STA. FE SAN MARCELINO , ZAMBALES
- Contractor: REPOLMAN CONSTRUCTION CORP. (FORMERLY: REPOLMAN CONSTRUCTION) (32842)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-03-03
- Fund source: Regular Infra - GAA 2018 LP
- Contract price: ₱9,166,849.00
- Contract status: Completed Report
- BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES, CONSUEL O BR. (B01646LZ) ALONG OLONGAPO-BUGALLON RD, SAN MARCELINO, ZAMBALES
- Contractor: HIGH STRENGTH DEV. CORPORATION (31976)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-06-13
- Fund source: Regular Infra - GAA 2018 OO-1
- Contract price: ₱31,927,690.00
- Contract status: Completed Report
- CONSTRUCTION OF TWO (2) STOREY, 4CL SCHOOL BUILDING BAN ICAIN ELEMENTARY SCHOOL, OLONGAPO CITY
- Contractor: SUBICCON CORPORATION (FORMERLY: SUBCON CORPORATION (25079)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-06-14
- Fund source: Regular Infra - Support for Infrastructure Projects and Social = Program 2018
- Contract price: ₱9,595,723.00
- Contract status: Completed Report
- CONSTRUCTION OF TWO (2) STOREY, 4CL SCHOOL BUILDING IRA M HIGH SCHOOL, OLONGAPO CITY
- Contractor: SUBICCON CORPORATION (FORMERLY: SUBCON CORPORATION (25079)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-06-14
- Fund source: Regular Infra - Support for Infrastructure Projects and Social = Program 2018
- Contract price: ₱9,595,723.00
- Contract status: Completed Report
- DREDGING WORKS AT PORT FACILITIES AT NSD (MARINE TERMIN AL, WEST/EAST BULKHEAD, SATTLER) AND SRF (ALAVA, BRAVO AND RIVERA WHARVES) COMPOUND, BOTON, LEYTE WHARF AND NCT 1 & 2, SUBIC BAY FREEPORT ZONE, OL ONGAPO CITY
- Contractor: ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY) (05349)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-05-05
- Fund source: Regular Infra - Support for Infrastructure Projects and Social = Program 2018
- Contract price: ₱75,320,872.00
- Contract status: Completed Report
- CONCRETING OF ROAD WITH DRAINAGE SYSTEM AT 14TH STREET (GORDON AVE - BRIDGE), OLONGAPO CITY
- Contractor: ALFEL CONSTRUCTION CORPORATION (40473)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-03-05
- Fund source: Regular Infra - Support for Infrastructure Projects and Social = Program 2018
- Contract price: ₱5,558,394.00
- Contract status: Completed Report
- CONCRETING OF ROAD WITH 2 SIDE DRAINAGE SYSTEM AT BEGON IA STREET (FILTRATION ROAD - AMAPOLA STREET), OLONGAPO CITY
- Contractor: ALFEL CONSTRUCTION CORPORATION (40473)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-02-23
- Fund source: Regular Infra - Support for Infrastructure Projects and Social = Program 2018
- Contract price: ₱3,728,951.00
- Contract status: Completed Report
- CONCRETING OF AVOCADO STREET, BRGY. NEW CABALAN, OLONGA PO CITY
- Contractor: ALFEL CONSTRUCTION CORPORATION (40473)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-02-05
- Fund source: Regular Infra - Support for Infrastructure Projects and Social = Program 2018
- Contract price: ₱2,325,044.75
- Contract status: Completed Report
- CONCRETING OF 18TH STREET, EAST BAJAC-BAJAC (RIZAL AVEN UE TO BARANGAY HALL), OLONGAPO CITY
- Contractor: ALFEL CONSTRUCTION CORPORATION (40473)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-04-06
- Fund source: Regular Infra - Support for Infrastructure Projects and Social = Program 2018
- Contract price: ₱9,263,044.00
- Contract status: Completed Report
- CONST. OF DRAINAGE SYSTEM AT TABACUHAN ROAD (TULIO STRE ET - DEL ROSARIO STREET INCLUDING DECLOGGING OF TULIO STREET AND DEL ROSARI O STREET), OLONGAPO CITY
- Contractor: ALFEL CONSTRUCTION CORPORATION (40473)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-02-05
- Fund source: Regular Infra - Support for Infrastructure Projects and Social = Program 2018
- Contract price: ₱3,702,178.25
- Contract status: Completed Report
- CONCRETING OF LANDFILL STREET, BRGY. NEW CABALAN, OLONG APO CITY
- Contractor: ALFEL CONSTRUCTION CORPORATION (40473)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-02-05
- Fund source: Regular Infra - Support for Infrastructure Projects and Social = Program 2018
- Contract price: ₱2,415,122.75
- Contract status: Completed Report
- CONTINUATION OF SLOPE PROTECTION (KALAKLAN RIVER) FROM 9TH STREET TO 3RD STREET, OLONGAPO CITY
- Contractor: ALFEL CONSTRUCTION CORPORATION (40473)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-04-06
- Fund source: Regular Infra - Support for Infrastructure Projects and Social = Program 2018
- Contract price: ₱15,426,282.00
- Contract status: Completed Report
- CONSTRUCTION OF TWO(2) STOREY DIVISION OFFICE BUILDING, NEW ASINAN, OLONGAPO CITY
- Contractor: ALFEL CONSTRUCTION CORPORATION (40473)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-08-15
- Fund source: Regular Infra - Support for Infrastructure Projects and Social = Program 2018
- Contract price: ₱9,596,039.00
- Contract status: Completed Report