Infrastructure Projects in Region IV-B — Region IV-B - Region IV-B, 2022
This page lists public infrastructure projects implemented by Region IV-B - Region IV-B in Region IV-B during 2022. All data are sourced from the Department of Public Works and Highways (DPWH) official database (as of 9/30/2025): https://www.dpwh.gov.ph/dpwh/projects/infrastructure
This information is shared to promote transparency and public awareness. We encourage visitors to validate project details using the official DPWH source. In case of discrepancies, please refer to the original records published by the DPWH.
| Contractor | Projects | Total Price |
|---|---|---|
| LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465) | 15 | ₱1,453,035,436.25 |
| SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC. (25226) | 7 | ₱1,169,785,600.00 |
| STX ENTERPRISES (21547) | 8 | ₱1,135,201,952.00 |
| NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC (17542) | 12 | ₱997,559,504.00 |
| NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC (17542) | 8 | ₱981,090,272.00 |
- ROAD WIDENING OF MARINDUQUE CIRCUMFERENTIAL ROAD, KO039+00 0-KO041+359, MARINDUQUE
- Contractor: MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC. (5733)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-04-17
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱101,325,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MISSING LINKS/NEW ROADS-DR. DAMIAN REYES R OAD (BOAC SIDE), PACKAGE 1, STA. 33+220.00-STA. 34+020.00, MARINDUQUE
- Contractor: MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC. (5733)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-10-18
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱125,440,888.00
- Contract status: Completed Report
- WIDENING OF PERMANENT BRIDGES-LUMINTAO BRIDGE (B00084MR) A LONG MINDORO WEST COASTAL RD. (PHASE II), STA. 263+758.72-STA. 264+095.95, MINDORO OCCIDENTAL
- Contractor: PLERM CONSTRUCTION AND DEVELOPMENT CORPORATION (33288) / ARCONIC INC. (48591)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-03-19
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱168,871,552.00
- Contract status: Completed Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPA G) - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LUMINTAO RIVER, STA. 0+0 00-STA. 0+844, BRGY. TANYAG, CALINTAAN, OCC. MINDORO
- Contractor: ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-01-23
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱130,274,624.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE C OLLAPSE AND LANDSLIDE - CALAPAN NORTH ROAD, KO042+740-KO042+1008, KO043+060 -KO043+170, ORIENTAL MINDORO
- Contractor: ST. TIMOTHY CONSTRUCTION CORPORATION (39196)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-06-15
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱154,882,176.00
- Contract status: Completed Report
- CONST. OF MISSING LINKS/NEW ROADS - VICTORIA SABLAYAN (MIN DORO CROSS ISLAND ROAD), PACKAGE I, STA. 0+0472.90-STA. 0+670.30; STA. 0+67 0.30-STA. 0+771.30, ORIENTAL MINDORO
- Contractor: STX ENTERPRISES (21547) / EQUI-PARCO CONSTRUCTION COMPANY (14332)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-07-28
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱144,749,776.00
- Contract status: Completed Report
- WIDENING OF PERMANENT BRIDGES-BUCAYAO BRIDGE (B00004MR) AL ONG CALAPAN SOUTH ROAD, STA. 15+792.50-STA. 15+918.10, ORIENTAL MINDORO
- Contractor: DALCON CONSTRUCTION (40601) / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) (13722)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-07-13
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱120,624,848.00
- Contract status: Completed Report
- CONSTRUCTION OF RIVER CONTROL PROJECT AT SUBAAN RIVER (PH ASE I), STA. 00+000.00-STA. 00+882.60, SAN TEODORO, ORIENTAL MINDORO
- Contractor: NEWBIG FOUR J CONSTRUCTION INC. (FORMERLY: FOUR J CONSTRUCTION) (15104)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-04-09
- Fund source: Regular Infra - GAA 2022 OO-2
- Contract price: ₱144,749,616.00
- Contract status: Completed Report
- CONSTRUCTION OF RIVER CONTROL PROJECT AT SUBAAN RIVER (PH ASE II), SAN TEODORO, ORIENTAL MINDORO, STA. 00+882.60-STA. 02+042.27
- Contractor: PRIME PACIFIC MARINE & INDUSTRIAL SERVICES CORP. (36171)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-04-25
- Fund source: Regular Infra - GAA 2022 OO-2
- Contract price: ₱144,748,800.00
- Contract status: Completed Report
- CONSTRUCTION OF RIVER CONTROL PROJECT AT SUBAAN RIVER (PH ASE III), SAN TEODORO, ORIENTAL MINDORO, STA. 00+000.00-STA. 00+454.10 (BS)
- Contractor: ROAD EDGE TRADING & DEVELOPMENT SERVICES (33140)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2022-11-18
- Fund source: Regular Infra - GAA 2022 OO-2
- Contract price: ₱96,490,896.00
- Contract status: Completed Report
- CONST./IMPV'T. OF VARIOUS INFRASTRUCTURES IN SUPPORT OF N ATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD P ROGRAM-TIKAS)- CONST. OF FIRING RANGE, CAMP EFIGENIO C. NAVARRO, BRGY. SUQU I, CALAPAN CITY, OR. MINDORO
- Contractor: MAMA'S BOY CONSTRUCTION (49288)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2022-05-08
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱9,600,979.00
- Contract status: Completed Report
- CONST./IMPV'T. OF VARIOUS INFRASTRUCTURES IN SUPPORT OF N ATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD P ROGRAM-TIKAS)- CONST. OF POLICE COMMISSIONED OFFICER'S QUARTERING FACILITY, CAMP EFIGENIO C. NAVARRO, BRGY. SUGUI, CALAPAN
- Contractor: SGDG CONSTRUCTION AND SUPPLIES (46273)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2022-05-08
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱9,649,960.00
- Contract status: Completed Report
- CONST./IMPV'T. OF VARIOUS INFRASTRUCTURES IN SUPPORT OF N ATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD P ROGRAM-TIKAS)- CONST. OF POLICE NON-COMMISSIONED OFFICER'S QUARTERING FACIL ITY, CAMP EFIGENIO C. NAVARRO, BRGY. SUGUI, CALA
- Contractor: MAMA'S BOY CONSTRUCTION (49288)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2022-05-08
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱9,649,953.00
- Contract status: Completed Report
- CONST./IMPV'T. OF VARIOUS INFRASTRUCTURES IN SUPPORT OF N ATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD-T IKAS)- CONST. OF REGIONAL POLICE SECURITY & PROTECTION UNITS (RPSPUS) & amp; PRESIDENTIAL PROTECTION DIVISION (PPD) BUILDING UND
- Contractor: MENDOPAD PROPERTY DEVELOPMENT AND MANAGEMENT CORPORATION (46305)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2022-05-08
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱9,647,422.00
- Contract status: Completed Report
- ROAD WIDENING OF PUERTO PRINCESA NORTH ROAD, KO120+000-KO 123+280, PALAWAN
- Contractor: YURICH BUILDERS AND CONSTRUCTION SUPPLY INC. (37064)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-02-13
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱123,150,720.00
- Contract status: Completed Report
- ROAD WIDENING OF PUERTO PRINCESA NORTH ROAD, KO128+000 - KO131+150, PALAWAN
- Contractor: YURICH BUILDERS AND CONSTRUCTION SUPPLY INC. (37064)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-03-15
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱112,405,800.00
- Contract status: Completed Report
- ROAD WIDENING OF PUERTO PRINCESA NORTH ROAD, KO142+961-KO 146+065, PALAWAN
- Contractor: ONE HUNDRED PERCENT CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY:BCT TRADING & CONSTRUCTION) (15199)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-03-19
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱120,746,312.00
- Contract status: Completed Report
- ROAD WIDENING OF PUERTO PRINCESA NORTH ROAD, KO155+000-KO 157+294, KO157+469-KO157+959, PALAWAN
- Contractor: ONE HUNDRED PERCENT CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY:BCT TRADING & CONSTRUCTION) (15199)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-03-17
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱117,474,952.00
- Contract status: Completed Report
- ROAD WIDENING OF PUERTO PRINCESA NORTH ROAD, SAN VICENTE, PALAWAN, KO175+000-KO176+000; KO176+087-KO176+259; KO176+776-KO177+476
- Contractor: GOLDROCK CONSTRUCTION & DEVELOPMENT CORP. (5389)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-05-25
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱107,894,920.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPO RTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM-KATUPARAN)-BANTUL AN-SANDOVAL AIRPORT ACCESS ROAD, STA. 16+836.40-STA. 18+296.10; STA. 18+559 .50-STA. 20+866, TAYTAY, PALAWAN
- Contractor: DCEBUILDERS CORPORATION (FORMERLY: DCESTRANERO CORPORATION) (29347)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2022-11-07
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱117,650,608.00
- Contract status: Completed Report
- CONST./IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS (K ALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM-KATUPARAN)-ACCESS ROAD LEADING TO FRANCISCO B. REYES AIRPORT (BRGY. SAN NICOLAS TO BRGY. DECALACHA O), STA. 23+604-STA. 24+324, CORON, PALAWAN
- Contractor: ONE HUNDRED PERCENT CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY:BCT TRADING & CONSTRUCTION) (15199)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-07-22
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱18,701,132.00
