Infrastructure Projects in Region IV-B — Region IV-B - Romblon District Engineering Office, 2020
This page lists public infrastructure projects implemented by Region IV-B - Romblon District Engineering Office in Region IV-B during 2020. All data are sourced from the Department of Public Works and Highways (DPWH) official database (as of 9/30/2025): https://www.dpwh.gov.ph/dpwh/projects/infrastructure
This information is shared to promote transparency and public awareness. We encourage visitors to validate project details using the official DPWH source. In case of discrepancies, please refer to the original records published by the DPWH.
| Contractor | Projects | Total Price |
|---|---|---|
| SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) (15906) | 9 | ₱786,164,500.00 |
| LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465) | 8 | ₱236,140,901.50 |
| THREE W BUILDERS, INC. (10722) | 3 | ₱99,832,758.00 |
| C.S. RAYOS CONSTRUCTION & GENERAL SERVICES, INC. (9790) | 3 | ₱98,638,504.00 |
| TWIN DRAGON CONSTRUCTION (11392) | 7 | ₱81,904,624.88 |
- CONSTRUCTION OF EVACUATION CENTER IN BARANGAY PANANGCALA N, SAN FERNANDO, ROMBLON
- Contractor: TWIN DRAGON CONSTRUCTION (11392)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-09-15
- Fund source: Regular Infra - GAA 2019 LP
- Contract price: ₱34,039,484.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, BRGY. POBLACIO N, FERROL, ROMBLON
- Contractor: EMQ DESIGN & CONSTRUCTION (16128)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-10-07
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱5,940,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, BRGY. MATUTUNA , SAN ANDRES, ROMBLON
- Contractor: R N V CONSTRUCTION (12570)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-05-30
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,929,970.12
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, BRGY. JUN CARL O, SAN ANDRES, ROMBLON
- Contractor: TABLAS CONSTRUCTION CORPORATION (45015)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-07-30
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,958,870.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG SIBUYAN CIRCUMFERENTIAL ROAD, K0071 + 485.30 - K0071 + 559.10, SIBUYAN ISLAND, ROMBLON
- Contractor: MT. GUITING-GUITING CONSTRUCTION (17412)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-12-02
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱1,949,566.25
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG ROMBLON - COGON - SABLAYAN ROAD, K0016 + 150.00 - K0016 + 273. 90, ROMBLON ISLAND, ROMBLON
- Contractor: MT. GUITING-GUITING CONSTRUCTION (17412)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-07-29
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱2,206,440.25
- Contract status: Completed Report
- PREVENTIVE MAINTENANCE ALONG ROMBLON - COGON - SABLAYAN ROAD, K0002 + 943 - K0003 + 225, K0003 + 578 - K0003 + 823.00, K0004 + 155 - K0004 + 809.50, K0005 + 299.30 - K0006 + 131.60, K0011 + 249 - K0011 + 53 1.10, K0014 + 742.20 - K0015 + 000.70, ROMBLON IS
- Contractor: MT. GUITING-GUITING CONSTRUCTION (17412)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-01-16
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱3,875,616.75
- Contract status: Completed Report
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGE - BA C3 91ADERO BR. (B00025TL) ALONG TABLAS CIRCUMFERENTIAL ROAD, TABLAS ISLAND, R OMBLON
- Contractor: ALPHATEC CHEMICAL CORPORATION (39938)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-06-03
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱4,914,698.50
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG SIBUYAN CIRCUMFERENTIAL ROAD,K0006 + 860.29 - K0007 + 193.20 ( AS PER ACTUAL)K0006 + 860.09 - K0007 + 195 (AS PER RBIA), SIBUYAN ISLAND, R OMBLON
- Contractor: MT. GUITING-GUITING CONSTRUCTION (17412)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-02-26
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱8,967,893.00
- Contract status: Completed Report
- CONSTRUCTION OF BULWANG-GABAWAN FLOOD CONTROL, K0000 + 7 80 - K0000 + 840 L/SK0000 + 700 - K0000 + 800 R/S, ODIONGAN, ROMBLON
- Contractor: EMQ DESIGN & CONSTRUCTION (16128)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-12-05
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱24,682,598.00
- Contract status: Completed Report
- CONSTRUCTION OF GABAWAN FLOOD CONTROL, K0000 + 000.00 - K000 + 285.20, GABAWAN, ODIONGAN, ROMBLON
- Contractor: R N V CONSTRUCTION (12570)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-12-19
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱28,612,022.00
