Infrastructure Projects in Region IV-B — Region IV-B - Palawan 2nd District Engineering Office, 2020
This page lists public infrastructure projects implemented by Region IV-B - Palawan 2nd District Engineering Office in Region IV-B during 2020. All data are sourced from the Department of Public Works and Highways (DPWH) official database (as of 9/30/2025): https://www.dpwh.gov.ph/dpwh/projects/infrastructure
This information is shared to promote transparency and public awareness. We encourage visitors to validate project details using the official DPWH source. In case of discrepancies, please refer to the original records published by the DPWH.
| Contractor | Projects | Total Price |
|---|---|---|
| C.T. LEONCIO CONSTRUCTION & TRADING (17371) | 5 | ₱181,765,612.00 |
| L. B. LEONCIO TRADING AND CONSTRUCTION CORPORATION (FORMERLY: L.B. LEONCIO TRADING & CONSTRUCTION) (31587) | 6 | ₱148,395,628.00 |
| MGB CONSTRUCTION & TRADING (32387) | 2 | ₱107,451,376.00 |
| CRISHELLE CONSTRUCTION (17108) | 5 | ₱91,948,514.00 |
| IVY MICHELLE CONSTRUCTION AND TRADING INC. (FORMERLY:IVY MICHELLE TRADING & CONTRUCTION) (24093) | 1 | ₱90,648,376.00 |
- PAVING OF UNPAVED ROAD QUEZON-PUNTA BAJA ROAD, K0148+640 -K0148+664, K0148+753-K0148+780, K0154+187-K0155+375, QUEZON, PALAWAN
- Contractor: JB & SONS TRADING & CONSTRUCTION (30133)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-06-16
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱22,292,300.00
- Contract status: Completed Report
- REHABILITATION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLA PSE AND LANDSLIDE PPSR JCT (ABO-ABO)-QUEZON RD K0133+330-K0133+400, QUEZON, PALAWAN
- Contractor: CUTTING EDGE CONSTRUCTION SUPPLIES TRADING (46642)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-10-08
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱5,113,400.00
- Contract status: Completed Report
- RETROFITTING OF PERMANENT BRIDGE BULILUYAN BR. (B00115PW ) ALONG PUERTO PRINCESA SOUTH RD, BROOKE'S POINT, PALAWAN
- Contractor: MAZON ENGINEERING AND CONSTRUCTION (43006)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-09-05
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱7,571,862.50
- Contract status: Completed Report
- RETROFITTING OF PERMANENT BRIDGE ALFONSO XIII BR. (B0037 7PW) ALONG QUEZON-PUNTA BAJA RD, QUEZON, PALAWAN
- Contractor: RESILIENT INFRABUILDERS CORP. (44855)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-11-13
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱9,408,572.00
- Contract status: Completed Report
- CONSTRUCTION OF SOWANGAN ES BUILDING, BRGY. SOWANGAN, QU EZON, PALAWAN
- Contractor: PJ CONSTRUCTION & SUPPLY (32305)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-07-30
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,471,251.62
- Contract status: Completed Report
- CONSTRUCTION OF SITIO LAMBATAN ES BUILDING, BRGY MALATGA O, QUEZON, PALAWAN
- Contractor: MAINTIN CONSTRUCTION & SUPPLY (45472)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-07-30
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,470,274.75
- Contract status: Completed Report
- CONSTRUCTION OF BERONG NHS BUILDING BRGY. BERONG, QUEZON , PALAWAN
- Contractor: MAINTIN CONSTRUCTION & SUPPLY (45472)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-07-30
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,455,321.00
- Contract status: Completed Report
- CONSTRUCTION OF ARAMAYWAN NATIONAL HIGH SCHOOL BUILDING, BRGY. ARAMAYWAN, NARRA, PALAWAN
- Contractor: NEW SPACE TRADING AND CONSTRUCTION CORP. (FORMERLY: KUDZ TRADING & CONSTRUCTION SUPPLY) (33042)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-07-30
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,429,646.62
- Contract status: Completed Report
- CONSTRUCTION OF SETIAS ES BUILDING, SITIO TAGPERARA, BRG Y SARAZA, BROOKE'S POINT, PALAWAN
- Contractor: MAZON ENGINEERING AND CONSTRUCTION (43006)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-07-30
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,455,250.00
- Contract status: Completed Report
- CONSTRUCTION OF SANDOVAL ES BUILDING BRGY. SANDOVAL, BAT ARAZA, PALAWAN
- Contractor: MAINTIN CONSTRUCTION & SUPPLY (45472)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-07-30
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,454,934.88
- Contract status: Completed Report
