Infrastructure Projects in Region IV-B — Region IV-B - Region IV-B, 2025
This page lists public infrastructure projects implemented by Region IV-B - Region IV-B in Region IV-B during 2025. All data are sourced from the Department of Public Works and Highways (DPWH) official database (as of 9/30/2025): https://www.dpwh.gov.ph/dpwh/projects/infrastructure
This information is shared to promote transparency and public awareness. We encourage visitors to validate project details using the official DPWH source. In case of discrepancies, please refer to the original records published by the DPWH.
| Contractor | Projects | Total Price |
|---|---|---|
| LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465) | 22 | ₱4,548,250,568.00 |
| D.T. RECIO INCORPORATED (44927) | 13 | ₱3,186,437,264.00 |
| IVY MICHELLE CONSTRUCTION AND TRADING INC. (FORMERLY:IVY MICHELLE TRADING & CONTRUCTION) (24093) | 11 | ₱2,673,678,160.00 |
| STX ENTERPRISES (21547) | 12 | ₱2,646,235,856.00 |
| RAYMAN BUILDERS INC., (16023) | 8 | ₱1,978,196,640.00 |
- ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- SECOND ARY ROADS- MARINDUQUE CIRCUMFERENTIAL ROAD, K027+112-K027+786; K028+930-K03 0+651, MARINDUQUE
- Contractor: T. N. RAMOS CONSTRUCTION & DEVELOPMENT CORP. (31363)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-04-07
- Fund source: Regular Infra - GAA 2025 OO-1
- Contract price: ₱111,744,648.00
- Contract status: On-Going Report
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE, BOAC RIVER (UPSTREAM-LEFTSIDE), BOAC, MARINDUQUE
- Contractor: MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC. (5733)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱212,627,984.00
- Contract status: On-Going Report
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE, BOAC RIVER (UPSTREAM-RIGHTSIDE), BOAC, MARINDUQUE
- Contractor: ZUIDEN BUILDERS INC. (44108) / MARKBILT CONSTRUCTION TRADING & DEVELOPMENT CORP. (FORMERLY:MARKBILT CONSTRUCTION) (12522)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱184,734,032.00
- Contract status: On-Going Report
- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENT PROTECTION/CONSERVA TION- CONST. OF ROAD, BALANACAN-INO COASTAL ROAD, MOGPOG, MARINDUQUE
- Contractor: MARKBILT CONSTRUCTION TRADING & DEVELOPMENT CORP. (FORMERLY:MARKBILT CONSTRUCTION) (12522)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-09-15
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱91,979,392.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTRE PROJECTS ALLEVIATING GAPS (SIPAG )- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONST. OF SABO DAM AT MOGPOG RIVER, MOGPOG, MARINDUQUE
- Contractor: R.R. ENCABO CONSTRUCTORS INCORPORATED (FORMERLY RR (14716)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-09-14
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱92,172,576.00
- Contract status: On-Going Report
- ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- SECOND ARY ROADS- MINDORO WEST COASTAL ROAD, K0362+000-K0381+050 (INTERMITTENT SEC TIONS), ABRA DE ILOG, OCC. MINDORO
- Contractor: D.T. RECIO INCORPORATED (44927)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-22
- Fund source: Regular Infra - GAA 2025 OO-1
- Contract price: ₱233,167,280.00
- Contract status: On-Going Report
- ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- SECOND ARY ROADS, MINDORO WEST COASTAL ROAD, ABRA DE ILOG, OCCIDENTAL MINDORO
- Contractor: D.T. RECIO INCORPORATED (44927)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-22
- Fund source: Regular Infra - GAA 2025 OO-1
- Contract price: ₱231,176,944.00
- Contract status: On-Going Report
- CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONST. OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG PALUAN RIVER, BRGY. SAN JOSE POBLACION (BRGY. 6) SECTION (R/S), PALUAN, OCC. MINDORO
- Contractor: ANORE CONSTRUCTION (34048) / NGV CONSTRUCTION OPC (58077)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱229,989,456.00
- Contract status: On-Going Report
- CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONST. OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG PALUAN RIVER, BRGY. SAN JOSE POBLACION (BRGY. 6) SECTION (L/S), PALUAN, OCC. MINDORO
- Contractor: ANORE CONSTRUCTION (34048) / NGV CONSTRUCTION OPC (58077)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱230,099,808.00
- Contract status: On-Going Report
- FLOOD MANAGEMENT PROGRAM- CONST./REHAB. OF FLOOD MITIGATIO N FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE MUMPONG RIVER, TUBAN-BATONG BUHAY, BRGY. TUBAN, SABLAYAN, OCC. MINDOR O
- Contractor: SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) (15906)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱291,775,712.00
- Contract status: On-Going Report
- FLOOD MANAGEMENT PROGRAM- CONST./REHAB. OF FLOOD MITIGATI ON FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROA D DIKE, MUMPONG RIVER, TUBAN-STA. LUCIA, BRGY. TUBAN, SABLAYAN, OCC. MINDOR O
- Contractor: SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) (15906)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱291,496,704.00
- Contract status: On-Going Report
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, BUSUANGA RIVER, BR GY. SAN AGUSTIN (UPSTREAM), SAN JOSE, OCC. MINDORO
- Contractor: D.T. RECIO INCORPORATED (44927)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱276,622,432.00
- Contract status: On-Going Report
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, BUSUANGA RIVER, BR GY. SAN AGUSTIN (DOWNSTREAM), SAN JOSE, OCC. MINDORO
- Contractor: D.T. RECIO INCORPORATED (44927)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱276,436,864.00
- Contract status: On-Going Report
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, BUSUANGA RIVER, BR GY. ADELA (DOWNSTREAM), RIZAL, OCC.MINDORO
- Contractor: D.T. RECIO INCORPORATED (44927)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱275,800,000.00
- Contract status: On-Going Report
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE, MOMP ONG RIVER,BRGY. STA. LUCIA, SABLAYAN, OCC. MINDORO
- Contractor: ANORE CONSTRUCTION (34048) / K.A.L.I. CONSTRUCTION CORPORATION (58095)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱230,183,536.00
- Contract status: On-Going Report
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURES, MOM PONG RIVER, BRGY. SANTA LUCIA (UPSTREAM-RS), SABLAYAN, OCC. MINDORO< /li>
- Contractor: ANORE CONSTRUCTION (34048) / TRIPLE K CONSTRUCTION (39448)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-21
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱231,341,552.00
- Contract status: On-Going Report
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF BANK PROTECTION STRUCTURE WIT H ROAD DIKE ALONG LUMINTAO RIVER, BRGY. MAGSIKAP AND BRGY. MALAWAAN (DOWNST REAM), RIZAL, OCC. MINDORO
- Contractor: AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP. ([REVOKED] 49129) / MIGHTY DRAGON BUILDERS INC. (51900)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱225,581,984.00
- Contract status: On-Going Report
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF BANK PROTECTION STRUCTURE WIT H ROAD DIKE ALONG LUMINTAO RIVER, BRGY. MAGSIKAP (UPSTREAM), RIZAL, OCC. MI NDORO
- Contractor: D.T. RECIO INCORPORATED (44927)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱221,859,920.00
- Contract status: On-Going Report
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF RIVERBANK PROTECTION STRUCTUR E ALONG MAMARA RIVER (UPSTREAM), BRGY. TUBILI, PALUAN, OCC. MINDORO< /li>
- Contractor: ANORE CONSTRUCTION (34048) / NGV CONSTRUCTION OPC (58077)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱177,940,272.00
- Contract status: On-Going Report
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE WITH ESPLANADE ALONG POLA RIVER, BRGY. LUMANGBAYAN SECTION (DOWNSTREAM/LS), STA. CRUZ, OCC. MINDORO
- Contractor: D.T. RECIO INCORPORATED (44927)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱230,999,776.00
- Contract status: On-Going Report
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE WITH ESPLANADE ALONG POLA RIVER, BRGY. LUMANGBAYAN SECTION (UPSTREAM/LS), STA. C RUZ, OCC. MINDORO
- Contractor: D.T. RECIO INCORPORATED (44927)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱231,106,032.00
- Contract status: On-Going Report
- FLOOD MANAGEMENT PROGRAM- CONST./REHAB. OF FLOOD MITIGATI ON FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROA D DIKE, PATRICK RIVER, SITIO MANAMOK, BRGY. TAGUMPAY, SABLAYAN, OCC. MINDOR O
- Contractor: SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) (15906)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱277,831,680.00
- Contract status: On-Going Report
- FLOOD MANAGEMENT PROGRAM- CONST./REHAB. OF FLOOD MITIGATI ON FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROA D DIKE, PATRICK RIVER, OLD TAGUMPAY, BRGY. TAGUMPAY, SABLAYAN, OCC. MINDORO
- Contractor: SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) (15906)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱277,501,088.00
- Contract status: On-Going Report
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF BANK PROTECTION STRUCTURE WIT H ROAD DIKE ALONG LUMINTAO RIVER, BRGY. RIZAL, OCC. MINDORO
- Contractor: JELSIE CONSTRUCTION & SUPPLY (44943)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-01-03
