Infrastructure Projects in Region III — Region III - Zambales 2nd District Engineering Office, 2019
This page lists public infrastructure projects implemented by Region III - Zambales 2nd District Engineering Office in Region III during 2019. All data are sourced from the Department of Public Works and Highways (DPWH) official database (as of 9/30/2025): https://www.dpwh.gov.ph/dpwh/projects/infrastructure
This information is shared to promote transparency and public awareness. We encourage visitors to validate project details using the official DPWH source. In case of discrepancies, please refer to the original records published by the DPWH.
| Contractor | Projects | Total Price |
|---|---|---|
| STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096) | 8 | ₱448,141,016.00 |
| REPOLMAN CONSTRUCTION CORP. (FORMERLY: REPOLMAN CONSTRUCTION) (32842) / THREE W BUILDERS, INC. (10722) | 3 | ₱277,391,672.00 |
| HIGH STRENGTH DEV. CORPORATION (31976) | 5 | ₱214,853,503.00 |
| ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY) (05349) | 4 | ₱204,207,656.00 |
| JAMJLE PROPERTIES (SUBIC) AND DEVELOPMENT CORPORAT (35039) | 3 | ₱103,422,210.00 |
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT POBLACION CAS TILLEJOS, ZAMBALES
- Contractor: RGZAMORA CONSTRUCTION AND TRADING (42487)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-30
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,897,688.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT POBLACION, OL ONGAPO CITY, ZAMBALES
- Contractor: GERCEL CONSTRUCTION AND DEVELOPMENT GROUP INC. (FORMERLY: GERCEL CONSTRUCTION) (26541)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-08
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,860,718.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY OLD CABALAN, OLONGAPO CITY
- Contractor: CDCC CONSTRUCTION AND SUPPLY (40963)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-30
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,901,160.25
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY EAST TAPINAC, OLONGAPO CITY
- Contractor: RGZAMORA CONSTRUCTION AND TRADING (42487)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-30
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,881,080.38
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, AGUSUHIN ELEMEN TARY SCHOOL (COVERED COURT), CAWAG, SUBIC, ZAMBALES
- Contractor: REPOLMAN CONSTRUCTION CORP. (FORMERLY: REPOLMAN CONSTRUCTION) (32842)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-30
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱3,303,504.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARRETTO II ELE MENTARY SCHOOL (COVERED COURT), BARRETTO, OLONGAPO CITY
- Contractor: RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: RAIK CONSTRUCTION AND SUPPLY) (40660)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-30
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,358,372.75
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARRETTO NATION AL HIGH SCHOOL (COVERED COURT), BARRETTO, OLONGAPO CITY, ZAMBALES
- Contractor: RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: RAIK CONSTRUCTION AND SUPPLY) (40660)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-30
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,349,465.75
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, GORDON HEIGHTS I ELEMENTARY SCHOOL (COVERED COURT), GORDON HEIGHTS, OLONGAPO CITY, ZAMBALE S
- Contractor: JAM-C BUILDERS (32870)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-17
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱3,375,399.75
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, GORDON HEIGHTS II ELEMENTARY SCHOOL (COVERED COURT), GORDON HEIGHTS, OLONGAPO CITY, ZAMBAL ES
- Contractor: RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: RAIK CONSTRUCTION AND SUPPLY) (40660)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-30
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,819,708.75
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, IRAM ELEMENTARY SCHOOL (COVERED COURT), NEW CABALAN, OLONGAPO CITY, ZAMBALES
- Contractor: REPOLMAN CONSTRUCTION CORP. (FORMERLY: REPOLMAN CONSTRUCTION) (32842)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-23
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱3,292,609.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, LAWIN ELEMENTAR Y SCHOOL (COVERED COURT), SAN RAFAEL, SAN MARCELINO, ZAMBALES
- Contractor: REPOLMAN CONSTRUCTION CORP. (FORMERLY: REPOLMAN CONSTRUCTION) (32842)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-20
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,349,067.75
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, LOOC ELEMENTARY SCHOOL (COVERED COURT), LOOC, CASTILLEJOS, ZAMBALES
- Contractor: MICKAJETTE CONSTRUCTION AND TRADING (35239)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-30
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,348,669.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, LUCERO (COVERED COURT), LUCERO, SAN MARCELINO, ZAMBALES
- Contractor: MCB ZAMORA CONSTRUCTION & SUPPLY (32006)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-30