- PAVING OF UNPAVED ROAD PALAWAN CIRCUMFERENTIAL RD., BATA TARAZA, PALAWAN
- Contractor: IVY MICHELLE CONSTRUCTION AND TRADING INC. (FORMERLY:IVY MICHELLE TRADING & CONTRUCTION) (24093)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-09-07
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱90,648,376.00
- Contract status: Completed Report
- CONSTRUCTION OF IRAAN RIVER FLOOD CONTROL STRUCTURE, RIZ AL, PALAWAN
- Contractor: C.T. LEONCIO CONSTRUCTION & TRADING (17371)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-02-21
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱39,606,020.00
- Contract status: Completed Report
- CONSTRUCTION OF MALATGAO RIVER FLOOD CONTROL STRUCTURE, NARRA, PALAWAN
- Contractor: C.T. LEONCIO CONSTRUCTION & TRADING (17371)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-02-10
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱36,607,744.00
- Contract status: Completed Report
- CONSTRUCTION OF BATANG-BATANG RIVER FLOOD CONTROL STRUCT URE, NARRA, PALAWAN
- Contractor: C.T. LEONCIO CONSTRUCTION & TRADING (17371)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-02-10
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱26,490,992.00
- Contract status: Completed Report
- CONSTRUCTION OF ARAMAYWAN RIVER FLOOD CONTROL STRUCTURE, NARRA, PALAWAN.
- Contractor: C.T. LEONCIO CONSTRUCTION & TRADING (17371)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-02-10
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱36,495,692.00
- Contract status: Completed Report
- REHABILITATION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLA PSE, AND LANDSLIDE PALAWAN CIRCUMFERENTIAL RD, K0275+770-K0275+960, BATARAZ A, PALAWAN
- Contractor: RDF TRADING AND CONSTRUCTION (44539)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-07-23
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱18,627,228.00
- Contract status: Completed Report
- CONSTRUCTION OF SCHOOL BUILDING (2 CLASSROOM), PANACAN 2 ELEM. SCHOOL, (NARRA NHS COMPOUND) PANACAN 2, NARRA, PALAWAN
- Contractor: PTK GROUP INC. (37103)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-09-28
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,351,069.25
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY CULANDANUM, BATARAZA, PALAWAN
- Contractor: JULRIZ CONSTRUCTION AND SUPPLY (45586)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-09-28
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱3,360,417.75
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING BRGY. TAGNATO, BA TARAZA, PALAWAN
- Contractor: MAINTIN CONSTRUCTION & SUPPLY (45472)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-09-28
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱3,430,350.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING BRGY. CALATEGAS, NARRA, PALAWAN
- Contractor: KIM HAROLD TRADING, MANUFACTURING & CONSTRUCTION (28019)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-09-28
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱3,430,333.25
- Contract status: Completed Report
- ROAD WIDENING PALAWAN CIRCUM. RD. - K0248+(-114)-K0250+3 92, BATARAZA, PALAWAN
- Contractor: MGB CONSTRUCTION & TRADING (32387)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-02-15
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱70,956,296.00
- Contract status: Completed Report
- REHABILITATION OF DAMAGED PAVED ROAD PUERTO PRINCESA SOU TH RD., K0186+100-K0186+281, K0186+416-K0188+276, BROOKE'S POINT, PALAWAN
- Contractor: L. B. LEONCIO TRADING AND CONSTRUCTION CORPORATION (FORMERLY: L.B. LEONCIO TRADING & CONSTRUCTION) (31587)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-07-16
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱50,272,000.00
- Contract status: Completed Report
- REHABILITATION OF DAMAGED PAVED ROAD PUERTO PRINCESA SOU TH RD. K0235+600-K0236+441, K0236+532-K0236+692, BATARAZA, PALAWAN
- Contractor: PTK GROUP INC. (37103)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-10-14
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱37,019,208.00
- Contract status: Completed Report
- REHABILITATION OF DAMAGED PAVED ROAD PUERTO PRINCESA SOU TH RD. - K0133+070-K0133+255, K0133+268-K0135+072.50, K0135+247-K0135+327, SOFRONIO ESPA C3 91OLA, PALAWAN
- Contractor: CRISHELLE CONSTRUCTION (17108)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-09-21