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱137,992,608.00
- Contract status: On-Going Report
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITH MAJOR R IVER BASINS AND PRINCIPAL RIVERS- CONST. OF BANK PROTECTION STRUCTURE WITH ROAD DIKE ALONG LUMINTAO RIVER, BRGY. RIZAL (UPSTREAM), RIZAL, OCC. MINDORO
- Contractor: JELSIE CONSTRUCTION & SUPPLY (44943)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-01-03
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱138,126,496.00
- Contract status: On-Going Report
- ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- TERTI ARY ROADS- CALAPAN NORTH ROAD, K0039+197 - K0040+733, MINDORO ORIENTAL
- Contractor: ANORE CONSTRUCTION (34048)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-01-04
- Fund source: Regular Infra - GAA 2025 OO-1
- Contract price: ₱69,822,808.00
- Contract status: On-Going Report
- CONST./MAINT. OF FLOOD MITIGATION SRTRUCTURES AND DRAINAG E SYSTEM- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER, PJHASE 2, BRGY. MULAWIMN , NAUJAN, ORINTAL MINORO
- Contractor: ADSL CONSTRUCTION & TRADING (48245)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-12-09
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱137,919,872.00
- Contract status: On-Going Report
- CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER, BRGY. MULAWIN-BRGY. GENER AL ESCO, NAUJAN, OR. MINDORO
- Contractor: ADSL CONSTRUCTION & TRADING (48245)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-12-09
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱137,941,568.00
- Contract status: On-Going Report
- CONST. OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY- TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM (TIKAS)- CONST. OF QUARTERS AND BARRACKS AT 203RD BRIGADE PHILIPPINE ARMY PHASE 2 AT BRGY. CAMBUNANG, BULALACAO, OR. MINDO
- Contractor: RHODIUM 688 BUILDERS, INC. (FORMERLY: STUDIO26 CONSTRUCTION INC.) (41781)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-05-30
- Fund source: Regular Infra - GAA 2025 CP
- Contract price: ₱93,232,840.00
- Contract status: On-Going Report
- CONST./IMPV'T. OF VARIOUS INFRASTRUCTURES IN SUPPORT OF N ATIONAL SECURITY- TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD P ROGRAM (TIKAS)- CONST. OF QUARTERS AND BARRACKS AT ALPHA CO. & CHARLIE CO. 4IB PHILIPPINE ARMY PHASE 2 AT SITIO HAGINES, BR
- Contractor: K CONSTRUCTION & DEVELOPERS CORPORATION (50528)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-04-30
- Fund source: Regular Infra - GAA 2025 CP
- Contract price: ₱74,507,528.00
- Contract status: On-Going Report
- CONST./IMPV'T. OF VARIOUS INFRASTRUCTURES IN SUPPORT OF N ATIONAL SECURITY- TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD P ROGRAM (TIKAS)- CONST. OF QUARTERS AND BARRACKS AT 203RD BRIGADE PHILIPPINE ARMY PHASE 2 AT BRGY. PAG-ASA, BANSUD, OR. MIND
- Contractor: RHODIUM 688 BUILDERS, INC. (FORMERLY: STUDIO26 CONSTRUCTION INC.) (41781)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-06-29
- Fund source: Regular Infra - GAA 2025 CP
- Contract price: ₱123,953,408.00
- Contract status: On-Going Report
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJO R RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PANGALAAN RIVER, BRGY. APITONG SECTION (UPSTREAM LS), NAUJAN, OR. MINDORO
- Contractor: RAYMAN BUILDERS INC., (16023)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱275,599,168.00
- Contract status: On-Going Report
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PANGALAAN RIVER, B RGY. APITONG SECTION (DOWNSTREAM LS), NAUJAN, OR. MINDORO
- Contractor: RAYMAN BUILDERS INC., (16023)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱275,800,768.00
- Contract status: On-Going Report
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DFIKE, PANGALAAN RIVER, DOWNSTREAM (RIGHT SIDE), PACKAGE A, NAUJAN, OR. MINDORO
- Contractor: RAYMAN BUILDERS INC., (16023)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱275,748,736.00
- Contract status: On-Going Report
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PANGALAAN RIVER, B RGY. TIGKAN SECTION (LS), PACKAGE B, NAUJAN, OR. MINDORO
- Contractor: ANORE CONSTRUCTION (34048) / NGV CONSTRUCTION OPC (58077)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱275,974,496.00
- Contract status: On-Going Report
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PANGALAAN RIVER, B RGY. TIGKAN SECTION (DOWNSTREAM LS), PACKAGE C, NAUJAN, OR. MINDORO< /li>
- Contractor: ANORE CONSTRUCTION (34048) / NGV CONSTRUCTION OPC (58077)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱276,127,840.00
- Contract status: On-Going Report
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PANGALAAN RIVER, B RGY. SAMPAGUITA (DOWNSTREAM), NAUJAN, OR. MINDORO
- Contractor: RAYMAN BUILDERS INC., (16023)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱229,601,216.00
- Contract status: On-Going Report
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PANGALAAN RIVER, B RGY. TIGKAN-BRGY. SAMPAGUITA (UPSTREAM), PACKAGE A, NAUJAN, OR. MINDORO
- Contractor: RAYMAN BUILDERS INC., (16023)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱229,908,160.00
- Contract status: On-Going Report
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PANGALAAN RIVER, B RGY. TIGKAN-BRGY. SAMPAGUITA, PACKAGE B, NAUJAN, OR. MINDORO
- Contractor: RAYMAN BUILDERS INC., (16023)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱229,869,488.00
- Contract status: On-Going Report
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER , (UPSTREAM), BRGY. MULAWIN-BRGY. DEL PILAR, NAUJAN,
- Contractor: HGG BUILDERS & SUPPLY (17824)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱275,998,560.00
- Contract status: On-Going Report
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER , (DOWNSTREAM), BRGY. MULAWIN-BRGY. DEL PILAR, NAUJAN, OR. MINDORO
- Contractor: HGG BUILDERS & SUPPLY (17824)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱229,974,224.00
- Contract status: On-Going Report
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE ALONG PANGALAAN RIV ER, (LEFT SIDE), BRGY. SAMPAGUITA, NAUJAN, OR. MINDORO
- Contractor: LE BRON CONSTRUCTION (32219)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱276,204,544.00
- Contract status: On-Going Report
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER , PHASE 1, BRGY. MULAWIN, NAUJAN, OR. MINDORO
- Contractor: HGG BUILDERS & SUPPLY (17824)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱239,302,848.00
- Contract status: On-Going Report
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE ALONG PANGALAAN RIV ER, BRGY. SAMPAGUITA, PHASE 2, NAUJAN, OR. MINDORO
- Contractor: LE BRON CONSTRUCTION (32219)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱230,045,888.00
- Contract status: On-Going Report
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE ALONG BUCAYAO GRAND E RIVER, BRGY. MALVAR (UPSTREAM-LEFTSIDE), NAUJAN, OR. MINDORO
- Contractor: HGG BUILDERS & SUPPLY (17824)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-10-28
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱115,190,176.00
- Contract status: On-Going Report
- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSE RVATION- CONST. OF COASTAL ROAD, BRGY. SAN ANTONIO SECTION, NAUJAN, ORIENTA L MINDORO
- Contractor: ANORE CONSTRUCTION (34048) / K.A.L.I. CONSTRUCTION CORPORATION (58095)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱276,062,304.00
- Contract status: On-Going Report
- BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRU CTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF FLOOD MITIGA TING STRUCTURE WITH ROAD COMPONENT ALONG MAG-ASAWANG TUBIG RIVERT, BRGY. PI NAGSABANGAN I TO BRGY. PINAGSABANGAN II, NAUJAN,
- Contractor: STX ENTERPRISES (21547)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-12-27
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱151,108,944.00
- Contract status: On-Going Report
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE, TAGU MPAY RIVER (UPSTREAM), ROXAS, PALAWAN
- Contractor: IVY MICHELLE CONSTRUCTION AND TRADING INC. (FORMERLY:IVY MICHELLE TRADING & CONTRUCTION) (24093)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-10-28
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱115,026,160.00
- Contract status: On-Going Report
- ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- TERIA RY ROADS, CORON-BUSUANGA ROAD, K0000+000-K0001+432, CORON, PALAWAN
- Contractor: JASMIG CONSTRUCTION CORPORATION (FORMERLY: JASMIG CONSTRUCTION SUPPLY) (26069)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-11-30
- Fund source: Regular Infra - GAA 2025 OO-1
- Contract price: ₱81,613,184.00
- Contract status: On-Going Report
- ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- TERTI ARY ROADS, CORON-BUSUANGA ROAD, K0055+000-K0055+918, BUSUANGA, PALAWAN
- Contractor: JASMIG CONSTRUCTION CORPORATION (FORMERLY: JASMIG CONSTRUCTION SUPPLY) (26069)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-10-21
- Fund source: Regular Infra - GAA 2025 OO-1
- Contract price: ₱53,326,600.00
- Contract status: On-Going Report
- ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- TERTI ARY ROADS, CORON-BUSUANGA ROAD, K0008+000 - K0008+609, CORON, PALAWAN
