Infrastructure Projects in Region IV-B — Region IV-B - Romblon District Engineering Office, 2019
This page lists public infrastructure projects implemented by Region IV-B - Romblon District Engineering Office in Region IV-B during 2019. All data are sourced from the Department of Public Works and Highways (DPWH) official database (as of 9/30/2025): https://www.dpwh.gov.ph/dpwh/projects/infrastructure
This information is shared to promote transparency and public awareness. We encourage visitors to validate project details using the official DPWH source. In case of discrepancies, please refer to the original records published by the DPWH.
| Contractor | Projects | Total Price |
|---|---|---|
| LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465) | 23 | ₱818,873,448.00 |
| SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) (15906) | 6 | ₱454,163,760.00 |
| E.R. DELA CRUZ CONSTRUCTION & SUPPLY (32158) | 11 | ₱440,448,034.00 |
| MT. GUITING-GUITING CONSTRUCTION (17412) | 10 | ₱130,166,899.00 |
| ROLCO CONSTRUCTION & DEVELOPMENT CORPORATION ( FOR (29686) | 3 | ₱127,564,468.00 |
- PREVENTIVE MAINTENANCE (TERTIARY) - LOOC(COGON TULAY) - ODIONGAN ROAD, TABLAS ISLAND, ROMBLON
- Contractor: SUN RAYS BUILDERS & GENERAL SUPPLY (19995)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-08-13
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱1,748,287.25
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTIO N OF SAWANG FLOOD CONTROL STRUCTURE ALONG ROMBLON-COGON-SABLAYAN CIRCUMFERE NTIAL ROAD, K0000 + 030.50 - K0000 + 087.19 (SECTION 1), K0000 + 087.19 - K 0000 + 106.19 (SECTION 2), SAWANG, ROMBLON
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-09-01
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱4,331,886.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG SIBUYAN CIRCUMFERENTIAL ROAD, K0078 + 633 - K0078 + 977.50 (AS PER ACTUAL & RBIA), SIBUYAN ISLAND, ROMBLON
- Contractor: MT. GUITING-GUITING CONSTRUCTION (17412)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-09-04
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱6,734,649.50
- Contract status: Completed Report
- PREVENTIVE MAINTENANCE (SECONDARY ROADS) - SIBUYAN CIRCU MFERENTIAL ROAD,K0087 + 420 - K0087 + 960 (ACTUAL & RBIA), SIBUYAN ISLA ND, ROMBLON
- Contractor: MT. GUITING-GUITING CONSTRUCTION (17412)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-09-22
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱8,368,326.00
- Contract status: Completed Report
- PREVENTIVE MAINTENANCE (TERTIARY) - JCT. GUINHAYAAN - MA LBOG PORT ROAD, TABLAS ISLAND, ROMBLON
- Contractor: MT. GUITING-GUITING CONSTRUCTION (17412)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-10-23
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱11,442,782.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTIO N OF PILI FLOOD CONTROL STRUCTURE ALONG SIBUYAN CIRCUMFERENTIAL ROAD, STA. 00 + 195.25 - STA. 00 + 340.00 (B/S), SIBUYAN ISLAND, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-01-17
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱20,169,140.00
- Contract status: Completed Report
- PREVENTIVE MAINTENANCE (SECONDARY ROAD) - TABLAS CIRCUMF ERENTIAL ROADK0066 + 590.30 - K0067 + 247.80, K0103 + 099.30 - K0104 + 020 (RBIA), K0066 + 592.30 - K0067 + 247.80, K0103 + 087.30 - K0104 + 020 (ACTU AL), TABLAS ISLAND, ROMBLON
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-02-27
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱26,440,124.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTIO N OF AGUTAY FLOOD CONTROL STRUCTURE STA. 00 + 369.50 - STA. 00 + 575.47 (B/ S), MAGDIWANG, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-02-25
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱27,640,410.00
- Contract status: Completed Report
- PAVING OF UNPAVED ROADS ALONG SIBUYAN CIRCUMFERENTIAL RO AD, K0050 + 624.20 - K0051 + 317, K0072 + 675 - K0074 + 001.90 (AS PER ACTU AL)K0050 + 635.20 - K0051 + 317, K0072 + 675 - K0073 + 990.90 (AS PER RBIA) , SIBUYAN ISLAND, ROMBLON
- Contractor: MT. GUITING-GUITING CONSTRUCTION (17412)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-01-08
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱38,651,440.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTIO N OF LIBERTAD RIVER CONTROL, STA. 0 + 000 - STA. 0 + 266.00 (R/S), STA. 0 + 180 - STA. 0 + 240 (L/S), LIBERTAD, ODIONGAN, ROMBLON
- Contractor: E.R. DELA CRUZ CONSTRUCTION & SUPPLY (32158)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-03-12
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱37,617,460.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTIO N OF TUBURAN RIVER CONTROL, STA. 0 + 963.60 - STA. 0 + 384.40(R/S), TUBURAN , ODIONGAN, ROMBLON
- Contractor: E.R. DELA CRUZ CONSTRUCTION & SUPPLY (32158)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-03-12
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱38,307,608.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTIO N OF BUDIONG RIVER CONTROL, STA. 0 + 000 - STA. 0 + 334 (R/S), BUDIONG, ODI ONGAN, ROMBLON
- Contractor: E.R. DELA CRUZ CONSTRUCTION & SUPPLY (32158)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-07-10
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱38,364,184.00
- Contract status: Completed Report
- REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - BITAO GAN BR. (B00036TL) ALONG TABLAS CIRCUMFERENTIAL ROAD, K0070 + 760 - K0070 + 778, TABLAS ISLAND, ROMBLON
- Contractor: TRIPLE PEAK MOUNTAIN CONSTRUCTION & SUPPLY (43000)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-08-28
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱1,537,242.12
- Contract status: Completed Report
- REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - DAPAW AN BR. (B00054TL) ALONG DAPAWAN - TORREL ROAD, K0001 + 863 - K0001 +971, TA BLAS ISLAND, ROMBLON