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱39,205,484.00
- Contract status: Completed Report
- PAVING OF UNPAVED ROAD QUEZON-PUNTA BAJA ROAD-K0200+791- K0201+377, K0202+505-K0203+063, BRGY PUNTA BAJA, RIZAL, PALAWAN
- Contractor: L&M RODRIGUEZ CONSTRUCTION AND TRADING INC. (FORMERLY: M.M. RODRIGUEZ TRADING AND CONSTRUCTION) (37228) / NIRVANA CONSTRUCTION & SUPPLIES (18691)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-05-28
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱30,798,766.00
- Contract status: Completed Report
- CONSTRUCTION OF MALAMBUNGA RIVER FLOOD CONTROL STRUCTURE S, RIZAL, PALAWAN
- Contractor: L&M RODRIGUEZ CONSTRUCTION AND TRADING INC. (FORMERLY: M.M. RODRIGUEZ TRADING AND CONSTRUCTION) (37228) / RIVBROS CONSTRUCTION FACTORS & DEVELOPMENT (28504)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-02-27
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱40,708,120.00
- Contract status: Completed Report
- CONST./IMPROVEMENT OF ACCESS ROAD LEADING TO CALASAGUEN SHORE, BRGY CALASAGUEN, BROOKE'S POINT, PALAWAN
- Contractor: KIM HAROLD TRADING, MANUFACTURING & CONSTRUCTION (28019)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-08-29
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱14,687,318.00
- Contract status: Completed Report
- RETROFITTING OF PERMANENT BRIDGE BULALACAO BR. (BOO126PW ) ALONG PUERTO PRINCESA SOUTH RD, BATARAZA, PALAWAN
- Contractor: L. B. LEONCIO TRADING AND CONSTRUCTION CORPORATION (FORMERLY: L.B. LEONCIO TRADING & CONSTRUCTION) (31587)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-09-13
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱10,701,194.00
- Contract status: Completed Report
- RETROFITTING OF PERMANENT BRIDGE APILIAN BR. (BOO369PW) ALONG PUERTO PRINCESA RD, BROOKE'S POINT, PALAWAN
- Contractor: KIR KONSTRUCTICON BUILDERS AND SUPPLY INC. (FORMERLY: KONSTRUCTION BUILDERS AND SUPPLY) (44545)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-09-13
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱8,903,322.00
- Contract status: Completed Report
- PAVING OF UNPAVED ROAD ARAMAYWAN-BERONG-PUERTO PRINCESA RD. K0181+630-K0181+863, BRGY BERONG, QUEZON, PALAWAN
- Contractor: PANAAD CONSTRUCTION (37345)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-03-25
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱8,392,233.00
- Contract status: Completed Report
- RETROFITTING OF PERMANENT BRIDGE MALIS BR. (B00122PW) AL ONG PUERTO PRINCESA SOUTH RD, BROOKE'S POINT, PALAWAN
- Contractor: MAZON ENGINEERING AND CONSTRUCTION (43006)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-11-07
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱8,909,010.00
- Contract status: Completed Report
- RETROFITTING OF PERMANENT BRIDGE TAGLUMOT BR. (B00162PW) ALONG PPSR JCT. (ABO-ABO)-QUEZON RD., QUEZON, PALAWAN
- Contractor: KIR KONSTRUCTICON BUILDERS AND SUPPLY INC. (FORMERLY: KONSTRUCTION BUILDERS AND SUPPLY) (44545)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-08-01
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱3,908,137.75
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF UDIOK ROAD LEADING TO INKERA FALLS, BROOKE'S POINT, PALAWAN
- Contractor: PALBIC CONSTRUCTION AND SUPPLY (42744)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-08-12
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱9,702,122.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING LABOG HO TSPRING, BRGY. LABOG, SOFRONIO ESPA C3 91OLA, PALAWAN
- Contractor: HARDROCKPLATINUM DEVELOPMENT CORPORATION (39263)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-10-05
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱14,510,357.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING BRGY. TUBTUB, BRO OKE'S POINT, PALAWAN
- Contractor: PALBIC CONSTRUCTION AND SUPPLY (42744)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-07-30
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,960,200.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING BRGY. PRINCESS UR DUJA, NARRA, PALAWAN
- Contractor: HARDROCKPLATINUM DEVELOPMENT CORPORATION (39263)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-07-30
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,949,894.25
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDINGG BRGY. MALITUB, B ATARAZA, PALAWAN
