Infrastructure Projects in Region IV-B — Region IV-B - Southern Mindoro District Engineering Office, 2024
This page lists public infrastructure projects implemented by Region IV-B - Southern Mindoro District Engineering Office in Region IV-B during 2024. All data are sourced from the Department of Public Works and Highways (DPWH) official database (as of 9/30/2025): https://www.dpwh.gov.ph/dpwh/projects/infrastructure
This information is shared to promote transparency and public awareness. We encourage visitors to validate project details using the official DPWH source. In case of discrepancies, please refer to the original records published by the DPWH.
| Contractor | Projects | Total Price |
|---|---|---|
| LUMEL GLENN CONSTRUCTION (26817) | 14 | ₱413,465,896.25 |
| CAMBERWELL CONSTRUCTION AND SUPPLIES (39624) | 2 | ₱145,493,368.00 |
| ALBERTO UY CONSTRUCTION & DEVELOPMENT (20924) | 5 | ₱108,771,705.00 |
| ANORE CONSTRUCTION (34048) | 1 | ₱96,497,152.00 |
| ALBERTO UY CONSTRUCTION & DEVELOPMENT (20924) / BANAYAD CONSTRUCTION SERVICES (51462) | 1 | ₱67,547,128.00 |
- PREVENTIVE MAINTENANCE - SECONDARY ROADS - BONGABONG - S AGANA - ROXAS -SN AQUILINO RD - K0105+456 - K0105+574, BONGABONG, ORIENTAL MINDORO
- Contractor: LUMEL GLENN CONSTRUCTION (26817)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-07-17
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱3,959,006.75
- Contract status: Completed Report
- PREVENTIVE MAINTENANCE - SECONDARY ROADS - BONGABONG - S AGANA - ROXAS - SN AQUILINO RD - K0110+736 - K0111+005, BONGABONG, ORIENTAL MINDORO
- Contractor: SIXTEEN ENTERPRISES-CALAPAN BRANCH (18187)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-03-22
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱8,744,887.00
- Contract status: Completed Report
- PREVENTIVE MAINTENANCE - SECONDARY ROADS - BONGABONG - S AGANA - ROXAS -SN AQUILINO RD - K0111+334 - K0111+736, BONGABONG, ORIENTAL MINDORO
- Contractor: EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) (13722)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-05-01
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱29,781,266.00
- Contract status: Completed Report
- PREVENTIVE MAINTENANCE - SECONDARY ROADS - CALAPAN SOUTH ROAD - K0090+290 - K0090+418, K0090+798 - K0090+991, BANSUD, ORIENTAL MIND ORO
- Contractor: EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) (13722)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-04-21
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱19,443,986.00
- Contract status: Completed Report
- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROAD - CALAPAN SOUTH ROAD - K0080+663.00 - K0080 +982.00, GLORIA, ORIENTAL MINDORO
- Contractor: E.S.L. BUILDERS & PARTS SUPPLY (9014)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-10-02
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱9,131,270.00
- Contract status: Completed Report
- ROAD WIDENING - SECONDARY ROAD - BONGABONG - SAGANA - RO XAS - SAN AQUILINO ROAD - K0129+062 - K0129+207, ROXAS, ORIENTAL MINDORO
- Contractor: BANAYAD CONSTRUCTION SERVICES (51462)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-04-21
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱6,248,215.50
- Contract status: Completed Report
- ROAD WIDENING - SECONDARY ROADS - CALAPAN SOUTH ROAD - K 0144+011.00 - K0144+387.00, MANSALAY, ORIENTAL MINDORO
- Contractor: LUMEL GLENN CONSTRUCTION (26817)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-06-05
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱12,894,083.00
- Contract status: Completed Report
- ROAD WIDENING - SECONDARY ROADS - CALAPAN SOUTH ROAD - K 0140+283.00 - K0140+405.00, ROXAS, ORIENTAL MINDORO
- Contractor: RM SESCAR ENTERPRISES (36556)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-04-04
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱5,220,572.50
- Contract status: Completed Report
- ROAD WIDENING - SECONDARY ROADS - CALAPAN SOUTH ROAD - K 0150+681 - K0150+775, K0151+011 - K0151+074, MANSALAY, ORIENTAL MINDORO
- Contractor: A.D.L. CONSTRAK OPC (FORMERLY: A.D.L. CONSTRAK) (26442)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-05-16
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱5,828,902.00
