Infrastructure Projects in Region VI — Region VI - Iloilo 1st District Engineering Office, 2016
This page lists public infrastructure projects implemented by Region VI - Iloilo 1st District Engineering Office in Region VI during 2016. All data are sourced from the Department of Public Works and Highways (DPWH) official database (as of 9/30/2025): https://www.dpwh.gov.ph/dpwh/projects/infrastructure
This information is shared to promote transparency and public awareness. We encourage visitors to validate project details using the official DPWH source. In case of discrepancies, please refer to the original records published by the DPWH.
| Contractor | Projects | Total Price |
|---|---|---|
| IBC INTERNATIONAL BUILDERS CORPORATION (8576) | 6 | ₱135,012,881.00 |
| JHJ CONSTRUCTION (3781) | 3 | ₱57,048,772.00 |
| F. GURREA CONSTRUCTION, INCORPORATED (6995) | 1 | ₱45,599,460.00 |
| J.E. TICO CONSTRUCTION CO., INC. (FORMERLY: JET CO (7063) | 2 | ₱44,358,546.00 |
| GALENO CONSTRUCTION, INC. (3427) | 2 | ₱24,877,952.50 |
- CONSTRUCTION OF CAMANGAHAN-BACONG ROAD, GUIMBAL, ILOILO S TA. 0+000 - STA. 0+297
- Contractor: BILLENA CONSTRUCTION (7434)
- Implementing Agency: Region VI - Iloilo 1st District Engineering Office
- Region: Region VI
- Contract effectivity:
- Contract expiry: 2016-03-11
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱3,761,400.50
- Contract status: Completed Report
- REHABILITATION/MAJOR REPAIR OF ALAMEDA BRIDGE (B00043PN) ALONG GUIMBAL-IGBARAS-TUBUNGAN-LEON ROAD, IGBARAS, ILOILO, K47+303< /li>
- Contractor: ALJ CONSTRUCTION AND SUPPLY (30571)
- Implementing Agency: Region VI - Iloilo 1st District Engineering Office
- Region: Region VI
- Contract effectivity:
- Contract expiry: 2016-04-27
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱949,820.12
- Contract status: Completed Report
- RETROFITTING/STRENGTHENING OF NITO-AN BRIDGE (B00038PN) A LONG GUIMBAL-IGBARAS-TUBUNGAN-LEON ROAD, GUIMBAL, ILOILO, K0034+451< /li>
- Contractor: ALJ CONSTRUCTION AND SUPPLY (30571)
- Implementing Agency: Region VI - Iloilo 1st District Engineering Office
- Region: Region VI
- Contract effectivity:
- Contract expiry: 2016-03-04
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱2,792,937.75
- Contract status: Completed Report
- REHABILITATION/MAJOR REPAIR OF JOVELLAR BRIDGE (B00039PN) ALONG GUIMBAL-IGBARAS-TUBUNGAN-LEON ROAD, IGBARAS, ILOILO K36+728
- Contractor: ALJ CONSTRUCTION AND SUPPLY (30571)
- Implementing Agency: Region VI - Iloilo 1st District Engineering Office
- Region: Region VI
- Contract effectivity:
- Contract expiry: 2016-03-04
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱949,418.19
- Contract status: Completed Report
- RETROFITTING/STRENGTHENING OF IYASAN BRIDGE (B00037PN) AL ONG GUIMBAL-IGBARAS-TUBUNGAN-LEON ROAD, GUIMBAL, ILOILO, K0033+400
- Contractor: VANNIE CONSTRUCTION AND SUPPLY (FORMERLY: VANNIE (27335)
- Implementing Agency: Region VI - Iloilo 1st District Engineering Office
- Region: Region VI
- Contract effectivity:
- Contract expiry: 2016-03-04
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱3,723,207.25
- Contract status: Completed Report
- CONSTRUCTION OF IGBUGO-IGSOLIGUE ROAD, MIAG-AO, ILOILO ST A. 0+000 - STA. 0+248 W/ EXCEPTION
- Contractor: BILLENA CONSTRUCTION (7434)
- Implementing Agency: Region VI - Iloilo 1st District Engineering Office
- Region: Region VI
- Contract effectivity:
- Contract expiry: 2016-04-06
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱2,960,710.25
- Contract status: Completed Report
- REHAB/CONST/UPGRADING OF DAMAGED PAVED NATIONAL ROAD INCL UDING DRAINAGE, GUIMBAL-TUBUNGAN ROAD, GUIMBAL, ILOILO, K0034+079 - K0034+2 18; K0035+653 - K0036+164; K0040+179 - K0040+324
- Contractor: JHJ CONSTRUCTION (3781)
- Implementing Agency: Region VI - Iloilo 1st District Engineering Office
- Region: Region VI
- Contract effectivity:
- Contract expiry: 2016-07-23