- Contractor: JASMIG CONSTRUCTION CORPORATION (FORMERLY: JASMIG CONSTRUCTION SUPPLY) (26069)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-10-19
- Fund source: Regular Infra - GAA 2025 OO-1
- Contract price: ₱51,251,832.00
- Contract status: On-Going Report
- ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- TERTI ARY ROADS, CORON-BUSUANGA ROAD, KO030+000-K0030+950, CORON, PALAWAN< /li>
- Contractor: JASMIG CONSTRUCTION CORPORATION (FORMERLY: JASMIG CONSTRUCTION SUPPLY) (26069)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-10-22
- Fund source: Regular Infra - GAA 2025 OO-1
- Contract price: ₱54,734,612.00
- Contract status: On-Going Report
- ASSET PRESERVATION PROGRAM- REHAB./RECONST. OF NATIONAL R OADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE- SECONDARY ROADS, CORON-BUSU ANGA ROAD, K0057+700-K0057+823, BUSUANGA, PALAWAN
- Contractor: JASMIG CONSTRUCTION CORPORATION (FORMERLY: JASMIG CONSTRUCTION SUPPLY) (26069)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-21
- Fund source: Regular Infra - GAA 2025 OO-1
- Contract price: ₱186,101,056.00
- Contract status: On-Going Report
- FLOOD MANAGEMENT PROGRAM- CONST./MAINT. OF FLOOD MITIGATI ON STRUCTURES AND DRAINAGE SYSTEMS- CONST. OF SLOPE PROTECTION STRUCTURE (P ARINPIN BR. 1), ROXAS, PALAWAN
- Contractor: JASMIG CONSTRUCTION CORPORATION (FORMERLY: JASMIG CONSTRUCTION SUPPLY) (26069)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-07-31
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱46,320,000.00
- Contract status: On-Going Report
- FLOOD MANAGEMENT PROGRAM- CONST./MAINT. OF FLOOD MITIGATI ON STRUCTURES AND DRAINAGE SYSTEM- CONST. OF SLOPE PROTECTION STRUCTURE (KI WIT BR. 1), BUSUANGA, PALAWAN
- Contractor: ALPHA VECTOR CONSTRUCTION AND SUPPLY (44630) / JASMIG CONSTRUCTION CORPORATION (FORMERLY: JASMIG CONSTRUCTION SUPPLY) (26069)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-09-18
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱72,493,848.00
- Contract status: On-Going Report
- FLOOD MANAGEMENT PROGRAM- CONST./MAINT. OF FLOOD MITIGATI ON STRUCTURES AND DRAINAGE SYSTEM- CONST. OF SLOPE PROTECTION STRUCTURE (TA LOG BRIDGE), TAYTAY, PALAWAN
- Contractor: JASMIG CONSTRUCTION CORPORATION (FORMERLY: JASMIG CONSTRUCTION SUPPLY) (26069)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-01-18
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱138,960,000.00
- Contract status: On-Going Report
- FLOOD MANAGEMENT PROGRAM- CONST./MAINT. OF FLOOD MITIGATI ON STRUCTURES AND DRAINAGE SYSTEMS- CONST. OF SLOPE PROTECTION STRUCTURE (L AMORO BR. 1), STA. 000+000-STA. 000+082.13 (LEFT SIDE), EL NIDO, PALAWAN
- Contractor: WAWAO BUILDERS (46535)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-07-31
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱46,271,756.00
- Contract status: On-Going Report
- FLOOD MANAGEMENT PROGRAM- CONST./MAINT. OF FLOOD MITIGATI ON STRUCTURES AND DRAINAGE SYSTEMS- CONST. OF SLOPE PROTECTION STRUCTURE (A RUTAYAN BRIDGE), ROXAS, PALAWAN
- Contractor: WAWAO BUILDERS (46535)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-07-31
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱46,271,756.00
- Contract status: On-Going Report
- ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- SECON DARY ROADS, PUERTO PRINCESA SOUTH ROAD, K0100+441- K0102+625, NARRA, PALAWA N
- Contractor: NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC (17542)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-24
- Fund source: Regular Infra - GAA 2025 OO-1
- Contract price: ₱235,641,088.00
- Contract status: On-Going Report
- ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- SECON DARY ROADS, PUERTO PRINCESA SOUTH ROAD, K0111+715 - K0112+950, NARRA, PALAW AN
- Contractor: NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC (17542)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-12-30
- Fund source: Regular Infra - GAA 2025 OO-1
- Contract price: ₱172,990,608.00
- Contract status: On-Going Report
- ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- SECON DARY ROADS- PUERTO PRINCESA SOUTH ROAD, K0116+431-K0118+404, NARRA, PALAWAN
- Contractor: NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC (17542)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-01-21
- Fund source: Regular Infra - GAA 2025 OO-1
- Contract price: ₱172,990,704.00
- Contract status: On-Going Report
- ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- SECON DARY ROADS, PUERTO PRINCESA SOUTH ROAD, NARRA, PALAWAN
- Contractor: NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC (17542)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-12-06
- Fund source: Regular Infra - GAA 2025 OO-1
- Contract price: ₱145,873,152.00
- Contract status: On-Going Report
- ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- SECON DARY ROADS- PUERTO PRINCESA SOUTH ROAD, K0140+245-K0141+434, SOFRONIO, ESPA NOLA, PALAWAN
- Contractor: NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC (17542)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-12-26
- Fund source: Regular Infra - GAA 2025 OO-1
- Contract price: ₱168,315,248.00
- Contract status: On-Going Report
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD MITIGATION STRUCTURE, B ATANG-BATANG RIVER, NARRA, PALAWAN
- Contractor: IVY MICHELLE CONSTRUCTION AND TRADING INC. (FORMERLY:IVY MICHELLE TRADING & CONTRUCTION) (24093)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱230,635,008.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIP AG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTYAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. ZONE III-BRGY. QUINABIGAN, PINAM ALAYAN, OR. MINDORO
- Contractor: STX ENTERPRISES (21547)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱230,990,544.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIP AG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. ZONE III, STA. 000+290-STA. 000+6 20; STA. 000+660-STA. 000+813.50, PINAMALAYAN, O
- Contractor: STX ENTERPRISES (21547)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱230,808,400.00
- Contract status: On-Going Report
- ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- SECON DARY ROADS- PUERTO PRINCESA SOUTH ROAD, K0094+000-K0094+965, NARRA, PALAWAN
- Contractor: NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC (17542)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-12-24
- Fund source: Regular Infra - GAA 2025 OO-1
- Contract price: ₱140,262,752.00
- Contract status: On-Going Report
- ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- SECON DARY ROADS, PUERTO PRINCESA SOUTH ROAD, NARRA, PALAWAN
- Contractor: NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC (17542)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-12-01
- Fund source: Regular Infra - GAA 2025 OO-1
- Contract price: ₱140,262,592.00
- Contract status: On-Going Report
- ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-SECONDA RY ROADS, PUERTO PRINCESA SOUTH ROAD, K0105+832-K0106+665, NARRA, PALAWAN
- Contractor: T. N. RAMOS CONSTRUCTION & DEVELOPMENT CORP. (31363)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-12-04
- Fund source: Regular Infra - GAA 2025 OO-1
- Contract price: ₱108,962,928.00
- Contract status: On-Going Report
- ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- SECON DARY ROADS, ARAMAYWAN-BERONG-PTO. PRINCESA ROAD, K0098+750-K0098+809; K0098 +980-K0101+543, QUEZON, PALAWAN
- Contractor: T. N. RAMOS CONSTRUCTION & DEVELOPMENT CORP. (31363)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-12-22
- Fund source: Regular Infra - GAA 2025 OO-1
- Contract price: ₱125,684,376.00
- Contract status: On-Going Report
- ASSET PRESERVATION PROGRAM- REHAB./RECONST/UPGRADING OF D AMAGED PAVED ROADS- SECONDARY ROADS- ARAMYWAN-BERONG-PTO. PRINCESA ROAD, K0 107+915-K0110+822 (INTERMITTENT SECTIONS), QUEZON, PALAWAN
- Contractor: AR LUSTRE CONSTRUCTION CORPORATION (FORMERLY:A.R. LUSTRE JR. CONSTRUCTION) (7680)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-11-30
- Fund source: Regular Infra - GAA 2025 OO-1
- Contract price: ₱66,249,892.00
- Contract status: On-Going Report
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ABORLAN RIVER WATERWAY, PTO. PRINCESA SOUTH ROAD, UPSTREAM LEFTSIDE, ABORLAN, PALAWAN
- Contractor: YURICH BUILDERS AND CONSTRUCTION SUPPLY INC. (37064)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱229,910,816.00
- Contract status: On-Going Report
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ABORLAN RIVER WATERWAY, PTO. PRINCESA SOUTH ROAD, DOWNSTREAM RIGHTSIDE, ABORLAN, PALAWAN
- Contractor: YURICH BUILDERS AND CONSTRUCTION SUPPLY INC. (37064)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱229,910,768.00
- Contract status: On-Going Report
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE, STO. NINO RIVER WATERWAYS ALONG ARAMAYWAN-BERONG-PTO. PRINCESA ROAD, PALAWAN
- Contractor: C.T. LEONCIO CONSTRUCTION & TRADING (17371)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-01-21
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱161,781,984.00
- Contract status: On-Going Report
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE, TAGB ARUNGIS RIVER WATERWAYS (LS), PTO. PRINCESA CITY, PALAWAN