- Contract status: Completed Report
- ROAD WIDENING - SECONDARY ROADS - CALAPAN SOUTH ROAD - K 0167+710 - K0167+875, MANSALAY, ORIENTAL MINDORO
- Contractor: ANDREM CONSTRUCTION SERVICE (45282)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-04-21
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱7,112,656.50
- Contract status: Completed Report
- ROAD WIDENING - SECONDARY ROAD - CALAPAN SOUTH ROAD - K0 171+851.00 - K0172+116.00, BULALACAO, ORIENTAL MINDORO
- Contractor: KENTARU CONSTRUCTION AND SUPPLIES (42253)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-05-06
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱9,935,283.00
- Contract status: Completed Report
- ROAD WIDENING - SECONDARY ROAD - CALAPAN SOUTH ROAD - K 0180+715 - K0180+807, BULALACAO, ORIENTAL MINDORO
- Contractor: D.M. ALMERO ENTERPRISES (41675)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-03-22
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱3,152,781.25
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITI ES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF BALITE R IVER CONTROL, STA. 0+300 - STA. 0+718 (BALITE BRIDGE ABUTMENT B - UPSTREAM) , BARANGAY BALITE, GLORIA, ORIENTAL MINDORO
- Contractor: ALBERTO UY CONSTRUCTION & DEVELOPMENT (20924) / BANAYAD CONSTRUCTION SERVICES (51462)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-10-01
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱67,547,128.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITI ES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF BANSUD R IVER CONTROL, STA. 6+909 - STA. 7+340 (UPSTREAM - RIGHT SIDE), BARANGAY CON RAZON, BANSUD, ORIENTAL MINDORO
- Contractor: ALBERTO UY CONSTRUCTION & DEVELOPMENT (20924)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-12-29
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱67,547,176.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITI ES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF BONGABON G RIVER CONTROL, STA. 2+320 - STA. 2+798 (DOWNSTREAM - RIGHT SIDE), BARANGA Y ANILAO, BONGABONG, ORIENTAL MINDORO
- Contractor: LUMEL GLENN CONSTRUCTION (26817)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-11-22
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱67,547,160.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITI ES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF PULA RIV ER CONTROL, STA. 9+070 - STA. 9+490 (UPSTREAM - LEFT SIDE), BARANGAY PAMBIS AN MALAKI, PINAMALAYAN, ORIENTAL MINDORO
- Contractor: LUMEL GLENN CONSTRUCTION (26817)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-01-31
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱67,547,024.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITI ES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF RIVER CO NTROL STRUCTURE ALONG CAWACAT RIVER, CAMBUNANG SECTION, BULALACAO, ORIENTAL MINDORO
- Contractor: MADSAM ENTERPRISES (40136)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-08-04
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱29,396,724.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITI ES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF RIVER CO NTROL STRUCTURE ALONG GLORIA RIVER, MALAMIG SECTION, GLORIA, ORIENTAL MINDO RO
- Contractor: LUMEL GLENN CONSTRUCTION (26817)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-09-09
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱28,822,592.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIR PORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN) - PINAMALAYAN AIRPORT ROAD, PINAMALAYAN, ORIENTAL MINDORO
- Contractor: MG DRAGON CONSTRUCTION SERVICES (50676)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-06-30
- Fund source: Regular Infra - GAA 2024 CP
- Contract price: ₱18,751,146.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECL ARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) SAN ROQUE - SAN JUAN - TAFARMA ROAD, BRGY. SAN JUAN, BULALACAO, ORIENTAL MINDOR O
- Contractor: E E CONSTRUCTION (45017)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-05-06
- Fund source: Regular Infra - GAA 2024 CP