- Contract status: Completed Report
- CONSTRUCTION OF OLANGO FLOOD CONTROL, STA. 000 + 475.00 - STA. 000 + 735.00, SAN FERNANDO, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-12-12
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱28,178,662.00
- Contract status: Completed Report
- CONSTRUCTION OF CALAGONSAO FLOOD CONTROL, STA. 000 + 460 .00 - STA. 000 + 750.00, ALCANTARA, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-12-17
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱26,295,742.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING AT GABAWAN ELEM ENTARY SCHOOL, SITIO BULWANG, BRGY. GABAWAN, ODIONGAN, ROMBLON
- Contractor: R N V CONSTRUCTION (12570)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-07-22
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,951,331.75
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, BRGY. BAGSIK, ALCANTARA, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-09-15
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱5,357,572.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, BRGY. PINAMIHA GAN, SAN JOSE, ROMBLON
- Contractor: ANISCO CONSTRUCTION AND SUPPLY (45441)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-08-25
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱5,785,019.50
- Contract status: Completed Report
- PREVENTIVE MAINTENANCE ALONG TABLAS CIRCUMFERENTIAL ROAD , K0022 + 700 - K0023 + 048, K0036 + 520 - K0036 + 909, K0037 + 180 - K0037 + 724.5, K0057 + 571.5 - K0057 + 585, K0059 + 010 - K0060 + 008, K0060 + 0 50 - K0060 + 404.5, K0067 + 580.8, TABLAS I
- Contractor: MT. GUITING-GUITING CONSTRUCTION (17412)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-04-22
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱5,362,765.00
- Contract status: Completed Report
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - BARIRI BR. 1 (B00050TL) ALONG TABLAS CIRCUMFERENTIAL ROAD, TABLAS ISLAND, ROMBLON
- Contractor: ALPHATEC CHEMICAL CORPORATION (39938)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-03-22
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱5,866,364.50
- Contract status: Completed Report
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - POCTOY BRIDGE (B00010TL) ALONG TABLAS CIRCUMFERENTIAL ROAD, TABLAS ISLAND, ROMBLO N
- Contractor: ANISCO CONSTRUCTION AND SUPPLY (45441)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-03-23
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱5,651,886.00
- Contract status: Completed Report
- CONSTRUCTION OF AGBUNYOG FLOOD CONTROL, STA. 000 + 000 - STA. 000 + 271.00, STA. MARIA, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-12-16
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱27,019,710.00
- Contract status: Completed Report
- CONSTRUCTION OF MARIGONDON FLOOD CONTROL, STA. 000 + 000 - STA. 000 + 208.00, SAN ANDRES, ROMBLON
- Contractor: R.G. FLORENTINO CONST. & TRADING INC. (18301)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-12-19
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱26,014,924.00
- Contract status: Completed Report
- PAVING OF UNPAVED ROADS OF TUGDAN AIRPORT, CHAINAGE 52.3 5 - CHAINAGE 96, TABLAS ISLAND, ROMBLON
- Contractor: TRIPLE PEAK MOUNTAIN CONSTRUCTION & SUPPLY (43000)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-12-05
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱993,862.62
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, BRGY. LINAO, C ALATRAVA, ROMBLON
- Contractor: ANISCO CONSTRUCTION AND SUPPLY (45441)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-07-26
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,881,684.75
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, BRGY. MAYHA, O DIONGAN, ROMBLON
- Contractor: R N V CONSTRUCTION (12570)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-08-01
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,879,901.75
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, BRGY. MAYHA, O DIONGAN, ROMBLON
- Contractor: ANISCO CONSTRUCTION AND SUPPLY (45441)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-08-25
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱3,759,991.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, BRGY. LUMBANG WESTE, CAJIDIOCAN, ROMBLON
- Contractor: MT. GUITING-GUITING CONSTRUCTION (17412)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-09-22
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱5,360,057.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, BRGY. IPIL, MA GDIWANG, ROMBLON
- Contractor: MT. GUITING-GUITING CONSTRUCTION (17412)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-09-15
