Infrastructure Projects in Region VII — Region VII - Bohol 3rd District Engineering Office, 2024
This page lists public infrastructure projects implemented by Region VII - Bohol 3rd District Engineering Office in Region VII during 2024. All data are sourced from the Department of Public Works and Highways (DPWH) official database (as of 9/30/2025): https://www.dpwh.gov.ph/dpwh/projects/infrastructure
This information is shared to promote transparency and public awareness. We encourage visitors to validate project details using the official DPWH source. In case of discrepancies, please refer to the original records published by the DPWH.
| Contractor | Projects | Total Price |
|---|---|---|
| MUANA CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY (9354) | 12 | ₱758,307,882.00 |
| NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC (17542) | 6 | ₱497,188,496.00 |
| MOG CONSTRUCTION INC. (56306) / N.N. YU CONSTRUCTION, INC. (FORMERLY: YU CONSTRUCTION) (10470) | 8 | ₱480,860,280.00 |
| N.N. YU CONSTRUCTION, INC. (FORMERLY: YU CONSTRUCTION) (10470) | 4 | ₱243,041,484.00 |
| KMCM BUILDERS AND DEVELOPMENT CORPORATION (54920) / GICAR CONSTRUCTION, INC. (12624) | 1 | ₱241,195,024.00 |
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE IN FRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURE S PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION O F FLOOD CONTROL STRUCTURE, SITIO PONOD TO SITIO S
- Contractor: ZLREJ TRADING AND CONSTRUCTION CORPORATION (49171)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2025-04-19
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱96,400,000.00
- Contract status: Completed Report
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATI ONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE - SECO NDARY ROADS - JCT (TER)-JAGNA-SIERRA BULLONES RD - K0070 + 439 - K0071 + 43 9; K0079 + 245 - K0080 + 000; K0096 + 792 - K0098
- Contractor: NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC (17542)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-11-15
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱106,148,712.00
- Contract status: Completed Report
- ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF CASB U RIVER FLOOD CONTROL, CANDIJAY, BOHOL STA. 0+03
- Contractor: JAS MIXER CONSTRUCTION AND DEVELOPMENT CORPORATION (50738) / M.R. VARGAS CONSTRUCTION CORPORATION (FORMERLY: M.R. VARGAS CONSTRUCTION) (8215)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2025-05-09
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱144,664,416.00
- Contract status: Completed Report
- ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITAT ION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF WAHIG RIVER CONTROL STRU
- Contractor: MUANA CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY (9354)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2025-01-31
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱130,419,496.00
- Contract status: Completed Report
- ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITAT ION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF ITUM RIVER CONTROL, ITUM
- Contractor: LEDA CONSTRUCTION INCORPORATED (12229)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2025-04-15
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱96,019,080.00
- Contract status: Completed Report
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATI ONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE - SECO NDARY ROADS LOAY INTERIOR RD - K0176 + 281 - K0178 + 122; K0186 + 624 - K0187 + 000; K0192 + 480 - K0192 + 930
- Contractor: NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC (17542)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-11-30
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱110,947,992.00
- Contract status: Completed Report
- OO1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM - A SSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE- SECONDARY ROADS - JCT. DAT-AN-CARMEN-SIERRA BULLONES-PILAR-ALICIA RD. - K0063+000 - K0064+450; K00 66+653 - K0067+440
- Contractor: NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC (17542)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-12-07
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱98,419,408.00
- Contract status: Completed Report
- ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF GABA YAN RIVER FLOOD CONTROL, CANDIJAY, BOHOL STA.0+08
- Contractor: FUENTABUILT CONSTRUCTION CORP. (36098) / M.R. VARGAS CONSTRUCTION CORPORATION (FORMERLY: M.R. VARGAS CONSTRUCTION) (8215)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2025-05-11
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱139,442,016.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING IN DIMIAO, BOHOL< /li>
- Contractor: LTS BUILDERS AND CONSTRUCTION SUPPLY (33473)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-11-01
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱9,815,507.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING IN ANDA, BOHOL
- Contractor: WBV CONSTRUCTION (42790)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-11-09
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱9,899,999.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING IN BATUAN, BOHOL< /li>
- Contractor: REBER ENTERPRISES AND CONSTRUCTION (48384)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-10-19
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱9,900,000.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD F UND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION O F ROAD SAFETY DEVICES ALONG TAGBILARAN EAST RD (TAGBILARAN-JAGNA) - K0193 + 568 - K0193 + 757; K0193 + 804 - K0193 + 878; K0
- Contractor: 5 JEWEL'S CONSTRUCTION AND SUPPLY CORP. (48420)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-11-30
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱144,720,016.00
- Contract status: Completed Report
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATI ONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - JCT (LIR) CARMEN-SAGBAYAN-BACANI RD - K0171 + 640.00 - K0173 + 641. 00
- Contractor: YS CONSTRUCTION (11928)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-11-06
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱85,089,832.00
- Contract status: Completed Report
- OO1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM - A SSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - JCT. DAT-AN-CARMEN-SIERRA BULLONES-PILAR-ALICIA RD. - K0073+726 - K0075+025; K00 81+349 - K0082+395
- Contractor: NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC (17542)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-10-31