- Contract price: ₱9,797,029.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECL ARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) GALL EGO ROAD LEADING TO CASABANGAN BEACH AND MANGAL MARINE PROTECTED AREA (MMPA ), MANSALAY, ORIENTAL MINDORO
- Contractor: D.M. MALIWANAG BUILDERS AND ENTERPRISES (32589)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-04-16
- Fund source: Regular Infra - GAA 2024 CP
- Contract price: ₱4,897,439.50
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECL ARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) INTE RNAL ACCESS ROAD TO SITIO PALAMANG, MANIHALA, LEADING TO MANIHALA WATERFALL S II, BANSUD, ORIENTAL MINDORO
- Contractor: GREEN ISLAND ENTERPRISES (36835)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-07-05
- Fund source: Regular Infra - GAA 2024 CP
- Contract price: ₱14,697,705.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECL ARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - NR J LEADING TO PHANTOM CAVE AND BAMBOO PLANTATION, GLORIA, ORIENTAL MINDORO
- Contractor: LED REYES CONSTRUCTION (LRC), OPC (54658)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-05-06
- Fund source: Regular Infra - GAA 2024 CP
- Contract price: ₱14,696,222.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECL ARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - BR GY. MALUBAY TO BRGY. BUONG LUPA TO WALANG LANGIT FALLS, GLORIA, ORIENTAL MI NDORO
- Contractor: E E CONSTRUCTION (45017)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-06-05
- Fund source: Regular Infra - GAA 2024 CP
- Contract price: ₱14,697,051.00
- Contract status: Completed Report
- INSTALLATION OF SIGNAGE - WARNING ADVISORY AND REGULATOR Y SIGNS AND PAVEMENT MARKINGS - PEDESTRIAN AND PEDESTRIAN FENCING ALONG CAL APAN SOUTH RD - K0067+000 - K0068+000, PINAMALAYAN, ORIENTAL MINDORO
- Contractor: D.M. ALMERO ENTERPRISES (41675)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-04-01
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱989,292.62
- Contract status: Completed Report
- INSTALLATION OF SIGNAGE-WARNING, ADVISORY AND REGULATORY SIGNS, PAVEMENT MARKINGS-CENTERLINES, EDGE LINES (INCLUDING PROFILE EDGE L INES) AND INDENTED PARKING, BAN PARKING, INDENTED BUS/JEEPNEY STOP, RELOCAT E BUS/JEEPNEY STOP ALONG CALAPAN SOUTH ROAD-K0069
- Contractor: D.M. ALMERO ENTERPRISES (41675)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-04-01
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱468,901.56
- Contract status: Completed Report
- INSTALLATION/APPLICATION/CONSTRUCTION OF SIGNAGE-WARNING , ADVISORY AND REGULATORY SIGNS AND PAVEMENT MARKINGS-CENTERLINES, EDGELINE S (INCLUDING PROFILE EDGELINES) ALONG CALAPAN SOUTH RD K0075+000-K0076+000, BRGY. BULAKLAKAN, GLORIA, ORIENTAL MINDORO
- Contractor: D.M. ALMERO ENTERPRISES (41675)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-04-01
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱1,540,201.62
- Contract status: Completed Report
- INSTALLATION/APPLICATION OF SIGNAGE - WARNING ADVISORY A ND REGULATORY SIGNS AND PAVEMENT MARKINGS - CENTERLINES, EDGELINES ALONG MI NDORO ORIENTAL/OCCIDENTAL EAST COASTAL RD - K0200+000 - K0201+500, BULALACA O, ORIENTAL MINDORO
- Contractor: D.M. ALMERO ENTERPRISES (41675)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-04-11
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱2,185,619.50
- Contract status: Completed Report
- INSTALLATION/APPLICATION OF SIGNAGE, PAVEMENT MARKINGS A LONG CALAPAN SOUTH RD - K0072+000 - K0074+000, PINAMALAYAN, ORIENTAL MINDOR O
- Contractor: WEBUILD CONSTRUCTION (47494)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-04-01
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱1,234,245.75
- Contract status: Completed Report
- SUSTAINABLE INFRASTRUCTURE PROJECT ALLEVIATING GAPS (SIP AG) - CONSTRUCTION OF MARAYOS - SABANG ROAD, PINAMALAYAN, ORIENTAL MINDORO< /span>
- Contractor: LUMEL GLENN CONSTRUCTION (26817)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-10-30
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱48,997,948.00
- Contract status: Completed Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG) - CONSTRUCTION OF PILI - BANILAD ROAD, PINAMALAYAN, ORIENTAL MINDORO< /span>