- Contractor: MAINTIN CONSTRUCTION & SUPPLY (45472)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-07-30
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,950,300.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING BRGY. MAMBALOT, B ROOKE'S POINT, PALAWAN
- Contractor: RAK TRADING AND CONSTRUCTION (42613)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-07-30
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,960,200.00
- Contract status: Completed Report
- CONSTRUCTION OF TRIBAL HALL, BRGY. AMAS, BROOKE'S POINT, PALAWAN
- Contractor: PALBIC CONSTRUCTION AND SUPPLY (42744)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-07-30
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,960,200.00
- Contract status: Completed Report
- CONSTRUCTION OF INOGBONG FLOOD CONTROL STRUCTURE, BATARA ZA, PALAWAN
- Contractor: L. B. LEONCIO TRADING AND CONSTRUCTION CORPORATION (FORMERLY: L.B. LEONCIO TRADING & CONSTRUCTION) (31587)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-03-13
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱43,111,732.00
- Contract status: Completed Report
- CONSTRUCTION OF PULOT RIVER FLOOD CONTROL STRUCTURE, SOF RONIO ESPA C3 91OLA, PALAWAN
- Contractor: C.T. LEONCIO CONSTRUCTION & TRADING (17371)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-12-24
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱42,565,164.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF MATANGKAY ROAD LEADING TO OC EAN SPRING
- Contractor: PALBIC CONSTRUCTION AND SUPPLY (42744)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-10-05
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱14,552,916.00
- Contract status: Completed Report
- CONSTRUCTION OF ACCESS ROAD LEADING TO CALASAGUEN SHORE CROSSING THE CANOPY WALK, BROOKE'S POINT, PALAWAN
- Contractor: KIM HAROLD TRADING, MANUFACTURING & CONSTRUCTION (28019)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-08-11
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱9,702,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING IN WESTERN PHILIP PINES UNIVERSITY (WPU), BRGY. POBLACION, QUEZON, PALAWAN
- Contractor: SAMURAI CONSTRUCTION (32214)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-09-28
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱3,419,416.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING BRGY. SAPA, BATAR AZA, PALAWAN
- Contractor: MAINTIN CONSTRUCTION & SUPPLY (45472)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-07-30
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,950,300.00
- Contract status: Completed Report
- CONSTRUCTION OF MULRI-PURPOSE BUILDING BRGY. IPILAN, BRO OKE'S POINT, PALAWAN
- Contractor: UGM CONSTRUCTION (22047)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-07-30
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,954,220.62
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF PARATUNGON ROAD LAEDING TO S IR BROOKE'S AND TANAKI BEACH RESORTS, PANGOBILIAN, BROOKE'S POINT, PALAWAN< /span>
- Contractor: PALBIC CONSTRUCTION AND SUPPLY (42744)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-10-03
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱12,564,090.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF TAGPINASAO ROAD LEADING TO E CO-TOURISM SITE IN SALOGON, BROOKE'S POINT, PALAWAN
- Contractor: L. B. LEONCIO TRADING AND CONSTRUCTION CORPORATION (FORMERLY: L.B. LEONCIO TRADING & CONSTRUCTION) (31587)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-08-11
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱9,704,204.00
- Contract status: Completed Report
- RETROFITTING OF PERMANENT BRIDGE IPILAN BR. 3 (BOO160PW) ALONG PPSR JCT. (ABO-ABO)-QUEZON RD, NARRA, PALAWAN
- Contractor: AR LUSTRE CONSTRUCTION CORPORATION (FORMERLY:A.R. LUSTRE JR. CONSTRUCTION) (7680)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-01-26
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱12,955,600.00
- Contract status: Completed Report
- CONSTRUCTION OF TRIBAL HALL, BRGY. ALFONSO XIII, QUEZON, PALAWAN
- Contractor: RAK TRADING AND CONSTRUCTION (42613)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-07-30
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,960,200.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING BRGY. ISUMBO, SOF RONIO ESPA C3 91OLA, PALAWAN