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱82,023,600.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD F UND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION O F SOLAR STREET LIGHTS ALONG TAGBILARAN EAST RD (TAGBILARAN-JAGNA) - K0171 + 174 - K0174 + 695; K0177 + 088 - K0180 + 070
- Contractor: N.N. YU CONSTRUCTION, INC. (FORMERLY: YU CONSTRUCTION) (10470)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-09-01
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱72,983,808.00
- Contract status: Completed Report
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHAB./RECONST./UPGRADING OF DAMAGED PAVED ROADS-SECO NDARY ROADS-LOAY INTERIOR ROAD-K0167+337 - K0168+839
- Contractor: FUENTABUILT CONSTRUCTION CORP. (36098)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2025-02-08
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱48,760,312.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - REHABILITATION OF MULTI-PURPOSE BUILDING (KANKOKA), BRGY. ABIHI LAN, CANDIJAY, BOHOL
- Contractor: J.F. ESTAPIA CONSTRUCTION (40112)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-10-08
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,910,504.50
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUC TURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SER VICES - CONST. OF MULTI-PURPOSE BUILDING IN SEVILLA, BOHOL
- Contractor: FUENTABUILT CONSTRUCTION CORP. (36098)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-11-12
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱9,819,297.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD F UND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF ROAD SAFETY DEVICES, INFORMATIVE SIGNS AND SOLAR LIGHTLING ALONG JCT D AT-AN-CARMEN-SIERRA BULLONES-PILAR-ALICIA RD K007
- Contractor: N.N. YU CONSTRUCTION, INC. (FORMERLY: YU CONSTRUCTION) (10470)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2025-01-17
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱72,367,776.00
- Contract status: Completed Report
- CONVERGENCE & SPECIAL SUPPORT PROGRAM-SUSTAINABLE IN FRASTRUCTURE PROJECTS ALLEVIATING GAPS-FLOOD MITIGATION STRUCTURES PROTECTI NG MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF FLOOD CONTROL STRU CTURE, BRGY. POBLACION, CANDIJAY, BOHOL, STA. 0+000 -
- Contractor: MUANA CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY (9354)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2025-02-18
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱48,190,168.00
- Contract status: Completed Report
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES A GAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAITENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONST. OF FLOOD CONTROL AT ALEJAWAN RIVER (BOTH SIDES), DUERO AND JAGNA,
- Contractor: MUANA CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY (9354)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-09-26
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱39,199,916.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING IN LILA, BOHOL
- Contractor: EFB CONSTRUCTION SERVICES (46194)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-07-01
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,908,885.50
- Contract status: Completed Report
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATI ONAL ROAD SYSTEM - BRIDGE PROGRAM - REHABILITATION/ MAJOR REPAIR OF PERMANE NT BRIDGES - PANGDAN BR. 1 (B00050BH) ALONG TAGBILARAN EAST RD (TAGBILARAN- JAGNA) KO196+586
- Contractor: JAS MIXER CONSTRUCTION AND DEVELOPMENT CORPORATION (50738)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-05-14
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱1,944,805.88
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING IN SIERRA BULLONES, BOHO L
- Contractor: WBV CONSTRUCTION (42790)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-07-10
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,950,000.00
- Contract status: Completed Report
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATI ONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUC TION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS LOAY INTERIOR RD - K0163 + 000 - K0164 + 000
- Contractor: LABB CONSTRUCTION DEVELOPMENT INC. (FORMERLY: LABB CONSTRUCTION) (13524)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-10-01
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱49,000,000.00
- Contract status: Completed Report
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATI ONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM CONSTRUCTION/ UPGRADING/ REHA BILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS TAGBILARAN EA ST RD (TAGBILARAN-JAGNA) - K0177 + 583 - K0177 +
- Contractor: RL EARTH HAULING & EQUIPMENT SERVICES INC. (41817)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-08-26
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱29,393,972.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONE S (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) - JCT. (DIMIAO-BILAR) OAC-OMJON ROAD I
- Contractor: FUENTABUILT CONSTRUCTION CORP. (36098)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-05-11
- Fund source: Regular Infra - GAA 2024 CP
- Contract price: ₱14,581,566.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONE S (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) - HINAWANAN (LOAY)-CONCEPTION - JCT. (
- Contractor: AL CHRIS CONSTRUCTION (12406)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-05-30
- Fund source: Regular Infra - GAA 2024 CP
- Contract price: ₱14,641,200.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING IN LOAY, BOHOL
- Contractor: RONNYL CONSTRUCTION (38487)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2025-01-17
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱9,651,075.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURI SM ROAD INFRASTRUCTURE PROGRAM - TRIP) - BRGY. BACONG LEADING TO CABAGNAO C AVE, ANDA, BOHOL STA.0+000.00 - STA.0+985.30; STA
- Contractor: MUANA CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY (9354)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-08-06
- Fund source: Regular Infra - GAA 2024 CP
- Contract price: ₱31,785,168.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURI SM ROAD INFRASTRUCTURE PROGRAM - TRIP) - JCT. (TER) ITUM - DUAY - PAYAO ROA D, DUERO LEADING TO CAMP VERDE NATURE PARK, DUERO
- Contractor: REBER ENTERPRISES AND CONSTRUCTION (48384)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-05-06
- Fund source: Regular Infra - GAA 2024 CP
- Contract price: ₱9,767,887.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONE S (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) - JCT. (TER) POB. (VALENCIA)-ANOYON-OM
- Contractor: FUENTABUILT CONSTRUCTION CORP. (36098)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-06-07