- Contractor: ALBERTO UY CONSTRUCTION & DEVELOPMENT (20924)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-10-25
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱29,397,460.00
- Contract status: Completed Report
- SUSTAINABLE INFRASTRUCTURE PROJECT ALLEVIATING GAPS (SIP AG) - CONSTRUCTION OF STA. ISABEL - GUINHAWA ROAD, PINAMALAYAN, ORIENTAL MI NDORO
- Contractor: LUMEL GLENN CONSTRUCTION (26817)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-12-12
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱48,995,052.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD LEADING TO PNP RTC & AFP, BARAN GAY PAG-ASA, BANSUD, ORIENTAL MINDORO
- Contractor: GREEN ISLAND ENTERPRISES (36835)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-05-21
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱9,897,386.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD BARANGAY ANILAO - MASAGUISI, BONGA BONG, ORIENTAL MINDORO
- Contractor: BANAYAD CONSTRUCTION SERVICES (51462)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-04-01
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,947,351.50
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, BARANGAY B. DEL MUNDO, MANSALAY, O RIENTAL MINDORO
- Contractor: WECONSTRUCT CONSTRUCTION AND SUPPLY (42049)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-04-17
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,947,909.50
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, SITIO BIL-ISAN, BARANGAY BANILAD, PINAMALAYAN, ORIENTAL MINDORO
- Contractor: TWENTY SIXTEEN CONSTRUCTION AND GENERAL MERCHANDISE (41944)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-07-19
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱19,795,980.00
- Contract status: Completed Report
- CONSTRUCTION OF DRAINAGE CANAL, BARANGAY MAUJAO, BULALAC AO, ORIENTAL MINDORO
- Contractor: SOSEP BUILDERS (33845)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-05-16
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,947,019.50
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF LEGISLATIVE BUILDING AT BAR ANGAY ZONE III, PINAMALAYAN, ORIENTAL MINDORO
- Contractor: L.N. SALVADOR CONSTRUCTION CORP. (FOR: L.N. SALVADOR CONSTRUCTION) (16661)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-03-11
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱19,426,172.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF LEGISLATIVE BUILDING AT BAR ANGAY BAGUMBAYAN, ROXAS, ORIENTAL MINDORO
- Contractor: LUCKY SHINING STAR DEVELOPMENT CORP. (53982)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-10-08
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱14,847,209.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BAR ANGAY POLUSAHI, BONGABONG, ORIENTAL MINDORO
- Contractor: D.M. ALMERO ENTERPRISES (41675)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-05-01
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱1,977,185.12
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BAR ANGAY BAGONG SIKAT, BULALACAO, ORIENTAL MINDORO
- Contractor: D.M. ALMERO ENTERPRISES (41675)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-05-01
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱1,943,053.25
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BAR ANGAY BUKAL, BONGABONG, ORIENTAL MINDORO
- Contractor: RM SESCAR ENTERPRISES (36556)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-05-04
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱1,947,439.75
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BAR ANGAY CAMBUNANG, BULALACAO, ORIENTAL MINDORO
- Contractor: D.M. ALMERO ENTERPRISES (41675)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-07-21
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱1,943,053.25
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BAR ANGAY DAYHAGAN, BONGABONG ORIENTAL MINDORO
- Contractor: ALBERTO UY CONSTRUCTION & DEVELOPMENT (20924)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-05-01
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱1,932,832.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BAR ANGAY MAASIN, BULALACAO, ORIENTAL MINDORO
- Contractor: ANDREM CONSTRUCTION SERVICE (45282)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-05-01