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱5,282,818.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, BRGY. AZAGRA, SAN FERNANDO, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-09-15
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,865,311.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, BRGY. MASUDSUD , CONCEPCION, ROMBLON
- Contractor: ANISCO CONSTRUCTION AND SUPPLY (45441)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-10-24
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱5,813,645.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, BRGY. CALUNACO N, SAN ANDRES, ROMBLON
- Contractor: TRIPLE PEAK MOUNTAIN CONSTRUCTION & SUPPLY (43000)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-12-08
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱5,445,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, BRGY. SAN VICE NTE, CORCUERA, ROMBLON
- Contractor: TWIN DRAGON CONSTRUCTION (11392)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-10-31
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱5,760,351.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION/UPGRADING OFDAMAGED PAVED ROADS ALONG TABLAS CIRCUMFERENTIAL ROAD, K0069 + 600 - K0069 + 849, TABLAS ISLAND, ROMBLON
- Contractor: ST. PIUS CONSTRUCTION AND SUPPLY (41263)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-07-14
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱6,815,718.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION/UPGRADING OFDAMAGED PAVED ROADS ALONG TABLAS CIRCUMFERENTIAL ROAD, K0022 + 500 - K0022 + 660, K0038 + 000 - K0038 + 256, TABLAS ISLAND, ROMBLON,
- Contractor: TWIN DRAGON CONSTRUCTION (11392)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-03-26
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱11,209,105.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - LOOC (COGON TULAY) - ODIONGAN ROAD, K0118 + 957 - K0118 + 989.70 (AS PER SURVEY), TABLAS ISLAND, ROMBLON
- Contractor: ST. PIUS CONSTRUCTION AND SUPPLY (41263)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-01-16
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱12,426,135.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION/ UPGRADING OF DAMAGED PAVE D ROADS ALONG TABLAS CIRCUMFERENTIAL ROAD, K0080 + 879.02 - K0081 + 360.00 (AS PER ACTUAL), K0080 + 885.02 - K0081 + 360.00 (AS PER RBIA), TABLAS ISLA ND, ROMBLON
- Contractor: TABLAS CONSTRUCTION CORPORATION (45015)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-04-27
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱14,925,659.00
- Contract status: Completed Report
- OFF - CARRIAGEWAY IMPROVEMENT ALONG TABLAS CIRCUMFERENTI AL ROAD, K0092 + 396 - K0093 + 270, K0093 + 855 - K0094 + 994, TABLAS ISLAN D, ROMBLON
- Contractor: ATHENA CONSTRUCTION AND DEVELOPMENT (37750)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-05-07
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱17,554,072.00
- Contract status: Completed Report
- CONSTRUCTION OF PANIQUE (UPSTREAM) FLOOD CONTROL, TABLAS ISLAND, ROMBLON
- Contractor: ATHENA CONSTRUCTION AND DEVELOPMENT (37750)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-07-28
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱26,024,984.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SIBUYAN CIRCUMFERENTIAL ROAD, K0047 + 950 - K0047 + 997.55 (R/S), SIBUYAN ISLAND, ROMBLON
- Contractor: REBTRADE INTERNATIONAL CORPORATION (36213)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-04-27
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱28,449,684.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE -TABLAS ISLAND CIRCUMFERENTIAL ROAD, K0040 + 138.35 - K0040 + 163.96,K0000 + 000 -K0000 + 049 (R/S) , TABLAS ISLAND, ROMBLON
- Contractor: REBTRADE INTERNATIONAL CORPORATION (36213)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-02-16
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱28,458,946.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECL ARED TOURISM DESTINATION - PROMENADE BOULEVARD (FERROL TO GAHAC, CANDUYONG) , ROMBLON, TABLAS ISLAND, ROMBLON
- Contractor: E.R. DELA CRUZ CONSTRUCTION & SUPPLY (32158)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-10-15
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱64,836,096.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECL ARED TOURISM DESTINATION - PROMENADE BOULEVARD (BAGU-LAYAG, TUBIGON), , TAB LAS ISLAND, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2022-01-07