- Contract status: Completed Report
- CONST./IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TO URISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP)- ACCESS ROAD LEADING TO ROXAS DIVING SPOTS, STA. 133+396-STA. 134+759; STA. 135+230-STA. 135+517, ROXAS, PALAWAN
- Contractor: KATHA BUILDERS & SUPPLIES INC. (34651) / ELIMARED CONSTRUCTION AND TRADING INC. (45592)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-02-14
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱117,068,184.00
- Contract status: Completed Report
- CONST./IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TO URISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP)- DECABOBO-B UENAVISTA-TURDA-BORAC RORO PORT, STA. 29+327-STA. 32+211, CORON, PALAWAN
- Contractor: ONE HUNDRED PERCENT CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY:BCT TRADING & CONSTRUCTION) (15199)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-02-06
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱110,968,480.00
- Contract status: Completed Report
- REHABILITATION OF ROADS WITH SLIPS, SLOPE COLLAPSE & LANDSLIDE, SAN JOSE-PORT BARTON ROAD, STA. 13+000-STA. 13+060; STA. 13+129- STA. 13+140; STA. 13+210-STA. 13+250; STA. 13+393-STA. 13+465.40, PALAWAN
- Contractor: ROAD EDGE TRADING & DEVELOPMENT SERVICES (33140)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-02-16
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱101,322,240.00
- Contract status: Completed Report
- CONSTRUCTION OF MISSING LINKS/NEW ROADS- PALAWAN CIRCUMFE RENTIAL ROAD (LATUD-CANIPAAN SECTION), PACKAGE G, STA. 283+054.00-STA. 288+ 150.00, PALAWAN
- Contractor: IVY MICHELLE CONSTRUCTION AND TRADING INC. (FORMERLY:IVY MICHELLE TRADING & CONTRUCTION) (24093)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-12-03
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱144,744,432.00
- Contract status: Completed Report
- WIDENING OF PERMANENT BRIDGES-TARITIEN BRIDGE (B00030PW) ALONG PUERTO PRINCESA SOUTH ROAD, APP. A: STA. 86+902.20-STA. 86+956, BRIDG E: STA. 86+956-STA. 87+008.60, APP. B: STA. 87+008.60-STA. 87+057.60, NARRA , PALAWAN
- Contractor: KIR KONSTRUCTICON BUILDERS AND SUPPLY INC. (FORMERLY: KONSTRUCTION BUILDERS AND SUPPLY) (44545) / C.T. LEONCIO CONSTRUCTION & TRADING (17371)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-05-27
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱107,220,616.00
- Contract status: Completed Report
- CONST./IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TO URISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP)- BALABAC CI RCUMFERENTIAL ROAD, STA. 1+795-STA.3+340
- Contractor: ONE HUNDRED PERCENT CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY:BCT TRADING & CONSTRUCTION) (15199)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-05-13
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱48,245,604.00
- Contract status: Completed Report
- ROAD WIDENING OF PUERTO PRINCESA NORTH ROAD, KO035+000-KO 037+243; KO038+045-KO039+000, PALAWAN
- Contractor: AR LUSTRE CONSTRUCTION CORPORATION (FORMERLY:A.R. LUSTRE JR. CONSTRUCTION) (7680)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2022-11-10
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱125,448,480.00
- Contract status: Completed Report
- ROAD WIDENING OF PUERTO PRINCESA NORTH ROAD, KO041+161-KO 043+605, PALAWAN
- Contractor: AR LUSTRE CONSTRUCTION CORPORATION (FORMERLY:A.R. LUSTRE JR. CONSTRUCTION) (7680)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-02-05
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱110,928,816.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLA RED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP)-BACUNGA N-SIMPUCAN-BAGUMBAYAN-NAPSAN ROAD, STA. 29+500-STA. 31+130; STA. 46+084-STA . 47+495, PUERTO PRINCESA CITY, PALAWAN
- Contractor: IVY MICHELLE CONSTRUCTION AND TRADING INC. (FORMERLY:IVY MICHELLE TRADING & CONTRUCTION) (24093)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-01-17
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱100,009,528.00
- Contract status: Completed Report
- SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - PREVENTIVE MAINTENANCE (ASPHALT OVERLAY) ALONG JCT.-NAPSA N-APURAWAN ROAD, KO023+(-069)-KO026+809; KO026+856-KO027+796, PALAWAN
- Contractor: NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC (17542)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2022-10-26
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱97,795,096.00
- Contract status: Completed Report
- CONSTRUCTION OF BUILDING OF PRESIDENTIAL MANAGEMENT STAFF (PMS) - OFFICE OF THE PRESIDENT (OP) INTEGRATED OPERATIONS AND SERVICE CON TINUITY (IOSC), BRGY. STA. MONICA, PUERTO PRINCESA CITY, PALAWAN
- Contractor: T. N. RAMOS CONSTRUCTION & DEVELOPMENT CORP. (31363)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2022-12-19
- Fund source: Regular Infra - GAA 2022 LP
- Contract price: ₱28,948,062.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SIBUYAN CIRCUMFERENTIAL ROAD, KO002+431-KO002+771, R OMBLON
- Contractor: REBTRADE INTERNATIONAL CORPORATION (36213)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-03-16
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱258,959,328.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TABLAS CIRCUMFERENTIAL ROAD, KO032+867-KO033+327, ROMBLON
- Contractor: ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958) / AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP. ([REVOKED] 49129)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-05-15
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱109,980,792.00
- Contract status: Completed Report
- CO0NSTRUCTION OF BY-PASS AND DIVERSION ROADS-ODIONGAN BYP ASS ROAD, STA. 0+000-STA. 1+500, ROMBLON
- Contractor: ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-09-21
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱140,468,416.00
- Contract status: Completed Report
- CONSTRUCTION OF MISSING LINKS/NEW ROADS - ODIONGAN EAST-W EST ROAD, STA. 11+839.00-STA. 16+665.40, TABLAS ISLAND, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-12-13
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱254,103,952.00
- Contract status: Completed Report
- WIDENING OF PERMANENT BRIDGES - SIIJERON BR. (B00031TL) A LONG TABLAS CIRCUMFERENTIAL ROAD, TABLAS ISLAND, ROMBLON
- Contractor: PLERM CONSTRUCTION AND DEVELOPMENT CORPORATION (33288)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-11-29
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱241,241,536.00
- Contract status: Completed Report
- REPLACEMENT OF WEAK BRIDGES - BINAYAAN BRIDGE (B00037SY) ALONG SIBUYAN CIRCUMFERENTIAL ROAD, STA. 27+718.40 - STA. 28+226.50, ROMBLO N
- Contractor: PERSAN CONSTRUCTION, INC. (FORMERLY: PERSAN CONST. (2852) / JAP CONST & DEVELOPMENT CORP. (31443)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-11-20
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱221,912,368.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF SAN JOSE CIRCUMFERENTIAL ROAD LEADING TO VARIOUS BEACHES, STA. 6+800.00-STA. 8+023.00, SAN JOSE, ROMBLON
- Contractor: ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-07-29
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱100,167,368.00
- Contract status: Completed Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIP AG)- CONSTRUCTION OF PILI FLOOD CONTROL STRUCTURE (PHASE 2), STA. 0+210-STA . 0+431.70 (BS); STA. 0+640-STA. 0+740 (LS), LOOC, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2022-12-31
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱115,776,408.00
- Contract status: Completed Report
- CONST. OF MISSING LINKS/NEW ROADS-BULALACAO-SAN JOSE ROAD (BULALACAO SECTION); ROAD: STA. 1+336-STA. 2+706; STA. 2+905-STA. 3+455; B RIDGE 1: STA. 1+302-STA. 1+332; BRIDGE 2: STA. 2+710-STA. 2+735, ORIENTAL M INDORO
- Contractor: MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC. (5733)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-05-27
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱82,988,312.00
- Contract status: Completed Report
- WIDENING OF PERMANENT BRIDGES-BALITE BRIDGE (B00036MR) AL ONG CALAPAN SOUTH ROAD, STA. 79+591.66-STA. 79+987.78, ORIENTAL MINDORO
- Contractor: MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC. (5733)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-03-30
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱111,649,720.00
- Contract status: Completed Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIP AG)-CONST. OF STA. MARIA TO MANGUYANG ROAD, STA. 2+260-STA. 2+514.76, STA. 2+900-STA. 3+637.95, STA. 4+490.21-STA. 8+470, GLORIA, OR. MINDORO
- Contractor: LUMEL GLENN CONSTRUCTION (26817)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-05-10
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱107,109,024.00
- Contract status: Completed Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIP AG)-CONSTRUCTION OF CAGANCAN RIVER CONTROL, STA. 0+028-STA. 0+920 (RS); STA . 0+345-STA. 0+920 (LS), BRGY. DON PEDRO, MANSALAY, ORIENTAL MINDORO
- Contractor: D.M. MALIWANAG BUILDERS AND ENTERPRISES (32589) / MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC. (5733)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-04-30
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱144,740,432.00
- Contract status: Completed Report
- ROAD WIDENING OF PUERTO PRINCESA SOUTH ROAD, KO118+000-KO 118+459, KO118+715-KO119+868, KO120+171-KO122+000, PALAWAN