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱1,976,922.25
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BAR ANGAY PANGGULAYAN, PINAMALAYAN, ORIENTAL MINDORO
- Contractor: WEBUILD CONSTRUCTION (47494)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-05-31
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱2,967,748.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BAR ANGAY POBLACION, MANSALAY, ORIENTAL MINDORO
- Contractor: LUMEL GLENN CONSTRUCTION (26817)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-08-13
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,867,020.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT PNP, BARANGAY CACAWAN, PINAMALAYAN, ORIENTAL MINDORO
- Contractor: MENDOPAD PROPERTY DEVELOPMENT AND MANAGEMENT CORPORATION (46305)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-10-14
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,947,868.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BAR ANGAY ORCONUMA, BONGABONG, ORIENTAL MINDORO
- Contractor: WEBUILD CONSTRUCTION (47494)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-05-01
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱1,977,936.25
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, BARANGAY TAWAS , BONGABONG, ORIENTAL MINDORO
- Contractor: ARCHIDUS DEVELOPMENT CORPORATION (48828)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-07-30
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,947,016.00
- Contract status: Completed Report
- CONSTRUCTION MULTI-PURPOSE BUILDING, GATOL ELEMENTARY SC HOOL, BARANGAY SAN ROQUE, BULALACAO, ORIENTAL MINDORO
- Contractor: RM SESCAR ENTERPRISES (36556)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-08-02
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,947,225.50
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, MAG DALENA UMALI SUYON MEMORIAL ELEMENTARY SCHOOL, BARANGAY IPIL, BONGABONG, OR IENTAL MINDORO
- Contractor: BANAYAD CONSTRUCTION SERVICES (51462)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-05-31
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱2,967,880.25
- Contract status: Completed Report
- ROAD WIDENING - SECONDARY ROADS CALAPAN SOUTH ROAD K0138 +131 - K0138+473, ROXAS, ORIENTAL MINDORO
- Contractor: AIDFELART CONST. CORP. (38811)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-05-21
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱14,118,848.00
- Contract status: Completed Report
- INSTALLATION/APPLICATION/CONSTRUCTION OF SIGNAGE-WARNING , ADVISORY AND REGULATORY SIGNS AND PAVEMENT MARKINGS-CENTERLINES, EDGELINE S, PEDESTRIAN AND PEDESTRIAN FENCING ALONG CALAPAN SOUTH RD K0088+000-K0095 +000, BANSUD, ORIENTAL MINDORO
- Contractor: AIDFELART CONST. CORP. (38811)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-04-16
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,492,294.50
- Contract status: Completed Report
- INTERVENTION/COUNTERMEASURES OF BLACKSPOT IDENTIFIED LOC ATIONS ALONG CALAPAN SOUTH ROAD, BONGABONG, ORIENTAL MINDORO, CALAPAN SOUTH RD-K0102+000 K0104+000, BONGABONG, ORIENTAL MINDORO
- Contractor: RM SESCAR ENTERPRISES (36556)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-04-09
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱2,038,584.62
- Contract status: Completed Report
- INSTALLATION/APPLICATION/CONSTRUCTION OF SIGNAGE-WARNING , ADVISORY AND REGULATORY SIGNS AND PAVEMENT MARKINGS-CENTERLINES, EDGELINE S PEDESTRIAN AND PEDESTRIAN FENCING ALONG BONGABONG-SAGANA-ROXAS-SAN AQUILI NO RD K0125+700-K0126+200, ROXAS, ORIENTAL MIND
- Contractor: WEBUILD CONSTRUCTION (47494)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-04-01
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱587,605.75
- Contract status: Completed Report
- ROAD WIDENING SECONDARY ROADS - CALAPAN SOUTH ROAD K017 6+215 K0176+535, BULALACAO, ORIENTAL MINDORO
- Contractor: LUMEL GLENN CONSTRUCTION (26817)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-04-26
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱17,077,270.00
- Contract status: Completed Report
- WIDENING OF PERMANENT BRIDGES: BUDBURAN BR. (B00233MR) A LONG CALAPAN SOUTH ROAD, MANSALAY, ORIENTAL MINDORO