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱96,500,000.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAP ORTS - ACCESS ROAD LEADING TO POCTOY PORT, ODIONGAN, ROMBLON, TABLAS ISLAND , ROMBLON
- Contractor: SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) (15906)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-01-29
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱94,895,200.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, BRGY. POBLACIO N 1, ROMBLON, ROMBLON
- Contractor: R N V CONSTRUCTION (12570)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-07-29
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,948,673.50
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI - PURPOSE BUILDING, B RGY. ALEGRIA, CORCUERA, ROMBLON
- Contractor: TWIN DRAGON CONSTRUCTION (11392)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-08-01
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,919,939.62
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG TABLAS CIRCUMFERENTIAL ROAD, K0074 + 837.50 - K0074 + 900.00, TABLAS ISLAND, ROMBLON
- Contractor: TRIPLE PEAK MOUNTAIN CONSTRUCTION & SUPPLY (43000)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-08-18
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱1,568,000.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG TABLAS CIRCUMFERENTIAL ROAD, K0124 + 620 - K0124 + 884 & K 0128 + 943 - K0129 + 066 (AS PER ACTUAL), K0124 + 620 - K0124 + 884 & K 0128 + 943 - K0129 + 058 (AS PER RBIA), TABLAS ISLAND,
- Contractor: TRIPLE PEAK MOUNTAIN CONSTRUCTION & SUPPLY (43000)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-05-14
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱11,173,951.00
- Contract status: Completed Report
- CONSTRUCTION OF TORREL FLOOD CONTROL STRUCTURE ALONG TAB LAS CIRCUMFERENTIAL ROAD, ODIONGAN, ROMBLON
- Contractor: TWIN DRAGON CONSTRUCTION (11392)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-01-24
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱24,106,970.00
- Contract status: Completed Report
- REPLACEMENT OF PERMANENT WEAK BRIDGES - MARIGONDON BR. ( B00028SY) ALONG SIBUYAN CIRCUMFERENTIAL ROAD, SIBUYAN ISLAND, ROMBLON
- Contractor: THREE W BUILDERS, INC. (10722)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-01-22
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱22,718,950.00
- Contract status: Completed Report
- CONSTRUCTION OF CALUNACON FLOOD CONTROL STRUCTURE ALONG TABLAS CIRCUMFERENTIAL ROAD, TABLAS ISLAND, ROMBLON
- Contractor: R.G. FLORENTINO CONST. & TRADING INC. (18301)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-12-11
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱24,109,008.00
- Contract status: Completed Report
- CONSTRUCTION OF MABLARAN FLOOD CONTROL STRUCTURE ALONG T ABLAS CIRCUMFERENTIAL ROAD, TABLAS ISLAND, ROMBLON
- Contractor: ST. TIMOTHY CONSTRUCTION CORPORATION (39196)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-01-06
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱29,649,066.00
- Contract status: Completed Report
- ROAD WIDENING - TABLAS CIRCUMFERENTIAL ROAD, K0025 + 594 .06 - K0026 + 541.00 (AS PER SURVEY), K0025 + 594.27 - K0026 + 546.21 (AS P ER RBIA), TABLAS ISLAND, ROMBLON
- Contractor: ROLCO CONSTRUCTION & DEVELOPMENT CORPORATION ( FOR (29686)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-01-26
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱32,418,400.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECL ARED TOURISM DESTINATIONS - JCT. SAN JOSE CIRCUMFERENTIAL ROAD LEADING CATH EDRAL CAVE, SAN JOSE, ROMBLON
- Contractor: SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) (15906)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-11-29
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱90,840,080.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, BGRY. MAINIT, BANTON, ROMBLON
- Contractor: SUN RAYS BUILDERS & GENERAL SUPPLY (19995)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-11-13
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱5,797,662.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, BGRY. CABOLUTA N, SAN AGUSTIN, ROMBLON
- Contractor: EMQ DESIGN & CONSTRUCTION (16128)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-10-22
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱5,797,441.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, BRGY. AMBULONG , CORCUERA, ROMBLON
- Contractor: TWIN DRAGON CONSTRUCTION (11392)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-09-16
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,443,757.75
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, BRGY. CAPACLAN , ROMBLON, ROMBLON