- Contractor: MAINTIN CONSTRUCTION & SUPPLY (45472)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-07-30
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,951,796.38
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF MAINIT FALLS ROAD LEADING TO SABSABAN FALL, BRGY ARIBUNGOS, BROOKE'S POINT, PALAWAN
- Contractor: RDF CONSTRUCTION & SUPPLY (12843)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-10-06
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱14,654,891.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF COVERED COURT IN BRGY PULOT CENTER, SOFRONIO ESPA C3 91OLA, PALAWAN
- Contractor: KIM HAROLD TRADING, MANUFACTURING & CONSTRUCTION (28019)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-07-13
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱995,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING BRGY. CALATAGBAK, QUEZON, PALAWAN
- Contractor: MAINTIN CONSTRUCTION & SUPPLY (45472)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-05-12
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,954,506.88
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF COVERED COURT IN BRGY. CALU MPANG, QUEZON, PALAWAN
- Contractor: RAK TRADING AND CONSTRUCTION (42613)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-03-28
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱495,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING BRGY. ALFONSO XII I, QUEZON, PALAWAN
- Contractor: MAZON ENGINEERING AND CONSTRUCTION (43006)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-09-28
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱3,430,350.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF PANGOBILIAN ROAD LEADING TO MAINIT SEVEN FALLS BRGY. MAINIT, BROOKE'S POINT, PALAWAN
- Contractor: RDF TRADING AND CONSTRUCTION (44539)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-10-08
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱14,508,764.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF TABUD ROAD LEADING TO TABUD WATERFALLS, BROOKE'S POINT, PALAWAN
- Contractor: PALBIC CONSTRUCTION AND SUPPLY (42744)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-08-12
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱9,702,060.00
- Contract status: Completed Report
- CONSTRUCTION OF TIGAPLAN RIVER FLOOD CONTROL STRUCTURE, BROOKE'S POINT, PALAWAN
- Contractor: MRRM TRADING & CONSTRUCTION (19657)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-01-25
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱42,250,424.00
- Contract status: Completed Report
- CONSTRUCTION OF PANACAN SEAWALL, NARRA, PALAWAN
- Contractor: MGB CONSTRUCTION & TRADING (32387)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-11-23
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱36,495,080.00
- Contract status: Completed Report
- RETROFITTING OF PERMANENT BRIDGES CALATEGAS BR. (BOOO46P W) ALONG PUERTO PRINCESA SOUTH RD., NARRA, PALAWAN
- Contractor: AR LUSTRE CONSTRUCTION CORPORATION (FORMERLY:A.R. LUSTRE JR. CONSTRUCTION) (7680)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-10-10
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱15,346,544.00
- Contract status: Completed Report
- RETROFITTING OF PERMANENT BRIDGES ARAMAYWAN BR. (BOOO80P W) ALONG QUEZON-ARAMAYWAN RD., QUEZON, PALAWAN
- Contractor: NORTH TECH BUILDERS AND CONSTRUCTION SUPPLY (37062)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-01-16
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱29,468,726.00
- Contract status: Completed Report
- RETROFITTING OF PERMANENT BRIDGES MALLAG BR. (BOO350PW) ALONG PALAWAN CIRCUMFERENTIAL RD., RIZAL, PALAWAN
- Contractor: KIR KONSTRUCTICON BUILDERS AND SUPPLY INC. (FORMERLY: KONSTRUCTION BUILDERS AND SUPPLY) (44545)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-08-01
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱3,872,334.25
- Contract status: Completed Report
- RETROFITTING OF PERMANENT BRIDGES BURIRAO BR. (BOO359PW) ALONG PUERTO PRINCESA SOUTH RD. NARRA, PALAWAN
- Contractor: CRISHELLE CONSTRUCTION (17108)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-07-04
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱14,553,191.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO FRESH WATER MINI LAGOON VERSION IN SAMARINIANA UPPER TAMLANG DAM, BRGY. SAMARINI ANA, BROOKE'S POINT, PALAWAN.