- Contractor: IVY MICHELLE CONSTRUCTION AND TRADING INC. (FORMERLY:IVY MICHELLE TRADING & CONTRUCTION) (24093)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-06-13
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱106,143,456.00
- Contract status: Completed Report
- ROAD WIDENING OF PUERTO PRINCESA SOUTH ROAD, KO108+960-KO 109+423; KO109+453-KO110+323; KO114+000-KO115+386; KO115+425-KO116+431, PAL AWAN
- Contractor: IVY MICHELLE CONSTRUCTION AND TRADING INC. (FORMERLY:IVY MICHELLE TRADING & CONTRUCTION) (24093)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-03-17
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱106,144,880.00
- Contract status: Completed Report
- CONSTRUCTION OF TIGUION RIVER FLOOD CONTROL, GASAN, MARIN DUQUE (PACKAGE 1), STA. 0+400-STA. 0+540.60 (RS), GASAN, MARINDUQUE< /li>
- Contractor: SAN SEBASTIAN CONSTRUCTION (51494)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-03-28
- Fund source: Regular Infra - GAA 2022 OO-2
- Contract price: ₱19,299,804.00
- Contract status: Completed Report
- BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDING S/FACILITIES TO SUPPORT SOCIAL SERVICES-CONST. OF MULTI-PURPOSE BUILDING ( PHASE IV), BRGY. POBLACION, TORRIJOS, MARINDUQUE
- Contractor: T. N. RAMOS CONSTRUCTION & DEVELOPMENT CORP. (31363)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2022-12-10
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱99,000,000.00
- Contract status: Completed Report
- SPECIAL ROAD FUND-MOTOR VEHICLES USER'S CHARGE (MVUC) AS PER R.A. 11239-PREVENTIVE MAINTENANCE (ASPHALT OVERLAY) ALONG SAN JOSE-CAMI NAWIT PORT ROAD, KO237+(-663)-KO240+209, OCCIDENTAL MINDORO
- Contractor: STX ENTERPRISES (21547)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-02-23
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱72,903,864.00
- Contract status: Completed Report
- CLUSTER 13: REHABILITATION/RECONSTRUCTION OF ROADS WITH S LIPS, SLOPE COLLAPSE, AND LANDSLIDE, MINDORO WEST COASTAL ROAD, 13.1: KO346 +150-KO346+241; 13.2: KO346+950-KO347+027; 13.3: KO348+250-KO348+327.90; 13 .4: KO348+330-KO348+351.80, SABLAYAN, OCC. MIND
- Contractor: ST. TIMOTHY CONSTRUCTION CORPORATION (39196) / STX ENTERPRISES (21547)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-05-01
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱77,488,648.00
- Contract status: Completed Report
- REHABILITATION / RECONSTRUCTION OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - MINDORO WEST COASTAL RAOD K033 6+1083.61 - K0337+031.90; K0337+046.44 - K0337+080.00, OCCIDENTAL MINDORO
- Contractor: ROAD EDGE TRADING & DEVELOPMENT SERVICES (33140)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-04-12
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱96,499,960.00
- Contract status: Completed Report
- CLUSTER 8:CONST./REHABILITATION OF FLOOD MITIGATION FACIL ITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, 8.1: CONST. OF FLOOD C ONTROL STRUC., AMNAY RIVER: STA. 0+000-STA. 0+307, CLAUDIO SALGADO SECT., 8 .2: STA. 0+320-STA. 0+603, CLAUDIO SALGADO SECT,
- Contractor: ANORE CONSTRUCTION (34048)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-07-03
- Fund source: Regular Infra - GAA 2022 OO-2
- Contract price: ₱226,774,704.00
- Contract status: Completed Report
- CLUSTER 14: REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - MINDORO WEST COAST AL ROADS: 14.1 - K0446+(-089) - K0446+(-049); K0446+180 - K0446+225.10; 14. 2 - K0446+(-250) - K0446+(-175), OCCIDENTAL MIND
- Contractor: J.H. PAJARA CONSTRUCTION CORPORATION (1890) / S-ANG CONSTRUCTION & GENERAL TRADING, INC. (37149)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-05-10
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱173,698,528.00
- Contract status: Completed Report
- REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOP E COLLAPSE AND LANDSLIED - SECONDARY ROADS - MINDORO WEST COASTAL ROAD K044 7+300 - K0447+360; K0447+400 - K0447+450.82, OCCIDENTAL MINDORO
- Contractor: NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC (17542)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2022-12-26
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱86,850,000.00
- Contract status: Completed Report
- NATIONAL BUILDING PROGRAM - CONSTRUCTION OF OCD MIMAROPA, REGIONAL OFFICE, DND SOCORRO, ORIENTAL MINDORO
- Contractor: WTL CONSTRUCTION (36866) / EXCELSIUS ENGINEERING SERVICES (35269)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-12-26
- Fund source: Regular Infra - GAA 2022 LP
- Contract price: ₱48,250,000.00
- Contract status: Completed Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIP AG)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONST. OF PRRD BOULEVARD AND BICYCLE LANE (PHASE 2), SOCORRO, ORIENTAL MINDORO
- Contractor: HARVEE ENTERPRISES (33927)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-07-07
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱115,799,664.00
- Contract status: Completed Report
- CLUSTER 5: ROAD WIDENING OF PUERTO PRINCESA NORTH ROAD, P ALAWAN 5.1. KO147+000-KO147+820; 5.2. KO158+000-KO158+306; KO158+348-KO158+ 775; 5.3. KO161+795-KO162+484 AND 5.4. KO180+686-KO180+793; KO180+812-KO181 +256, PALAWAN
- Contractor: YURICH BUILDERS AND CONSTRUCTION SUPPLY INC. (37064)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-03-07
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱104,823,384.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLA RED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) ACCES S ROAD FROM CORON TOWN PROPER TO BORAC RORO PORT STA.11+426.00 - STA, 11+87 3.00, CORON, PALAWAN
- Contractor: ONE HUNDRED PERCENT CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY:BCT TRADING & CONSTRUCTION) (15199)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2022-12-09
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱19,292,422.00
- Contract status: Completed Report
- CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO DEC LARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP) - NEW QUEZON - CHEEY - SAN JOSE - DECALACHAO ROAD LEADING TO BUSUANGA AIRPORT ST A.44+667-STA.45+072, BUSUANGA, PALAWAN
- Contractor: ONE HUNDRED PERCENT CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY:BCT TRADING & CONSTRUCTION) (15199)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2022-12-09
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱19,295,926.00
- Contract status: Completed Report
- CLUSTER 10: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATI NG GAPS (SIPAG)-REHABILITATION OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDS LIDE, PALAWAN, 10.1: PORT BARTON-TDC ROAD, STA. 17+477-STA. 17+644; 10.2: P ORT BARTON-KEMDENG ROAD, STA. 0+573-STA. 0+633,
- Contractor: ROAD EDGE TRADING & DEVELOPMENT SERVICES (33140)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-02-13
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱103,208,552.00
- Contract status: Completed Report
- PREVENTIVE MAINTENANCE - SECONDARY ROADS - PUERTO PRINCES A NORTH ROAD, KO168+000-KO172+721, PALAWAN
- Contractor: NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC (17542)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2022-10-26
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱102,427,624.00
- Contract status: Completed Report
- PREVENTIVE MAINTENANCE - SECONDARY ROADS - PUERTO PRINCES A NORTH ROAD, KO179+000-KO183+688, PALAWAN
- Contractor: NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC (17542)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2022-11-03
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱102,801,744.00
- Contract status: Completed Report
- PREVENTIVE MAINTENANCE - SECONDARY ROADS - PUERTO PRINCES A NORTH ROAD, KO203+500-KO208+238, PALAWAN
- Contractor: NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC (17542)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2022-12-05
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱100,614,800.00
- Contract status: Completed Report
- PREVENTIVE MAINTENANCE-SECONDARY ROADS-PUERTO PRINCESA NO RTH ROAD, KO216+000-KO220+952, PALAWAN
- Contractor: NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC (17542)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-01-02
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱143,054,240.00
- Contract status: Completed Report
- PREVENTIVE MAINTENANCE-SECONDARY ROADS-PUERTO PRINCESA NO RTH ROAD, KO257+000-KO261+812, PALAWAN
- Contractor: NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC (17542)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2022-11-21
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱104,228,768.00
- Contract status: Completed Report
- PREVENTIVE MAINTENANCE-SECONDARY ROADS-PUERTO PRINCESA NO RTH ROAD, KO227+000-KO231+698, PALAWAN
- Contractor: NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC (17542)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2022-11-21
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱102,144,072.00
- Contract status: Completed Report
- REHABILITATION OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LAN DSLIDE ALONG TDC-PAGDANAN ROAD, STA. 9+318-STA. 9+495; STA. 9+864-STA. 10+0 55, PALAWAN
- Contractor: ROCK-WBL CONSTRUCTION CORP. (FOR: ROCK-WBL CONSTRUCTION TRADING & SERVICES) (44551)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-06-30