- Contractor: TWIN DRAGON CONSTRUCTION (11392)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-09-05
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱5,059,678.00
- Contract status: Completed Report
- REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - COGON BR. (B00040TL) ALONG LOOC (COGON) ROAD, K0114 + 039 - K0114 + 062.50, TAB LAS ISLAND, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-10-05
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱6,136,787.50
- Contract status: Completed Report
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGE - BONLAO BR. (B00003TL) ALONG TABLAS CIRCUMFERENTIAL ROAD, K0087 + 873 - K0087 + 892 , TABLAS ISLAND, ROMBLON
- Contractor: ULTIMATE BUILDER'S & CONST. SUPPLY (39221)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-09-15
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱6,749,004.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (COVERED COURT/ EVACUATION CENTER), PROGRESO WESTE, ODIONGAN, ROMBLON
- Contractor: EMQ DESIGN & CONSTRUCTION (16128)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-11-30
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱6,930,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (COVERED COURT/ EVACUATION CENTER), POBLACION, LOOC, ROMBLON
- Contractor: EMQ DESIGN & CONSTRUCTION (16128)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-11-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱7,425,000.00
- Contract status: Completed Report
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGE - LINAWAN BR. (B00022TL) ALONG TABLAS CIRCUMFERENTIAL ROAD, K0021 + 914 - K0021 + 94 4.50, TABLAS ISLAND, ROMBLON
- Contractor: ALPHATEC CHEMICAL CORPORATION (39938)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-10-09
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱9,083,108.00
- Contract status: Completed Report
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGE - CANTING AS BR. 3 (B00009SY) ALONG SIBUYAN CIRCUMFERENTIAL ROAD, K0020 + 862 - K0020 + 922, SIBUYAN ISLAND, ROMBLON
- Contractor: ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-09-08
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱9,638,843.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG TABLAS CIRCUMFERENTIAL ROAD, K0001 + 477 - K0002 +186 (AS PER RBIA), K0001 + 477 - K0002 +119.44 (AS PER SURVEY), TABLAS ISLAND, ROMBLON
- Contractor: TWIN DRAGON CONSTRUCTION (11392)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-01-27
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱21,542,662.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG DAPAWAN - TORREL ROAD, K0001 + 074 - K0001 + 863, TABLAS ISLAN D, ROMBLON
- Contractor: SIM CONSTRUCTION, TRADING AND SERVICES (42329)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-02-01
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱24,499,854.00
- Contract status: Completed Report
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGE - TAGUILO S BR. 2 (B00030SY) ALONG SIBUYAN CIRCUMFERENTIAL ROAD, K0021 + 914 - K0021 + 944.5, SIBUYAN ISLAND, ROMBLON
- Contractor: ULTIMATE BUILDER'S & CONST. SUPPLY (39221)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-10-30
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱19,647,970.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTIO N OF MAYHA RIVER CONTROL, STA. 00 + 376.80 - STA. 00 + 735.60 (L/S) (AS PER SURVEY), MAYHA, ODIONGAN, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-03-02
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱38,181,124.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTIO N OF TABOBO-AN RIVER CONTROL, STA. 00 + 018 - STA. 00 + 376.80 (L/S) (AS PE R SURVEY), TABOBO - AN, ODIONGAN, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-03-02
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱38,360,096.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG TABLAS CIRCUMFERENTIAL ROAD, K0017 + 970.12 - K0019 + 038.91, K0019 + 038.9 - K0019 + 490, K0019 + 740 - K0020 + 200, K0020 + 541.67 - K0 021 + 008 (AS PER RBIA), K0017 + 970.12,
- Contractor: ROLCO CONSTRUCTION & DEVELOPMENT CORPORATION ( FOR (29686)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-08-28
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱54,842,388.00
- Contract status: Completed Report
- REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - TABUK BR. (B00005TL) ALONG TABLAS CIRCUMFERENTIAL ROAD, TABLAS ISLAND, ROMBLON
- Contractor: NOLAN CONSTRUCTION (44243)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-08-18
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱2,449,913.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING(COVERED COURT/E VACUATION CENTER), TAMBAC, ROMBLON, ROMBLON
- Contractor: EMQ DESIGN & CONSTRUCTION (16128)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-11-30
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱5,803,229.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING(COVERED COURT/E VACUATION CENTER), DANAO, CAJIDIOCAN, ROMBLON
- Contractor: EMQ DESIGN & CONSTRUCTION (16128)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-11-30
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱6,874,545.50
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTIO N OF BANADERO FLOOD CONTROL STRUCTURE, STA. 000 + 005 - STA. 000 + 267.40 ( L/S) (AS PER SURVEY), CALATRAVA, ROMBLON
- Contractor: ROLCO CONSTRUCTION & DEVELOPMENT CORPORATION ( FOR (29686)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-03-17
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱38,279,116.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG TABLAS CIRCUMFERENTIAL ROAD, K0041 + 475 - K0 041 + 583 (AS PER SURVEY), TABLAS ISLAND, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-06-21