- Contractor: KEILANA RESOURCE AND DEVELOPMENT CORPORATION (37270)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-08-09
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱9,769,733.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO OGIS TAU'T BATO CULTURAL COMMUNITY BRGY. RANSANG, RIZAL, PALAWAN
- Contractor: CUTTING EDGE CONSTRUCTION SUPPLIES TRADING (46642)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-10-28
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱14,554,331.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO PUNAN G CHRISTIAN MUSLIM NATIVE ROAD CONNECTING BARANGAY ROAD OF PUNANG IN SUPPOR T OF OIL PALM INDUSTRY, SOFRONIO ESPA C3 91OLA, PALAWAN
- Contractor: CRISHELLE CONSTRUCTION (17108)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-11-08
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱14,699,384.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO MALAL ONG MULTI-PURPOSE COOPERATIVE ROAD IN SUPPORT OF OIL PALM INDUSTRY OF PUNAN G CHRISTIAN MUSLIM NATIVE, SOFRONIO ESPA C3 91OLA, PALAWAN
- Contractor: CRISHELLE CONSTRUCTION (17108)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-11-09
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱14,564,429.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, BRGY TABUD TO NATIONAL HIGHWAY BRG Y. TABUD, BATARAZA, PALAWAN
- Contractor: N. SALES CONSTRUCTION (25045)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-07-10
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,900,648.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD BRGY. PULOT SHORE, SOFRONIO ESPA C3 91OLA, PALAWAN
- Contractor: PALBIC CONSTRUCTION AND SUPPLY (42744)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-07-15
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,742,400.62
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, PUROK MALIGAYA, BRGY. ARAMAYWAN, N ARRA, PALAWAN
- Contractor: PALBIC CONSTRUCTION AND SUPPLY (42744)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-04-27
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,741,290.00
- Contract status: Completed Report
- CONCRETING OF ROAD, BRGY TERESA, NARRA, PALAWAN
- Contractor: PTK GROUP INC. (37103)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-04-27
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,960,297.25
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, BRGY. IPILAN, NARRA, PALAWAN
- Contractor: PALBIC CONSTRUCTION AND SUPPLY (42744)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-07-15
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,916,360.25
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF COVERED COURT IN PULOT INTE RIOR, BRGY PULOT II, SOFRONIO ESPA C3 91OLA, PALAWAN
- Contractor: RAK TRADING AND CONSTRUCTION (42613)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-04-27
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱495,000.00
- Contract status: Completed Report
- REHABILITATION OF COVERED COURT IN BARANGAY CANDAWAGA, R IZAL, PALAWAN
- Contractor: CUTTING EDGE CONSTRUCTION SUPPLIES TRADING (46642)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-04-27
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱495,060.25
- Contract status: Completed Report
- REHABILITATION OF MULTI-PURPOSE BUILDING IN BRGY. MAASIN , QUEZON, PALAWAN
- Contractor: RAK TRADING AND CONSTRUCTION (42613)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-04-27
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱495,000.00
- Contract status: Completed Report
- REHABILITATION OF SENIOR CITIZEN'S BUILDING IN BRGY. TER ESA, NARRA, PALAWAN
- Contractor: PALBIC CONSTRUCTION AND SUPPLY (42744)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-03-28
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱565,336.56
- Contract status: Completed Report
- REHABILITATION OF MULTI-PURPOSE BUILDING PRINCESS URDUJA , NARRA, PALAWAN
- Contractor: PTK GROUP INC. (37103)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-06-15
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱593,968.12
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. POBLACION, NARRA, PALAWAN
- Contractor: PTK GROUP INC. (37103)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-09-28
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,938,758.25
- Contract status: Completed Report
- RETROFITTING OF PERMANENT BRIDGES MAASIN BR. (B00070PW) ALONG PUERTO PRINCESA SOUTH RD. BROOKE'S POINT, PALAWAN
- Contractor: NORTH TECH BUILDERS AND CONSTRUCTION SUPPLY (37062)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-08-15
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱34,258,724.00
- Contract status: Completed Report