- Fund source: Regular Infra - GAA 2024 CP
- Contract price: ₱14,643,768.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, VALENCIA, BOHOL STA.0+310.00 - STA.0+480.0
- Contractor: REBER ENTERPRISES AND CONSTRUCTION (48384)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-06-21
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,931,903.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE IN FRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGE S FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FA CILITIES - CONSTRUCTION OF ROAD, SITIO CUTAN, BRG
- Contractor: ALOJA BUILDERS AND REALTY (39144)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-09-27
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱19,227,750.00
- Contract status: Completed Report
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATI ONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - JCT (LIR) CARMEN-SAGBAYAN-BACANI RD - K0173 + 641 - K0173 + 988
- Contractor: SLP CONSTRUCTION (35992)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-06-16
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱14,947,846.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONE S (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) - JCT. (TER) DIMIAO-OAC-BILAR JCT. (LI
- Contractor: JJF BUILDERS AND SUPPLY (37015)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-05-30
- Fund source: Regular Infra - GAA 2024 CP
- Contract price: ₱14,669,944.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURI SM ROAD INFRASTRUCTURE PROGRAM - TRIP) - JCT. (TER) DIMIAO-OAC-BILAR - JCT. (LIR) ROAD ACCESS FROM BEACHES LEADING TO MAN-MA
- Contractor: MK ZACK BUILDERS CORP. (42193)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-04-21
- Fund source: Regular Infra - GAA 2024 CP
- Contract price: ₱9,754,633.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIA L SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (BFP BUILDING), BRGY. S AN ROQUE, MABINI, BOHOL
- Contractor: BARBRINZ ENTERPRISES (43735)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2025-03-11
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱9,849,650.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, BILAR, BOHOL STA.0+000.00 - STA.0+198.00
- Contractor: WBV CONSTRUCTION (42790)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-04-08
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,925,816.50
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIA L SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING IN ALICIA, BOHOL
- Contractor: FUENTABUILT CONSTRUCTION CORP. (36098)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-09-27
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,950,000.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIA L SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, PILAR, BOHOL
- Contractor: REBER ENTERPRISES AND CONSTRUCTION (48384)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-10-12
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,922,417.50
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIA L SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BILAR, BOHOL
- Contractor: REBER ENTERPRISES AND CONSTRUCTION (48384)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-10-13
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,923,051.50
- Contract status: Completed Report
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATI ONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM CONSTRUCTION/ UPGRADING/ REHA BILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS - TAGBILARAN EAST RD (TAGBILARAN-JAGNA) - K0233 + 998 - K0234
- Contractor: FUENTABUILT CONSTRUCTION CORP. (36098)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-09-24
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱30,184,000.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONE S (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) - JCT. (LIR) BUENOS AIRES-NUEVA VIDA (
- Contractor: CLAVITE CONSTRUCTION AND SUPPLY (40502)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-05-11
- Fund source: Regular Infra - GAA 2024 CP
- Contract price: ₱14,678,233.00
- Contract status: Completed Report
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATI ONAL ROAD SYSTEM - BRIDGE PROGRAM - RETROFITTING/ STRENGTHENING OF PERMANEN T BRIDGES - MALINAO BR. (B00068BH) ALONG TAGBILARAN EAST RD (TAGBILARAN-JAG NA) KO228+908
- Contractor: ZLREJ TRADING AND CONSTRUCTION CORPORATION (49171)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-06-09
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱5,780,000.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, MABINI, BOHOL STA.0+000.00 - STA.0+203.18
- Contractor: KEPRISHYLIE CIVIL ENGINEERING CONSTRUCTION (54219)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-04-18
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,924,802.50
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE IN FRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURE S PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION O F DRAINAGE SYSTEM, BRGY. TUGAS, CANDIJAY, BOHOL K
- Contractor: JAS MIXER CONSTRUCTION AND DEVELOPMENT CORPORATION (50738)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-09-02
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,783,629.50
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONE S (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) - JCT. (LIR) QUINOGUITAN-SEVILLA-HANOP
- Contractor: RONNYL CONSTRUCTION (38487)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-07-07
- Fund source: Regular Infra - GAA 2024 CP
- Contract price: ₱14,662,897.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONE S (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) - JCT. (TER) ITUM-DUAY-PAYAO-ESKAYA RO
- Contractor: BMG CONSTRUCTION & SUPPLY (42489)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-06-04
- Fund source: Regular Infra - GAA 2024 CP
- Contract price: ₱14,699,994.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURI SM ROAD INFRASTRUCTURE PROGRAM - TRIP) - CABUNGAAN-LONOY ROAD LEADING TO KI NAHUGAN FALLS AND LONOY SPRING, BRGY. CABUNGA-AN,
- Contractor: FUENTABUILT CONSTRUCTION CORP. (36098)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-10-08
- Fund source: Regular Infra - GAA 2024 CP
- Contract price: ₱9,773,056.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, SIERRA BULLONES, BOHOL SECTION1: STA.0+000.
- Contractor: KEPRISHYLIE CIVIL ENGINEERING CONSTRUCTION (54219)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-03-25
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,940,172.50
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, GUINDULMAN, BOHOL STA.0+120.00 - STA.0+308.