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱59,125,260.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (GRAND STAND/SP ORT FACILITIES), LOOC NATIONAL HIGH, PHASE I, POBLACION, LOOC, ROMBLON
- Contractor: EMQ DESIGN & CONSTRUCTION (16128)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-08-08
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,898,727.75
- Contract status: Completed Report
- CONSTRUCTION OF TIMBAON ACCESS ROAD, STA. 00 + 223 - 00+ 339.50, STA. 00 + 455 - 00 + 517.90, STA. 00 + 000 - 00 + 134, ODIONGAN, R OMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-08-14
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,896,918.50
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTIO N OF BACHAWAN (I-LAYA) FLOOD CONTROL STRUCTURE ALONG TABLAS CIRCUMFERENTIAL ROAD, STA. 000 + 000 - STA. 000 + 104.80 (L/S) (AS PER SURVEY), BACHAWAN, SAN AGUSTIN, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-10-11
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱9,571,707.00
- Contract status: Completed Report
- CONSTRUCTION OF SLOPE PROTECTION STRUCTURE - CONSTRUCTIO N OF BARIRI SLOPE PROTECTION, STA. 000 + 110 - STA. 000 + 217.60 (B/S) (AS PER SURVEY), SITIO BARIRI, HINAG-OMAN, FERROL, ROMBLON
- Contractor: SUN RAYS BUILDERS & GENERAL SUPPLY (19995)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-01-12
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱18,906,122.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTIO N OF ILAYA FLOOD CONTROL STRUCTURE, STA. 000 + 588 - STA. 000 + 715.60 (L/S ), STA. 000 + 640 - STA. 000 + 740 (R/S), STA. MARIA, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465) / EMQ DESIGN & CONSTRUCTION (16128)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-04-10
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱28,606,872.00
- Contract status: Completed Report
- REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAV ED ROADS ALONG TABLAS CIRCUMFERENTIAL ROAD, K0126 + 900 - K0127 + 540, K012 8 + 020 - K0128 + 277.34, K0128 + 500 - K0128 + 943 (RBIA & ACTUAL SURV EY), TABLAS ISLAND, ROMBLON
- Contractor: ROLCO CONSTRUCTION & DEVELOPMENT CORPORATION ( FOR (29686)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-06-16
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱34,442,964.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTIO N OF PANIQUE FLOOD CONTROL STRUCTURE, STA. 000 + 000.00 - VSTA. 000 + 409.2 0 (L/S), PANIQUE, ODIONGAN, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-02-18
- Fund source: Regular Infra - GAA 2019 OO-2
- Contract price: ₱47,944,792.00
- Contract status: Completed Report
- REHABILITATION OF MULTI-PURPOSE BUILDING(COVERED COURT), BRGY. LIMON NORTE, LOOC, ROMBLON
- Contractor: EMQ DESIGN & CONSTRUCTION (16128)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-11-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,934,456.62
- Contract status: Completed Report
- CONSTRUCTION OF BRGY. CABULOTAN MULTI - PURPOSE BUILDING , CABULOTAN, SAN AGUSTIN, ROMBLON
- Contractor: EMQ DESIGN & CONSTRUCTION (16128)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-10-07
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,938,424.25
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (BARANGAY HALL) , PATO-O, ODIONGAN, ROMBLON
- Contractor: EMQ DESIGN & CONSTRUCTION (16128)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-10-07
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,910,557.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (COVERED COURT/ STAGE), BRGY. GUITIVAN, CAJIDIOCAN, ROMBLON
- Contractor: EMQ DESIGN & CONSTRUCTION (16128)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-10-23
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,913,370.75
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI - PURPOSE BUILDING (C OVERED COURT/STAGE), ROMBLON STATE UNIVERSITY, CAJIDIOCAN, ROMBLON
- Contractor: EMQ DESIGN & CONSTRUCTION (16128)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-10-13
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱3,375,229.75
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (COVERED COURT/ EVACUATION CENTER), SITIO GK, SAN ROQUE, CALATRAVA, ROMBLON
- Contractor: EMQ DESIGN & CONSTRUCTION (16128)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-10-23
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱3,878,874.25
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (COVERED COURT/ EVACUATION CENTER), SUGOD, CAJIDIOCAN, ROMBLON
- Contractor: EMQ DESIGN & CONSTRUCTION (16128)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-10-17
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,361,484.00
- Contract status: Completed Report
- CONSTRUCTION OF SITIO ILAYA, BRGY. HINUGUSAN ACCESS ROAD , 00 + 000 - 00 + 235, HINUGUSAN, SAN AGUSTIN, ROMBLON
- Contractor: EMQ DESIGN & CONSTRUCTION (16128)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-08-22
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱3,854,911.00
- Contract status: Completed Report
- CONSTRUCTION OF PATOO - MAINIT - BATIANO ROADK000 + 000. 00 - K000 + 400.00, ODIONGAN, ROMBLON
- Contractor: TWIN DRAGON CONSTRUCTION (11392)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-08-21
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,899,999.00
- Contract status: Completed Report
- PAVING OF UNPAVED ROADS OF LUBI - BINOOG ROAD,K0067 + 66 2 - K0068 + 319 (AS PER RBIA) K0067 + 468.18 - K0068 + 313.64 (AS PER SURVE Y), TABLAS ISLAND, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-12-17
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱39,291,488.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG TABLAS CIRCUMFERENTIAL ROAD, K0039 + 945 - K 0040 + 001, K0041 + 505 - K0041 + 560, K0068 + 385 - K068 + 569, K0087 + 84 5 - K0087 + 871 (AS PER RBIA & SURVEY), TABLAS
- Contractor: MT. GUITING-GUITING CONSTRUCTION (17412)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-08-09