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱208,484,912.00
- Contract status: Completed Report
- REHABILITATION OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LAN DSLIDE ALONG TDC-PAGDANAN ROAD, STA. 9+617-STA. 9+813; STA. 8+266-STA. 8+40 0, PALAWAN
- Contractor: ROCK-WBL CONSTRUCTION CORP. (FOR: ROCK-WBL CONSTRUCTION TRADING & SERVICES) (44551)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-05-07
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱152,882,368.00
- Contract status: Completed Report
- REHABILITATION OF ROAD WITH SLIPS, SLOPE COLLAPSE, AND LA NDSLIDE ALONG TDC-PAGDANAN ROAD, STA. 10+458.00-STA. 10+624.00, SAN VICENTE , PALAWAN
- Contractor: DELPAR CONSTRUCTION & SUPPLIES (32677)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-02-25
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱96,740,184.00
- Contract status: Completed Report
- REHABILITATION OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LAN DSLIDE ALONG TDC-PAGDANAN ROAD, STA. 14+973.00-STA. 15+167.00, SAN VICENTE, PALAWAN
- Contractor: ROCK-WBL CONSTRUCTION CORP. (FOR: ROCK-WBL CONSTRUCTION TRADING & SERVICES) (44551)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-03-08
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱109,683,776.00
- Contract status: Completed Report
- REHABILITATION OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LAN DSLIDE, STA. 7+163.00 TO STA. 7+646.00, KEMDENG, SAN VICENTE, PALAWAN
- Contractor: NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC (17542) / SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC. (25226)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-10-10
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱330,382,176.00
- Contract status: Completed Report
- REHABILITATION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LA NDSLIDE, KEMDENG, SAN VICENTE, PALAWAN, STA. 9+180-STA. 9+435
- Contractor: SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC. (25226)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-01-20
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱120,703,152.00
- Contract status: Completed Report
- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEAD ING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-REHAB. OF ROADS WITH SLI PS, SLOPE COLLAPSE AND LANDSLIDE, PORT BARTON-KEMDENG ROAD, SAN VICENTE, PA LAWAN, STA. 0+000-STA. 0+218, PALAWAN
- Contractor: R.B. ABITAL CONSTRUCTION CORP. (48919) / C.T. LEONCIO CONSTRUCTION & TRADING (17371)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-04-15
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱140,216,256.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG PORT BARTON-TDC ROAD SECTION, STA. 017+770-STA . 017+865; STA. 017+914-STA. 017+969; STA. 018+023-STA. 018+244, PALAWAN
- Contractor: ROAD EDGE TRADING & DEVELOPMENT SERVICES (33140)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-04-20
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱144,457,392.00
- Contract status: Completed Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIP AG)-REHAB./RECONST. OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG T BRGY. PORT BARTON TO BRGY. KEMDENG ROAD, STA. 1+121-STA. 1+555, SAN VICEN TE, PALAWAN
- Contractor: ROAD EDGE TRADING & DEVELOPMENT SERVICES (33140)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-01-21
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱99,973,064.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG BRGY. PORT BARTON TO BARANGAY KEMDENG ROAD, ST A. 13+490-STA. 13+783.60; STA. 14+590-STA. 14+886, SAN VICENTE, PALAWAN
- Contractor: ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-09-07
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱170,611,296.00
- Contract status: Completed Report
- REHABILITATION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND L ANDSLIDE ALONG ITABIAK-SAN VICENTE ROAD, STA. 171+246-STA. 171+482, SAN VIC ENTE, PALAWAN
- Contractor: C.T. LEONCIO CONSTRUCTION & TRADING (17371)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-05-30
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱155,071,936.00
- Contract status: Completed Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIP AG)- REHABILITATION OF ROAD WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE ALONG ITABIAK-SAN VICENTE ROAD, STA. 165+191-STA. 165+374, PALAWAN
- Contractor: C.T. LEONCIO CONSTRUCTION & TRADING (17371)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-03-30
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱119,609,424.00
- Contract status: Completed Report
- REHABILITATION OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LAN DSLIDE ALONG ITABIAK-SAN VICENTE ROAD, STA. 169+642-STA. 169+841, SAN VICEN TE, PALAWAN
- Contractor: C.T. LEONCIO CONSTRUCTION & TRADING (17371)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-04-17
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱130,013,576.00
- Contract status: Completed Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIP AG)- REHABILITATION OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG ITABIAK-SAN VICENTE ROAD, STA. 169+841-STA. 170+041, SAN VICENTE, PALAWAN
- Contractor: SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC. (25226)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-04-19
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱130,667,464.00
- Contract status: Completed Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)-REHABILITATION OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG ITABIAK-SAN VICENTE ROAD, STA. 165+662-STA. 165+924, PALAWAN
- Contractor: SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC. (25226)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-08-27
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱192,992,384.00
- Contract status: Completed Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)-REHABILITATION OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG ITABIAK-SAN VICENTE ROAD, STA. 165+924-STA. 166+234, SAN VICENTE, PALAWAN
- Contractor: SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC. (25226)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-12-08
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱192,991,872.00
- Contract status: Completed Report
- REHABILITATION OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LA NDSLIDE ALONG TAYTAY-BANTULAN-STA. CRUZ PORT ROAD, TAYTAY, PALAWAN, STA. 2+ 360-STA. 2+583
- Contractor: SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC. (25226)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-03-26
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱121,956,984.00
- Contract status: Completed Report
- CLUSTER 7: PREVENTIVE MAINTENANCE-SECONDARY ROADS-PUERTO PRINCESA NORTH ROAD, 7.1: KO246+000-KO249+703; 7.2: KO232+531-KO236+460; 7 .3: KO189+681-KO194+358, PALAWAN
- Contractor: NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC (17542) / C.T. LEONCIO CONSTRUCTION & TRADING (17371)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2022-11-22
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱262,672,704.00
- Contract status: Completed Report
- CLUSTER 16: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIAT ING GAPS (SIPAG) - RWEHABILITATION OF ROAD WITH SLIPS, SLOPE COLLAPSE AND L ANDSLIDE ALONG TDC-PAGDANAN ROAD, 16.1 STA. 14+040-STA. 14+113; 16.2: STA. 14+274-STA. 14+346; 16.3: STA. 14+747-STA. 14+896
- Contractor: C.T. LEONCIO CONSTRUCTION & TRADING (17371)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-06-10
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱135,540,544.00
- Contract status: Completed Report
- CLUSTER 17: SUSTAINABLE INFRASTRUCTURE ALLEVIATING GAPS (SIPAG)-REHABILITATION OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALO NG TDC-PAGDANAN ROAD, 17.1: STA. 9+012-STA. 9+149; 17.2: STA. 7+893-STA. 7+ 946; 17.3: STA. 8+030-STA. 8+063; 17.4: STA. 7+94
- Contractor: SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC. (25226)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-07-18
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱216,257,072.00
- Contract status: Completed Report
- CLUSTER 9: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATI NG GAPS (SIPAG)-REHABILITATION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LAND SLIDE, PORT BARTON-KEMDENG ROAD, 9.1: STA. 0+218-STA. 0+250; 9.2: STA. 0+25 0-STA. 0+458; 9.3: STA. 0+458-STA. 0+485; 9.4: ST
- Contractor: HGG BUILDERS & SUPPLY (17824)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-07-18
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱196,953,936.00
- Contract status: Completed Report
- CLUSTER 18: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIAT ING GAPS (SIPAG)-REHAB. OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, P ORT BARTON-KEMDENG ROAD, SAN VICENTE, PALAWAN, 18.1: STA. 0+633-STA. 0+770; 18.2: STA. 0+770-STA. 0+812; 18.3: STA. 0+812-S
- Contractor: NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC (17542)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-06-03
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱131,920,544.00
- Contract status: Completed Report
- CLUSTER 19: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIAT ING GAPS (SIPAG)-REHAB. OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, K EMDENG, SAN VICENTE, PALAWAN, 19.1: STA. 10+302-STA. 10+360; 19.2: STA. 11+ 007-STA. 11+102; 19.3: STA. 9+047-STA. 9+108; 19.