- Contractor: JEGSTONE CONSTRUCTION (45922)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-04-18
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,923,560.00
- Contract status: Completed Report
- LOCAL PROGRAM - NATIONAL BUILDING PROGRAM - BUILDINGS AN D OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - CONSTRUCTION OF DPWH BOHOL 3RD DEO, ANNEX BUILDING, GUINDULMAN, BOHOL
- Contractor: DIADEMA CONSTRUCTION AND ENTERPRISES INC. (FORMERLY: DIADEMA ENTERPRISES) (16759)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2025-03-07
- Fund source: Regular Infra - GAA 2024 LP
- Contract price: ₱29,368,336.00
- Contract status: Completed Report
- ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF CAYA CAY SRIS FLOOD PROTECTION DIKE, ALICIA, BOHOL STA
- Contractor: FUENTABUILT CONSTRUCTION CORP. (36098)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-10-07
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱14,677,315.00
- Contract status: Completed Report
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATI ONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - PAVING OF UNPAVED ROADS - TERTIARY ROADS - JCT (LIR) BUENAVISTA-CARMEN-DANAO-JETAFE RD - K0163 + 880 - K0164 + 205
- Contractor: JJF BUILDERS AND SUPPLY (37015)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-05-15
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱9,960,678.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURI SM ROAD INFRASTRUCTURE PROGRAM - TRIP) - POB. ONDOL, TAYTAY, CAMBANCE ROAD LEADING TO CRUZ DAKO, BRGY. TAYTAY, LOBOC, BOHOL
- Contractor: CEMPRON CONSTRUCTION & DEVELOPMENT (17929)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-06-09
- Fund source: Regular Infra - GAA 2024 CP
- Contract price: ₱9,769,189.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD F UND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - REHABILITATION / RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS ALONG JCT (TER)-JAGNA-SI ERRA BULLONES RD - K0077 + 000 - K0077 + 050
- Contractor: VNCO CONSTRUCTION (48929)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-04-12
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱2,354,195.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE IN FRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDG ES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUIL
- Contractor: MUANA CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY (9354)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-08-07
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱46,549,708.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONE S (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) - SAN ROQUE TO BAYBAYON ROAD, MABINI,
- Contractor: REBER ENTERPRISES AND CONSTRUCTION (48384)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-04-21
- Fund source: Regular Infra - GAA 2024 CP
- Contract price: ₱4,808,159.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONE S (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) - JCT. (TER) GABAYAN-ANOLING (CANDIJAY
- Contractor: J.F. ESTAPIA CONSTRUCTION (40112)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-04-22
- Fund source: Regular Infra - GAA 2024 CP
- Contract price: ₱4,884,987.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, PILAR, BOHOL STA.0+000.00-STA.0+241
- Contractor: WBV CONSTRUCTION (42790)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-04-21
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,927,210.50
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCI AL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, DUERO, BOHOL
- Contractor: JEGSTONE CONSTRUCTION (45922)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-07-13
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,950,000.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCI AL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING IN SIERRA BULLONES, BO HOL
- Contractor: REBER ENTERPRISES AND CONSTRUCTION (48384)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-09-18
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,949,991.50
- Contract status: Completed Report
- LOCAL PROGRAM - NATIONAL BUILDING PROGRAM -BUILDINGS AND OTHER STRUCTURES - MULTI-PURPOSE FACILITIES - CONSTRUCTION OF QAS LABORATO RY BUILDING, DPWH BOHOL 3RD DEO, GUINDULMAN, BOHOL
- Contractor: DIADEMA CONSTRUCTION AND ENTERPRISES INC. (FORMERLY: DIADEMA ENTERPRISES) (16759)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2025-06-08
- Fund source: Regular Infra - GAA 2024 LP
- Contract price: ₱29,400,000.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE IN FRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND / OR BRID GES FROM THE NATIONAL ROAD / S LEADING TO MAJOR / STRATEGIC PUBLIC BUILDING S / FACILITIES - CONSTRUCTION OF ROAD, SITIO MAHA
- Contractor: MUANA CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY (9354)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-12-09
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱28,924,988.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM -CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURI SM ROAD INFRASTRUCTURE PROGRAM - TRIP) JCT. (TER) GABAYAN- CANAWA (CANDIJAY ) - INAGHUBAN - PILAR ROAD LEADING TO CANAWA SPR
- Contractor: J.F. ESTAPIA CONSTRUCTION (40112)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-06-23
- Fund source: Regular Infra - GAA 2024 CP
- Contract price: ₱9,789,978.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UCTURE PROGRAM (BIP) - ACCESS ROADS AND / OR BRIDGES FROM THE NATIONAL ROAD /S LEADING TO MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTIO N OF ROAD, MABINI, BOHOL PHASE II STA. 0+236.50-
- Contractor: JEGSTONE CONSTRUCTION (45922)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-04-22
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,939,952.50
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE IN FRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND / OR BRID GES FROM THE NATIONAL ROAD / S LEADING TO MAJOR / STRATEGIC PUBLIC BUILDING S / FACILITIES - CONSTRUCTION OF ROAD, SITIO MALA
- Contractor: J.F. ESTAPIA CONSTRUCTION (40112)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-07-17
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,820,000.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCI AL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING IN JAGNA, BOHOL
- Contractor: A & D CONSTRUCTION AND SUPPLY (45105)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-10-13
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,900,521.00
- Contract status: Completed Report
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIO NAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCT ION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - LOAY INTERIOR RD - K0190 + 802- K0191 + 011
- Contractor: BNYU DEVELOPMENT CORPORATION (FORMERLY:BNYU ENTERPRISES & CONSTRUCTION) (27725)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-07-22
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱9,338,000.00
- Contract status: Completed Report
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIO NAL ROAD SYSTEM - BRIDGE PROGRAM - RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - GABAYAN BR. (B00032BH) ALONG TAGBILARAN EAST RD (TAGBILARAN - JAG NA) K0163 + 921