- REPLACEMENT OF PERMANENT WEAK BRIDGE TAGMAYA BR. (BOO303 PW) ALONG PALAWAN CIRCUMFERENTIAL ROAD, BATARAZA, PALAWAN
- Contractor: YURICH BUILDERS AND CONSTRUCTION SUPPLY INC. (37064)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-08-29
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱37,337,324.00
- Contract status: Completed Report
- CONSTRUCTION OF NEW BRIDGES CULIMBAWANG BR. ALONG CULAND ANUM-PANALINGAAN CROSS COUNTRY ROAD, BATARAZA, PALAWAN
- Contractor: JB & SONS TRADING & CONSTRUCTION (30133)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-10-06
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱19,626,792.00
- Contract status: Completed Report
- CONSTRUCTION OF BALABAC CIRCUMFERENTIAL ROAD, BALABAC, P ALAWAN
- Contractor: ONE HUNDRED PERCENT CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY:BCT TRADING & CONSTRUCTION) (15199)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-10-28
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱14,700,000.00
- Contract status: Completed Report
- CONSTRUCTION OF ACCESS ROAD LEADING TO BALABAC PORT, BAL ABAC, PALAWAN
- Contractor: ONE HUNDRED PERCENT CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY:BCT TRADING & CONSTRUCTION) (15199)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-10-28
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱13,613,706.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING BRGY. CATAGUPAN, BALABAC, PALAWAN
- Contractor: KRB CONSTRUCTION (34197)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-09-28
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,272,093.50
- Contract status: Completed Report
- REHABILITATION OF MULTI-PURPOSE BUILDING BRGY. PANDANAN, BALABAC, PALAWAN
- Contractor: KRB CONSTRUCTION (34197)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-08-30
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,975,683.50
- Contract status: Completed Report
- RETROFITTING OF PERMANENT BRIDGES ARAMAYWAN BR. (B00049P W) ALONG PUERTO PRINCESA SOUTH RD., NARRA, PALAWAN
- Contractor: L. B. LEONCIO TRADING AND CONSTRUCTION CORPORATION (FORMERLY: L.B. LEONCIO TRADING & CONSTRUCTION) (31587)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-11-21
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱20,127,768.00
- Contract status: Completed Report
- RETROFITTING OF PERMANENT BRIDGES IWAHIG BR. (B00077PW) ALONG QUEZON-ARAMAYWAN RD., QUEZON, PALAWAN
- Contractor: PALBIC CONSTRUCTION AND SUPPLY (42744)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-12-12
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱24,010,078.00
- Contract status: Completed Report
- REHABILITATION OF 2 STOREY CLASSROOM BUILDING, BATARAZA NHS, BRGY. MARANGAS, BATARAZA, PALAWAN
- Contractor: PALBIC CONSTRUCTION AND SUPPLY (42744)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-05-05
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱495,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING BRGY. ELVITA, NAR RA, PALAWAN
- Contractor: VCH CONSTRUCTION AND TRADING (32050)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-08-29
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,982,426.38
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING BRGY. IRAAN, RIZA L, PALAWAN
- Contractor: CUTTING EDGE CONSTRUCTION SUPPLIES TRADING (46642)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-08-29
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,960,228.50
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF NRJ LEADING TO KAPANGYAN FAL LS, BRGY. MALIHUD, BATARAZA, PALAWAN
- Contractor: AR LUSTRE CONSTRUCTION CORPORATION (FORMERLY:A.R. LUSTRE JR. CONSTRUCTION) (7680)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-09-09
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱19,649,888.00
- Contract status: Completed Report
- CONSTRUCTION OF 2-STOREY LEGISLATIVE BUILDING BRGY. ALFO NSO XIII, QUEZON, PALAWAN
- Contractor: CRISHELLE CONSTRUCTION (17108)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-07-23
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱8,926,026.00
- Contract status: Completed Report
- CONSTRUCTION OF 2-STOREY MULTI-PURPOSE BUILDING (COLISEU M/EVACUATION CENTER), BRGY, PULOT CENTER, SOFRONIO ESPA C3 91OLA, PALAWAN
- Contractor: L. B. LEONCIO TRADING AND CONSTRUCTION CORPORATION (FORMERLY: L.B. LEONCIO TRADING & CONSTRUCTION) (31587)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-08-12
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱14,478,730.00
- Contract status: Completed Report
- CONSTRUCTION OF 2-STOREY MULTI-PURPOSE BUILDING (GOVERNM ENT CENTER). BRGY. TUBTUB, BROOKE'S POINT, PALAWAN