- Contractor: NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC (17542)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-04-13
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱106,324,880.00
- Contract status: Completed Report
- CLUSTER 20: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIAT ING GAPS (SIPAG)-REHAB. OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE AL ONG ITABIAK-SAN VICENTE ROAD, SAN VICENTE, PALAWAN, 20.1: STA. 167+325-STA. 167+445; 20.2: STA. 169+254-STA. 169+405; 20.3:
- Contractor: SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC. (25226)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-07-18
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱257,088,448.00
- Contract status: Completed Report
- CLUSTER 21: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIAT ING GAPS (SIPAG)- REHAB. OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE A LONG ITABIAK-SAN VICENTE ROAD, 21.1: STA. 171+039-STA. 171+062; 21.2: STA. 171+173-STA. 171+236; 21.3: STA. 171_736-STA. 171
- Contractor: J.H. PAJARA CONSTRUCTION CORPORATION (1890) / S-ANG CONSTRUCTION & GENERAL TRADING, INC. (37149)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-07-18
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱204,115,984.00
- Contract status: Completed Report
- CONST./IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURI DAD PROGRAM-TIKAS), CONST. OF TAXIWAY, BRGY. CATAGUPAN, BALABAC, PALAWAN, S TA. 1+099-STA.1+244 TAXIWAY 1; STA. 1+426-STA. 1+
- Contractor: ONE HUNDRED PERCENT CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY:BCT TRADING & CONSTRUCTION) (15199)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-08-19
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱14,472,700.00
- Contract status: Completed Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)-CONSTRUCTION OF ROAD, BRGY. POBLACION, NARRA, PALAWAN, STA. 0+000-STA. 0+501; STA. 0+000-STA. 0+509; STA. 0+000-STA. 0+721; STA. 0+000-STA. 0+695 ; STA. 0+000-STA. 0+111; STA. 0+000-STA. 0+416,
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465) / MEGA TAM SUMMIT INCORPORATED (50571)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-03-03
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱53,070,168.00
- Contract status: Completed Report
- WIDENING OF BRIDGES - TAGBOLANTE BR. (B00030PW) ALONG AR AMAYWAN-BERONG PUERTO PRINCESA SOUTH ROAD, APPROACH A: STA. 195+120-STA. 19 5+204; BRIDGE: STA. 195+204-STA. 195+264.60; APPROACH B: STA. 195+264.60-ST A. 195+300, PALAWAN
- Contractor: YURICH BUILDERS AND CONSTRUCTION SUPPLY INC. (37064)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-02-26
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱60,567,980.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-TERTIARY ROADS-PALAWAN CIRCUMFERENTIAL ROAD (PANALI NGAAN-TAGBITA-LATUD), KO263+580-KO263+832, PALAWAN
- Contractor: C.T. LEONCIO CONSTRUCTION & TRADING (17371)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-03-16
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱100,837,616.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-TERTIARY ROADS-PALAWAN CIRCUMFERENTIAL ROAD (PANALI NGAAN-TAGBITA-LATUD), KO250+029-KO250+215; KO263+832-KO263+912, PALAWAN
- Contractor: SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC. (25226)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-05-21
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱115,023,984.00
- Contract status: Completed Report
- CLUSTER 11: REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS-PALAWAN CIRCUMFERENTIAL ROAD, 11.1:(PANALINGAAN-TAGBITA-LATUD), KO274+219-KO274+284; 11.2: (PANALI NGAAN-TAGBITA-LATUD), KO274+284-KO274+309; 11.3:
- Contractor: SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC. (25226)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-06-19
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱73,474,856.00
- Contract status: Completed Report
- CLUSTER 23: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIAT ING GAPS (SIPAG)- REHAB. OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE A LONG TABON CAVE ROAD, QUEZON, PALAWAN, 23.1: STA. 007+100-STA. 007+154; 23. 2: STA. 006+356-STA. 006+436; 23.3: STA. 006+539-
- Contractor: NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC (17542)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-04-08
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱89,891,776.00
- Contract status: Completed Report
- CLUSTER 6: ROAD WIDENING OF PUERTO PRINCESA SOUTH ROAD, PALAWAN, 6.1. KO012+180.00-KO013+780.00; 6.2. KO013+967.00-KO014+740.00, PA LAWAN
- Contractor: IVY MICHELLE CONSTRUCTION AND TRADING INC. (FORMERLY:IVY MICHELLE TRADING & CONTRUCTION) (24093)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-12-02
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱110,972,032.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEM, PHASE I, PUERTO PRINCESA NORTH ROAD, BRGY. SAN MANUEL TO OUTFALL, S TA. 0+000-STA. 0+556.40, PALAWAN
- Contractor: HARDROCKPLATINUM DEVELOPMENT CORPORATION (39263) / C.T. LEONCIO CONSTRUCTION & TRADING (17371)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-11-30
- Fund source: Regular Infra - GAA 2022 OO-2
- Contract price: ₱96,496,296.00
- Contract status: Completed Report
- PREVENTIVE MAINTENANCE-SECONDARY ROADS-PPSR-JCT. NAPSAN- APURAWAN ROAD, KO049+000-KO052+000; KO052+000-KO053+567, PALAWAN
- Contractor: AR LUSTRE CONSTRUCTION CORPORATION (FORMERLY:A.R. LUSTRE JR. CONSTRUCTION) (7680)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-02-11
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱107,381,488.00
- Contract status: Completed Report
- PREVENTIVE MAINTENANCE-SECONDARY ROADS-PUERTO PRINCESA N ORTH ROAD, KO067+298.00-KO074+036.00, PALAWAN
- Contractor: NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC (17542)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2022-10-08
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱131,801,320.00
- Contract status: Completed Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)-CONST. OF TUGUIS FLOOD CONTROL STRUCTURE (PHASE 2) ALONG LOOC-COGON-TU LAY ODIONGAN ROAD, STA. 0+000-STA. 0+315.50 SECTION 1 (RS), BRGY. PROGRESO ESTE
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2022-12-26
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱53,074,432.00
- Contract status: Completed Report
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - PUERTO PRI NCESA SOUTH DIVERSION ROAD II, STA. 47+635-STA. 49+460, PALAWAN
- Contractor: IVY MICHELLE CONSTRUCTION AND TRADING INC. (FORMERLY:IVY MICHELLE TRADING & CONTRUCTION) (24093)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-01-22
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱132,204,216.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS-PPSR JCT.-NAPSAN-APURAWAN ROAD, STA . 035+634-STA. 035+772, PALAWAN
- Contractor: HGG BUILDERS & SUPPLY (17824)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-03-18
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱106,298,768.00
- Contract status: Completed Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS - S IPAG - CONSTRUCTION OF MAGBABADIL-MAGSAYSAY ROAD STA.0+000-STA.3+392, ABORL AN, PALAWAN
- Contractor: IVY MICHELLE CONSTRUCTION AND TRADING INC. (FORMERLY:IVY MICHELLE TRADING & CONTRUCTION) (24093)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-11-30
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱96,491,912.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - PUERTO PRINCESA NORTH ROAD, KO0 17+121-KO017+300, PALAWAN
- Contractor: NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC (17542)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-04-09
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱110,576,296.00
- Contract status: Completed Report
- CLUSTER 25: REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-SECONDARY ROADS-PPSR JCT.-NAPSAN-APURA WAN ROAD, 25.1: KO036+825-KO036+976; KO037+469-KO037+490; 25.2: KO037+409-K O037+469; 25.3: KO039+658-KO039+695, PALAWAN
- Contractor: NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC (17542)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-04-02
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱106,186,288.00
- Contract status: Completed Report
- CLUSTER 26: REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-SECONDARY ROADS-PPSR JCT. NAPSAN-APURA WAN ROAD, 26.1: KO036+734-KO036+805; 26.2: KO038+578-KO038+656; 26.3: KO041 +808-KO041+863, PALAWAN
- Contractor: NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC (17542)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-04-05
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱107,877,232.00
- Contract status: Completed Report
- CONSTRUCTION/MAINTENANCE OF FLOOD CONTROL MITIGATION STR UCTURES AND DRAINAGE SYSTEMS-CONST. OF TUGUIS FLOOD CONTROL STRUCTURES ALON G LOOC (COGON TULAY)-ODIONGAN ROAD, BRGY. PROGRESO ESTE, STA. 0+315.50-STA. 0+611.90 (RS), ODIONGAN, ROMBLON
- Contractor: ASHLEYKA CONSTRUCTION AND SUPPLIES (41140)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2022-12-16
- Fund source: Regular Infra - GAA 2022 OO-2
- Contract price: ₱48,231,860.00
- Contract status: Completed Report
- CLUSTER 1: CONSTRUCTION OF FLOOD CONTROL STRUCTURES IN M AGDIWANG ROMBLON, 1.1-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG)- CONST. OF DANAO F/C STRUC. (PHASE 2), 1.2-SUSTAINABLE INFRA. PROJECTS ALLEV IATING GAPS (SIPAG)-CONST. OF ITURALBA F/C STRUC.