- Contractor: GICAR CONSTRUCTION, INC. (12624)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-08-27
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱24,498,196.00
- Contract status: Completed Report
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIO NAL ROAD SYSTEM - BRIDGE PROGRAM - RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - DAT-AN BR. (B00090BH) ALONG JCT DAT-AN - CARMEN - SIERRA BULLONES - PILAR - ALICIA RD K00062 + 085
- Contractor: GICAR CONSTRUCTION, INC. (12624)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-08-27
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱24,420,000.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM -CONSTRUCTION/IM PROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP)- BRGY. CATUNGAWAN SUR LEADING TO LANDT HAI HILLS, GUINDULMAN, BOHOL STA.2+900 - STA.3+1
- Contractor: N.N. YU CONSTRUCTION, INC. (FORMERLY: YU CONSTRUCTION) (10470)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-09-15
- Fund source: Regular Infra - GAA 2024 CP
- Contract price: ₱48,189,900.00
- Contract status: Completed Report
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIO NAL ROAD SYSTEM - BRIDGE PROGRAM - RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES -NAUSOK BR. (B00048BH) ALONG TAGBILARAN EAST RD (TAGBILARAN - JAGNA ) K194+803
- Contractor: GICAR CONSTRUCTION, INC. (12624)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-07-09
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱5,800,000.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SUSTAINABLE INF RASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND / OR BRIDG ES FROM THE NATIONAL ROAD / S LEADING TO MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF ROAD, BRGY. ABIH
- Contractor: LEDA CONSTRUCTION INCORPORATED (12229)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2025-01-07
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱28,900,986.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UCTURE PROGRAM (BIP) -ACCESS ROADS AND / OR BRIDGES FROM THE NATIONAL ROAD / S LEADING TO MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES -CONSTRUCTIO N OF ROAD, GUINDULMAN, BOHOL STA. 0+000.00 -
- Contractor: JAS MIXER CONSTRUCTION AND DEVELOPMENT CORPORATION (50738)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-05-18
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,944,956.00
- Contract status: Completed Report
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIO NAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TER TIARY ROADS - JCT (LIR) BUENAVISTA - CARMEN - DANAO - JETAFE RD - K0155 + ( -669) - K0156 + 392
- Contractor: NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC (17542)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-11-23
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱82,988,784.00
- Contract status: Completed Report
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIO NAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TER TIARY ROADS - BALILIHAN -HANOPOL - BATUAN RD-K0045 + 000 - K0045 + 421
- Contractor: NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC (17542)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2025-01-18
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱16,660,000.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SUSTAINABLE INF RASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND / OR BRIDG ES FROM THE NATIONAL ROAD / S LEADING TO MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF ROAD, SITIO BOON
- Contractor: MUANA CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY (9354)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-11-19
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱28,934,918.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE IN FRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND / OR BRID GES FROM THE NATIONAL ROAD / S LEADING TO MAJOR / STRATEGIC PUBLIC BUILDING S / FACILITIES - CONSTRUCTION OF ROAD, SITIO BOON
- Contractor: JAS MIXER CONSTRUCTION AND DEVELOPMENT CORPORATION (50738)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-09-18
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱9,641,802.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM -BASIC INFRASTRU CTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING IN ANDA, BOHOL, PHASE I
- Contractor: JEGSTONE CONSTRUCTION (45922)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-08-14
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,904,795.50
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE FACILITY, PUROK MAHOGANY, BRGY. T AYONG OCCIDENTAL, LOAY, BOHOL
- Contractor: BRECE CONSTRUCTION SERVICES (49408)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-09-13
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱6,920,000.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM -BASIC INFRASTRU CTURE PROGRAM (BIP) -MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL S ERVICES -CONSTRUCTION OF MULTI-PURPOSE FACILITY, MABINI CENTRAL ELEMENTARY SCHOOL, POBLACION 2, MABINI, BOHOL
- Contractor: REBER ENTERPRISES AND CONSTRUCTION (48384)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-08-14
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,928,759.50
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING IN LOBOC, BOHOL
- Contractor: WBV CONSTRUCTION (42790)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-08-14
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,931,993.50
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF R OADS, BARANGAY PANADTARAN - BULAWAN - CABIDIAN, M
- Contractor: J.F. ESTAPIA CONSTRUCTION (40112)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-09-19
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱49,449,972.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING IN SEVILLA, BOHOL, PHASE I
- Contractor: REBER ENTERPRISES AND CONSTRUCTION (48384)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-08-14
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,921,425.50
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (CLASSROOM BUILDING) LOA Y, BOHOL
- Contractor: ZLREJ TRADING AND CONSTRUCTION CORPORATION (49171)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2025-02-15
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱14,750,000.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM -BASIC INFRASTRU CTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF RO ADS, PILAR, BOHOL STA. 0+0.000.00 - STA. 2+040.0
- Contractor: MOG CONSTRUCTION INC. (56306) / N.N. YU CONSTRUCTION, INC. (FORMERLY: YU CONSTRUCTION) (10470)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-11-10
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱49,499,388.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF R OADS, ANDA, BOHOL STA. 0+0.000.00 - STA. 1+040.00
- Contractor: JAS MIXER CONSTRUCTION AND DEVELOPMENT CORPORATION (50738)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-11-25
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱34,614,856.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF EVACUATION CENTER AMBASSADOR PABLO SUAREZ NATIO NAL HIGH SCHOOL, BARANGAY BICAO, CARMEN, BOHOL