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱40,707,000.00
- Contract status: Completed Report
- PAVING OF UNPAVED ROADS OF PARPAGOHA (MARIGONDON) - BINO OG ROAD, K0023 +383 - K0023 + 585, K0027 +700 - K0028 + 673 (AS PER RBIA)K0 023 + 382.67 - K0023 + 520, K0027 +700 - K0028 + 572.47 (AS PER SURVEY), T ABLAS ISLAND, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-04-22
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱66,068,144.00
- Contract status: Completed Report
- REPAIR/IMPROVEMENT OF MULTI - PURPOSE BUILDING (STAGE AN D BARANGAY HALL), BONGA, STA. MARIA, ROMBLON
- Contractor: TRIPLE PEAK MOUNTAIN CONSTRUCTION & SUPPLY (43000)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-10-29
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,978,626.25
- Contract status: Completed Report
- CONSTRUCTION OF ROADS, BRGY. TANAGAN AND BRGY. VICTORIA, STA. 000 + 000 - STA. 000 + 600, SAN ANDRES, ROMBLON
- Contractor: SUN RAYS BUILDERS & GENERAL SUPPLY (19995)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-09-28
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱14,525,326.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECL ARED TOURISM DESTINATION - ACCESS ROAD LEADING TO TUBURAN FALLS (PACKAGE II ), K001 + 355 - K001 + 744.30, BRGY. TUBURAN, ROMBLON
- Contractor: E.R. DELA CRUZ CONSTRUCTION & SUPPLY (32158)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-11-27
- Fund source: Regular Infra - GAA 2019 CSSP
- Contract price: ₱15,361,174.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ANAHAO - CANDUYONG ROAD, K00 00 + 000 - K0000 + 698.8, K0000 + 000 - K0000 + 560, K0000 + 000 - K000 + 0 35.90 (AS PER SURVEY), ODIONGAN, ROMBLON
- Contractor: TWIN DRAGON CONSTRUCTION (11392)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-12-11
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱19,475,678.00
- Contract status: Completed Report
- CONCRETING OF DONA TRINIDAD TO MABINI ROAD, STA. 000 + 0 00 - STA. 000 + 620, BRGY. DONA TRINIDAD, SAN ANDRES, ROMBLON
- Contractor: SUN RAYS BUILDERS & GENERAL SUPPLY (19995)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-01-04
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱29,399,768.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECL ARED TOURISM DESTINATION - ACCESS ROAD LEADING TO TUBURAN FALLS (PACKAGE I) , STA. 00 + 000 - STA. 01 + 355, BRGY. TUBURAN, ROMBLON
- Contractor: E.R. DELA CRUZ CONSTRUCTION & SUPPLY (32158)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-02-16
- Fund source: Regular Infra - GAA 2019 CSSP
- Contract price: ₱47,786,800.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD AT BGRY. LI-O, ROMBLON, ROMBLON
- Contractor: EMQ DESIGN & CONSTRUCTION (16128)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-08-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,412,326.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL TRANSP ORT TERMINAL), SAN AGUSTIN, ROMBLON
- Contractor: EMQ DESIGN & CONSTRUCTION (16128)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-02-10
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱9,687,225.00
- Contract status: Completed Report
- CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOU S INFRASTRUCTURE LOCAL PROJECTS - BACHAWAN TO ILAYA ROAD LEADING TO TRANGKA LAN FALLS, SAN AGUSTIN, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-12-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱9,606,171.00
- Contract status: Completed Report
- REPLACEMENT OF PERMANENT WEAK BRIDGE - COLIS BRIDGE (B00 020TL) ALONG TABLAS CIRCUMFERENTIAL ROAD, TABLAS ISLAND, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-02-28
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱16,165,678.00
- Contract status: Completed Report
- REPLACEMENT OF PERMANENT WEAK BRIDGE - BANGON BRIDGE 1 ( B00045TL) ALONG TABLAS CIRCUMFERENTIAL ROAD, TABLAS ISLAND, ROMBLON< /li>
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-07-07
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱20,580,000.00
- Contract status: Completed Report
- CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOU S INFRASTRUCTURE LOCAL PROJECTS - SUGOD - CAWAYAN ROAD LEADING TO BLUE HOLE (PACKAGE II), SAN AGUSTIN, ROMBLON
- Contractor: E.R. DELA CRUZ CONSTRUCTION & SUPPLY (32158)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-01-26
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱26,335,072.00
- Contract status: Completed Report
- CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOU S INFRASTRUCTURE LOCAL PROJECTS - SUGOD - CAWAYAN ROAD LEADING TO BLUE HOLE (PACKAGE I), SAN AGUSTIN, ROMBLON
- Contractor: E.R. DELA CRUZ CONSTRUCTION & SUPPLY (32158)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-07-21
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱47,806,680.00
- Contract status: Completed Report
- CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOU S INFRASTRUCTURE LOCAL PROJECTS - PROGRESO ESTE TO GARING FALLS - MALILICO PACKAGE I, ODIONGAN, ROMBLON
- Contractor: E.R. DELA CRUZ CONSTRUCTION & SUPPLY (32158)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-07-21
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱49,000,000.00
- Contract status: Completed Report
- CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOU S INFRASTRUCTURE LOCAL PROJECTS - PROGRESO ESTE TO GARING FALLS - MALILICO PACKAGE II, ODIONGAN, ROMBLON
- Contractor: E.R. DELA CRUZ CONSTRUCTION & SUPPLY (32158)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-06-21
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱45,417,760.00
- Contract status: Completed Report
- CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOU S INFRASTRUCTURE LOCAL PROJECTS - PROGRESO ESTE TO GARING FALLS - MALILICO PACKAGE III, ODIONGAN, ROMBLON