- Contractor: ASHLEYKA CONSTRUCTION AND SUPPLIES (41140)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-05-07
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱48,136,032.00
- Contract status: Completed Report
- BASIC INFRASTRUCTURE PROGRAM (BIP)-CONST. OF ESPANA FLOO D CONTROL STRUCTURE (PHASE 2), BRGY. ESPANA, STA. 0+000-STA. 0+213 (BS), SA N FERNANDO, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-06-09
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱74,202,416.00
- Contract status: Completed Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)-CONSTRUCTION OF ROAD FROM KABALIWAN-VICTORIA ROAD, SAN AGUSTIN AND SAN ANDRES, ROMBLON, STA. 006+000-STA. 006+994, SAN ANDRES, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-11-15
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱135,094,688.00
- Contract status: Completed Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)-CONSTRUCTION OF ROAD, CAWAYAN-LONG BEACH-SUGOD-CARMEN ROAD LEADING TO BLUE HOLES, STA. 010+520-STA. 012+156, SAN AGUSTIN, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-09-03
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱106,143,832.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS - PARPAGOHA (MARIGONDON) - BINOOG ROADS K0023+220 - K0023+320, TABLAS ISLAND, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2022-12-07
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱48,247,988.00
- Contract status: Completed Report
- SUSTAINABLE INFRASTRUCTURE PROJECT ALLEVIATING GAPS (SIP AG)-CONST. (COMPLETION) OF RIVER CONTROL STRUCTURE AND DRAINAGE SYSTEM, BAN GON RIVER CONTROL, STA. 0+000-STA. 0+542.65, TABLAS ISLAND, ROMBLON< /li>
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-06-07
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱106,147,624.00
- Contract status: Completed Report
- CONSTRUCTION OF RIVER CONTROL STRUCTURE AND DRAINAGE SYS TEM, CAMBAJAO RIVER CONTROL, SIBUYAN ISLAND, ROMBLON (PHASE 2), STA. 00+000 -STA. 00+420 (R/S); STA. 0+279-STA. 0+420 (L/S), SIBUYAN, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-06-01
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱106,137,744.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS-SIBUYAN CIRCUMFERENTIAL ROAD, KO038 +900-KO039+326, ROMBLON
- Contractor: J.H. PAJARA CONSTRUCTION CORPORATION (1890) / STX ENTERPRISES (21547)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-11-30
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱192,969,216.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS-TABLAS CIRCUMFERENTIAL ROAD, KO028+ 000-KO028+144, ROMBLON
- Contractor: J.H. PAJARA CONSTRUCTION CORPORATION (1890) / STX ENTERPRISES (21547)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-08-16
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱192,988,224.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS-TABLAS CIRCUMFERENTIAL ROAD, KO042+ 340-KO042+632, ROMBLON
- Contractor: J.H. PAJARA CONSTRUCTION CORPORATION (1890) / STX ENTERPRISES (21547)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-08-27
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱220,003,056.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-TERTIARY ROADS-ODIONGAN EAST-WEST ROAD, STA. 8+601- STA. 8+840, ROMBLON
- Contractor: MGM PADOR CORPORATION (FORMERLY: MA. GINA M. PADOR CONSTRUCTION) (25600) / ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-06-30
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱188,164,640.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-TERTIARY ROADS-ODIONGAN EAST-WEST ROAD, STA. 8+840- STA. 8+940; STA. 9+158-STA. 9+392, ROMBLON
- Contractor: MGM PADOR CORPORATION (FORMERLY: MA. GINA M. PADOR CONSTRUCTION) (25600) / ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-05-18
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱226,759,248.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG ACCESS ROAD MALBOG JCT.-STA. FE GUMBIRAYAN PR OVINCIAL ROAD LEADING TO SAN JOSE BEACHES, STA. 7+953-STA. 8+154, ROMBLON
- Contractor: HGG BUILDERS & SUPPLY (17824) / S-ANG CONSTRUCTION &; GENERAL TRADING, INC. (37149)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2022-12-31
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱110,914,296.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG ACCESS ROAD MALBOG JCT.-STA. FE GUMBIRAYAN PR OVINCIAL ROAD LEADING TO SAN JOSE BEACHES, STA. 8+968-STA. 9+230, ROMBLON
- Contractor: J.H. PAJARA CONSTRUCTION CORPORATION (1890) / S-ANG CONSTRUCTION & GENERAL TRADING, INC. (37149)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-06-30
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱192,842,016.00
- Contract status: Completed Report
- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONS ERVATION - CONSTRUCTION OF ROXAS BYPASS/TOURISM COASTAL ROAD AT BRGY. DANGA Y, STA. 00+000-STA. 00+277.80, ROXAS, OR. MINDORO
- Contractor: MARCPHIL CONSTRUCTION OPC (FORMERLY: MARCPHIL CONSTRUCTION) (10949)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-06-08
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱136,136,368.00
- Contract status: Completed Report
- PREVENTIVE MAINTENANCE ALONG CALAPAN SOUTH ROAD, KO064+0 00-KO069+180, SOUTHERN MINDORO
- Contractor: STX ENTERPRISES (21547)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-12-10
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱279,847,360.00
- Contract status: Completed Report
- PREVENTIVE MAINTENANCE-SECONDARY ROADS-CALAPAN SOUTH ROA D, KO071+867-KO075+036, KO075+850-KO078+475
- Contractor: STX ENTERPRISES (21547)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-12-05
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱298,184,960.00
- Contract status: Completed Report
- PREVENTIVE MAINTENANCE-SECONDARY ROADS-PUERTO PRINCESA S OUTH ROAD, KO028+525.00-KO033+001.00, PALAWAN
- Contractor: NORTHERN BUILDERS (8789) / ANORE CONSTRUCTION (34048)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-01-05
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱96,534,912.00
- Contract status: Completed Report
- CONSTRUCTION OF MISSING LINKS / NEW ROADS - LUBANG CIRCU MFERENTIAL ROAD STA.0+000 - STA.0+800, OCCIDENTAL MINDORO
- Contractor: ROAD EDGE TRADING & DEVELOPMENT SERVICES (33140)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-12-28
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱48,249,648.00
- Contract status: Completed Report
- CONSTRUCTION OF RAIN WATER CIOLLECTORS IN PUBLIC FACILIT IES, DPWH REGION IV-B, EDSA, DILIMAN, QUEZON CITY
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-01-30
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱2,201,692.25
- Contract status: Completed Report
- ROAD WIDENING OF MARINDUQUE CIRCUMFERENTIAL ROAD, KO016+0 00.00-KO018+351.00, MARINDUQUE
- Contractor: PERSAN CONSTRUCTION, INC. (FORMERLY: PERSAN CONST. (2852) / R.R. ENCABO CONSTRUCTORS INCORPORATED (FORMERLY RR (14716)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-10-14
- Fund source: Regular Infra - GAA 2021 OO-1
- Contract price: ₱228,355,632.00
- Contract status: Completed Report
- ROAD WIDENING OF MARINDUQUE CIRCUMFERENTIAL ROAD, KO018+3 51-KO020+619; KO020+644-KO020+664; KO020+704-KO021+378; KO021+398-KO022+137 , MARINDUQUE
- Contractor: TCSC CORP. (15453) / ROCKSTEEL CONSTRUCTION AND DEV'T CORPORATION (44554)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-09-14
- Fund source: Regular Infra - GAA 2021 OO-1
- Contract price: ₱246,355,488.00
- Contract status: Completed Report
- PREVENTIVE MAINTENANCE-SECONDARY ROADS, CALAPAN NORTH ROA D, KO019+511-KO020+000; KO022+554-KO023+422; KO023+465-KO025+385; KO026+325 -KO026+1065; KO027+311-KO028+002, ORIENTAL MINDORO
- Contractor: STX ENTERPRISES (21547)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-05-03
- Fund source: Regular Infra - GAA 2021 OO-1
- Contract price: ₱110,967,128.00
- Contract status: Completed Report
- PREVENTIVE MAINTENANCE OF CALAPAN SOUTH ROAD, KO001+850-K O002+698; KO022+438-KO024+778; KO039+048-KO040+583; KO048+480-KO050+750, OR IENTAL MINDORO
- Contractor: STX ENTERPRISES (21547)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-05-06
- Fund source: Regular Infra - GAA 2021 OO-1
- Contract price: ₱103,074,352.00
- Contract status: Completed Report
- PREVENTIVE MAINTENANCE OF CALAPAN SOUTH ROAD, KO005+415-K O005+861; KO009+571-KO0010+803; KO012+799-KO015+211, ORIENTAL MINDORO
- Contractor: STX ENTERPRISES (21547)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2022-12-15
- Fund source: Regular Infra - GAA 2021 OO-1
- Contract price: ₱89,925,336.00
- Contract status: Completed Report
- PREVENTIVE MAINTENANCE OF CALAPAN SOUTH ROAD, KO027+547.0 0-KO031+087.00, ORIENTAL MINDORO
- Contractor: STX ENTERPRISES (21547)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-04-17