- Contractor: WILLIAM UY CONSTRUCTION CORPORATION (560)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-03-15
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱48,994,044.00
- Contract status: Completed Report
- WIDENING OF PERMANENT BRIDGES: BURABOD BR. (B00070MR) AL ONG CALAPAN SOUTH RD., MANSALAY, ORIENTAL MINDORO
- Contractor: D.M. MALIWANAG BUILDERS AND ENTERPRISES (32589)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-11-27
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱22,537,628.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITI ES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF BANSUD R IVER CONTROL, BARANGAY MALAYA SECTION, BANSUD, ORIENTAL MINDORO
- Contractor: IGWT-JAV CONSTRUCTION & DEVELOPMENT CORPORATION (49131)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-09-26
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱48,997,596.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITI ES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF BANUS RI VER CONTROL, BARANGAY MALAYONG - BARANGAY MANGUYANG SECTION, GLORIA, ORIENT AL MINDORO
- Contractor: LUMEL GLENN CONSTRUCTION (26817)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-12-04
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱48,997,248.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITI ES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF BONGABON G RIVER CONTROL, BRGY. MORENTE SECTION, BONGABONG, ORIENTAL MINDORO< /li>
- Contractor: CAMBERWELL CONSTRUCTION AND SUPPLIES (39624)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-02-18
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱96,496,496.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITI ES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF MADUGO I RIVER CONTROL, BARANGAY MALAYA SECTION, ROXAS, ORIENTAL MINDORO
- Contractor: LUMEL GLENN CONSTRUCTION (26817)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-12-21
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱48,997,656.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITI ES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF CAWACAT RIVER (DOWNSTREAM), BRGY. CAMPAASAN SECTION, BULALACAO, ORIENTAL MINDORO
- Contractor: ANORE CONSTRUCTION (34048)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-01-07
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱96,497,152.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITI ES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF WASIG RI VER CONTROL (DOWNSTREAM), BARANGAY WASIG, MANSALAY, ORIENTAL MINDORO
- Contractor: CAMBERWELL CONSTRUCTION AND SUPPLIES (39624)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-12-17
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱48,996,872.00
- Contract status: Completed Report
- CONSTRUCTION OF LUMANGBAYAN PCDG BRIDGE, BRGY. LUMANGBAY AN, PINAMALAYAN, ORIENTAL MINDORO
- Contractor: ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762) / MG DRAGON CONSTRUCTION SERVICES (50676)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-02-16
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱48,959,548.00
- Contract status: Completed Report
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SI PAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILI TIES - CONSTRUCTION OF CAVILLAN RIVER WATERWAY ENHANCEMENT STRUCTURE (NASUK OB SECTION), ALONG SITIO CAVILLAN, BARANGAY NASUK
- Contractor: D.M. MALIWANAG BUILDERS AND ENTERPRISES (32589)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-10-26
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱29,397,112.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD AT BARANGAY LABASAN, BONGABONG, ORI ENTAL MINDORO, PHASE I
- Contractor: DNY CONSTRUCTION AND SUPPLY (40011)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-05-02
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,947,462.50
- Contract status: Completed Report
- CONSTRUCTION OF ROAD AT BARANGAY LABASAN, BONGABONG, ORI ENTAL MINDORO, PHASE II
- Contractor: DNY CONSTRUCTION AND SUPPLY (40011)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-05-02
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,947,254.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD AT BARANGAY MANAUL, MANSALAY, ORIEN TAL MINDORO