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,352,008.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, NAGBAYAN (COVER ED COURT), NAGBAYAN, CASTILLEJOS, ZAMBALES
- Contractor: REPOLMAN CONSTRUCTION CORP. (FORMERLY: REPOLMAN CONSTRUCTION) (32842)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-24
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,351,179.75
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, NEW CABALAN ELE MENTARY SCHOOL (COVERED COURT), NEW CABALAN, OLONGAPO CITY
- Contractor: REPOLMAN CONSTRUCTION CORP. (FORMERLY: REPOLMAN CONSTRUCTION) (32842)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-24
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱3,292,903.25
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, OLD CABALAN ELE MENTARY SCHOOL (COVERED COURT), OLD CABALAN, OLONGAPO CITY, ZAMBALES
- Contractor: JAM-C BUILDERS (32870)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-18
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱3,375,399.75
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, PILI ELEMENTARY SCHOOL (COVERED COURT), BUHAWEN, SAN MARCELINO, ZAMBALES
- Contractor: MCB ZAMORA CONSTRUCTION & SUPPLY (32006)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-24
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱3,287,861.25
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, PRES. RAMON MAG SAYSAY ELEMENTARY SCHOOL (COVERED COURT), SAN JUAN, CASTILLEJOS, ZAMBALES
- Contractor: MICKAJETTE CONSTRUCTION AND TRADING (35239)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-30
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,343,267.75
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, PUROK 6 CALAPAC UAN (COVERED COURT), CALAPACUAN, SUBIC, ZAMBALES
- Contractor: REPOLMAN CONSTRUCTION CORP. (FORMERLY: REPOLMAN CONSTRUCTION) (32842)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-26
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱3,304,242.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, AGLAO ELEMENTAR Y SCHOOL (COVERED COURT), AGLAO SAN MARCELINO, ZAMBALES
- Contractor: R.M. VITUG CONSTRUCTION (9227)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-04
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,375,367.75
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, SERGIA SORIANO ESTEBAN INTEGRATED SCHOOL II (COVERED COURT), KALAKLAN, OLONGAPO CITY, ZAMB ALES
- Contractor: MDAN CONSTRUCTION AND TRADING (38077)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-26
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,375,393.75
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, SITIO ALUSIIS ( COVERED COURT), LOOC, CASTILLEJOS, ZAMBALES
- Contractor: MICKAJETTE CONSTRUCTION AND TRADING (35239)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-30
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,349,389.25
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, SITIO GALA ELEM ENTARY SCHOOL (COVERED COURT), ANINGWAY-SACATIHAN, SUBIC, ZAMBALES
- Contractor: REPOLMAN CONSTRUCTION CORP. (FORMERLY: REPOLMAN CONSTRUCTION) (32842)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-30
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,351,452.75
- Contract status: Completed Report
- CONSTRUCTION OF ROAD AT EAST BAJAC-BAJAC, OLONGAPO CITY
- Contractor: JOYNIELTIN CONSTRUCTION AND TRADING (41858)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-07-22
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,834,096.50
- Contract status: Completed Report
- CONSTRUCTION OF ROAD AT NEW CABALAN, OLONGAPO CITY
- Contractor: JOYNIELTIN CONSTRUCTION AND TRADING (41858)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-08-07
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱3,667,155.75
- Contract status: Completed Report
- ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE - PR IMARY ROADS, JOSE ABAD SANTOS AVENUE (JASA), K0118+253 - K0118+755, OLONGAP O CITY
- Contractor: MCB ZAMORA CONSTRUCTION & SUPPLY (32006)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-08-10
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱5,785,474.50
- Contract status: Completed Report
- ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE - SE CONDARY ROADS, OLONGAPO - BUGALLON ROAD, K0147+298 - K0147+712, CASTILLEJOS , ZAMBALES
- Contractor: RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: RAIK CONSTRUCTION AND SUPPLY) (40660)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-08-10
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱10,561,285.00
- Contract status: Completed Report
- LOCAL ROADS - ASPHALTING OF ROADS, STA. ELENA, ST. JAME S ROAD, CALAPACUAN, SUBIC, ZAMBALES
- Contractor: HIGH STRENGTH DEV. CORPORATION (31976)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-26
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱8,543,687.00
- Contract status: Completed Report
- FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF F LOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, IMPROVEMENT OF MALINTA CREE K, SUBIC, ZAMBALES
- Contractor: RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: RAIK CONSTRUCTION AND SUPPLY) (40660)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-24
