This page lists public infrastructure projects implemented by Region IV-B - Romblon District Engineering Office in Region IV-B during 2017. All data are sourced from the Department of Public Works and Highways (DPWH) official database (as of 9/30/2025): https://www.dpwh.gov.ph/dpwh/projects/infrastructure
This information is shared to promote transparency and public awareness. We encourage visitors to validate project details using the official DPWH source. In case of discrepancies, please refer to the original records published by the DPWH.
| Contractor | Projects | Total Price |
|---|---|---|
| ED1SON DEVELOPMENT & CONSTRUCTION INC. (2400) | 6 | ₱189,095,695.00 |
| MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC. (5733) | 2 | ₱165,481,248.00 |
| ARKY CONSTRUCTION AND SUPPLY (32692) | 2 | ₱160,535,800.00 |
| LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465) | 7 | ₱160,533,220.12 |
| ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762) | 3 | ₱129,071,364.00 |
- CONSTRUCTION OF 1 EVACUATION CENTER, DAPAWAN, ODIONGAN, ROMBLON
- Contractor: TWIN DRAGON CONSTRUCTION (11392)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2018-01-02
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱11,234,094.00
- Contract status: Completed Report
- CONSTRUCTION OF 1 EVACUATION CENTER, DAPAWAN, ODIONGAN, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2018-06-01
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱22,398,198.00
- Contract status: Completed Report
- ROAD UPGRADING (UNPAVED TO PAVED) OF SIBUYAN CIRCUMFERENT IAL ROAD, SIBUYAN, ROMBLON (K0082+297-K0084+943; K0085+092-K0087+042)
- Contractor: ARKY CONSTRUCTION AND SUPPLY (32692)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2018-01-28
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱84,912,464.00
- Contract status: Completed Report
- ROAD UPGRADING (UNPAVED TO PAVED) OF PARPAGOHA (MARIGONDO N)-BINOOG ROAD K0023+585-K0025+741, TABLAS, ROMBLON
- Contractor: ED1SON DEVELOPMENT & CONSTRUCTION INC. (2400)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2018-03-31
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱96,477,424.00
- Contract status: Completed Report
- CONST/REPAIR/REHABILITATION/IMPROVEMENT OF SABLAYAN-AGNAG A-CALABOGO ROAD STA.18+730-STA.20+081.40; STA.20+517.40-STA.20+950.40; STA. 22+317.60-STA.23+329.00, ROMBLON, ROMBLON
- Contractor: ARKY CONSTRUCTION AND SUPPLY (32692)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2018-01-14
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱75,623,336.00
- Contract status: Completed Report
- CONSTRUCTION OF CAMBAJAO RIVER CONTROL, CAJIDIOCAN, ROMB LON LD
- Contractor: ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762) / R.G. FLORENTINO CONST. & TRADING INC. (18301)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2017-10-22
- Fund source: Regular Infra - GAA 2017 MFO-2
- Contract price: ₱37,974,872.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ALONG SIBUYAN CIRCUMFERENTIAL ROAD, K0031 + 733 - K0031 + 979 (AS PER RBIA ), K0031 + 730 - K0031 + 973.10 (AS PER SURVEY), SIBUYAN ISLAND, ROMBLON
- Contractor: CSR CONSTRUCTION & SUPPLY (14427)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2017-07-13
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱4,523,373.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD AT SITIO LUMBIA, BRGY. LIMON NORTE, LOOC, ROMBLON
- Contractor: PABLO S. LABASBAS CONSTRUCTION CORPORATION (FORMERLY: PABLOS. LABASBAS CONSTRUCTION CORPORATION) (6302)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2017-04-07
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,931,212.75
- Contract status: Completed Report
- CONSTRUCTION OF DANAO RIVER CONTROL, CAJIDIOCAN, ROMBLON LD
- Contractor: PROTECH CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY (15408) / MT. GUITING-GUITING CONSTRUCTION (17412)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2017-11-07
- Fund source: Regular Infra - GAA 2017 MFO-2
- Contract price: ₱38,219,924.00
- Contract status: Completed Report
- REHABILITATION OF PUNONG RIVER CONTROL ALONG, SIBUYAN CI RCUMFERENTIAL ROAD, ESPA C3 91A, SAN FERNANDO, ROMBLON LD
- Contractor: SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC. (25226)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2017-11-29