- Contractor: YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC. (45002)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-01-21
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱161,782,608.00
- Contract status: On-Going Report
- CONST./IMPV'T. OF VARIOUS INFRASTRUCTURES IN SUPPORT OF N ATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD P ROGRAM-TIKAS)- CONST. OF MULTI-PURPOSE/TRAINING CENTER, TINIGUIBAN, PTO. PR INCESA CITY, PALAWAN
- Contractor: ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP. (49128)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-09-12
- Fund source: Regular Infra - GAA 2025 CP
- Contract price: ₱25,533,922.00
- Contract status: On-Going Report
- ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- SECON DARY ROADS, PUERTO PRINCESA NORTH ROAD, PTO. PRINCESA CITY, PALAWAN< /li>
- Contractor: AR LUSTRE CONSTRUCTION CORPORATION (FORMERLY:A.R. LUSTRE JR. CONSTRUCTION) (7680)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-24
- Fund source: Regular Infra - GAA 2025 OO-1
- Contract price: ₱93,073,624.00
- Contract status: On-Going Report
- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSE RVATION- CONST. OF RIZAL AVENUE EXTENSION BOARDWALK, PHASE II, BRGY. BANCAO -BANCAO, PTO. PRINCESA CITY, PALAWAN
- Contractor: YURICH BUILDERS AND CONSTRUCTION SUPPLY INC. (37064)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-09-25
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱92,349,872.00
- Contract status: On-Going Report
- CONSTRUCTION OF MISSING LINKS/NEW ROADS- ODIONGAN EAST-WE ST ROAD, ODIONGAN, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-11-21
- Fund source: Regular Infra - GAA 2025 OO-1
- Contract price: ₱139,679,888.00
- Contract status: On-Going Report
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF RIVERSIDE PROTECTION STRUCTUR E, PILI RIVER, UPSTREAM, POBLACION, SAN FERNANDO, SIBUYAN ISLAND, ROMBLON
- Contractor: YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC. (45002)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱230,111,472.00
- Contract status: On-Going Report
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF PILI RIVERSIDE PROTECTION STR UCTURE, DOWNSTREAM, POBLACION, SAN FERNANDO, ROMBLON
- Contractor: YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC. (45002)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-12-09
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱137,846,928.00
- Contract status: On-Going Report
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF LICO FLOOD MITIGATION STRUCTU RE, UPSTREAM/RS, CAJIDIOCAN, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-10-28
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱115,076,136.00
- Contract status: On-Going Report
- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEAD ING TO MAJOR/STRATEGIC P[UBLIC BUILDINGS/FACILITIES- CONST. OF COASTAL ROAD , BRGY. CALAGONSAO, ALCANTARA, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-06
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱276,180,064.00
- Contract status: On-Going Report
- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSE RVATION- CONST. OF COASTAL ROAD AND CAUSEWAY, BRGY. ALIBAGON, SIBUYAN ISLAN D, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱230,150,400.00
- Contract status: On-Going Report
- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSE RVATION- CONST. OF COASTAL ROAD, PHASE 3, BRGY. TUGDAN, TABLAS, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱230,152,208.00
- Contract status: On-Going Report
- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSE RVATION- CONST. OF COASTAL ROAD, BRGY. TUGDAN-BRGY. CALAGONSAO, TABLAS, ROM BLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱230,153,808.00
- Contract status: On-Going Report
- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSE RVATION- CONSTRUCTION OF COASTAL ROAD, BRGY POBLACION-BRGY. AGMANIK, STA. F E, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-12-09
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱139,524,832.00
- Contract status: On-Going Report
- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSE RVATION- CONST. OF COASTAL ROAD, BRGY. ALIBAGON, CAJIDIOCAN, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-12-09
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱138,090,176.00
- Contract status: On-Going Report
- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCT URES/FACILITIES- CONST. OF RIVERSIDE PROTECTION STRUCTURE, DOWNSTREAM, BRGY . PUNONG, SAN FERNANDO, ROMBLON
- Contractor: YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC. (45002)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱229,779,648.00
- Contract status: On-Going Report
- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSE RVATION- CONST. OF COASTAL ROAD, BRGY. AGMANIK, STA. FE, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465) / GROUND UP CONSTRUCTION AND SUPPLIES (42322)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱230,153,232.00
- Contract status: On-Going Report
- BASIC INFRASTRUCTURE PROGRAM (BIP)- COASTAL ROADS AUGMENT RESILIENCY OF COMMUNITIES- CONST. OF COASTAL ROAD, BRGY. POBLACION, STA. F E, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱230,874,064.00
- Contract status: On-Going Report
- BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRU CTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF FLOOD MITIGA TING STRTUCTURE, TINGARAY
- Contractor: YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC. (45002)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱247,496,656.00
- Contract status: On-Going Report
- BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRU CTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF FLOOD MITIGA TING STRUCTURE, TINGARAY RIVER, UPSTREAM R/S, BRGY. POBLACION, FERROL, ROMB LON
- Contractor: YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC. (45002)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱247,496,688.00
- Contract status: On-Going Report
- BRIDGE PROGRAM- WIDENING OF PERMANENT BRIDGES- SIJERON BR . (B00031TL), PHASE III ALONG TABLAS CIRCUMFERENTIAL OAD, STA. 62+372.204-S TA. 62+675.055, TABLAS ISLAND, ROMBLON
- Contractor: PLERM CONSTRUCTION AND DEVELOPMENT CORPORATION (33288)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-21
- Fund source: Regular Infra - GAA 2025 OO-1
- Contract price: ₱280,725,920.00
- Contract status: On-Going Report
- BRIDGE PROGRAM- RETROFITTING/STRENGTHENING OF PERMANENT B RIDGES- BALITE BR. (B00036MR) ALONG CALAPAN SOUTH ROAD, GLORIA, ORIENTAL MI NDORO
- Contractor: LUMEL GLENN CONSTRUCTION (26817)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-06-17
- Fund source: Regular Infra - GAA 2025 OO-1
- Contract price: ₱27,921,840.00
- Contract status: On-Going Report
- WIDENING OF PERMANENT BRIDGES- ORCONUMA BR. (B00217MR) AL ONG BONGABONG-SAGANA-ROXAS-SAN AQUILINO ROAD (PHASE II), BONGABONG, OR. MIN DORO
- Contractor: LUMEL GLENN CONSTRUCTION (26817) / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) (13722)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-07-23
- Fund source: Regular Infra - GAA 2025 OO-1
- Contract price: ₱46,705,320.00
- Contract status: On-Going Report
- CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONST. OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG BALITE RIVER, BRGY. PAPANDUNGIN (UPSTREAM-LS), GLORIA, OR. MINDORO
- Contractor: GOLDEN J'S CONSTRUCTION SERVICES (51135)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-06-29
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱231,183,200.00
- Contract status: On-Going Report
- CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONST. OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG BALITE RIVER, BRGY. PAPANDUNGIN (DOWNSTREAM-LS), GLORIA, OR. MINDORO
- Contractor: GOLDEN J'S CONSTRUCTION SERVICES (51135)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-06-29
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱231,048,416.00
- Contract status: On-Going Report
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BANSUD RIVER, BRGY. CONRAZON, BANSUD, OR. MINDORO
- Contractor: LE BRON CONSTRUCTION (32219)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱230,119,200.00
- Contract status: On-Going Report
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BANSUD RIVER BRGY. CONRAZON (UPSTREAM), BANSUD, OR. MINDORO
- Contractor: LE BRON CONSTRUCTION (32219)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱229,984,208.00
- Contract status: On-Going Report
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJO R RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALON G BONGABONG RIVER UPSTREAM, BONGABONG, OR. MINDORO
- Contractor: JJPR CONSTRUCTION SERVICES (53478)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱229,798,752.00
- Contract status: On-Going Report
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJO R RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALON G BALETE RIVER DOWNSTREAM, GLORIA, OR. MINDORO
- Contractor: JIIK CONSTRUCTION SERVICES (50966)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱230,100,944.00
- Contract status: On-Going Report
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJO R RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALON G BALETE RIVER, (DOWNSTREAM, RIGHT SIDE), BRGY. BALETE, GLORIA, OR. MINDORO