- Contractor: R N V CONSTRUCTION (12570)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-05-24
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,729,629.75
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, BRGY. DAPAWAN, ODIONGAN, ROMBLON
- Contractor: TWIN DRAGON CONSTRUCTION (11392)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-09-16
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱2,425,017.50
- Contract status: Completed Report
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - GUINTA C-AN BR. (B00015SY) ALONG SIBUYAN CIRCUMFERENTIAL ROAD, SIBUYAN ISLAND, RO MBLON
- Contractor: ALPHATEC CHEMICAL CORPORATION (39938)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-08-15
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱6,668,226.00
- Contract status: Completed Report
- CONSTRUCTION OF NAABANG FLOOD CONTROL STRUCTURE, NAABANG , STA. MARIA, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-10-05
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱18,964,930.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE HALL, BRGY. CAPACLAN, RO MBLON, ROMBLON
- Contractor: ANISCO CONSTRUCTION AND SUPPLY (45441)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-12-23
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱23,848,922.00
- Contract status: Completed Report
- CONSTRUCTION OF NEW BRIDGES - MERTINO BRIDGE ALONG TABLA S CIRCUMFERENTIAL ROAD, TABLAS ISLAND, ROMBLON
- Contractor: ULTIMATE BUILDER'S & CONST. SUPPLY (39221)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-03-22
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱25,743,396.00
- Contract status: Completed Report
- REPLACEMENT OF PERMANENT WEAK BRIDGES - CANGUMBA BRIDGE (B00034SY) ALONG SIBUYAN CIRCUMFERENTIAL ROAD, SIBUYAN ISLAND, ROMBLON
- Contractor: C.S. RAYOS CONSTRUCTION & GENERAL SERVICES, INC. (9790)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-01-20
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱31,761,002.00
- Contract status: Completed Report
- REPLACEMENT OF PERMANENT WEAK BRIDGES - CANJALON BRIDGE 2 (B00031SY) ALONG SIBUYAN CIRCUMFERENTIAL ROAD, SIBUYAN ISLAND, ROMBLON
- Contractor: C.S. RAYOS CONSTRUCTION & GENERAL SERVICES, INC. (9790)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-01-20
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱31,774,810.00
- Contract status: Completed Report
- REPLACEMENT OF PERMANENT WEAK BRIDGES - CANJALON - OTOD BRIDGE (B00032SY) ALONG SIBUYAN CIRCUMFERENTIAL ROAD, SIBUYAN ISLAND, ROMBL ON
- Contractor: C.S. RAYOS CONSTRUCTION & GENERAL SERVICES, INC. (9790)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-02-02
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱35,102,692.00
- Contract status: Completed Report
- REPLACEMENT OF PERMANENT WEAK BRIDGES - PILI BRIDGE (B00 035SY) ALONG SIBUYAN CIRCUMFERENTIAL ROAD
- Contractor: THREE W BUILDERS, INC. (10722)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-11-01
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱31,850,040.00
- Contract status: Completed Report
- REPLACEMENT OF PERMANENT WEAK BRIDGES - SILUM BR. (B0002 5SY) ALONG SIBUYAN CIRCUMFERENTIAL ROAD, SIBUYAN ISLAND, ROMBLON
- Contractor: THREE W BUILDERS, INC. (10722)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-02-01
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱45,263,768.00
- Contract status: Completed Report
- CONSTRUCTION OF NEW BRIDGES - DAVID BRIDGE ALONG ODIONGA N - EAST - WEST ROAD, TABLAS ISLAND, ROMBLON
- Contractor: GROUND UP CONSTRUCTION AND SUPPLIES (42322) / FFJJ CONSTRUCTION (16712)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-07-20
- Fund source: Regular Infra - GAA 2020 OO-1
- Contract price: ₱47,393,192.00
- Contract status: Completed Report
- CONSTRUCTION OF LIMON SUR FLOOD CONTROL, LOOC, ROMBLON
- Contractor: ANISCO CONSTRUCTION AND SUPPLY (45441)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2020-12-23
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱27,557,600.00
- Contract status: Completed Report
- CONSTRUCTION OF MALAOAY FLOOD CONTROL STRUCTURES ALONG T ABLAS CIRCUMFERENTIAL ROAD, SAN AGUSTIN, ROMBLON
- Contractor: ULTIMATE BUILDER'S & CONST. SUPPLY (39221)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-01-21
- Fund source: Regular Infra - GAA 2020 OO-2
- Contract price: ₱28,806,566.00
- Contract status: Completed Report
- CONSTRUCTION OF SHORE PROTECTION ALONG POBLACION CAJIDIO CAN, CAJIDIOCAN, ROMBLON
- Contractor: SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) (15906)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-08-12