- Contractor: ZLREJ TRADING AND CONSTRUCTION CORPORATION (49171)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-10-21
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱6,830,000.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM -BASIC INFRASTRU CTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES -COMPLETION OF MULTI-PURPOSE BUILDING IN VALENCIA, BOHOL
- Contractor: G.U. AUDITOR CONSTRUCTION & SUPPLY (50255)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-08-14
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,905,370.50
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM -BASIC INFRASTRU CTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF RO ADS, BARANGAY BUYOG, JAGNA, BOHOL STA. 4+020.0
- Contractor: SMSY CONSTRUCTION SERVICES (48796) / N.N. YU CONSTRUCTION, INC. (FORMERLY: YU CONSTRUCTION) (10470)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-11-07
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱98,999,928.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF T IGBAO CIRCUMFERENTIAL ROAD, TIGBAO, LOBOC, BOHOL
- Contractor: RL EARTH HAULING & EQUIPMENT SERVICES INC. (41817) / N.N. YU CONSTRUCTION, INC. (FORMERLY: YU CONSTRUCTION) (10470)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2025-04-12
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱98,893,416.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF R OADS, ALICIA, BOHOL SECTION 1: STA. 0+000.00 - ST
- Contractor: CCMALUENDA CONSTRUCTION INC. (FORMERLY:C.C.M. CONSTRUCTION) (11043)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-11-14
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱49,499,980.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM -BASIC INFRASTRU CTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING BRGY. POBLAC ION, CANDIJAY, BOHOL
- Contractor: JAS MIXER CONSTRUCTION AND DEVELOPMENT CORPORATION (50738)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2025-07-07
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱29,690,000.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD F UND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF ROAD SAFETY DEVICES, INFORMATIVE SIGNS AND SOLAR LIGHTING ALONG JCT. DAT-A N - CARMEN - SIERRA BULLONES - PILAR - ALICIA RD
- Contractor: MOG CONSTRUCTION INC. (56306) / N.N. YU CONSTRUCTION, INC. (FORMERLY: YU CONSTRUCTION) (10470)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2025-02-10
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱97,946,328.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD F UND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF ROAD SAFETY DEVICES, INFORMATIVE SIGNS AND SOLAR LIGHTING ALONG JCT. (TER) JAGNA - SIERRA BULLONES ROAD, K0063+478 - K0070
- Contractor: JAS MIXER CONSTRUCTION AND DEVELOPMENT CORPORATION (50738)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2025-01-27
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱97,999,968.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD F UND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF ROAD SAFETY DEVICES, INFORMATIVE SIGNS AND SOLAR LIGHTING ALONG JCT. DAT-A N - CARMEN - SIERRA BULLONES - PILAR - ALICIA RD
- Contractor: ERA CONSTRUCTION INC. (53864) / N.N. YU CONSTRUCTION, INC. (FORMERLY: YU CONSTRUCTION) (10470)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-12-10
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱97,944,352.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, DIMIAO, BOHOL
- Contractor: REBER ENTERPRISES AND CONSTRUCTION (48384)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-08-14
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,930,000.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (SEVILLA CE NTRAL ELEMENTARY SCHOOL), POBLACION, SEVILLA, BOH
- Contractor: WIL TAN CONSTRUCTION (8622)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-07-15
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱2,961,508.50
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEG IC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF MANABA RIVER CONTROL, GARC IA - HERNANDEZ (TABUAN SECTION), BOHOL STA. 0+000
- Contractor: MUANA CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY (9354)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2025-05-20
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱98,944,928.00
- Contract status: Completed Report
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES A GAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE O F FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF TUMURA N - SARANGANI RIVER CONTROL, PHASE II, CANDIJAY,
- Contractor: MUANA CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY (9354)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2025-04-03
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱144,590,160.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM -BASIC INFRASTRU CTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATE GIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF CAROOD RIVER CONTROL STRU CTURE, CANDIJAY, BOHOL, BOHOL (PHASE 2) STA.0+00
- Contractor: MOG CONSTRUCTION INC. (56306) / N.N. YU CONSTRUCTION, INC. (FORMERLY: YU CONSTRUCTION) (10470)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-09-25
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱39,525,948.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF R OADS, DUERO, BOHOL STA. 0+300.00 - STA. 1+368.80;
- Contractor: MUANA CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY (9354)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-09-20
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱34,620,168.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, GARCIA-HERNANDEZ, BOHOL PHASE I
- Contractor: ALOJA BUILDERS AND REALTY (39144)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2025-01-10
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱9,899,914.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING IN GUINDULMAN, BOHOL
- Contractor: REBER ENTERPRISES AND CONSTRUCTION (48384)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-10-13
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,942,394.50
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATE GIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DRAINAGE SYSTEM, BRGY. CO GTONG, CANDIJAY, BOHOL STA. 0+000.00 - STA. 0+274
- Contractor: KEPRISHYLIE CIVIL ENGINEERING CONSTRUCTION (54219)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-07-29
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,940,000.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC BLGS/FACILITIES - CONSTRUCTION OF ROADS, BRGY. C ANDANAS-DATAG ROAD, GARCIA-HERNANDEZ, BOHOL, SEC.
- Contractor: J.F. ESTAPIA CONSTRUCTION (40112)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-08-03
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱9,895,000.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF R OADS, SIERRA BULLONES, BOHOL PHASE 2 STA. 0+000.0
- Contractor: LABB CONSTRUCTION DEVELOPMENT INC. (FORMERLY: LABB CONSTRUCTION) (13524)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-12-01
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱39,599,800.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BLDGS./FCILITIES - CONSTRUCTION OF ROADS, BRGY. CASBU-BRGY. BATO, GUINDULMAN, BOHOL, STA.