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱12,860,277.00
- Contract status: Completed Report
- FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF F LOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, IMPROVEMENT OF MAPANAO CREE K, SUBIC, ZAMBALES
- Contractor: RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: RAIK CONSTRUCTION AND SUPPLY) (40660)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-24
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱12,829,229.00
- Contract status: Completed Report
- CONST./UPGRADING/REHAB. OF DRAINAGE ALONG NATL. ROADS - TERTIARY ROADS, SAN MARCELINO-SAN ANTONIO-SAN NARCISO RD., K0153+596 - KO1 54+100, KO154+100 - KO154+437, KO154+437 - KO154+550, KO156+178 - KO156+505 , SAN MARCELINO, ZAMBALES
- Contractor: MICKAJETTE CONSTRUCTION AND TRADING (35239)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-02-06
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱17,728,366.00
- Contract status: Completed Report
- FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF F LOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, IMPROVEMENT OF KALAKLAN RIV ER, OLONGAPO CITY
- Contractor: ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY) (05349)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-03-07
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱40,012,256.00
- Contract status: Completed Report
- FLOOD MANAGEMENT PROGRAM, CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, IMPROVEMENT OF BANICAIN R IVER, OLONGAPO, ZAMBALES
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-01-28
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱45,370,504.00
- Contract status: Completed Report
- FLOOD MANAGEMENT PROGRAM, CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, IMPROVEMENT OF EAST BAJAC BAJAC CHANNEL, OLONGAPO, ZAMBALES
- Contractor: JAMJLE PROPERTIES (SUBIC) AND DEVELOPMENT CORPORAT (35039)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-29
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱45,362,920.00
- Contract status: Completed Report
- FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF F LOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, IMPROVEMENT OF JADJAD RIVER , OLONGAPO CITY, ZAMBALES
- Contractor: JAMJLE PROPERTIES (SUBIC) AND DEVELOPMENT CORPORAT (35039)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-29
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱45,372,856.00
- Contract status: Completed Report
- FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF F LOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, IMPROVEMENT OF MARELALEC RI VER, SUBIC, ZAMBALES
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-29
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱45,342,020.00
- Contract status: Completed Report
- FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF F LOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, IMPROVEMENT OF MATAIN RIVER DIKE (UPSTREAM), SUBIC, ZAMBALES
- Contractor: ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY) (05349)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-01-28
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱45,416,320.00
- Contract status: Completed Report
- FLOOD MANAGEMENT PROGRAM, CONS/MAINT. OF FLOOD MITIGATI ON STRUCTURES AND DRAINAGE SYSTEM, IMPROVEMENT OF BANICAIN CHANNEL IN BETWE EN OLONGAPO CITY AND SBMA, OLONGAPO CITY, ZAMBALES
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-01-28
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱47,766,868.00
- Contract status: Completed Report
- FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, IMPROV EMENT OF STA. RITA RIVER, STA. 5+600 TO 6+078, OLONGAPO CITY, ZAMBALES
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-01-24
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱45,375,452.00
- Contract status: Completed Report
- FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, IMPROV EMENT OF STA. RITA RIVER, STA. 6+078 TO 6+556, OLONGAPO CITY, ZAMBALES
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-01-24
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱45,375,692.00
- Contract status: Completed Report
- FLOOD MANAGEMENT PROGRAM, CONST./MAINT. OF FLOOD MITIGA TION STRUCTURES AND DRAINAGE SYSTEM, IMPROVEMENT OF VEGA-LAWIN DIKE, SAN MA RCELINO, ZAMBALES
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-01-17
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱45,415,488.00
- Contract status: Completed Report
- FLOOD MANAGEMENT PROGRAM, CONST./MAINT. OF FLOOD MITIGA TION STRUCTURES AND DRAINAGE SYSTEM, IMPROVEMENT OF CAMACHILE RIVER (DOWNST REAM), CASTILLEJOS, ZAMBALES
- Contractor: CHIARA2300 INCORPORATED (8736)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-04-14
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱90,792,376.00
- Contract status: Completed Report
- CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND D RAINAGE SYSTEM, IMPROVEMENT OF PAMATAWAN RIVER, CASTILLEJOS, ZAMBALES
- Contractor: REPOLMAN CONSTRUCTION CORP. (FORMERLY: REPOLMAN CONSTRUCTION) (32842) / THREE W BUILDERS, INC. (10722)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-03-16
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱93,005,808.00