- Fund source: Regular Infra - GAA 2017 MFO-2
- Contract price: ₱38,013,768.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ALONG TUGDAN AIRPORT ROAD, CHAINAGE 194 - CHAINAGE 716 (AS PER RBIA), K000 0 + 173.87 - K0000 + 718.67 (AS PER SURVEY), TABLAS ISLAND, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2017-07-18
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱11,607,677.00
- Contract status: Completed Report
- CONSTRUCTION OF PROGRESO WESTE ROAD, BRGY. PROGRESO WEST E, ODIONGAN, ROMBLON
- Contractor: PABLO S. LABASBAS CONSTRUCTION CORPORATION (FORMERLY: PABLOS. LABASBAS CONSTRUCTION CORPORATION) (6302)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2017-05-05
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱4,845,589.50
- Contract status: Completed Report
- CONSTRUCTION OF ROAD AT BRGY. MANGASAG, CORCUERA, ROMBLO N
- Contractor: MGM PADOR CORPORATION (FORMERLY: MA. GINA M. PADOR CONSTRUCTION) (25600)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2017-05-13
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,938,419.88
- Contract status: Completed Report
- CONSTRUCTION OF NEW PERMANENT BRIDGES WINCEL BR. ALONG S IBUYAN CIRCUMFERENTIAL ROAD, SIBUYAN ISLAND, ROMBLON
- Contractor: ED1SON DEVELOPMENT & CONSTRUCTION INC. (2400)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2018-01-19
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱16,736,747.00
- Contract status: Completed Report
- REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, CULASI -AN BR. (B00024SY) ALONG SIBUYAN CIRCUMFERENTIAL ROAD, MAGDIWANG, ROMBLON
- Contractor: TWIN DRAGON CONSTRUCTION (11392)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2017-06-04
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱5,703,439.00
- Contract status: Completed Report
- CONSTRUCTION OF CALAGONSAO ROAD, BRGY. CALAGONSAO, ALCAN TARA, ROMBLON
- Contractor: TWIN DRAGON CONSTRUCTION (11392)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2017-05-27
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱5,000,000.00
- Contract status: Completed Report
- REHABILITATION OF OTOD RIVER CONTROL ALONG SIBUYAN CIRCU MFERENTIAL ROAD, SAN FERNANDO, ROMBLON LD
- Contractor: MGM PADOR CORPORATION (FORMERLY: MA. GINA M. PADOR CONSTRUCTION) (25600) / LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2017-09-07
- Fund source: Regular Infra - GAA 2017 MFO-2
- Contract price: ₱24,963,322.00
- Contract status: Completed Report
- OFF - CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE OF LUBI - BINOOG ROAD, K0059 + (-1034) - K0059 + 166 AS PER RBIA, K0057 + 966 - K0 059 + 166 AS PER SURVEY, SAN AGUSTIN, ROMBLON
- Contractor: ROLCO CONSTRUCTION & DEVELOPMENT CORPORATION ( FOR (29686)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2017-07-11
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱9,602,481.00
- Contract status: Completed Report
- REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, CANLUW AY BR. (B00026SY) ALONG SIBUYAN CIRCUMFERENTIAL ROAD, CAJIDIOCAN, ROMBLON
- Contractor: ULTIMATE BUILDER'S & CONST. SUPPLY (39221)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2017-06-01
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱2,418,657.00
- Contract status: Completed Report
- OFF - CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE ALONG B ATIANO - POCTOY RD,CHAINAGE 0 - CHAINAGE 190 (AS PER RBIA)K0000 + 065.59 - K0000 + 172.59 (AS PER ACTUAL), TABLAS ISLAND, ROMBLON
- Contractor: MGM PADOR CORPORATION (FORMERLY: MA. GINA M. PADOR CONSTRUCTION) (25600)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2017-05-26
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱1,920,287.75
- Contract status: Completed Report
- REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, PILI B R. (B00035SY) ALONG SIBUYAN CIRCUMFERENTIAL ROAD, SAN FERNANDO, ROMBLON < /span>
- Contractor: MGM PADOR CORPORATION (FORMERLY: MA. GINA M. PADOR CONSTRUCTION) (25600)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2017-05-21
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱1,913,613.75
- Contract status: Completed Report
- REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, TORREL BR. (B00009TL) ALONG TABLAS CIRCUMFERENTIAL ROAD, ODIONGAN, ROMBLON
- Contractor: TWIN DRAGON CONSTRUCTION (11392)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2017-07-06