- Fund source: Regular Infra - GAA 2021 OO-1
- Contract price: ₱82,032,416.00
- Contract status: Completed Report
- CONSTRUCTION OF NAUJAN-POLA BYPASS ROAD-MELGAR B TO MONTE LAGO TO MONTEMAYOR, STA. 0+000.00-STA. 2+040.00, NAUJAN, ORIENTAL MINDORO
- Contractor: TCSC CORP. (15453) / ROCKSTEEL CONSTRUCTION AND DEV'T CORPORATION (44554) / EFREN RAMIREZ CONSTRUCTION AND GENERAL SERVICES CORPORATION (45033)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-02-10
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱96,499,944.00
- Contract status: Completed Report
- VIILP- CONST./REPAIR/REHAB./IMPROVEMENT OF VARIOUS INFRAS TRUCTURE INCLUDING LOCAL ROADS, CONST. OF PALHI-SAPUL-BAYANAN BYPASS ROAD, STA. 0+000.00-STA. 1+931.00; STA. 1+954.00-STA. 3+445.00, CALAPAN CITY, OR. MINDORO
- Contractor: SANLAHI GROUP OF BUILDERS INC. (11874)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-01-28
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱86,850,000.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLA RED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE - TRIP) CONCRETING OF PUROK 4 STO. NINO ROAD LEADING TO OMBO FALLS VIA BATO NINGNING SITE, STA. 0+000.00 - STA. 1+915.00, PALAWAN
- Contractor: YURICH BUILDERS AND CONSTRUCTION SUPPLY INC. (37064)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-05-22
- Fund source: Regular Infra - GAA 2021 CSSP
- Contract price: ₱101,313,720.00
- Contract status: Completed Report
- CLUSTER 2: REHAB./RECONSTRUCTION OF ROADS WITH SLIPS, SLO PE COLLAPSE & LANDSLIDE, KO166+260-KO166+480; KO166+480-KO166+735, SAN VICENTE, PALAWAN
- Contractor: NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC (17542) / KATHA BUILDERS & SUPPLIES INC. (34651)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2022-11-03
- Fund source: Regular Infra - GAA 2021 OO-1
- Contract price: ₱186,624,880.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE ALONG ITABIAK - SAN VICENTE ROAD, KO169+000.00 - KO 169+181.00, PALAWAN
- Contractor: THREE W BUILDERS, INC. (10722)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2022-11-08
- Fund source: Regular Infra - GAA 2021 OO-1
- Contract price: ₱96,340,416.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE ALONG ITABIAK - SAN VICENTE ROAD, KO169+403.00 - KO 169+592.00, PALAWAN
- Contractor: THREE W BUILDERS, INC. (10722)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2022-09-19
- Fund source: Regular Infra - GAA 2021 OO-1
- Contract price: ₱75,268,568.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG ITABIAK-SAN VICENTE ROAD, KO170+158.50-KO170+2 60.00, SAN VICENTE, PALAWAN
- Contractor: THREE W BUILDERS, INC. (10722)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2022-07-19
- Fund source: Regular Infra - GAA 2021 OO-1
- Contract price: ₱49,173,476.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG ITABIAK-SAN VICENTE ROAD, KO170+300.00-KO170+5 80.00, SAN VICENTE, PALAWAN
- Contractor: THREE W BUILDERS, INC. (10722)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2022-09-19
- Fund source: Regular Infra - GAA 2021 OO-1
- Contract price: ₱75,034,320.00
- Contract status: Completed Report
- REHAB./RECONST. OF ROADS WITH SLIPS, SLOPE COLLAPSE AND L ANDSLIDE ALONG PUERTO PRINCESA SOUTH ROAD, KO034+060-KO034+100; KO034+440- KO034+480; KO034+580-KO034+660; KO035+020-KO035+127, PALAWAN
- Contractor: THREE W BUILDERS, INC. (10722)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-02-17
- Fund source: Regular Infra - GAA 2021 OO-1
- Contract price: ₱96,499,320.00
- Contract status: Completed Report
- VIILP- CONSTRUCTION OF JAO-ASAN FLOOD CONTROL, STA. 0+258 .40-STA. 0+378.40 (RS); STA. 0+315.00-STA. 0+433 (L/S), MAGDIWANG, ROMBLON< /span>
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2022-12-07
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱48,184,308.00
- Contract status: Completed Report
- CLUSTER 3: CONSTRUCTION OF FLOOD CONTROL STRUCTURES/FACIL ITIES, ROMBLON, 3.1. CONST. OF CABULUTAN FLOOD CONTROL, STA. 0+033-STA. 0+1 62, SAN AGUSTIN, ROMBLON, 3.2. CONST. OF PILI FLOOD CONTROL, STA. 0+000-STA . 0+240, LOOC, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2022-12-22
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱135,059,248.00
- Contract status: Completed Report
- CLUSTER 4: CONST. OF FLOOD CONTROL STRUCTURES/FACILITIES, STA. 0+000-STA. 0+486; STA. 0+439 (L/S), ROMBLON, 4.1. VIILP- CONST. OF TU BURAN FLOOD CONTROL, STA. 0+000-STA. 0+486, TUBURAN, ODIONGAN, 4.2. VIILP- CONST. OF TUGUIS FLOOD CONTROL ALONG LOOC (COGON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465) / FFJJ CONSTRUCTION (16712)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-03-16
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱173,568,464.00
- Contract status: Completed Report
- CLUSTER 5: REHAB./RECONST. OF ROADS WITH SLIPS, SLOPE COL LAPSE & LANDSLIDE,(SECTION 1) STA. 98+600-STA. 99+200; (SECTION 2) STA. 99+960-STA. 100+500; STA. 98+799-STA. 98+995, SANTA FE, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2022-12-31
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱173,689,072.00
- Contract status: Completed Report
- CONST./IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS: C ONC. OF ACCESS ROAD LEADING TO SAN VICENTE PORT BARTON DOCKING AREA, STA. 1 +283.50-STA. 1+710.00; STA. 1+920-STA. 2+225.25; STA. 00+000.00-STA. 00+033 .14, MIMAROPA, PALAWAN
- Contractor: YURICH BUILDERS AND CONSTRUCTION SUPPLY INC. (37064)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2022-05-03
- Fund source: Regular Infra - GAA 2021 CSSP
- Contract price: ₱38,599,772.00
- Contract status: Completed Report
- CLUSTER 9: VIILP- CONST./IMPROVEMENT OF ROADS, PALAWAN, 9 .1. VIILP-CONST. OF ROAD LEADING TO SAN VICENTE PORT BARTON, STA. 0+000-STA . 0+650; 9.2. VIILP-CONST/IMPROVEMENT OF TARADUNGAN-ANTONINO ROAD, STA. 0+0 00-STA. 0+167.42; STA. 0+224.43-STA. 1+007.75, P
- Contractor: ONE HUNDRED PERCENT CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY:BCT TRADING & CONSTRUCTION) (15199)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2022-12-14
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱43,421,676.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF PUNTA (NATIONAL ROAD JCT.) ILAYA-AYOG-OG-KABALIWAN ROAD, STA. 0+260-STA. 0+523, BACHAWAN, SAN AGUSTIN , ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2022-12-20
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱46,724,888.00
- Contract status: Completed Report
- VIILP- COMPLETION/CONCRETING OF KABALIWAN-BOLIGANAY ROAD (PHASE II), STA. 2+377-STA. 2+598, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-07-01
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱48,247,144.00
- Contract status: Completed Report
- CLUSTER 7: LIP- CONSTRUCTION OF SLOPE PROTECTION ALONG CA LAPAN SOUTH ROAD, KO0118+080-KO0118+208; KO0118+240-KO0118+267; KO118+353-K O0118+460; KO0119+200-KO0119+287; KO0119+130-KO0119+190, BONGABONG, OR. MIN DORO
- Contractor: ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958) / STX ENTERPRISES (21547)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-01-08
- Fund source: Regular Infra - GAA 2021 LP
- Contract price: ₱197,999,552.00
- Contract status: Completed Report
- CONSTRUCTION OF BY-PASS AND DIVERSION ROAD, BOAC-MOGPOG BY -PASS ROAD, PACKAGE 1, STA. 7+048.00-STA. 8+938.50; STA. 9+168.50-STA. 485. 00, MARINDUQUE
- Contractor: R.R. ENCABO CONSTRUCTORS INCORPORATED (FORMERLY RR (14716)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-12-04
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱144,750,000.00
- Contract status: On-Going Report
- CONSTRUCTION OF BY-PASS & DIVERSION ROADS-BOAC-MOGPOG BY-PASS ROAD, PACKAGE 2, STA. 4+080-STA. 7+048.50, STA. 9+485-STA. 10+590.5 5, STA. 10+914.80-STA. 12+112.80, MARINDUQUE
- Contractor: DQT BUILDERS CORPORATION (FORMERLY DQT BUILDERS) (7950)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2022-11-19
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱111,775,840.00
- Contract status: On-Going Report
- CONSTRUCTION OF MISSING LINKS/NEW ROADS-VICTORIA SABLAYAN (MINDORO CROSS ISLAND ROAD), PACKAGE VIII, STA. 7+000-STA. 8+100, OCC. MIND ORO
- Contractor: STX ENTERPRISES (21547)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-01-14
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱98,266,536.00
- Contract status: On-Going Report
- ROAD WIDENING OF PUERTO PRINCESA NORTH ROAD, KO131+870-KO 132+432, KO132+712-KO133+456, KO140+(-676)-KO140+478, PALAWAN
- Contractor: YURICH BUILDERS AND CONSTRUCTION SUPPLY INC. (37064)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-01-06
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱99,427,584.00
- Contract status: On-Going Report