- Contractor: NEW SPACE TRADING AND CONSTRUCTION CORP. (FORMERLY: KUDZ TRADING & CONSTRUCTION SUPPLY) (33042)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-06-13
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱14,553,089.00
- Contract status: Completed Report
- CONSTRUCTION OF 2-STOREY MULTI-PURPOSE BUILDING BRGY. PO BLACION, NARRA, PALAWAN
- Contractor: L&M RODRIGUEZ CONSTRUCTION AND TRADING INC. (FORMERLY: M.M. RODRIGUEZ TRADING AND CONSTRUCTION) (37228)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-07-23
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱9,601,192.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING BRGY. PULOT SHORE , SOFRONIO ESPA C3 91OLA, PALAWAN
- Contractor: CUTTING EDGE CONSTRUCTION SUPPLIES TRADING (46642)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-01-24
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,960,200.00
- Contract status: Completed Report
- CONST. OF ABACA PROCESSING BUILDING/FACILITY, BALABAC, P ALAWAN
- Contractor: D.J. VALERA CONSTRUCTION & SUPPLY (34003)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-04-24
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱3,949,993.50
- Contract status: Completed Report
- CONSTRUCTION OF ABACA PROCESSING BUILDING/FACILITY, QUEZ ON, PALAWAN
- Contractor: J.N. DELA TORRE CONSTRUCTION (24978)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-02-23
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱3,959,987.00
- Contract status: Completed Report
- CONST. OF ABACA PROCESSING BUILDING/FACILITY, BROOKE'S P OINT, PALAWAN
- Contractor: RESILIENT INFRABUILDERS CORP. (44855)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-02-23
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱3,880,627.25
- Contract status: Completed Report
- COMPLETION OF ROAD, BRGY. PUNANG, SOFRONIO ESPA C3 91OLA , PALAWAN
- Contractor: RDF TRADING AND CONSTRUCTION (44539)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-05-04
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱14,571,922.00
- Contract status: Completed Report
- COMPLETION OF ROAD, BRGY. TABUD, BATARAZA, PALAWAN
- Contractor: JIBER TRADING & CONSTRUCTION (36910)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-07-23
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱18,118,428.00
- Contract status: Completed Report
- CONSTRUCTION OF PANACAN SEA WALL, NARRA, PALAWAN< /li>
- Contractor: RDF TRADING AND CONSTRUCTION (44539)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-03-21
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱19,799,996.00
- Contract status: Completed Report
- CLUSTER I-1. CONST. OF RAIN WATER COLLECTION SYSTEM (RWC S) BATANG-BATANG BEACH ELEM. SCHOOL 2. CABULUAN ELEM. SCHOOL 3. DPWH PAL. 2ND DEO, MOTORPOOL BLDG.4. BUONG ELEM. SCHOOL 5. MATUGBONG ELEM SCHOOL 6. P ULOT INTERIOR MULTIPURPOSE HALL
- Contractor: RAK TRADING AND CONSTRUCTION (42613)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-11-29
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱1,109,002.25
- Contract status: Completed Report
- CLUSTER II-1. CONST. OF RAIN WATER COLLECTION SYSTEM (RW CS) EL SALVADOR ELEM. SCHOOL 2. OLYMPIC ELEM. SCHOOL 3. SINCAB ELEM. SCHOOL 4. PULOT NAT'L. HIGH SCHOOL-PULOT INT. EXTENSION 5. MALANAP INT. ELEM. SCH OOL SOFRONIO ESPA C3 91OLA, PALAWAN
- Contractor: RAK TRADING AND CONSTRUCTION (42613)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-11-29
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱924,168.50
- Contract status: Completed Report
- CLUSTER III-1. CONST. OF RAIN WATER COLLECTION SYSTEM (R WCS) NEW PANAY ELEM SCHOOL 2. IRADER ELEM SCHOOL 3. RIZAL NAT'L. HIGH SCHOO L 4. LINAO ELEM. SCHOOL 5. CABAR ELEM. SCHOOL 6. BAYOG ELEM. SCHOOL 7. TAGU SAO SHORE ELEM. SCHOOL, BROOKE'S POINT, PALAWAN
- Contractor: RAK TRADING AND CONSTRUCTION (42613)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-11-29
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱1,177,081.88
- Contract status: Completed Report
- CLUSTER IV-1. CONST. OF RAIN WATER COLLECTION SYSTEM (RW CS) MANGKONGON ELEM. SCHOOL 2. AMAS ELEM SCHOOL 3. SOUTHERN BATARAZA NAT'L. HIGH SCHOOL 4. SAYAB ELEM. SCHOOL, 1-2. BROOKE'S POINT, PAL. 3-4 BATARAZA, PALAWAN
- Contractor: RAK TRADING AND CONSTRUCTION (42613)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-11-29
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱741,192.00
- Contract status: Completed Report
- CONSTRUCTION 0F 2-STOREY MULTI-PURPOSE BUILDING (GOVERNM ENT CENTER), BALABAC, PALAWAN
- Contractor: KRB CONSTRUCTION (34197)
- Implementing Agency: Region IV-B - Palawan 2nd District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-11-20
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱6,085,055.50
- Contract status: Terminated Report