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱1,901,121.75
- Contract status: Completed Report
- REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, POCTOY BR. (B00010TL) ALONG TABLAS CIRCUMFERENTIAL ROAD, ODIONGAN, ROMBLON
- Contractor: R N V CONSTRUCTION (12570)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2017-05-04
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱960,277.69
- Contract status: Completed Report
- REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, BINONG AAN BR. (B00055TL) ALONG TABLAS CIRCUMFERENTIAL ROAD, SAN AGUSTIN, ROMBLON
- Contractor: ULTIMATE BUILDER'S & CONST. SUPPLY (39221)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2017-06-03
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱1,440,596.00
- Contract status: Completed Report
- REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, BARIRI BR. 1 (B00050TL) ALONG TABLAS CIRCUMFERENTIAL ROAD, FERROL, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2017-07-26
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱1,383,187.12
- Contract status: Completed Report
- REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, BALOGO BR. (B00024TL) ALONG TABLAS CIRCUMFERENTIAL ROAD, CALATRAVA, ROMBLON
- Contractor: ULTIMATE BUILDER'S & CONST. SUPPLY (39221)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2017-06-05
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱1,440,577.62
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION OF DAMAGED PAVED ALONG TAB LAS CIRCUMFERENTIAL ROADK0001 + 252 - K0001 + 570 (ACTUAL)/K0001 + 243 - K0 001 + 477 (RBIA),K0002 + 203 - K0002 + 609 (ACTUAL)/K0002 + 201 - K0002 + 7 00 (RBIA)/K0002 + 778 - K0003 + 348.36, TABLA
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2017-11-25
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱38,809,536.00
- Contract status: Completed Report
- CONSTRUCTION OF NEW PERMANENT BRIDGES DIEGO SALVADOR BR. ALONG SIBUYAN CIRCUMFERENTIAL ROAD, SIBUYAN ISLAND, ROMBLON
- Contractor: ED1SON DEVELOPMENT & CONSTRUCTION INC. (2400)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2018-01-19
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱16,714,436.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO AMBUL ONG PORT, MAGDIWANG, ROMBLON LONE DISTRICT
- Contractor: MT. GUITING-GUITING CONSTRUCTION (17412)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2017-05-12
- Fund source: Regular Infra - GAA 2017 MFO-3
- Contract price: ₱2,496,829.00
- Contract status: Completed Report
- REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, MARIGO NDON BR. (B00028SY) ALONG SIBUYAN CIRCUMFERENTIAL ROAD, MARIGONDON, CAJIDIO CAN, ROMBLON
- Contractor: TWIN DRAGON CONSTRUCTION (11392)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2017-04-27
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱963,848.38
- Contract status: Completed Report
- REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, BUENAV ISTA BR. (B00051TL) ALONG TABLAS CIRCUMFERENTIAL ROAD, LOOC, ROMBLON
- Contractor: MT. GUITING-GUITING CONSTRUCTION (17412)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2017-04-29
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱964,101.94
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, BRGY. CANDUYON G, ODIONGAN, ROMBLON
- Contractor: ULTIMATE BUILDER'S & CONST. SUPPLY (39221)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2017-09-20
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱7,398,449.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, BRGY. BONLAO, ALCANTARA, ROMBLON
- Contractor: EMQ DESIGN & CONSTRUCTION (16128)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2017-10-01
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱7,423,090.50
- Contract status: Completed Report
- REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, HINUGU SAN BR. (B00032TL) ALONG TABLAS CIRCUMFERENTIAL ROAD, SAN AGUSTIN, ROMBLON< /span>
- Contractor: ULTIMATE BUILDER'S & CONST. SUPPLY (39221)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2017-05-09
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱960,398.00
- Contract status: Completed Report
- REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, SILUM BR. (B00008SY) ALONG SIBUYAN CIRCUMFERENTIAL ROAD, MAGDIWANG, ROMBLON