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱15,219,222.00
- Contract status: Completed Report
- CONSTRUCTION OF BINANUA-AN UBOS ROAD, GUIMBAL, ILOILO 1ST L.D., BINANUA-AN, GUIMBAL, ILOILO, STA. 0+000 - STA. 0+286
- Contractor: BILLENA CONSTRUCTION (7434)
- Implementing Agency: Region VI - Iloilo 1st District Engineering Office
- Region: Region VI
- Contract effectivity:
- Contract expiry: 2016-09-18
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱2,964,499.00
- Contract status: Completed Report
- CONSTRUCTION OF PITOGO-CUBAY ROAD, SAN JOAQUIN, ILOILO, S TA. 00+000 STA. 00+135
- Contractor: BILLENA CONSTRUCTION (7434)
- Implementing Agency: Region VI - Iloilo 1st District Engineering Office
- Region: Region VI
- Contract effectivity:
- Contract expiry: 2016-04-06
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱2,710,682.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIP S, SLOPE COLLAPSE & LANDSLIDE, TIOLAS-SINUGBUHAN ROAD, SAN JOAQUIN, ILO ILO, K0065+300 - K0065+500
- Contractor: SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC. (25226)
- Implementing Agency: Region VI - Iloilo 1st District Engineering Office
- Region: Region VI
- Contract effectivity:
- Contract expiry: 2016-10-30
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱18,647,316.00
- Contract status: Completed Report
- REHABILITATION/MAJOR REPAIR OF SEGUIDAN BRIDGE (B00045PN ) ALONG GUIMBAL-IGBARAS-TUBUNGAN-LEON ROAD, IGBARAS, ILOILO, K0056+201
- Contractor: KENBE CONSTRUCTION & SUPPLY (34290)
- Implementing Agency: Region VI - Iloilo 1st District Engineering Office
- Region: Region VI
- Contract effectivity:
- Contract expiry: 2016-03-30
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱1,857,041.38
- Contract status: Completed Report
- LOCAL INFRASTRUCTURE PROGRAM - CONSTRUCTION OF LEVEL II WATER SYSTEM, GUIMBAL, ILOILO 1ST L.D.
- Contractor: ALJ CONSTRUCTION AND SUPPLY (30571)
- Implementing Agency: Region VI - Iloilo 1st District Engineering Office
- Region: Region VI
- Contract effectivity:
- Contract expiry: 2016-06-20
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱1,974,972.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE, OTON-PAKIAD-MANDURRIAO ROAD, OTON, ILOI LO, K009+(-326) - K009+000
- Contractor: JHJ CONSTRUCTION (3781)
- Implementing Agency: Region VI - Iloilo 1st District Engineering Office
- Region: Region VI
- Contract effectivity:
- Contract expiry: 2016-07-24
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱9,196,402.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE, GUIMBAL-IGBARAS-TUBUNGAN-LEON ROAD, GUI MBAL, ILOILO 1ST L.D., STA. 31+463 - STA. 31+903
- Contractor: TOPMOST DEVELOPMENT & MKTG. CORP. (13361)
- Implementing Agency: Region VI - Iloilo 1st District Engineering Office
- Region: Region VI
- Contract effectivity:
- Contract expiry: 2016-05-27
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱9,492,918.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE, ILOILO-ANTIQUE ROAD, OTON, GUIMBAL & ; MIAG-AO, ILOILO, K0012+814 - K0015+118; K0025+544 - K0025+708; K0033+037 - K0033+340; K0042+530 - K0043+000
- Contractor: J.E. TICO CONSTRUCTION CO., INC. (FORMERLY: JET CO (7063)
- Implementing Agency: Region VI - Iloilo 1st District Engineering Office
- Region: Region VI
- Contract effectivity:
- Contract expiry: 2016-11-25
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱25,555,738.00
- Contract status: Completed Report
- CONSTRUCTION ACCESS ROAD LEADING TO GUIMBAL PORT, GUIMBA L, ILOILO 1ST L.D., STA. 0+182.80 - STA. 0+232.282
- Contractor: GALENO CONSTRUCTION, INC. (3427)
- Implementing Agency: Region VI - Iloilo 1st District Engineering Office
- Region: Region VI
- Contract effectivity:
- Contract expiry: 2016-07-25
- Fund source: Regular Infra - GAA 2016 MFO-3
- Contract price: ₱6,137,042.50
- Contract status: Completed Report
- CONSTRUCTION OF SHORE PROTECTION GUIMBAL ILOILO 1ST L.D.