- Contractor: WTL CONSTRUCTION (36866)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-05-20
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,947,931.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD AT SITIO HIGHLANDER, BARANGAY BANUT AN, GLORIA, ORIENTAL MINDORO
- Contractor: ALBERTO UY CONSTRUCTION & DEVELOPMENT (20924)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-05-07
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,946,915.50
- Contract status: Completed Report
- CONSTRUCTION OF ROAD AT SITIO RIVERSIDE, BARANGAY SAN IS IDRO, ROXAS, ORIENTAL MINDORO
- Contractor: ALBERTO UY CONSTRUCTION & DEVELOPMENT (20924)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-05-02
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,947,321.50
- Contract status: Completed Report
- CONSTRUCTION OF ROAD AT SITIO TAGAO, BARANGAY MANIHALA, BANSUD, ORIENTAL MINDORO
- Contractor: MADSAM ENTERPRISES (40136)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-07-11
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,947,198.50
- Contract status: Completed Report
- CONSTRUCTION OF ROAD AT SITIO UYAO, BAGUMBAYAN, ROXAS, O RIENTAL MINDORO
- Contractor: WEBUILD CONSTRUCTION (47494)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-05-02
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,947,972.50
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, BRGY. SAN MARIANO, ROXAS, ORIENTAL MINDORO
- Contractor: MARCPHIL CONSTRUCTION OPC (FORMERLY: MARCPHIL CONSTRUCTION) (10949)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-07-01
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱13,436,351.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, SITIO MASAGANA, BARANGAY POBLACION , BANSUD, ORIENTAL MINDORO
- Contractor: MADSAM ENTERPRISES (40136)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-07-09
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,781,798.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI- PURPOSE BUILDING AT BARANGAY BAGONG BAYAN I, BONGABONG, ORIENTAL MINDORO
- Contractor: BANAYAD CONSTRUCTION SERVICES (51462)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-08-22
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱2,921,996.50
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT B ARANGAY SAN RAFAEL, ROXAS, ORIENTAL MINDORO
- Contractor: AIDFELART CONST. CORP. (38811)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-08-29
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱2,922,440.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT B ARANGAY STA. MARIA, PINAMALAYAN, ORIENTAL MINDORO
- Contractor: WECONSTRUCT CONSTRUCTION AND SUPPLY (42049)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-09-09
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱2,966,871.25
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI- PURPOSE BUILDING AT SITIO AVOCADO, BARANGAY ANOLING, PINAMALAYAN, ORIENTAL MINDORO
- Contractor: ANSAVILLA CONSTRUCTION AND DEVELOPMENT CORPORATION (38518)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-08-30
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱2,966,928.25
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT S ITIO CENTRO, BARANGAY MARAYOS, PINAMALAYAN, ORIENTAL MINDORO
- Contractor: ARCHIDUS DEVELOPMENT CORPORATION (48828)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-08-28
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱2,922,179.75
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY SAN R OQUE, BULALACAO, ORIENTAL MINDORO
- Contractor: LUMEL GLENN CONSTRUCTION (26817)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-09-15
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,869,870.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING AT BRGY. VILLA CELESTIAL, MANSALAY, ORIENTAL MINDORO
- Contractor: LUMEL GLENN CONSTRUCTION (26817)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-08-30
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,947,398.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT CONRAZON ELEME NTARY SHOOL, BARANGAY CONRAZON, BANSUD, ORIENTAL MINDORO
- Contractor: BANAYAD CONSTRUCTION SERVICES (51462)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-10-18