- Contractor: MT. GUITING-GUITING CONSTRUCTION (17412)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2017-05-02
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱970,141.44
- Contract status: Completed Report
- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG TABLAS CIRCUMFERENTIAL ROAD,K0084 + 000 - K0090 + 210, K0120 + 920 - K00124 + 010.00, K0128 + 000 - K0129 + 020 (AS PER RBIA), TABLAS ISLAND, ROMBLON< /span>
- Contractor: MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC. (5733)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2018-08-06
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱84,059,992.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ALONG TABLAS CIRCUMFERENTIAL ROAD, K0035 + 672 - K0036 + 458/K0072 + 800 - K0072 + 900/K0084 + 315 - K0084 + 562/K0098 + 000 - K0098 + 128.50/K0114 + 000 - K0114 + 300/K0115 + 200 - K0115 + 360/K011
- Contractor: MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC. (5733)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2018-05-29
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱81,421,256.00
- Contract status: Completed Report
- CONSTRUCTION/COMPLETION OF BACHAWAN - KABALIWAN ROAD, SA N AGUSTIN, ROMBLON
- Contractor: MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC. (5733) / R N V CONSTRUCTION (12570)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2017-12-19
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱88,791,048.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLI PS ALONG ODIONGAN - EAST - WEST ROAD, K0005 + 000 - K0006 + 000, TABLAS ISL AND, ROMBLON
- Contractor: ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2017-12-27
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱59,491,248.00
- Contract status: Completed Report
- OFF - CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE ALONG R OMBLON - COGON - SABLAYAN ROAD, K0001 + 300 - K0004 + 600 (AS PER RBIA), K0 001 + 287.70 - K0001 + 989.00, K0002 + 000 - K0004 + 700.00, K0006 + 559.00 - K0007 + 000, K0007 + 146.00, K0007 + 280.00 (A
- Contractor: ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2017-11-12
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱45,570,116.00
- Contract status: Completed Report
- OFF - CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE ALONG S IBUYAN CIRCUMFERENTIAL ROAD, K0014 + 878.40 - K0015 + 680,K0015 + 680 - K00 16 + 000,K0016 + 000 - K0016 + 515, K0016 + 715 - K0016 + 900, K0017 + 410 - K0017 + 983, K0018 + 180 - K0018 + 240, K00
- Contractor: MGM PADOR CORPORATION (FORMERLY: MA. GINA M. PADOR CONSTRUCTION) (25600) / LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2018-02-01
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱42,133,800.00
- Contract status: Completed Report
- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG ODIONGAN - EAST - WEST ROAD, K0004 + 000 - K0004 + 200, K0004 + 480 - K00 04 + 597.79K0006 + 674.64 - K0007 + 508.50, K0007 + 931 - K0008 + 186.91 (A S PER RBIA), K0004 + 000 -K0004 + 220K00
- Contractor: ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762) / TWIN DRAGON CONSTRUCTION (11392)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2018-02-21
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱42,830,200.00
- Contract status: Completed Report
- REHABILITATION OF SLOPE PROTECTION ALONG TABLAS CIRCUMFE RENTIAL ROAD, K0080 + 000 + K0082 + 000, CONCEPCION SUR, STA.MARIA, ROMBLON LD
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2018-01-15
- Fund source: Regular Infra - GAA 2017 MFO-2
- Contract price: ₱34,068,384.00
- Contract status: Completed Report
- REHABILITATION OF SLOPE PROTECTION ALONG ROMBLON - COGON - SABLAYAN ROAD, K0002 + 000 - K0005 + 000, LI-O, ROMBLON
- Contractor: MGM PADOR CORPORATION (FORMERLY: MA. GINA M. PADOR CONSTRUCTION) (25600) / LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2018-01-08
- Fund source: Regular Infra - GAA 2017 MFO-2
- Contract price: ₱29,679,542.00
- Contract status: Completed Report
- CONSTRUCTION OF AGBULUTO - TOMINHOK - LAMAO ROAD, ROMBLO N, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2017-09-25
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱27,168,438.00
- Contract status: Completed Report
- REHABILITATION OF SLOPE PROTECTION ALONG SIBUYAN CIRCUMF ERENTIAL ROAD, K0083 + 000 - K0085 + 000, CAJIDIOCAN, ROMBLON LD