- Contractor: IBC INTERNATIONAL BUILDERS CORPORATION (8576)
- Implementing Agency: Region VI - Iloilo 1st District Engineering Office
- Region: Region VI
- Contract effectivity:
- Contract expiry: 2016-07-17
- Fund source: Regular Infra - GAA 2016 MFO-2
- Contract price: ₱22,309,640.00
- Contract status: Completed Report
- REHABILITATION/IMPROVEMENT OF GUIMBAL COASTAL ROAD LEADI NG TO BANTAYAN MORO TOWERS, BEACHES AND SEAPORT/TOURISM GATEWAY, GUIMBAL, I LOILO
- Contractor: GALENO CONSTRUCTION, INC. (3427)
- Implementing Agency: Region VI - Iloilo 1st District Engineering Office
- Region: Region VI
- Contract effectivity:
- Contract expiry: 2016-09-13
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱18,740,910.00
- Contract status: Completed Report
- RETROFITTING/STRENGTHENING OF BARAS BRIDGE (B00127PN) AL ONG ILOILO-ANTIQUE ROAD, GUIMBAL, ILOILO
- Contractor: H.L.J CONSTRUCTION & ENTERPRISES (18080)
- Implementing Agency: Region VI - Iloilo 1st District Engineering Office
- Region: Region VI
- Contract effectivity:
- Contract expiry: 2016-05-29
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱4,654,761.00
- Contract status: Completed Report
- COMPLETION OF MULTI-PURPOSE BUILDING IN OTON AND TIGBAUA N (CLUSTER 1), OTON AND TIGBAUAN, ILOILO 1ST L.D.: A) COMPLETION OF MP BUI LDINGS OF STA. RITA-PAKIAD-BOTONG-CABANBANAN ELEMENTARY SCHOOL, OTON, ILOIL O 1ST L.D.; B) COMPLETION OF MP BUILDINGS OF PAR
- Contractor: S.T. SALCEDO CONSTRUCTION CORP.(FORMERLY: SHAK CONSTRUCTION & SUPPLY) (28289)
- Implementing Agency: Region VI - Iloilo 1st District Engineering Office
- Region: Region VI
- Contract effectivity:
- Contract expiry: 2016-05-15
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱1,385,071.25
- Contract status: Completed Report
- COMPLETION OF MULTI-PURPOSE BUILDINGS IN GUIMBAL, IGBARA S AND TUBUNGAN (CLUSTER 2), GUIMBAL, IGBARAS & TUBUNGAN, ILOILO 1ST L.D .: A) COMPLETION OF MP BUILDINGS OF GUIMBAL-CAMANGAHAN-NALUNDAN-PARTICION E LEMENTARY SCHOOL, GUIMBAL, ILOILO 1ST L.D.; B) COMPLE
- Contractor: S.T. SALCEDO CONSTRUCTION CORP.(FORMERLY: SHAK CONSTRUCTION & SUPPLY) (28289)
- Implementing Agency: Region VI - Iloilo 1st District Engineering Office
- Region: Region VI
- Contract effectivity:
- Contract expiry: 2016-06-19
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱2,176,775.50
- Contract status: Completed Report
- COMPLETION OF MULTI-PURPOSE BUILDINGS IN MIAG-AO AND SAN JOAQUIN (CLUSTER 3), MIAG-AO AND SAN JOAQUIN, ILOILO 1ST L.D.: A) COMPLETI ON OF MP BUILDINGS OF MIAG-AO EAST-MIAG-AO WEST-GUIBOANGAN ELEMENTARY SCHOO L, MIAG-AO, ILOILO 1ST L.D.; B) COMPLETION OF MP
- Contractor: S.T. SALCEDO CONSTRUCTION CORP.(FORMERLY: SHAK CONSTRUCTION & SUPPLY) (28289)
- Implementing Agency: Region VI - Iloilo 1st District Engineering Office
- Region: Region VI
- Contract effectivity:
- Contract expiry: 2016-12-12
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱1,235,205.88
- Contract status: Completed Report
- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS, ILOILO-ANTIQUE ROAD, TIGBAUAN & MIAG-AO, ILOILO, K0022+ 904 -K0023+027; K0037+850 - K0038+150; K0043+800 - K0044+262; K0047+000 - K 0047+164
- Contractor: SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC. (25226)
- Implementing Agency: Region VI - Iloilo 1st District Engineering Office
- Region: Region VI
- Contract effectivity:
- Contract expiry: 2016-10-15
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱15,049,778.00
- Contract status: Completed Report
- CONCRETING OF NALUNDAN ROAD LEADING TO NALUNDAN NATIONAL HIGH SCHOOL, BRGY. NALUNDAN, GUIMBAL, ILOILO, KM. 0+000 - KM. 0+201.20
- Contractor: ALLENCON DEVELOPMENT CORPORATION (12302)
- Implementing Agency: Region VI - Iloilo 1st District Engineering Office
- Region: Region VI
- Contract effectivity:
- Contract expiry: 2016-07-04