- Contractor: N.N. YU CONSTRUCTION, INC. (FORMERLY: YU CONSTRUCTION) (10470)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-10-13
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱49,500,000.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UCTURE PROGRAM (BIP) - EVACUATION CENTERS/QUARANTINE FACILITIES/PUBLIC HEAL TH FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), BRGY. AURORA, PILAR, BOHOL
- Contractor: M.M. SUAREZ CONSTRUCTION & SUPPLY (41341)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-10-02
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,930,000.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM -BASIC INFRASTRU CTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF RO ADS, BATUAN, BOHOL STA. 3+238.40 - STA. 4+318.40
- Contractor: LABB CONSTRUCTION DEVELOPMENT INC. (FORMERLY: LABB CONSTRUCTION) (13524)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-11-09
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱34,569,892.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF R OADS, CARMEN, BOHOL, SEC. 1 : STA. 0+000 - STA. 0
- Contractor: CLAVITE CONSTRUCTION AND SUPPLY (40502)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-10-15
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱34,609,948.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UCTURE PROGRAM (BIP) - EVACUATION CENTERS/QUARANTINE FACILITIES/PUBLIC HEAL TH FACILITIES - CONSTRUCTION OF EVACUATION CENTER, BRGY. KATIPUNAN, CARMEN, BOHOL
- Contractor: ZLREJ TRADING AND CONSTRUCTION CORPORATION (49171)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2025-02-11
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱11,779,955.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, GARCIA-HERNANDEZ, BOHOL
- Contractor: JAS MIXER CONSTRUCTION AND DEVELOPMENT CORPORATION (50738)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2025-02-02
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱9,885,452.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF R OADS, SITIO TIPO - LANTAY (PUROK 3) - SITIO LUMBA
- Contractor: JAS MIXER CONSTRUCTION AND DEVELOPMENT CORPORATION (50738)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-08-06
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱9,866,134.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - COMPLETION OF MULTI-PURPOSE BUILDING IN JAGNA, BOHOL
- Contractor: ALOJA BUILDERS AND REALTY (39144)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2025-01-09
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,940,000.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF WATER SYSTEM, CANDIJAY, BOHOL
- Contractor: JTA BUILDERS (18401)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2025-06-28
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱62,724,072.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UCTURE PROGRAM (BIP) - MULTI - PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCI AL SERVICES -CONSTRUCTION OF MULTI-PURPOSE BUILDING IN DUERO, BOHOL PHASE I I
- Contractor: A & D CONSTRUCTION AND SUPPLY (45105)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2025-02-02
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱9,800,535.00
- Contract status: Completed Report
- CONVERGENCE & SPECIAL SUPPORT PROGRAM - BASIC INFRAS TRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPOT SOCIA L SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY ALEGRIA, LOBO C, BOHOL
- Contractor: CEMPRON CONSTRUCTION & DEVELOPMENT (17929)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2025-01-13
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱9,879,961.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF R OADS, GARCIA-HERNANDEZ, BOHOL SEC1: STA. 3+500.00
- Contractor: MOG CONSTRUCTION INC. (56306) / N.N. YU CONSTRUCTION, INC. (FORMERLY: YU CONSTRUCTION) (10470)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2025-04-11
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱49,469,944.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SUSTAINABLE INF RASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF S EAWALL PROTECTION, GARCIA-HERNANDEZ, BOHOL STA.
- Contractor: MOG CONSTRUCTION INC. (56306) / N.N. YU CONSTRUCTION, INC. (FORMERLY: YU CONSTRUCTION) (10470)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2025-03-30
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱57,877,936.00
- Contract status: Completed Report
- CONVERGENCE & SPECIAL SUPPORT PROGRAM - BASIC INFRAS TRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD /S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, SITIO FARMERSVILLE - SITIO BOONGON, BRGY. POBL
- Contractor: J.F. ESTAPIA CONSTRUCTION (40112)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-08-04
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱9,895,000.00
- Contract status: Completed Report
- CONVERGENCE & SPECIAL SUPPORT PROGRAM - BASIC INFRAS TRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD /S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROADS, BENTIG, CALINGINAN SUR, SEVILLA, BOHOL, STA.0
- Contractor: BNYU DEVELOPMENT CORPORATION (FORMERLY:BNYU ENTERPRISES & CONSTRUCTION) (27725)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2025-02-03
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱49,409,400.00
- Contract status: Completed Report
- CONVERGENCE & SPECIAL SUPPORT PROGRAM - BASIC INFRAS TRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD /S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROADS, BARANGAY CANDANAS - ESTACA, GARCIA-HERNANDEZ,
- Contractor: JAS MIXER CONSTRUCTION AND DEVELOPMENT CORPORATION (50738)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-08-07
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱9,894,777.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM -BASIC INFRASTRU CTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BRGY. LUNGS ODAAN, CANDIJAY, BOHOL
- Contractor: J.F. ESTAPIA CONSTRUCTION (40112)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2025-05-30
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱29,685,000.00
- Contract status: Completed Report
- CONVERGENCE & SPECIAL SUPPORT PROGRAM - BASIC INFRAS TRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD /S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, DIMIAO, BOHOL, STA. 4+118.06 - STA. 4+318.06
- Contractor: KEPRISHYLIE CIVIL ENGINEERING CONSTRUCTION (54219)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-07-20
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,945,000.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF R OAD, BARANGAY CAMBUYO - DATAG, GARCIA - HERNANDEZ
- Contractor: J.F. ESTAPIA CONSTRUCTION (40112)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-08-27
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱9,895,000.00
- Contract status: Completed Report
- CONVERGENCE & SPECIAL SUPPORT PROGRAM - EVACUATION C ENTERS/QUARANTINE FACILITIES/PUBLIC HEALTH FACILITIES TO SUPPORT SOCIAL SER VICES - CONSTRUCTION OF EVACUATION CENTER, BARANGAY ILAUD, PILAR, BOHOL
- Contractor: ZLREJ TRADING AND CONSTRUCTION CORPORATION (49171)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-11-16
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱7,820,000.00
- Contract status: Completed Report