- Contractor: JIIK CONSTRUCTION SERVICES (50966)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱230,041,184.00
- Contract status: On-Going Report
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJO R RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALON G BALETE RIVER, (UPSTREAM, LEFT SIDE), BRGY. BALETE, GLORIA, OR. MINDORO
- Contractor: ALRIE CONSTRUCTION SERVICES (54139)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱230,007,952.00
- Contract status: On-Going Report
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJO R RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALON G BALETE RIVER, (UPSTREAM, RIGHT SIDE), BRGY. BALETE, GLORIA, OR. MINDORO
- Contractor: ALRIE CONSTRUCTION SERVICES (54139)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱230,115,680.00
- Contract status: On-Going Report
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJO R RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALON G BONGABONG RIVER, BONGABONG, OR. MINDORO
- Contractor: JJPR CONSTRUCTION SERVICES (53478)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱229,928,160.00
- Contract status: On-Going Report
- BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STR UCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF FLOOD CONTR OL STRUCTURE, BALETE RIVER, BRGY. PAPANDUNGIN, GLORIA, OR. MINDORO
- Contractor: ALRIE CONSTRUCTION SERVICES (54139)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-09
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱236,134,848.00
- Contract status: On-Going Report
- ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- SECO NDARY ROADS- MINDORO WEST COASTAL ROAD, K0231+067-K0368+000 (INTERMITTENT S ECTIONS), SABLAYAN, OCC. MINDORO
- Contractor: EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) (13722)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-01-04
- Fund source: Regular Infra - GAA 2025 OO-1
- Contract price: ₱186,112,384.00
- Contract status: On-Going Report
- ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- SECO NDARY ROADS- MINDORO WEST COASTAL ROAD, K0368+000-K0411+250 (INTERMITTENT S ECTIONS), MAMBURAO, OCC. MINDORO
- Contractor: EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) (13722)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-03
- Fund source: Regular Infra - GAA 2025 OO-1
- Contract price: ₱186,157,632.00
- Contract status: On-Going Report
- ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- SECO NDARY ROADS- MINDORO WEST COASTAL ROAD, K0417+000 - K0445+498 (INTERMITTENT SECTIONS), ABRA DE ILOG, OCC. MINDORO
- Contractor: EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) (13722)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-17
- Fund source: Regular Infra - GAA 2025 OO-1
- Contract price: ₱202,142,720.00
- Contract status: On-Going Report
- ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- TERT IARY ROADS- JCT. MWCR (LABANGAN)-MURTHA-IRIRON ROAD, K0235+000-K0241+722 (I NTERMITTENT SECTIONS), SAN JOSE, OCC. MINDORO
- Contractor: EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) (13722)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-12-28
- Fund source: Regular Infra - GAA 2025 OO-1
- Contract price: ₱169,548,400.00
- Contract status: On-Going Report
- ASSET PRESERVATION POGRAM- PREVENTIVE MAINTENANCE- TERTI ARY ROADS- JCT. MWCR (LABANGAN)-MURTHA-JCT. IRIRON ROAD, K0243+500-K0246+00 0; K0247+000-K0247+997, SAN JOSE, OCC. MINDORO
- Contractor: EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) (13722)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-01
- Fund source: Regular Infra - GAA 2025 OO-1
- Contract price: ₱184,636,944.00
- Contract status: On-Going Report
- ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- TERT IARY ROADS- JCT. MWCR (LABANGAN)-MURTHA-JCT. IRIRON ROAD, K0251+232-K0252+9 60; K0252+996-K0255+284, SAN JOSE, OCC. MINDORO
- Contractor: SILVERWOLVES CONSTRUCTION CORPORATION (48466) / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) (13722)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-01-07
- Fund source: Regular Infra - GAA 2025 OO-1
- Contract price: ₱181,713,168.00
- Contract status: On-Going Report
- ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- TERT IARY ROADS- JCT. MWCR (LABANGAN)-MURTHA-JCT. IRIRON ROAD, K0256+699-K0260+9 00, CALINTAAN, OCC. MINDORO
- Contractor: SILVERWOLVES CONSTRUCTION CORPORATION (48466) / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) (13722)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-01-01
- Fund source: Regular Infra - GAA 2025 OO-1
- Contract price: ₱183,146,336.00
- Contract status: On-Going Report
- CONST. OF MISSING LINKS/NEW ROADS- MINDORO ISLAND CIRCUM FERENTIAL ROAD (PUERTO GALERA-ABRA DE ILOG), PACKAGE D, STA. 0+000-STA. 0+5 10; STA. 3+978-STA. 4+194, ABRA DE ILOG, OCC. MINDORO
- Contractor: ST. TIMOTHY CONSTRUCTION CORPORATION (39196)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-09-27
- Fund source: Regular Infra - GAA 2025 OO-1
- Contract price: ₱70,782,768.00
- Contract status: On-Going Report
- NETWORK DEVELOPMENT PROGRAM- BULALACAO-SAN JOSE ROAD, ST A. 0+000.00-STA. 0+881.63, SAN JOSE, OCC. MINDORO
- Contractor: F.A. TORRES CONSTRUCTION (27150)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-22
- Fund source: Regular Infra - GAA 2025 OO-1
- Contract price: ₱55,935,336.00
- Contract status: On-Going Report
- FLOOD MANAGEMENT PROGRAM- CONST./MAINTENANCE OF FLOOD MI TIGATION STRUCTURES AND DRAINAGE SYSTEM- CONST. OF FLOOD MITIGATION STRUCTU RES ALONG AMNAY RIVER, STA. 000+600-STA. 000+956.28, SABLAYAN, OCC. MINDORO
- Contractor: STX ENTERPRISES (21547)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-06-29
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱185,016,832.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- CONST. OF PUERTO GALERA-ABRA DE ILOG ROAD (MINDORO CIRCUMFERENTIAL RO AD), BRGY. UDALO, ABRA DE ILOG, OCC. MINDORO
- Contractor: ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958) / NGV CONSTRUCTION OPC (58077)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-06
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱186,124,000.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- CONST. OF PTO. GALERA-ABRA DE ILOG ROAD (MINDORO CIRCUMFERENTIAL ROAD ), CAMURONG SECTION, BRGY. UDALO, ABRA DE ILOG, OCC. MINDORO
- Contractor: ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958) / NGV CONSTRUCTION OPC (58077)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-06
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱186,126,656.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- CONSTRUCTION OF BRIDGE, BRGY. TABUK, STA. 000+080.00-STA. 000+140.00, SABLAYAN, OCC. MINDORO
- Contractor: MAG KONSTRUCTION & SUPPLY INC. (44604) / MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC. (5733)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-13
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱112,326,016.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COM,MUNITIES- CONST. O F COASTAL ROAD/SHORE PROTECTION ALONG BRGY. ADELA-BRGY. RUMBANG, STA. 000+0 00-STA. 000+377.63, RIZAL, OCC. MINDORO
- Contractor: STX ENTERPRISES (21547)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱231,111,248.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. IRIRON, STA. 000+000-STA. 000+38 0.50, CALINTAAN, OCC. MINDORO
- Contractor: STX ENTERPRISES (21547)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱231,004,416.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. MALAWAAN, STA. 000+000-STA. 000+ 408.42, RIZAL, OCC. MINDORO
- Contractor: STX ENTERPRISES (21547)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱231,505,920.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL ROADS/SHORE PROTECTION ALONG BRGY. NEW DAGUPAN-BRGY. POBLACION, STA. 000+429.07-STA. 000+847.35, CALINTAAN, OCC. MINDORO
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱230,868,912.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. NEW DAGUPAN, STA. 000+000-STA. 0 00+429.07, CALINTAAN, OCC. MINDORO
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱230,875,760.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. POBLACION-BRGY. IRIRON, STA. 000 +000-STA. 000+396.76, CALINTAAN, OCC. MINDORO
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱230,879,712.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRTUCTURE PROJECTS ALLEVIATING GAPS (S IPAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. O F COASTAL ROAD/SHORE PROTECTION ALONG BRGY. POBLACION, STA. 000+396.76-STA. 000+800.19, CALINTAAN, OCC. MINDORO
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱230,878,016.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. RUMBANG-BRGY. SALVACION, STA. 00 0+000-STA. 000+379.86, RIZAL, OCC. MINDORO
- Contractor: STX ENTERPRISES (21547)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱230,967,968.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. SALVACION-BRGY. MALAWAAN, STA. 0 00+000-STA. 000+395.38, RIZAL, OCC. MINDORO
- Contractor: STX ENTERPRISES (21547)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱230,847,968.00
- Contract status: On-Going Report
- BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STR UCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF R OAD DIKE/ESPLANADFE ALONG PATRICK RIVER (UPSTREAM), BRGY. SAN FRANCISCO-BRG Y. PAETAN SECTION, STA. 000+668.34-STA. 001+000 (
- Contractor: SILVERWOLVES CONSTRUCTION CORPORATION (48466)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱236,892,768.00
- Contract status: On-Going Report
- BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STR UCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF R IVERBANK PROTECTION WORKS ALONG LABANGAN RIVER (UPSTREAM), BRGY. MURTHA, ST A. 000+000-STA. 000+465.82, SAN JOSE, OCC. MINDOR
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-05-22
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱236,859,440.00
- Contract status: On-Going Report
- BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STR UCTURES PROTECTING MAJOR/STRATEGIC PUBLIC B UILDINGS/FACILITIES- CONST. OF RIVERBANK PROTECTION WORKS ALONG LABANGAN RIVER (DOWNSTREAM), BRGY. MURTHA, STA. 000+480-STA. 000+921.80, SAN JOSE, OCC. MIN
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱236,858,256.00
- Contract status: On-Going Report
- BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STR UCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF R OAD DIKE ALONG BUSUANGA RIVER, BRGY. CENTRAL-BRGY. SAN AGUSTIN, STA. 000+24 0-STA. 000+735.5 (LEFT SIDE), SAN JOSE, OCC. MIND
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465) / GROUND UP CONSTRUCTION AND SUPPLIES (42322)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱284,231,040.00
- Contract status: On-Going Report
- BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STR UCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF R OAD DIKE ALONG BUSUANGA RIVER, BRGY. BATASAN, STA. 000+000-STA. 000+473.35, SAN JOSE, OCC. MINDORO
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465) / BCV CONSTRUCTION (52490)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱284,226,528.00
- Contract status: On-Going Report
- BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STR UCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF R OAD DIKE/ESPLANADE ALONG PATRICK RIVER (UPSTREAM), BRGY. PAETAN-BRGY. TAGUM PAY, STA.01+010-STA. 001+335.99 (LEFT SIDE), SAB
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱236,860,208.00
- Contract status: On-Going Report
- BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STR UCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF R OAD DIKE/ESPLANADE ALONG PATRICK RIVER (DOWNSTREAM), BRGY. PAETAN-BRG. TAGU MPAY, STA. 001+345-STA. 001+639.06 (LEFT SIDE), S
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱236,857,840.00
- Contract status: On-Going Report
- BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STR UCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF F LOOD CONTROL STRUCTURE ALONG ABRA DE ILOG RIVER, SITIO KULI-KULI SECTION (R S), ARMADO, STA. 000+234-STA. 000+900, ABRA DE IL
- Contractor: D.T. RECIO INCORPORATED (44927)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱284,285,824.00
- Contract status: On-Going Report
- BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STR UCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUIDINGS/FACILITIES- CONST. OF RO AD DIKE ALONG BUSUANGA RIVER, BRGY. STO. NINO, STA. 000+000-STA. 000+284.32 , RIZAL, OCC. MINDORO
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱189,486,752.00
- Contract status: On-Going Report
- BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STR UCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF R OAD DIKE ALONG BUSUANGA RIVER, BRGY. STO NINO-BRGY. SAN PEDRO, STA. 000+284 .32-STA. 000+536.36, RIZAL, OCC. MINDORO
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-05-22
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱189,487,504.00
- Contract status: On-Going Report
- BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STR UCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF R OAD DIKE ALONG BUSUANGA RIVER, BRGY. SAN AGUSTIN (DOWNSTREAM), STA. 000+693 .20-STA. 000+980.09, SAN JOSE, OCC. MINDORO
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱189,484,064.00
- Contract status: On-Going Report
- BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STR UCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF R OAD DIKE ALONG BUSUANGA RIVER, BRGY. SAN AGUSTIN (UPSTREAM), STA. 000+406.9 7-STA. 000+693.20, SAN JOSE, OCC. MINDORO
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱189,488,016.00
- Contract status: On-Going Report
- BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STR UCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF R OAD DIKE ALONG BUSUANGA RIVER, BRGY. BATASAN-BRGY. CENTRAL (UPSTREAM), STA. 000+490-STA. 000+814.05, SAN JOSE, OCC. MINDORO
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱189,484,512.00
- Contract status: On-Going Report
- BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STR UCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF R OAD DIKE ALONG BUSUANGA RIVER, BRGY. BATASAN-BRGY. CENTRAL (DOWNSTREAM), ST A. 000+830-STA. 001+140.38, SAN JOSE, OCC. MINDOR
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465) / MLT CONSTRUCTION CORPORATION (59335)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱189,482,016.00
- Contract status: On-Going Report
- CONST./IMPV'T. OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY- TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM (TIKAS)- CONST. OF BARRACKS/TRAINING FACILITIES, 76IB, BRGY. PAKYAS , VICTORIA, OR. MINDORO
- Contractor: RHODIUM 688 BUILDERS, INC. (FORMERLY: STUDIO26 CONSTRUCTION INC.) (41781)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-29
- Fund source: Regular Infra - GAA 2025 CP
- Contract price: ₱139,800,736.00
- Contract status: On-Going Report
- CONST./IMPV'T. OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY- TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM (TIKAS)- CONST. OF ARMORY/TRAINING FACILITIES, 76IB BRGY. PAKYAS, V ICTORIA, OR. MINDORO
- Contractor: RHODIUM 688 BUILDERS, INC. (FORMERLY: STUDIO26 CONSTRUCTION INC.) (41781)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-29
- Fund source: Regular Infra - GAA 2025 CP
- Contract price: ₱139,789,552.00
- Contract status: On-Going Report
- CONST./IMPV'T. OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY- TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM (TIKAS)- CONST. OF BARRACKS/TRAINING FACILITIES, CHARLIE CO. 76IB, SITIO SAMPAGUITA, BRGY. SAN CARLOS, NAUJAN, OR. M
- Contractor: RHODIUM 688 BUILDERS, INC. (FORMERLY: STUDIO26 CONSTRUCTION INC.) (41781)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-29
- Fund source: Regular Infra - GAA 2025 CP
- Contract price: ₱139,858,448.00
- Contract status: On-Going Report
- BRIDGE PROGRAM- ALCATE BRIDGE (B00027MR) ALONG CSR JCT.- MINAS ROAD STA. 000+000.00-STA. 000+330.00, VICTORIA, ORIENTAL MINDORO
- Contractor: PLERM CONSTRUCTION AND DEVELOPMENT CORPORATION (33288)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 OO-1
- Contract price: ₱217,029,280.00
- Contract status: On-Going Report
- BRIDGE PROGRAM- ANINUAN BRIDGE (B00190MR) ALONG CALAPAN NORTH ROAD, STA. 0+000.00-STA. 0+035.00, PUERTO GALERA, ORIENTAL MINDORO
- Contractor: ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-10-21
- Fund source: Regular Infra - GAA 2025 OO-1
- Contract price: ₱29,234,696.00
- Contract status: On-Going Report
- BRIDGE PROGRAM- CANUBING BRIDGE (B00173MR) ALONG CALAPAN NORTH ROAD, STA. 0+000.00-STA. 0+042.00, CALAPAN, ORIENTAL MINDORO< /li>
- Contractor: ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-10-29
- Fund source: Regular Infra - GAA 2025 OO-1
- Contract price: ₱33,517,038.00
- Contract status: On-Going Report
- BRIDGE PROGRAM- CASILIGAN BRIDGE (B00028MR) ALONG CSR JC T. - POLA ROAD, POL;A, OR. MINDORO
- Contractor: NGV CONSTRUCTION OPC (58077)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-10-13
- Fund source: Regular Infra - GAA 2025 OO-1
- Contract price: ₱24,577,696.00
- Contract status: On-Going Report
- BRIDGE PROGRAM- REPLACEMENT OF PERMANENT WEAK BRIDGES- P INAGSABANGAN BR. (B00008MR) ALONG CALAPAN SOUTH ROAD, NAUJAN, OR. MINDORO
- Contractor: PLERM CONSTRUCTION AND DEVELOPMENT CORPORATION (33288)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-11-08
- Fund source: Regular Infra - GAA 2025 OO-1
- Contract price: ₱39,297,196.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. ESTRELLA-BRGY. SAN JOSE, STA. 00 0+617-STA. 001+148.6, NAUJAN, OR. MINDORO
- Contractor: HGG BUILDERS & SUPPLY (17824)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱231,095,152.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTUCTURE PROJECTS ALLEVIATING GAPS (SIP AG)- COASTAL ROADS TO AUGMENTRESILIENCY OF COASTAL COMMUNITIES- CONST. OF C OASTAL ROAD/SHORE PROTECTION ALONG ESTRELLA, STA. 000+000-STA. 000+616.85, NAUJAN, OR. MINDORO
- Contractor: HGG BUILDERS & SUPPLY (17824)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱277,163,328.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. MASAGUING, STA. 000+000-STA. 000 +333.60, NAUJAN, OR. MINDORO