- Contractor: E.R. DELA CRUZ CONSTRUCTION & SUPPLY (32158)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-07-19
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱45,452,400.00
- Contract status: Completed Report
- CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOU S INFRASTRUCTURE LOCAL PROJECTS - MAGSAYSAY - TABUGON ROAD LEADING TO STA. FE BEACHES, TABLAS POINT, STA. FE, ROMBLON
- Contractor: E.R. DELA CRUZ CONSTRUCTION & SUPPLY (32158)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-07-04
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱48,998,896.00
- Contract status: Completed Report
- CONST/IMPRVMT. OF ACCESS RD LEADING TO DECLARED TOURISM DESTINATIONS-MALBOG JCT.STA.FE-GUINBIRAYAN
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-12-06
- Fund source: Regular Infra - GAA 2019 CSSP
- Contract price: ₱65,490,208.00
- Contract status: Completed Report
- REPAIR/REHABILITATION/CONCRETING FROM PUNTA (NATIONAL RO AD JUNCTION) - ILAYA - AYOG - OG, BACHAWAN, SAN AGUSTIN, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-10-04
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱96,496,640.00
- Contract status: Completed Report
- COMPLETION/CONCRETING OF KABALIWAN - BOLIGANAY ROAD, SAN AGUSTIN, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-10-04
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱96,288,024.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG ODIONGAN EAST - WEST ROAD, K0007 + 465.50 - K 0007 + 496.50 (AS PER SURVEY), TABLAS ISLAND, ROMBLON
- Contractor: TWIN DRAGON CONSTRUCTION (11392)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-08-07
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱808,357.12
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, LIWAYWAY, ODIO NGAN, ROMBLON
- Contractor: EMQ DESIGN & CONSTRUCTION (16128)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-10-23
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,950,871.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, POBLACION, STA . FE, ROMBLON
- Contractor: MAYAD AX CORPORATION (43864)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-10-22
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,960,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, CONCEPCION NOR TE, STA. MARIA, ROMBLON
- Contractor: MAYAD AX CORPORATION (43864)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-10-22
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,960,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, SAWANG, ROMBLO N, ROMBLON
- Contractor: MAYAD AX CORPORATION (43864)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-10-22
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,920,435.62
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI - PURPOSE BUILDING (C OVERED COURT/EVACUATION CENTER), BRGY. PANIQUE, ODIONGAN, ROMBLON
- Contractor: TWIN DRAGON CONSTRUCTION (11392)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-11-12
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,895,704.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF DPWH BUILDING, ROMBLON DIST RICT ENGINEERING OFFICE, RIZAL STREET, TABIN DAGAT, ODIONGAN, ROMBLON
- Contractor: MT. GUITING-GUITING CONSTRUCTION (17412)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-11-28
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,474,852.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (COVERED COURT/ EVACUATION CENTER), PAGSANGAHAN, CALATRAVA, ROMBLON
- Contractor: EMQ DESIGN & CONSTRUCTION (16128)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-12-12
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,845,995.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (COVERED COURT/ EVACUATION CENTER), PANANGCALAN, SAN FERNANDO, ROMBLON
- Contractor: ARIK CONSTRUCTION (32786)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-12-20
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,842,194.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI - PURPOSE BUILDING (C OVERED COURT), LUMBANG ESTE, CAJIDIOCAN, ROMBLON
- Contractor: EMQ DESIGN & CONSTRUCTION (16128)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-10-17
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,423,022.25
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING(COVERED COURT/E VACUATION CENTER), LAMAO, ROMBLON, ROMBLON
- Contractor: EMQ DESIGN & CONSTRUCTION (16128)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-12-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,842,169.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING(COVERED COURT/E VACUATION CENTER), RECTO, FERROL, ROMBLON
- Contractor: R.G. FLORENTINO CONST. & TRADING INC. (18301)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-12-08
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,820,368.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTIPURPOSE BUILDING (COVERED COURT/EVA CUATION CENTER), SAN AGUSTIN, CORCUERA, ROMBLON
- Contractor: TWIN DRAGON CONSTRUCTION (11392)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-01-01
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,829,665.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING AT ROMBLON STAT E UNIVERSITY, SAN FERNANDO CAMPUS (COVERED COURT/EVACUATION CENTER), POBLAC ION, SAN FERNANDO, ROMBLON
- Contractor: ASHLEYKA CONSTRUCTION AND SUPPLIES (41140)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-02-20
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,801,500.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (COVERED COURT/ EVACUATION CENTER), COLONG - COLONG, CORCUERA, ROMBLON
- Contractor: TWIN DRAGON CONSTRUCTION (11392)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-01-01
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,834,905.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (COVERED COURT/ EVACUATION CENTER), LABNIG, CORCUERA, ROMBLON