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱47,966,772.00
- Contract status: Completed Report
- CONSTRUCTION/OPENING OF ACCESS ROAD, BRGY. MAT - I (STA. FE) - BRGY. AGOHO (LOOC), STA. 00 + 000 TO STA. 03 + 050, STA.FE, ROMBLON< /span>
- Contractor: SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) (15906)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-07-19
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱77,078,440.00
- Contract status: Completed Report
- CONSTRUCTION OF COASTAL ROAD ALONG TAMBUYANGAN LEADING T O DUBDUBAN, STA. 00 + 000 TO STA. 00 + 155, SAN AGUSTIN, ROMBLON
- Contractor: SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) (15906)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-11-06
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱94,651,768.00
- Contract status: Completed Report
- CONSTRUCTION/OPENING OF MAT-I, SITIO SAYAW, BRGY. CANYAY O ROAD, STA. 03 + 701.15, STA.FE, ROMBLON
- Contractor: SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) (15906)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-07-23
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱95,264,080.00
- Contract status: Completed Report
- CONSTRUCTION OF SHORE PROTECTION ALONG BRGY. CARMEN LEAD ING TO FISH SANCTUARY, STA. 00 + 000 - STA. 00 + 170, SAN AGUSTIN, ROMBLON< /span>
- Contractor: SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) (15906)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-11-06
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱97,020,624.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO DECLA RED TOURISM DESTINATION - CONSTRUCTION OF SHORE PROTECTION CAUSEWAY, POBLAC ION, SAN JOSE, ROMBLON
- Contractor: SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) (15906)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-11-07
- Fund source: Regular Infra - GAA 2020 CSSP
- Contract price: ₱95,105,144.00
- Contract status: Completed Report
- CONSTRUCTION OF SHORE PROTECTION/CAUSEWAY, POBLACION, SA N FERNANDO, ROMBLON
- Contractor: SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) (15906)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-11-07
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱93,342,392.00
- Contract status: Completed Report
- CONSTRUCTION/COMPLETION OF MULTI - PURPOSE BUILDING (PAS SENGER TERMINAL PHASE II), BRGY. POBLACION, SAN AGUSTIN, ROMBLON
- Contractor: LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2022-02-04
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱28,958,974.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (AUDITORIUM PHA SE I), BRGY. POBLACION, SAN AGUSTIN, ROMBLON
- Contractor: EMQ DESIGN & CONSTRUCTION (16128)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-10-02
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱19,641,824.00
- Contract status: Completed Report
- CONSTRUCTION OF SEAWALL, BRGY. MASUDSUD, CONCEPCION, ROM BLON
- Contractor: PATRILA BUILDERS, INC. (26628)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-07-04
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱14,849,941.00
- Contract status: Completed Report
- REHABILITATION/CONCRETING OF LOCAL ROAD, BRGY. MAPULA, R OMBLON, ROMBLON
- Contractor: EMQ DESIGN & CONSTRUCTION (16128)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-07-06
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱9,719,389.00
- Contract status: Completed Report
- CONSTRUCTION OF LOCAL ROAD IN SITIO CAHAYAGAN, ALCANTARA , ROMBLON
- Contractor: TABLAS CONSTRUCTION CORPORATION (45015)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-02-27
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,950,000.00
- Contract status: Completed Report
- CONCRETING OF LOCAL ROAD, BRGY. ANAHAO, ODIONGAN, ROMBLO N
- Contractor: TABLAS CONSTRUCTION CORPORATION (45015)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-01-04
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱4,824,060.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (MUNICIPAL GYMN ASIUM), PHASE I, STA. MARIA, ROMBLON
- Contractor: EMQ DESIGN & CONSTRUCTION (16128)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-01-20
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,891,952.12
- Contract status: Completed Report
- CONSTRUCTION/COMPLETION OF MULTI - PURPOSE BUILDING, CON CEPCION NATIONAL HIGH SCHOOL, CONCEPCION, ROMBLON
- Contractor: NOLAN CONSTRUCTION (44243)
- Implementing Agency: Region IV-B - Romblon District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2021-02-03
- Fund source: Regular Infra - GAA 2020 LP
- Contract price: ₱1,933,353.12
- Contract status: Completed Report