- Contract status: Completed Report
- CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND D RAINAGE SYSTEM, IMPROVEMENT OF PAMATAWAN RIVER (LOOC SECTION), CASTILLEJOS, ZAMBALES
- Contractor: REPOLMAN CONSTRUCTION CORP. (FORMERLY: REPOLMAN CONSTRUCTION) (32842) / THREE W BUILDERS, INC. (10722)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-02-23
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱92,711,040.00
- Contract status: Completed Report
- REHAB/RECONS/UPGRADING OF DAMAGED PAVED ROADS SECONDARY ROADS, OLONGAPO-BUGALLON ROAD,K0139+000-K0139+714, K0140+000-K0141+757, K0 141+981 -K0142+320, K0142+562-K0143+060, K0143+287- K0143+660, K0146+180-K0 146+798.4, K0149+877-K0150+303,ZAMBALES
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-07-23
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱91,578,256.00
- Contract status: Completed Report
- NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BYPASS AN D DIVERSION ROAD, (INCLUDING ROW), CAWAG-PHILSECO BYPASS ROAD, SUBIC, ZAMBA LES
- Contractor: STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-06-23
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱81,916,736.00
- Contract status: Completed Report
- NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AN D DIVERSION ROADS, SUBIC BYPASS ROAD EXTENSION (NAUGSOL-TIPO-DINALUPIHAN), ZAMBALES
- Contractor: HIGH STRENGTH DEV. CORPORATION (31976)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-09-17
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱84,153,600.00
- Contract status: Completed Report
- NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AN D DIVERSION ROADS, SUBIC BY-PASS, SUBIC, ZAMBALES
- Contractor: REPOLMAN CONSTRUCTION CORP. (FORMERLY: REPOLMAN CONSTRUCTION) (32842) / THREE W BUILDERS, INC. (10722)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-04-25
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱91,674,824.00
- Contract status: Completed Report
- NETWORK DEVELOPMENT PROGRAM - OFF-CARRIAGEWAY IMPROVEME NT - SECONDARY ROADS - OLONGAPO BUGALLON ROAD, K0134+071 - K0134+980, K0137 +980 - K0139+000, SUBIC, ZAMBALES
- Contractor: MCB ZAMORA CONSTRUCTION & SUPPLY (32006)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-04-15
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱35,979,956.00
- Contract status: Completed Report
- NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-SECONDARY ROA DS OLONGAPO-BUGALLON ROAD, K0127+880 - K0128+300, K0130+000 - K0130+300, K0 132+355 - K0133+(-014), OLONGAPO CITY
- Contractor: ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY) (05349)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-02-14
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱56,081,948.00
- Contract status: Completed Report
- CONST./UPGRADING/REHAB. OF DRAINAGE ALONG NATL. ROADS - SECONDARY ROADS, OLONGAPO-BUGALLON ROAD, K0137+170 - KO137+495, K0139+000 - K0140+000, K0146+720 - K0147+400, KO150+090 - K0150+480, SUBIC, CASTILLEJ OS AND SAN MARCELINO, ZAMBALES
- Contractor: HIGH STRENGTH DEV. CORPORATION (31976)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-03-25
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱49,355,644.00
- Contract status: Completed Report
- CONST./UPGRADING/REHAB. OF DRAINAGE ALONG NATL. ROADS - PRIMARY ROADS ALONG JOSE ABAD SANTOS AVE., K0125+000 - K0125+962, OLONGAPO CITY
- Contractor: JAMJLE PROPERTIES (SUBIC) AND DEVELOPMENT CORPORAT (35039)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-01-22
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱12,686,434.00
- Contract status: Completed Report
- NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROAD - OLONGAPO BUGALLON ROAD, K0150+090 TO K0150+513.50, K0151+000 - K015 2+000, SAN MARCELINO, ZAMBALES
- Contractor: ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY) (05349)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-03-25
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱62,697,132.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD AT BRGY. STA. RITA, OLONGAPO CITY< /span>
- Contractor: JOYNIELTIN CONSTRUCTION AND TRADING (41858)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-08-31
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱3,659,684.75
- Contract status: Completed Report
- PACKAGE - REPAIR AND REHABILITATION OF SUBIC GYM AND SU BIC TENNIS COURTS, SUBIC BAY FREEPORT ZONE
- Contractor: EDFROBON CONSTRUCTION SERVICES INCORPORATED (36761) / CHRISTIAN IAN CONSTRUCTION CORPORATION (8191)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-20
- Fund source: Regular Infra - GAA 2019 CSSP
- Contract price: ₱85,401,192.00
- Contract status: Completed Report
- REPAIR AND REHABILITATION OF SUBIC BAY EXHIBITION AND C ONVENTION CENTER (SBECC), SUBIC BAY FREEPORT ZONE
- Contractor: HAIDEE CONSTRUCTION AND DEVELOPMENT CORP. (10365)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-20
- Fund source: Regular Infra - GAA 2019 CSSP
- Contract price: ₱92,603,552.00
- Contract status: Completed Report
- LOCAL ROADS - CONSTRUCTION OF ROAD AT BRGY. NEW CABALAN , OLONGAPO CITY
- Contractor: THREE KCS BUILDERS AND SUPPLY (38544)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-08-22