- Contractor: TWIN DRAGON CONSTRUCTION (11392)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-01-01
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,345,057.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (COVERED COURT/ EVACUATION CENTER), MABINI, SAN FERNANDO, ROMBLON
- Contractor: ASHLEYKA CONSTRUCTION AND SUPPLIES (41140)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-02-20
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,312,440.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING(COVERED COURT/E VACUATION CENTER), AGNAY, ROMBLON, ROMBLON
- Contractor: ASHLEYKA CONSTRUCTION AND SUPPLIES (41140)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-12-28
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,353,287.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (COVERED COURT/ EVACUATION CENTER), TALISAY, CALATRAVA, ROMBLON
- Contractor: MT. GUITING-GUITING CONSTRUCTION (17412)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-12-04
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,406,915.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING(COVERED COURT/E VACUATION CENTER), CANJALON, SAN FERNANDO, ROMBLON
- Contractor: ASHLEYKA CONSTRUCTION AND SUPPLIES (41140)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-02-20
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,325,805.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING(COVERED COURT/E VACUATION CENTER), CALABOGO, ROMBLON, ROMBLON
- Contractor: ASHLEYKA CONSTRUCTION AND SUPPLIES (41140)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-12-28
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,330,260.00
- Contract status: Completed Report
- COMPLETION OF MULTI - PURPOSE BUILDING (COVERED COURT/EV ACUATION CENTER), ESPANA, SAN FERNANDO, ROMBLON
- Contractor: ASHLEYKA CONSTRUCTION AND SUPPLIES (41140)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-12-20
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,877,930.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING(COVERED COURT/E VACUATION CENTER), CAGBO-AYA, SAN AGUSTIN, ROMBLON
- Contractor: ATHENA CONSTRUCTION AND DEVELOPMENT (37750)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-12-19
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,880,780.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING(COVERED COURT/E VACUATION CENTER), SITIO BOLIGANAY, PANIQUE, ODIONGAN, ROMBLON
- Contractor: ATHENA CONSTRUCTION AND DEVELOPMENT (37750)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-12-19
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,882,013.50
- Contract status: Completed Report
- COMPLETION OF MULTI - PURPOSE BUILDING (COVERED COURT), LINAWAN, SAN ANDRES, ROMBLON
- Contractor: R.G. FLORENTINO CONST. & TRADING INC. (18301)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-11-08
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,450,000.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI - PURPOSE BUILDING (C OVERED COURT/EVACUATION CENTER), MABINI, CORCUERA, ROMBLON
- Contractor: TWIN DRAGON CONSTRUCTION (11392)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-11-02
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,929,972.75
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING(COVERED COURT/E VACUATION CENTER), LUSONG, SAN AGUSTIN, ROMBLON
- Contractor: ATHENA CONSTRUCTION AND DEVELOPMENT (37750)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-12-09
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱3,841,200.00
- Contract status: Completed Report
- CONSTRUCTION/COMPLETION OF MULTI - PURPOSE BUILDING (STA GE/COVERED COURT), TUBURAN, ODIONGAN, ROMBLON
- Contractor: ATHENA CONSTRUCTION AND DEVELOPMENT (37750)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-11-24
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,894,129.88
- Contract status: Completed Report
- COMPLETION OF MULTI - PURPOSE BUILDING (COVERED COURT), RIZAL, ODIONGAN, ROMBLON
- Contractor: AUDRIC CONSTRUCTION & SUPPLY (34376)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-11-13
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,960,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING(COVERED COURT/E VACUATION CENTER), PATO-O, ODIONGAN, ROMBLON
- Contractor: TWIN DRAGON CONSTRUCTION (11392)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-03-25
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,343,558.50
- Contract status: Completed Report
- COMPLETION OF MULTI - PURPOSE BUILDING (COVERED COURT), CAMBIJANG, CAJIDIOCAN, ROMBLON
- Contractor: MT. GUITING-GUITING CONSTRUCTION (17412)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-10-15
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,449,842.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING AT POCTOY ELEME NTARY CAMPUS (COVERED COURT/EVACUATION CENTER), POCTOY, ODIONGAN, ROMBLON
- Contractor: TWIN DRAGON CONSTRUCTION (11392)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-03-04
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,895,167.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (COVERED COURT/ EVACUATION CENTER), STO. NINO, STA. MARIA, ROMBLON
- Contractor: TRIPLE PEAK MOUNTAIN CONSTRUCTION & SUPPLY (43000)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-04-26
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,839,685.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING(COVERED COURT/E VACUATION CENTER), AMATONG, ODIONGAN, ROMBLON
- Contractor: AUDRIC CONSTRUCTION & SUPPLY (34376)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-01-12
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,356,990.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (COVERED COURT/ EVACUATION CENTER), PANDAN, STA.FE, ROMBLON
- Contractor: EMQ DESIGN & CONSTRUCTION (16128)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-12-12