- ROAD WIDENING OF PUERTO PRINCESA NORTH ROAD, KO166+000-KO 166+084; KO166+152-KO166+496; KO166+632-KO166+1274; KO166+1335-KO168+065; K O168+137-KO168+544; KO168+799-KO169+563, PALAWAN
- Contractor: YURICH BUILDERS AND CONSTRUCTION SUPPLY INC. (37064)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2022-12-02
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱110,744,952.00
- Contract status: On-Going Report
- ROAD WIDENING OF PUERTO PRINCESA NORTH ROAD, KO171+400 - KO172+572; KO172+823 - KO173+954, PALAWAN
- Contractor: YURICH BUILDERS AND CONSTRUCTION SUPPLY INC. (37064)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-01-09
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱106,380,720.00
- Contract status: On-Going Report
- CONST./IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURID AD PROGRAM-TIKAS)-CONST. OF CORON MUNICIPAL POLICE STATION BUILDING, CORON, PALAWAN
- Contractor: ONE HUNDRED PERCENT CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY:BCT TRADING & CONSTRUCTION) (15199)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2022-09-04
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱7,103,773.00
- Contract status: On-Going Report
- CONST. OF MISSING LINKS/NEW ROADS-SOFRONIO ESPANOLA-QUEZO N CROSS COUNTRY ROAD (PULOT INTERIOR-TAGUSAO SECTION) PACKAGE D, STA. 162+8 40-STA. 165+525, PALAWAN
- Contractor: NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC (17542)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2022-08-16
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱35,996,628.00
- Contract status: On-Going Report
- CONST. OF MISSING LINKS/NEW ROADS-SOFRONIO ESPANOLA-QUEZO N CROSS COUNTRY ROAD (PULOT INTERIOR-TAGUSAO SECTION) PACKAGE E, STA. 165+5 25-STA. 169+390, PALAWAN
- Contractor: NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC (17542)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2022-08-16
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱36,035,320.00
- Contract status: On-Going Report
- CONST. OF MISSING LINKS/NEW ROADS-SOFRONIO ESPANOLA-QUEZO N CROSS COUNTRY ROAD (PULOT INTERIOR-TAGUSAO SECTION) PACKAGE F, STA. 169+3 90-STA. 173+019, STA. 173+080-STA. 173+380, PALAWAN
- Contractor: NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC (17542)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2022-08-16
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱38,820,104.00
- Contract status: On-Going Report
- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADI NG TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF ROAD, BRGY. MAN IWAYA, STA. CRUZ, MARINDUQUE (PHASE II), STA. 0+000-STA. 1+580 (RIGHT SIDE OF PIER); STA. 0+000-STA. 0+540 (LEFT SIDE OF PI
- Contractor: MORTAR MASTERS & CONCRETE BUILDERS (43228)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-02-09
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱140,291,632.00
- Contract status: On-Going Report
- CLUSTER 2: CONST. OF MISSING LINKS/NEW ROADS, MINDORO ISL AND CIRCUMFERENTIAL ROAD, 2.1-CONST. OF MISSING LINKS/NEW ROADS-MINDORO IS. CIRCUM. RD. (PTO. GALERA-ABRA DE ILOG), PACKAGE A, 2.2-CONST OF MISSING LI NKS/NEW ROADS-MINDORO IS. CIRCUM. RD. (PTO. GALE
- Contractor: MARCBILT CONSTRUCTION, INC. (21844)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-07-24
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱128,159,416.00
- Contract status: On-Going Report
- CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SU PPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT S EGURIDAD PROGRAM - TIKAS)- CONST. OF PNP BUILDING, MAMBURAO, OCCIDENTAL MIN DORO
- Contractor: ANORE CONSTRUCTION (34048) / ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-01-26
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱37,469,292.00
- Contract status: On-Going Report
- CLUSTER 15: REHABILITATION/RECONSTRUCTION OF ROADS WITH S LIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS, TAGBAC-LUBANG-LOOC RO AD, 15.1: KO034+110-KO034+204.25; 15.2: KO035+380-KO035+478; KO035+507-KO03 5+523.55; 15.3: KO035+170-KO035+197.51, LUBANG,
- Contractor: ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-07-07
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱180,048,448.00
- Contract status: On-Going Report
- CLUSTER 4: ROAD WIDENING OF EL NIDO-JCT. NEW IBAJAY ROAD, PALAWAN, 4.1. KO277+000-KO279+767; 4.2. KO279+767-KO283+000, PALAWAN
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-06-30
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱160,127,808.00
- Contract status: On-Going Report
- CLUSTER 3: CONST./IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP), P ALAWAN, 3.1. STA. 1+425-STA. 2+290.50; 3.2. STA. 0+325-STA. 1+124.50; 3.3. STA. 0+650-STA. 0+815.50; 3.4. STA. 1+017-STA. 1
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-04-20
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱121,999,680.00
- Contract status: On-Going Report
- BASIC INFRASTRUCTURE PROGRAM (BIP) - IMPROVEMENT OF ROADS , BARANGAY GUADALUPE ROAD SECTION 1: STA. 0+000 - STA. 0+270; SECTION 2: ST A.0+000 - STA.0+164; SECTION 3: STA. 0+000 - STA. 0+240; SECTION 4: STA. 0+ 000 - STA. 0+438 ; SECTION 5: STA.0+000- STA.0+0
- Contractor: NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC (17542)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-05-04
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱46,791,108.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIP AG)- CONSTRUCTION OF ROAD, LIMINANGCONG-CATABAN ROAD TO NATIONAL HIGHWAY, T AYTAY, PALAWAN, STA. 2+094-STA. 4+515; STA. 5+398-STA. 5+598; STA. 6+510-ST A. 7+280, PALAWAN
- Contractor: YURICH BUILDERS AND CONSTRUCTION SUPPLY INC. (37064)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-02-09
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱93,507,736.00
- Contract status: On-Going Report
- REHABILITATION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LA NDSLIDE ALONG ITABIAK-SAN VICENTE ROAD, STA. 171+482.00-STA. 171+718.00, SA N VICENTE, PALAWAN
- Contractor: J.H. PAJARA CONSTRUCTION CORPORATION (1890) / S-ANG CONSTRUCTION & GENERAL TRADING, INC. (37149)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-06-11
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱155,077,248.00
- Contract status: On-Going Report
- CLUSTER 22: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIAT ING GAPS (SIPAG)- REHAB. OF ROAD WITH SLIPS, SLOPE CIOLLAPSE AND LANDSLIDE ALONG TAYTAY-BANTULAN-STA. CRUZ PORT ROAD, 22.1: STA. 1+026-STA. 1+161 (R/S ); 22.2: STA. 1+057-STA. 1+164 (L/S); 22.3: STA.
- Contractor: HGG BUILDERS & SUPPLY (17824)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-07-18
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱252,392,880.00
- Contract status: On-Going Report
- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEA DING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF BURIRA O-ISUGOD CROSS COUNTRY ROAD, BRGY. BURIRAO NARRA AND BRGY. ISUGOD, QUEZON ( VIS BRGY. KALATAGBAK AND BRGY. MAASIN, QUEZON), P
- Contractor: NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC (17542)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-07-26
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱196,511,936.00
- Contract status: On-Going Report
- CLUSTER 24: REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - ARAMAYWAN-BERONG-P TO. PRINCESA ROAD, 24.1: KO183+442-KO183+492; 24.2: KO199+480-KO199+600, RI ZAL, PALAWAN
- Contractor: DELPAR CONSTRUCTION & SUPPLIES (32677)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2022-12-30
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱49,160,712.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)-MULTI-PURPOSE BUILDING/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCT ION OF CRUISE PORT AND FACILITIES-PACKAGE F, PUERTO PRINCESA CITY, PALAWAN< /span>
- Contractor: ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-08-25
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱95,537,792.00
- Contract status: On-Going Report
- CLUSTER 12: CONST./MAINTENANCE OF FLOOD MITIGATION STRUC TURES AND DRAINAGE SYSTEMS, ORIENTAL MINDORO, 12.1: CONST. OF BALITE R/C, B RGY. MALAMIG SECT., STA. 0+000-STA. 0+308.60; 12.2: CONST. OF CAWACAT R/C, TABUK SECT., BULALACAO, STA.0+000-STA. 0+324.3; 1
- Contractor: ST. TIMOTHY CONSTRUCTION CORPORATION (39196) / STX ENTERPRISES (21547)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-12-14
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱289,496,800.00
- Contract status: On-Going Report
- CONSTRUCTION OF MISSING LINKS/NEW ROADS - LUBANG CIRCUMF ERENTIAL ROAD STA. 0+000 - STA. 0+850, OCCIDENTAL MINDORO
- Contractor: ROAD EDGE TRADING & DEVELOPMENT SERVICES (33140)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2023-03-14
- Fund source: Regular Infra - GAA 2022 OO-1
- Contract price: ₱46,818,332.00
- Contract status: On-Going Report