- CONVERGENCE & SPECIAL SUPPORT PROGRAM - BASIC INFRAS TRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD /S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION O F ROADS, VALENCIA, BOHOL, SEC. 1: STA. 0+000.00 - STA
- Contractor: ALOJA BUILDERS AND REALTY (39144)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-12-07
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱34,610,000.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UCTURE PROGRAM (BIP) - EVACUATION CENTERS/QUARANTINE FACILITIES/PUBLIC HEAL TH FACILITIES - REHABILITATION OF MULTI-PURPOSE BUILDING (CANDIJAY COMMUNIT Y HOSPITAL) BRGY. POBLACION CANDIJAY, BOHOL
- Contractor: DAYBREAK ENTERPRISES - ENGINEERING & CONSTRUCTION (30174) / WBV CONSTRUCTION (42790)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2025-07-06
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱49,438,268.00
- Contract status: Completed Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM -CONSTRUCTION/RE HABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTOR SYST EM A.CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RCWS), LILA LEGISLATIVE BUILDING, LILA, BOHOLB.CONSTRUCTION OF RAI
- Contractor: JEGSTONE CONSTRUCTION (45922)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-11-14
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱2,886,480.00
- Contract status: Completed Report
- RECONSTRUCTION OF THE TIGBAO BRIDGE IN BAGUMBAYAN, LOBOC , PROVINCE OF BOHOL INTO A REINFORCED CONCRETE DECK GIRDER (RCDG) BRIDGE, I NCLUDING ROAD APPROACH WIDENING AND RIVER SLOPE PROTECTION ON EACH SIDE OF THE BRIDGE, LOBOC, BOHOL STA. 0+006.00 - STA. 0+0
- Contractor: KMCM BUILDERS AND DEVELOPMENT CORPORATION (54920) / GICAR CONSTRUCTION, INC. (12624)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2026-05-08
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱241,195,024.00
- Contract status: On-Going Report
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATI ONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM REHABILITATION/ RECONSTRUCTIO N/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - LOAY INTERIOR RD - K0168 + 839 - K0169 + 865
- Contractor: BNYU DEVELOPMENT CORPORATION (FORMERLY:BNYU ENTERPRISES & CONSTRUCTION) (27725)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2025-03-19
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱87,252,400.00
- Contract status: On-Going Report
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATI ONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM CONSTRUCTION / UPGRADING / RE HABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS - BALILIHAN- HANOPOL-BATUAN RD - K0045 + 945.50 - K0048 + 593
- Contractor: MOG CONSTRUCTION INC. (56306) / N.N. YU CONSTRUCTION, INC. (FORMERLY: YU CONSTRUCTION) (10470)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2025-05-12
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱83,594,528.00
- Contract status: On-Going Report
- ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANC E OF FLOOD MITIGATION STRUCTURES AND SYSTEMS - CONSTRUCTION OF SLOPE PROTEC TION STRUCTURE NEAR MAKAPIKO BRIDGE, BATUAN, BOHO
- Contractor: MUANA CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY (9354)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-12-12
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱77,149,952.00
- Contract status: On-Going Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURI SM ROAD INFRASTRUCTURE PROGRAM - TRIP) - JIMILIAN - TIGBAO ROAD LEADING TO ECO TOURISM ADVENTURE PARK, BRGY. JIMILIAN, LOBOC
- Contractor: RONNYL CONSTRUCTION (38487)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2024-05-06
- Fund source: Regular Infra - GAA 2024 CP
- Contract price: ₱9,731,978.00
- Contract status: On-Going Report
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIO NAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTI ON OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - L OAY INTERIOR RD - K0190+191 - K0190+276, K0193+72
- Contractor: MOG CONSTRUCTION INC. (56306) / N.N. YU CONSTRUCTION, INC. (FORMERLY: YU CONSTRUCTION) (10470)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2025-04-30
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱53,496,208.00
- Contract status: On-Going Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE IN FRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND / OR BRID GES FROM THE NATIONAL ROAD/S LEADING TO MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF BAGUMBAYAN-TIGBAO
- Contractor: LEDA CONSTRUCTION INCORPORATED (12229) / RL EARTH HAULING & EQUIPMENT SERVICES INC. (41817)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2025-06-15
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱96,373,656.00
- Contract status: On-Going Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SUSTAINABLE INF RASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACIL ITIES - CONSTRUCTION OF ROAD, BALBALAN - PAGSA,
- Contractor: CEBU 7H TECHNOCHEM INDUSTRIES, INC. (31578)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2025-04-09
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱48,959,980.00
- Contract status: On-Going Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM -BASIC INFRASTRU CTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF RO ADS, BILAR, BOHOL STA. 0+000.00 - STA. 1+080.00
- Contractor: HUSAIN CONSTRUCTION AND SUPPLY CO. (42783) / RL EARTH HAULING & EQUIPMENT SERVICES INC. (41817)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2025-02-03
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱34,613,756.00
- Contract status: On-Going Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCI AL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE FACILITY (CANDIJAY SPORTS COMPLEX), BRGY. POBLACION, CANDIJAY, BOHO
- Contractor: BNYU DEVELOPMENT CORPORATION (FORMERLY:BNYU ENTERPRISES & CONSTRUCTION) (27725)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2025-10-04
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱29,649,998.00
- Contract status: On-Going Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (CANDIJAY M UNICIPAL HALL), BRGY. POBLACION, CANDIJAY, BOHOL
- Contractor: MUANA CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY (9354)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2025-08-28
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱48,998,312.00
- Contract status: On-Going Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATE GIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF SLOPE PROTECTION WITH SL IP AND DRAINAGE SYSTEM AT ROAD LEADING TO CAN-UMA
- Contractor: MOG CONSTRUCTION INC. (56306) / N.N. YU CONSTRUCTION, INC. (FORMERLY: YU CONSTRUCTION) (10470)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2025-10-14
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱49,450,000.00
- Contract status: On-Going Report
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTR UCTURE PROGRAM (BIP) - PUBLIC WATER SUPPLY SYSTEM - REHABILITATION OF LOAY WATERWORKS SYSTEM, LOAY, BOHOL
- Contractor: CEBU 7H TECHNOCHEM INDUSTRIES, INC. (31578)
- Implementing Agency: Region VII - Bohol 3rd District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2025-10-08
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱29,680,000.00
- Contract status: On-Going Report