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,344,431.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (COVERED COURT/ EVACUATION CENTER), AGMANIC, STA.FE, ROMBLON
- Contractor: EMQ DESIGN & CONSTRUCTION (16128)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-12-12
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,344,431.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (COVERED COURT/ EVACUATION CENTER), BULI, SAN AGUSTIN, ROMBLON
- Contractor: ATHENA CONSTRUCTION AND DEVELOPMENT (37750)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-01-08
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,321,350.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (COVERED COURT/ EVACUATION CENTER), AGPUDLOS, SAN ANDRES, ROMBLON
- Contractor: R.G. FLORENTINO CONST. & TRADING INC. (18301)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-11-08
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱3,872,880.00
- Contract status: Completed Report
- CONSTRUCTION OF ROADS, BRGY. TUMINGAD, ODIONGAN, ROMBLON
- Contractor: NOLAN CONSTRUCTION (44243)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-08-21
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,920,290.38
- Contract status: Completed Report
- CONSTRUCTION OF ROADS, BRGY. PANIQUE, ODIONGAN, ROMBLON< /span>
- Contractor: NOLAN CONSTRUCTION (44243)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-08-06
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,920,059.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING(COVERED COURT/E VACUATION CENTER), GINABLAN, ROMBLON, ROMBLON
- Contractor: ASHLEYKA CONSTRUCTION AND SUPPLIES (41140)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-12-28
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,367,274.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING(COVERED COURT/E VACUATION CENTER), ALAD, ROMBLON, ROMBLON
- Contractor: NOLAN CONSTRUCTION (44243)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-12-04
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,377,525.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING(COVERED COURT/E VACUATION CENTER), AGPANABAT, ROMBLON, ROMBLON
- Contractor: ASHLEYKA CONSTRUCTION AND SUPPLIES (41140)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-12-28
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,376,186.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (COVERED COURT/ EVACUATION CENTER), AGTONGO, ROMBLON, ROMBLON
- Contractor: ASHLEYKA CONSTRUCTION AND SUPPLIES (41140)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-02-20
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,377,101.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING(COVERED COURT/E VACUATION CENTER), GUIMPINGAN, ROMBLON, ROMBLON
- Contractor: ASHLEYKA CONSTRUCTION AND SUPPLIES (41140)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-02-20
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,410,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING(COVERED COURT/E VACUATION CENTER), CALAGONSAO, ALCANTARA, ROMBLON
- Contractor: SMI CONSTRUCTION SERVICES, INC. (42341)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-12-19
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,400,515.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING(COVERED COURT/E VACUATION CENTER), AGBUDIA, ROMBLON, ROMBLON
- Contractor: ASHLEYKA CONSTRUCTION AND SUPPLIES (41140)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-12-28
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,398,831.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (COVERED COURT WITH STAGE) AT LIBERTAD NATIONAL HIGH SCHOOL, LIBERTAD, ODIONGAN, ROMBLON
- Contractor: NOLAN CONSTRUCTION (44243)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-12-05
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,908,951.25
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING(COVERED COURT/E VACUATION CENTER), BARANGAY TUMALUM, BANTON, ROMBLON
- Contractor: TWIN DRAGON CONSTRUCTION (11392)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-01-01
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,827,078.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING(COVERED COURT/E VACUATION CENTER), BARANGAY SILUM, MAGDIWANG, ROMBLON
- Contractor: MT. GUITING-GUITING CONSTRUCTION (17412)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-12-04
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,840,654.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (COVERED COURT) , PROGRESO ESTE ELEMENTARY SCHOOL, BARANGAY PROGRESO ESTE, ODIONGAN, ROMBLO N
- Contractor: EMQ DESIGN & CONSTRUCTION (16128)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-03-10
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,907,453.50
- Contract status: Completed Report
- CONSTRUCTION OF BINALIWAN ROAD LEADING TO GAONG RIVER - BRGY. TAMPAYAN, MAGDIWANG, ROMBLON
- Contractor: SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) (15906)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-11-24
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱33,723,896.00
- Contract status: Completed Report
- CONSTRUCTION/OPENING OF BRGY. MAT-I - SITIO AGLAGTANG - BRGY. PANDAN ROAD, STA. FE, ROMBLON
- Contractor: SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) (15906)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2019-12-26
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱48,181,512.00
- Contract status: Completed Report
- CONSTRUCTION/OPENING OF BRGY. DULANGAN - BRGY. TAMPAYAN LEADING TO AGLINGI ROAD, MAGDIWANG, ROMBLON
- Contractor: SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) (15906)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-05-22
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱87,416,672.00
- Contract status: Completed Report