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2017-10-30
- Fund source: Regular Infra - GAA 2017 MFO-2
- Contract price: ₱25,097,800.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, BRGY. MANGANSA G, CORCUERA, ROMBLON
- Contractor: TWIN DRAGON CONSTRUCTION (11392)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2017-11-16
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱7,540,762.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, BRGY. ALIBAGON , CAJIDIOCAN, ROMBLON
- Contractor: R.G. FLORENTINO CONST. & TRADING INC. (18301)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2017-10-20
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱7,326,786.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, BRGY. VICTORIA , SAN ANDRES, ROMBLON
- Contractor: R.G. FLORENTINO CONST. & TRADING INC. (18301)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2017-10-07
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱7,321,369.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (MUNICIPAL HALL ), BRGY. POBLACION, FERROL, ROMBLON
- Contractor: R.G. FLORENTINO CONST. & TRADING INC. (18301)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2017-05-23
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,947,464.88
- Contract status: Completed Report
- CONSTRUCTION OF 3 - UNIT CLASSROOM BUILDING, BRGY. LIMON NORTE, LOOC, ROMBLON
- Contractor: MT. GUITING-GUITING CONSTRUCTION (17412)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2017-08-07
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,940,409.25
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE CENTER, BRGY. BUDIONG, O DIONGAN, ROMBLON
- Contractor: PABLO S. LABASBAS CONSTRUCTION CORPORATION (FORMERLY: PABLOS. LABASBAS CONSTRUCTION CORPORATION) (6302)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2017-08-07
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,920,189.88
- Contract status: Completed Report
- IMPROVEMENT OF PUBLIC MARKET, BRGY. DAPAWAN, ODIONGAN, R OMBLON
- Contractor: R N V CONSTRUCTION (12570)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2017-05-24
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱970,103.12
- Contract status: Completed Report
- OFF - CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE ALONG T ABLAS CIRCUMFERENTIAL ROAD, K0003 + 348 - K0003 + 722.01, K0003 + 851.50 - K0005 + 824, K0081 + 968 - K0082 + 382 (AS PER RBIA) K0003 + 348 - K0003 + 722.01, K0003 + 854.50 - K0005 + 824, K0081 +
- Contractor: ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2017-10-30
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱24,010,000.00
- Contract status: Completed Report
- CONSTRUCTION OF NEW PERMANENT BRIDGES MABINI NAP - LEON BRIDGE ALONG SIBUYAN CIRCUMFERENTIAL ROAD, SIBUYAN ISLAND, ROMBLON
- Contractor: ED1SON DEVELOPMENT & CONSTRUCTION INC. (2400)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2018-02-08
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱19,456,424.00
- Contract status: Completed Report
- CONSTRUCTION OF NEW PERMANENT BRIDGES ESPANA ANCHETA BRI DGE ALONG SIBUYAN CIRCUMFERENTIAL ROAD, SIBUYAN ISLAND, ROMBLON
- Contractor: ED1SON DEVELOPMENT & CONSTRUCTION INC. (2400)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2018-02-08
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱20,460,136.00
- Contract status: Completed Report
- CONSTRUCTION OF NEW PERMANENT BRIDGES - AGTIJUTRAO BRIDG E ALONG SIBUYAN CIRCUMFERENTIAL ROAD, SIBUYAN ISLAND, ROMBLON
- Contractor: ED1SON DEVELOPMENT & CONSTRUCTION INC. (2400)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2017-12-10
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱19,250,528.00
- Contract status: Completed Report
- IMPROVEMENT OF BARANGAY HEALTH CENTER IN PROGRESO ESTE, ODIONGAN, ROMBLON
- Contractor: MT. GUITING-GUITING CONSTRUCTION (17412)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2017-07-20
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱980,294.62
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF MULTI - PURPOSE BUILDING (LIGA NG MGA BARANGAY BUILDING), BRGY. ROMBLON, ROMBLON
- Contractor: MGM PADOR CORPORATION (FORMERLY: MA. GINA M. PADOR CONSTRUCTION) (25600)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2017-09-08
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,895,587.75
- Contract status: Completed Report