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱2,820,052.50
- Contract status: Completed Report
- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS, GUIMBAL-TUBUNGAN ROAD, GUIMBAL, ILOILO, K0029+(-)750 - K002 9+(-)202
- Contractor: STELLAR BUILDERS (35031)
- Implementing Agency: Region VI - Iloilo 1st District Engineering Office
- Region: Region VI
- Contract effectivity:
- Contract expiry: 2016-06-24
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱3,493,494.00
- Contract status: Completed Report
- WIDENING OF NANGA BRIDGE (B00481PN) ALONG ILOILO-ANTIQUE ROAD
- Contractor: WILKINSON CONSTRUCTION (21422)
- Implementing Agency: Region VI - Iloilo 1st District Engineering Office
- Region: Region VI
- Contract effectivity:
- Contract expiry: 2017-01-04
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱12,724,885.00
- Contract status: Completed Report
- REHABILITATION/IMPROVEMENT OF NAMOCON-ZAYCO-BRGY. 4 ROAD LEADING TO PANAY FIRST SUGAR MILL AND DAIRY FARM, TIGBAUAN, ILOILO< /li>
- Contractor: J.E. TICO CONSTRUCTION CO., INC. (FORMERLY: JET CO (7063)
- Implementing Agency: Region VI - Iloilo 1st District Engineering Office
- Region: Region VI
- Contract effectivity:
- Contract expiry: 2016-11-11
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱18,802,808.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF OTON MULTI-PURPOSE BUILDING, BRGY. POBLACION SOUTH, OTON, ILOILO 1ST L.D.
- Contractor: CHAMPION BUILDERS AND SUPPLY (34222)
- Implementing Agency: Region VI - Iloilo 1st District Engineering Office
- Region: Region VI
- Contract effectivity:
- Contract expiry: 2016-08-27
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱1,880,875.50
- Contract status: Completed Report
- IMPROVEMENT OF GUIMBAL MULTI-PURPOSE BUILDING, GUIMBAL, ILOILO 1ST L.D.
- Contractor: ALJ CONSTRUCTION AND SUPPLY (30571)
- Implementing Agency: Region VI - Iloilo 1st District Engineering Office
- Region: Region VI
- Contract effectivity:
- Contract expiry: 2016-10-26
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱1,975,135.75
- Contract status: Completed Report
- IMPROVEMENT/CONSTRUCTION OF OTON-MAMBOG ROAD LEADING TO AIRPORT, K0012+(-)973 - K0012+(-)300, ILOILO 1ST L.D.
- Contractor: C.T. LEONCIO CONSTRUCTION & TRADING (17371)
- Implementing Agency: Region VI - Iloilo 1st District Engineering Office
- Region: Region VI
- Contract effectivity:
- Contract expiry: 2016-10-31
- Fund source: Regular Infra - GAA 2016 MFO-3
- Contract price: ₱7,430,000.00
- Contract status: Completed Report
- CONSTRUCTION OF INAWANGAN BRIDGE ALONG ILOILO-ANTIQUE RO AD (COMPLETION)
- Contractor: A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY) (3466)
- Implementing Agency: Region VI - Iloilo 1st District Engineering Office
- Region: Region VI
- Contract effectivity:
- Contract expiry: 2017-03-02
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱9,699,961.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF REVETMENT ALONG JAR-AO RI VER, BARANGAY PARTICION & BARANGAY SIPITAN, GUIMBAL, ILOILO 1ST L.D.
- Contractor: IBC INTERNATIONAL BUILDERS CORPORATION (8576)
- Implementing Agency: Region VI - Iloilo 1st District Engineering Office
- Region: Region VI
- Contract effectivity:
- Contract expiry: 2016-10-26
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱9,400,000.00
- Contract status: Completed Report
- CONSTRUCTION OF SIWARAGAN RIVER CONTROL, SIWARAGAN, SAN JOAQUIN, ILOILO
- Contractor: F. GURREA CONSTRUCTION, INCORPORATED (6995)
- Implementing Agency: Region VI - Iloilo 1st District Engineering Office
- Region: Region VI
- Contract effectivity:
- Contract expiry: 2016-11-30
- Fund source: Regular Infra - GAA 2016 MFO-2
- Contract price: ₱45,599,460.00
- Contract status: Completed Report
- CONSTRUCTION OF FOOD TERMINAL AT THE MUNICIPAL PUBLIC MA RKET, BRGY. BAYBAY NORTE, MIAG-AO, ILOILO 1ST L.D.