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,947,501.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING AT SITIO BALAGB AG, BARANGAY MALIGAYA, GLORIA, ORIENTAL MINDORO
- Contractor: LED REYES CONSTRUCTION (LRC), OPC (54658)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-12-10
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱14,845,593.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI- PURPOSE BUILDING (BALAY KALINGA), BANSUD, ORIENTAL MINDORO
- Contractor: A.D.L. CONSTRAK OPC (FORMERLY: A.D.L. CONSTRAK) (26442)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-06-09
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱29,690,632.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (BALAY ARUGA), MU NICIPALITY OF ROXAS, ORIENTAL MINDORO
- Contractor: MARCPHIL CONSTRUCTION OPC (FORMERLY: MARCPHIL CONSTRUCTION) (10949)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-05-23
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱19,599,618.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI- PURPOSE BUILDING (CLASSROOM), CAC AWAN HIGH SCHOOL, BRGY. CACAWAN, PINAMALAYAN, ORIENTAL MINDORO
- Contractor: A.D.L. CONSTRAK OPC (FORMERLY: A.D.L. CONSTRAK) (26442)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-11-11
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱9,897,996.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, POBLACION, BULAL ACAO, ORIENTAL MINDORO
- Contractor: ARCHIDUS DEVELOPMENT CORPORATION (48828)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-02-08
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,947,298.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. ZONE 2, PI NAMALAYAN, ORIENTAL MINDORO
- Contractor: EKB BUILDERS AND DEVELOPMENT CORP. (52867)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-01-27
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱9,897,197.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI- PURPOSE BUILDING (MUNICIPAL GYMNA SIUM), BANSUD, ORIENTAL MINDORO
- Contractor: GREEN ISLAND ENTERPRISES (36835)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-03-21
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱9,895,909.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD BRGY. BANGBANG, PINAMALAYAN, ORIENT AL MINDORO
- Contractor: LUMEL GLENN CONSTRUCTION (26817)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-07-18
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,946,568.00
- Contract status: Completed Report
- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROAD - BONGABONG - SAGANA - ROXAS - SAN AQUIL INO RD - K0112+022.00 - K0112+222.00, K0128+005.00 - K0128+396.00, BONGA BONG - ROXAS, ORIENTAL MINDORO
- Contractor: GREEN ISLAND ENTERPRISES (36835)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-04-13
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱16,947,476.00
- Contract status: Completed Report
- CONSTRUCTION OF RAINWATER COLLECTOR SYSTEM IN PUBLIC FAC ILITIES, BONGABONG - BULALACAO, ORIENTAL MINDORO
- Contractor: ANSAVILLA CONSTRUCTION AND DEVELOPMENT CORPORATION (38518)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2024-08-06
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱2,848,744.25
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE FACILITY, PIN AMALAYAN, ORIENTAL MINDORO
- Contractor: GREEN ISLAND ENTERPRISES (36835)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-04-23
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱9,715,623.00
- Contract status: On-Going Report
- REHABILITATION OF MULTI-PURPOSE FACILITY, PINAMALAYAN, O RIENTAL MINDORO (PHASE 2)
- Contractor: LEWIS GJANN CONSTRUCTION (54135)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-06-28
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱14,579,556.00
- Contract status: On-Going Report
- CONSTRUCTION OF MULTI- PURPOSE BUILDING, COMMUNITY COLLE GE, BRGY. POBLACION, MANSALAY, ORIENTAL MINDORO
- Contractor: WEBUILD CONSTRUCTION (47494)
- Implementing Agency: Region IV-B - Southern Mindoro District Engineering Office
- Region: Region IV-B
- Contract effectivity:
- Contract expiry: 2025-04-12
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱19,787,706.00
- Contract status: On-Going Report