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,815,675.75
- Contract status: Completed Report
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, RECONSTRUCTION OF MABAYUAN RIVER FCDS OLONGAPO CITY
- Contractor: RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: RAIK CONSTRUCTION AND SUPPLY) (40660)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-26
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱17,963,514.00
- Contract status: Completed Report
- REHABILITATION OF STA. RITA RIVER, OLONGAPO CITY
- Contractor: GCLT CONSTRUCTION INCORPORATED (FORMERLY: GCLT CONSTRUCTION) (30657)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-09-29
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,520,169.50
- Contract status: Completed Report
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, IMPROVEMENT OF STA. RITA RIVER, STA. 006+667 - STA. 006+871 (LEFT SIDE), OLONGAPO CITY, ZAMBALES
- Contractor: GCLT CONSTRUCTION INCORPORATED (FORMERLY: GCLT CONSTRUCTION) (30657)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-01-10
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱36,218,456.00
- Contract status: Completed Report
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, IMPROVEMENT OF STA. RITA RIVER, STA. 006+667 - STA. 006+871 (RIGHT SIDE), OLONGAPO CITY, ZAMBALES
- Contractor: GCLT CONSTRUCTION INCORPORATED (FORMERLY: GCLT CONSTRUCTION) (30657)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-01-10
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱36,218,456.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILIT IES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, REPAIR/REHABILITATION/I MPROVEMENT OF KALAKLAN RIVER REVETMENT, OLONGAPO CITY
- Contractor: GERCEL CONSTRUCTION AND DEVELOPMENT GROUP INC. (FORMERLY: GERCEL CONSTRUCTION) (26541)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-21
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱17,997,670.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILIT IES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, REPAIR/REHABILITATION/I MPROVEMENT OF MABAYUAN RIVER REVETMENT, OLONGAPO CITY
- Contractor: RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: RAIK CONSTRUCTION AND SUPPLY) (40660)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-11-26
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱17,998,908.00
- Contract status: Completed Report
- LOCAL ROADS - CONSTRUCTION OF AGLAO-BUHAWEN ROAD, SAN M ARCELINO, ZAMBALES
- Contractor: HIGH STRENGTH DEV. CORPORATION (31976)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-11
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱45,222,848.00
- Contract status: Completed Report
- IMPROVEMENT OF PAMATAWAN RIVER (SITIO BARING SECTION, R IGHT SIDE), BRGY. SAN NICOLAS, CASTILLEJOS, ZAMBALES
- Contractor: M.V.GUBALLA CONSTRUCTION CORPORATION (FORMERLY: M.V. GUBALLA CONSTRUCTION) (11722)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-11
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱22,676,398.00
- Contract status: Completed Report
- IMPROVEMENT OF PAMATAWAN RIVER (CABALLUCAN SECTION, RIG HT SIDE), SITIO SAN ISIDRO, BRGY. SAN PABLO, CASTILLEJOS, ZAMBALES
- Contractor: MICKAJETTE CONSTRUCTION AND TRADING (35239)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-11
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱22,674,426.00
- Contract status: Completed Report
- FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF F LOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION OF SLOPE PROTE CTION WORKS OF ANINGWAY CREEK SUBIC, ZAMBALES
- Contractor: HIGH STRENGTH DEV. CORPORATION (31976)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-03-15
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱27,577,724.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY ASINAN , OLONGAPO CITY
- Contractor: M.V.GUBALLA CONSTRUCTION CORPORATION (FORMERLY: M.V. GUBALLA CONSTRUCTION) (11722)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-20
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,909,637.25
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILIT IES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, REPAIR/REHAB/IMPROVEMEN T OF MATAIN RIVER REVETMENT, SUBIC, ZAMBALES
- Contractor: MICKAJETTE CONSTRUCTION AND TRADING (35239)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2019-12-26
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱18,582,572.00
- Contract status: Completed Report
- CONS/REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, REPAIR/REHAB/IMPROVEMENT OF STA. FE RIVE R REVETMENT, SAN MARCELINO, ZAMBALES
- Contractor: MICKAJETTE CONSTRUCTION AND TRADING (35239)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-01-19
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱18,562,784.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTOR SYSTEMS, OLONGAPO CITY, SUBIC, CASTILLEJOS, SAN MARCELINO, ZAMBALES
- Contractor: CDCC CONSTRUCTION AND SUPPLY (40963)
- Implementing Agency: Region III - Zambales 2nd District Engineering Office
- Region: Region III
- Contract effectivity:
- Contract expiry: 2020-02-19
- Fund source: Regular Infra - GAA 2019 CSSP
- Contract price: ₱3,675,361.00
- Contract status: Completed Report