- Contractor: SDB STEELSTRUCT BUILDERS ENTERPRISES (21542)
- Implementing Agency: Region VI - Iloilo 1st District Engineering Office
- Region: Region VI
- Contract effectivity:
- Contract expiry: 2016-12-10
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱4,695,595.00
- Contract status: Completed Report
- CONSTRUCTION OF JARAO FLOOD CONTROL PROJECT, PARTICION, GUIMBAL, ILOILO
- Contractor: IBC INTERNATIONAL BUILDERS CORPORATION (8576)
- Implementing Agency: Region VI - Iloilo 1st District Engineering Office
- Region: Region VI
- Contract effectivity:
- Contract expiry: 2017-02-23
- Fund source: Regular Infra - GAA 2016 MFO-2
- Contract price: ₱14,397,753.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF REVETMENT ALONG TANGYAN R IVER, BARANGAY NITO-AN-LUPSAG & BARANGAY LUBACAN, GUIMBAL, ILOILO 1ST L .D.
- Contractor: IBC INTERNATIONAL BUILDERS CORPORATION (8576)
- Implementing Agency: Region VI - Iloilo 1st District Engineering Office
- Region: Region VI
- Contract effectivity:
- Contract expiry: 2017-02-05
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱9,650,000.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF REVETMENT ALONG TUBUNGAN RIVER, BARANGAY POBLACION, TUBUNGAN, ILOILO 1ST L.D.
- Contractor: ALLENCON DEVELOPMENT CORPORATION (12302)
- Implementing Agency: Region VI - Iloilo 1st District Engineering Office
- Region: Region VI
- Contract effectivity:
- Contract expiry: 2017-01-19
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱4,900,000.00
- Contract status: Completed Report
- WIDENING OF BOTONG BRIDGE (B00120PN) ALONG ILOILO-ANTIQU E ROAD, OTON, ILOILO, K0014+145
- Contractor: A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY) (3466)
- Implementing Agency: Region VI - Iloilo 1st District Engineering Office
- Region: Region VI
- Contract effectivity:
- Contract expiry: 2017-04-24
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱12,543,793.00
- Contract status: Completed Report
- IMPROVEMENT/WIDENING OF NATIONAL ROADS, ILOILO-ANTIQUE R OAD, TIGBAUAN, GUIMBAL, MIAG-AO & SAN JOAQUIN, K0017+265-K0017+797, K00 36+111-K0036+209, K0046+142-K0046+240, K0054+533-K0054+651, K0056+300-K0056 +397, K0039+276-K0039+658
- Contractor: JHJ CONSTRUCTION (3781)
- Implementing Agency: Region VI - Iloilo 1st District Engineering Office
- Region: Region VI
- Contract effectivity:
- Contract expiry: 2017-04-04
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱32,633,148.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING WITH STAGE, 1ST D ISTRICT, ILOILO 1ST L.D., GUIMBAL CENTRAL ELEMENTARY SCHOOL, GUIMBAL, ILOIL O
- Contractor: G.F. FALCIS CONSTRUCTION & SUPPLY (26147)
- Implementing Agency: Region VI - Iloilo 1st District Engineering Office
- Region: Region VI
- Contract effectivity:
- Contract expiry: 2017-02-20
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱3,879,897.00
- Contract status: Completed Report
- REPLACEMENT OF QUIANAN BRIDGE (B00146PN) ALONG ILOILO-AN TIQUE ROAD, SAN JOAQUIN, ILOILO, K0062+468
- Contractor: IBC INTERNATIONAL BUILDERS CORPORATION (8576)
- Implementing Agency: Region VI - Iloilo 1st District Engineering Office
- Region: Region VI
- Contract effectivity:
- Contract expiry: 2017-09-30
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱40,299,956.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLI PS, SLOPE COLLAPSE, AND LANDSLIDE, GUIMBAL-IGBARAS-TUBUNGAN-LEON ROAD, TUBU NGAN ILOILO, K0059+900 - K0059+950; K0063-080 - K0053+200
- Contractor: IBC INTERNATIONAL BUILDERS CORPORATION (8576)
- Implementing Agency: Region VI - Iloilo 1st District Engineering Office
- Region: Region VI
- Contract effectivity:
- Contract expiry: 2017-04-19
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱38,955,532.00
- Contract status: Terminated Report