- WIDENING/REHABILITATION OF POBLACION - SAN VICENTE - DAL AHICAN - MASADYA - MASUDSUD ROAD, CONCEPCION, ROMBLON
- Contractor: SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) (15906)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-04-02
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱92,928,424.00
- Contract status: Completed Report
- WIDENING/REHABILITATION OF POBLACION - ILIJAN - LABNIG - ALEGRIA ROAD, CORCUERA, ROMBLON
- Contractor: SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) (15906)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-05-02
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱92,913,256.00
- Contract status: Completed Report
- CONSTRUCTION OF COASTAL ROADS/BOULEVARD FOR TOURISM - BR GY. POBLACION, SAN FERNANDO, ROMBLON, SIBUYAN ISLAND, ROMBLON
- Contractor: SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) (15906)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-07-11
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱99,000,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (COVERED COURT/ EVACUATION CENTER) , BRGY. TACLOBO, SAN FERNANDO, ROMBLON
- Contractor: ASHLEYKA CONSTRUCTION AND SUPPLIES (41140)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-03-25
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,376,369.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING(COVERED COURT/E VACUATION CENTER) , MAT - I, STA. FE, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-04-29
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,369,184.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, BRGY. ANAHAO, ODIONGAN, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-03-25
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,850,634.50
- Contract status: Completed Report
- CONSTRUCTION OF SEAWALL ALONG TABLAS CIRCUMFERENTIAL ROA D, TABLAS ISLAND, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-06-27
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱47,616,696.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (COVERED COURT/ EVACUATION CENTER) IN STA. MARIA NATIONAL HIGH SCHOOL , CONCEPCION NORTE, S TA. MARIA, ROMBLON
- Contractor: EMQ DESIGN & CONSTRUCTION (16128)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-07-09
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,950,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING AT BANTON NATIO NAL HIGH SCHOOL (COVERED COURT WITH STAGE), POBLACION, BANTON, ROMBLON
- Contractor: TRIPLE PEAK MOUNTAIN CONSTRUCTION & SUPPLY (43000)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-02-24
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,851,713.50
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF 3 - CLASSROOM, LOOC NATIONA L HIGH SCHOOL, LIMON NORTE, LOOC, ROMBLON
- Contractor: TRIPLE PEAK MOUNTAIN CONSTRUCTION & SUPPLY (43000)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-01-25
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱2,565,809.50
- Contract status: Completed Report
- CONSTRUCTION OF SEAWALL IN STO.SAPANGPALAY, BRGY. MASUDS UD, CONCEPCION, ROMBLON
- Contractor: PATRILA BUILDERS, INC. (26628)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-02-11
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,851,392.00
- Contract status: Completed Report
- CONCRETING OF SITIO SUONG BARANGAY CARMEN ACCESS ROAD, B RGY. CARMEN, SAN AGUSTIN, ROMBLON
- Contractor: EMQ DESIGN & CONSTRUCTION (16128)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-01-18
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱3,378,517.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (COVERED COURT/ EVACUATION CENTER), JAO - ASAN, MAGDIWANG, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-06-09
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,354,065.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (COVERED COURT/ EVACUATION CENTER), PILI, SAN FERNANDO, ROMBLON
- Contractor: ASHLEYKA CONSTRUCTION AND SUPPLIES (41140)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-06-29
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,307,435.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (COVERED COURT/ EVACUATION CENTER), LOGBON, ROMBLON, ROMBLON
- Contractor: ASHLEYKA CONSTRUCTION AND SUPPLIES (41140)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-06-29
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱4,313,513.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING AT SABLAYAN ELE MENTARY SCHOOL (STAGE/COVERED COURT), SABLAYAN, ROMBLON, ROMBLON
- Contractor: EMQ DESIGN & CONSTRUCTION (16128)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-04-01
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱1,918,954.50
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF CAUSEWAY ALONG TABLAS CIRCUM FERENTIAL ROAD, TABLAS ISLAND, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-01-01
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱47,471,520.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, DAPAWAN, ODION GAN, ROMBLON
- Contractor: R N V CONSTRUCTION (12570)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-10-27
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱9,596,310.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG PARPAGOHA (MARIGONDON) - BINOOG ROAD, K0020 + 900 - K0020 + 958.50 (AS PER SURVEY), TABLAS ISLAND, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-01-20
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱48,198,760.00
- Contract status: Terminated Report
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG ROMBLON-COGON-SABLAYAN ROAD, K0015 + 030 - K 0015 + 081, K0015 + 488 - K0015 + 514, ROMBLON ISLAND
- Contractor: MT. GUITING-GUITING CONSTRUCTION (17412)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-01-10
- Fund source: Regular Infra - GAA 2019 OO-1
- Contract price: ₱8,090,438.50
- Contract status: Terminated Report