- Contractor: RAYMAN BUILDERS INC., (16023)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱230,752,112.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. MELGAR A-BRGY. MELGAR B, STA. 00 0+760-STA. 001+191.26, NAUJAN, OR. MINDORO
- Contractor: ANORE CONSTRUCTION (34048) / NGV CONSTRUCTION OPC (58077)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱231,075,440.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. MELGAR A, STA. 000+000-STA. 000+ 463.95, NAUJAN, OR. MINDORO
- Contractor: E. GARCIA CONSTRUCTION CORP.(FOR. E. GARCIA CONST (7243) / VGDC CONSTRUCTION AND SUPPLY (45615)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱230,725,088.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. MELGAR B-BRGY. MASAGUING, STA. 0 01+760-STA. 002+203.20, NAUJAN, OR.MINDORO
- Contractor: STX ENTERPRISES (21547)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱230,882,144.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. MELGAR B, STA. 001+280-STA. 001+ 759.95, NAUJAN, OR. MINDORO
- Contractor: STX ENTERPRISES (21547)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱231,010,384.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. MISONG, STA. 000+000-STA. 000+34 5.83, NAUJAN, OR. MINDORO
- Contractor: RAYMAN BUILDERS INC., (16023)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-05-22
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱230,916,992.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. MONTEMAYOR, STA. 000+000-STA. 00 0+430.55, NAUJAN, OR. MINDORO
- Contractor: STX ENTERPRISES (21547)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱230,981,088.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. SAN JOSE, STA. 000+000-STA. 000+ 371.65, NAUJAN, OR. MINDORO
- Contractor: E. GARCIA CONSTRUCTION CORP.(FOR. E. GARCIA CONST (7243) / VGDC CONSTRUCTION AND SUPPLY (45615)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱231,064,912.00
- Contract status: On-Going Report
- BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STR UCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF R OAD DIKE/ESPLANADE ALONG DULANGAN RIVER, BRGY. CANUBING II, STA. 000+000-ST A. 000+305.50, CALAPAN, OR. MINDORO
- Contractor: ADSL CONSTRUCTION & TRADING (48245) / BGC20 CONSTRUCTION CORP. (58788)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱236,881,504.00
- Contract status: On-Going Report
- BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STR UCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF R OAD DIKE/ESPLANADE ALONG DULANGAN RIVER, BRGY. CANUBING II (DOWNSTREAM), ST A. 000+320-STA. 000+613.90, CALAPAN, OR. MINDORO
- Contractor: ADSL CONSTRUCTION & TRADING (48245) / BGC20 CONSTRUCTION CORP. (58788)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱236,990,880.00
- Contract status: On-Going Report
- FLOOD MANAGEMENT PROGRAM- CONST./MAINT. OF FLOOD MITIGAT ION STRUCTURES AND DRAINAGE SYSTEM- CONST. OF SLOPE PROTECTION STRUCTURE AL ONG BANABA BRIDGE, STA. 000+237.40-STA. 000+400, BUSUANGA, PALAWAN
- Contractor: JASMIG CONSTRUCTION CORPORATION (FORMERLY: JASMIG CONSTRUCTION SUPPLY) (26069)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-10-03
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱92,411,456.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR /STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF TENEGUIBAN ACCESS ROAD, S TA. 0+000.00-STA. 2+025.00; STA. 2+716.00-STA. 4
- Contractor: ELIMARED CONSTRUCTION AND TRADING INC. (45592)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱279,945,344.00
- Contract status: On-Going Report
- ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- SECO NDARY ROADS- PUERTO PRINCESA SOUTH ROAD, K0128+211-K0132+477 (INTERMITTENT SECTIONS), SOFRONIO, ESPANOLA, PALAWAN
- Contractor: NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC (17542)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-01-07
- Fund source: Regular Infra - GAA 2025 OO-1
- Contract price: ₱190,787,248.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPL E LGU JURISDICTIONS)- CONST. OF PANAS-TAGBITA DIVERSION ROAD, PACKAGE A, ST A. 0+000-STA. 2+820, BATARAZA, PALAWAN
- Contractor: IVY MICHELLE CONSTRUCTION AND TRADING INC. (FORMERLY:IVY MICHELLE TRADING & CONTRUCTION) (24093)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱279,322,016.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPL E LGU JURISDICTIONS)- CONST. OF PANAS-TAGBITA DIVERSION ROAD PACKAGE B, STA . 0+000.00-STA. 2+585.00, BATARAZA, PALAWAN
- Contractor: IVY MICHELLE CONSTRUCTION AND TRADING INC. (FORMERLY:IVY MICHELLE TRADING & CONTRUCTION) (24093)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱279,367,488.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPL E LGU JURISDICTIONS)- CONST. OF SANDOVAL-PAJO-(IGANG-IGANG)-SARONG-OCAYAN R OAD PACKAGE A, STA. 0+000.00-STA. 3+391.16, BATA
- Contractor: IVY MICHELLE CONSTRUCTION AND TRADING INC. (FORMERLY:IVY MICHELLE TRADING & CONTRUCTION) (24093)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱279,367,488.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTUCTURE PROJECTS ALLEVIATING GAPS (SIP AG)- INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)- CONST. OF SANDOVAL-PAJO-(IGANG-IGANG)-SARONG-OCAYAN RO AD, PACKAGE B, STA. 3+391.16-STA. 6+097.16, BATAR
- Contractor: IVY MICHELLE CONSTRUCTION AND TRADING INC. (FORMERLY:IVY MICHELLE TRADING & CONTRUCTION) (24093)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱279,367,488.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- CONST. OF SANDOVAL-PAJO-(IGANG-IGANG)-SARONG-OCAYAN ROAD PACKAGE C, S TA. 6+097.16-STA. 9+297.66, BATARAZA, PALAWAN
- Contractor: IVY MICHELLE CONSTRUCTION AND TRADING INC. (FORMERLY:IVY MICHELLE TRADING & CONTRUCTION) (24093)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱279,367,488.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- CONST. OF SANDOVAL-PAJO-(IGANG-IGANG)-SARONG-OCAYAN ROAD PACKAGE D, B ATARAZA, PALAWAN
- Contractor: IVY MICHELLE CONSTRUCTION AND TRADING INC. (FORMERLY:IVY MICHELLE TRADING & CONTRUCTION) (24093)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱232,806,256.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- CONST. OF SANDOVAL-PAJO-(IGANG-IGANG)-SARONG-OCAYAN ROAD PACKAGE E, B ATARAZA, PALAWAN
- Contractor: IVY MICHELLE CONSTRUCTION AND TRADING INC. (FORMERLY:IVY MICHELLE TRADING & CONTRUCTION) (24093)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱232,806,256.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- CONST. OF SANDOVAL-PAJO-(IGANG-IGANG)-SARONG-OCAYAN ROAD PACKAGE F, B ATARAZA, PALAWAN
- Contractor: KIR KONSTRUCTICON BUILDERS AND SUPPLY INC. (FORMERLY: KONSTRUCTION BUILDERS AND SUPPLY) (44545)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱232,810,704.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPL E LGU JURISDICTIONS)- CONST. OF TAGDAO-ISUGOD DIVERSION ROAD PACKAGE A, STA . 0+000-STA. 2+598, QUEZON, PALAWAN
- Contractor: AQUALINE CONSTRUCTION CORPORATION (FORMERLY: AQUALINE CONSTRUCTION) (11555) / SOLAR TRAFFIX (55553)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱232,614,992.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPL E LGU JURISDICTIONS)- CONST. OF TAGDAO-ISUGOD DIVERSION ROAD, QUEZON, PALAW AN
- Contractor: AQUALINE CONSTRUCTION CORPORATION (FORMERLY: AQUALINE CONSTRUCTION) (11555) / R8 ASPHALT PLANT AND CONSTRUCTION INC. (FORMERLY:R8 ASPHALT PLANT AND CONSTRUCTION) (46908)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱186,008,672.00
- Contract status: On-Going Report
- BRIDGE PROGRAM- LANGOGAN BRIDGE (B00201PW) ALONG PUERTO PRINCESA NORTH ROAD, PUERTO PRINCESA, PALAWAN
- Contractor: ST. TIMOTHY CONSTRUCTION CORPORATION (39196)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-09-26
- Fund source: Regular Infra - GAA 2025 OO-1
- Contract price: ₱16,559,451.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR /STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF EAST COASTAL ROAD, BRGY. BAGONG SILANG SECTION, STA. 000+446-STA. 000+660,
- Contractor: ELIMARED CONSTRUCTION AND TRADING INC. (45592)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱233,288,096.00
- Contract status: On-Going Report
- SUISTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (S IPAG)-- CONST. OF CABIGAAN-APURAWAN CROSS COUNTRY ROAD PACKAGE A, STA. 3+00 0.00-STA. 4+160.00, ABORLAN, PALAWAN
- Contractor: AQUALINE CONSTRUCTION CORPORATION (FORMERLY: AQUALINE CONSTRUCTION) (11555) / G.O.C. BUILDERS (36230)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-06-21
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱232,882,224.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- CONST. OF CABIGAAN-APURAWAN CROSS COUNTRY ROAD PACKAGE B, STA. 4+160. 00-STA. 4+860.00, ABORLAN, PALAWAN
- Contractor: KIR KONSTRUCTICON BUILDERS AND SUPPLY INC. (FORMERLY: KONSTRUCTION BUILDERS AND SUPPLY) (44545)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-06-21
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱232,806,256.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- CONST. OF CABIGAAN-APURAWAN CROSS COUNTRY ROAD PACKAGE C, ABORLAN, PA LAWAN
- Contractor: IVY MICHELLE CONSTRUCTION AND TRADING INC. (FORMERLY:IVY MICHELLE TRADING & CONTRUCTION) (24093)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-06-21
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱232,806,256.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- CONST. OF CABIGAAN-APUIRAWAN CROSS COUNTRY ROAD PACKAGE D, ABORLAN, P ALAWAN
- Contractor: AR LUSTRE CONSTRUCTION CORPORATION (FORMERLY:A.R. LUSTRE JR. CONSTRUCTION) (7680)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-06-21
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱232,564,864.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- CONSTRUCTION OF CABIGAAN-APURAWAN CROSS COUNTRY ROAD PACKAGE E, ABORL AN, PALAWAN
- Contractor: IVY MICHELLE CONSTRUCTION AND TRADING INC. (FORMERLY:IVY MICHELLE TRADING & CONTRUCTION) (24093)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-06-21
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱232,806,256.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF PALAWAN EAST COASTAL ROAD, PACKAGE A, STA. 000+000-STA. 000+219.65, PTO. P RINCESA,PALAWAN
- Contractor: ELIMARED CONSTRUCTION AND TRADING INC. (45592)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱233,288,400.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- CONST. OF PALAWAN EAST COASTAL ROAD PACKAGE B, STA. 000+220-STA. 000+ 446, PTO. PRINCESA, PALAWAN
- Contractor: ELIMARED CONSTRUCTION AND TRADING INC. (45592)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱233,529,376.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. CAMBIJANG-BRGY. POBLACION, STA. 000+748.60-STA. 001+020, CAJIDIOCAMN, ROMBLON
- Contractor: ST. PIUS CONSTRUCTION AND SUPPLY (41263)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱230,932,224.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE ALLEVIATING GAPS (SIPAG)- COA STAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. CAMBIJANG, STA. 000+398.65-STA. 000+440; STA. 000+520-STA. 000+740, CAJIDIOCAN, SIBUYAN IS
- Contractor: ST. PIUS CONSTRUCTION AND SUPPLY (41263)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱230,914,240.00
- Contract status: On-Going Report
- CONST./IMPV'T. OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY- TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PRIOGRAM (TIKAS)- CONST. OF BARRACKS/TRAINING FACILITIES, ALPHA CO. 76IB, B RGY. MALAMIG, GLORIA, OR. MINDORO
- Contractor: RHODIUM 688 BUILDERS, INC. (FORMERLY: STUDIO26 CONSTRUCTION INC.) (41781)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-29
- Fund source: Regular Infra - GAA 2025 CP
- Contract price: ₱139,803,648.00
- Contract status: On-Going Report
- FLOOD MANAGEMENT PROGRAM- CONST./REHAB. OF FLOOD MITIGAT ION FACILITIES WITHIN RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CO NTROL STRUCTURE, BONGABONG RIVER, BRGY. LISAP-BRGY. BATANGAN (UPSTREAM), ST A. 000+330-STA. 000+649.50, BONGABONG, OR. MINDOR
- Contractor: JJPR CONSTRUCTION SERVICES (53478)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-06
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱231,473,808.00
- Contract status: On-Going Report
- FLOOD MANAGEMENT PROGRAM- CONST./REHAB. OF FLOOD MITIGAT ION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FL OOD CONTROL STRUCTURE, BONGABONG RIVER, BRGY. LISAP-BRGY. BATANGAN (DOWNSTR EAM), STA. 000+680-STA. 000+995.85, BONGABONG, O.
- Contractor: JIIK CONSTRUCTION SERVICES (50966)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-06
- Fund source: Regular Infra - GAA 2025 OO-2
- Contract price: ₱231,114,688.00
- Contract status: On-Going Report
- CONST./IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY- TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURI DAD PROGRAM (TIKAS)- CONST. OF MARITIME POLICE COMMAND REGIONAL HQ (LUZON) OFFICE, BONGABONG, ORIENTAL MINDORO
- Contractor: RHODIUM 688 BUILDERS, INC. (FORMERLY: STUDIO26 CONSTRUCTION INC.) (41781)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-23
- Fund source: Regular Infra - GAA 2025 CP
- Contract price: ₱33,408,580.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- COASTAL ROADS TO AUGMENT RESILENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. AGSALIN, STA. 000+000-STA. 000+35 4.96, GLORIA, OR. MINDORO
- Contractor: JIIK CONSTRUCTION SERVICES (50966)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱231,567,792.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. ANILAO, STA. 000+000-STA. 000+35 4.06 (RIGHT SIDE), BONGABONG, OR. MINDORO
- Contractor: ALRIE CONSTRUCTION SERVICES (54139)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱231,173,456.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNTIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. BULAKLAKAN, STA. 000+860-STA. 001 +237.91, GLORIA, OR. MINDORO
- Contractor: D.T. RECIO INCORPORATED (44927)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱231,074,560.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. DEL RAZON-BRGY. BULAKLAKAN, STA. 000+390-STA. 000+540; STA. 000+640-STA. 000+846.
- Contractor: D.T. RECIO INCORPORATED (44927)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱231,449,104.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. DEL RAZON, STA. 000+000-STA. 000 +371.35, GLORIA, OR. MINDORO
- Contractor: D.T. RECIO INCORPORATED (44927)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱231,270,352.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. PROPER, STA. 000+000-STA. 000+36 8.64, BANSUD, OR. MINDORO
- Contractor: GOLDEN J'S CONSTRUCTION SERVICES (51135)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱231,451,056.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. PROPER, TIGUISAN, STA. 000+000-S TA. 000+375, BANSUD, OR. MINDORO
- Contractor: ALRIE CONSTRUCTION SERVICES (54139)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱231,112,704.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. QUINABIGAN, STA. 000+000-STA. 00 0+338.50, PINAMALAYAN, OR. MINDORO
- Contractor: D.T. RECIO INCORPORATED (44927)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱231,188,176.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. SALCEDO, STA. 000+229-STA. 000+5 80 (RIGHT SIDE), BANSUD, OR. MINDORO
- Contractor: NEW RICH GENERAL CONTRACTOR SERVICES & TRADING CO. INC. (27629)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱231,245,472.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. TAMBONG, STA. 000 3D000-STA. 000 +332.94, GLORIA, OR. MINDORO
- Contractor: GOLDEN J'S CONSTRUCTION SERVICES (51135)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-31
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱231,212,864.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- REHABILITATION OF PALANGAN CIRCUMFERENTIAL ROAD, STA. 0+000.00-STA. 2 +008.00, PTO. GALERA, ORIENTAL MINDORO
- Contractor: HPC CONSTRUCTION AND SERVICES CORPORATION (58153)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-11
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱93,076,288.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- REHABILITATION OF ROAD, LALAGUNA, SABANG, PTO. GALERA, STA. 0+000.00- STA. 0+247.00; STA. 0+000.00-STA. 0+447.30; STA. 0+000.00-STA. 2+305.70, PT O. GALERA, OR. MINDORO
- Contractor: HPC CONSTRUCTION AND SERVICES CORPORATION (58153)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-12-04
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱93,161,664.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- REHABILITATION OF ROAD, LIBTONG, BALATERO, PTO. GALERA, STA. 0+000.00 -STA. 2+097.00, ORIENTAL MINDORO
- Contractor: HPC CONSTRUCTION AND SERVICES CORPORATION (58153)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-11
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱92,942,840.00
- Contract status: On-Going Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG)- REHABILITATION OF ROAD, SINANDIGAN, STA. 0+000.00-STA. 2+835.00, PUER TO GALERA, OR. MINDORO
- Contractor: HPC CONSTRUCTION AND SERVICES CORPORATION (58153)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-02-11
- Fund source: Regular Infra - GAA 2025 SSP
- Contract price: ₱93,132,784.00
- Contract status: On-Going Report
- BRIDGE PROGRAM- KAINGARAN BRIDGE (B00117PW) ALONG PTO. P RINCESA SOUTH ROAD, BROOKE'S POINT, PALAWAN
- Contractor: PALBIC CONSTRUCTION AND SUPPLY (42744)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2026-03-18
- Fund source: Regular Infra - GAA 2025 OO-1
- Contract price: ₱51,621,200.00
- Contract status: On-Going Report
- CONST./IMPV'T. OF ACCESS ROADS LEADING TO DECLARED TOURI SM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM- TRIP)- ACCESS ROAD LE ADING TO CANDIS RIVER POOLS, BRGY. RANSANG, RIZAL, PALAWAN
- Contractor: AR LUSTRE CONSTRUCTION CORPORATION (FORMERLY:A.R. LUSTRE JR. CONSTRUCTION) (7680)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-12-15
- Fund source: Regular Infra - GAA 2025 CP
- Contract price: ₱48,772,488.00
- Contract status: On-Going Report
- CONST. OF RAINWATER COLLECTION SYSTEM (RWCS) AT SAN VICE NTE CENTRAL SCHOOL, SAN VICENTE NAT'L. HIGH SCHOOL, PORT BARTON ELEM. SCHOO L, NEW AGUTAYA ELEM. SCHOOL, TRANQUILINO L. OBLAN ELEM. SCHOOL, ALIMANGUAN ELEM. SCHOOL, ALIMANGUAN NAT'L. HIGH SCHOOL, NEW
- Contractor: ASHLEYKA CONSTRUCTION AND SUPPLIES (41140)
- Implementing Agency: Region IV-B - Region IV-B
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-10-20
- Fund source: Regular Infra - GAA 2025 LS Itemization
- Contract price: ₱8,650,261.00
- Contract status: On-Going Report