Infrastructure Projects in Region VII — Region VII - Cebu 4th District Engineering Office, 2016
This page lists public infrastructure projects implemented by Region VII - Cebu 4th District Engineering Office in Region VII during 2016. All data are sourced from the Department of Public Works and Highways (DPWH) official database (as of 9/30/2025): https://www.dpwh.gov.ph/dpwh/projects/infrastructure
This information is shared to promote transparency and public awareness. We encourage visitors to validate project details using the official DPWH source. In case of discrepancies, please refer to the original records published by the DPWH.
| Contractor | Projects | Total Price |
|---|---|---|
| ZION CONSTRUCTION(FORMERLY MASTERPIECE CONST. & SU (14881) | 6 | ₱258,462,680.00 |
| DUROS DEVELOPMENT CORP. (22729) | 7 | ₱205,702,984.00 |
| P.B. OBIAL CONSTRUCTION (16784) | 4 | ₱75,560,694.50 |
| R.U. AQUINO CONSTRUCTION AND DEVELOPMENT CORP. (FO (23507) | 4 | ₱61,216,345.25 |
| GONZALODO ENTERPRISES (30681) / SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC. (25226) | 1 | ₱45,432,800.00 |
- REHAB/RECONST/UPGRADING OF DAMAGED PAVED NATL ROADS INCL. DRAINAGE, SOGOD-TABUELAN ROAD TABUELAN
- Contractor: ZION CONSTRUCTION(FORMERLY MASTERPIECE CONST. & SU (14881)
- Implementing Agency: Region VII - Cebu 4th District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2016-10-01
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱37,428,812.00
- Contract status: Completed Report
- IMPVT/WIDENING OF NATIONAL ROADS ALONG SOGOD-TABUELAN ROA D (K0110+400...) TABUELAN, CEBU
- Contractor: ZION CONSTRUCTION(FORMERLY MASTERPIECE CONST. & SU (14881)
- Implementing Agency: Region VII - Cebu 4th District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2016-08-23
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱40,493,620.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL/FACILITIES, BOGO-CURVA-MEDE LLIN-DAANBANTAYAN ROAD, MEDELLIN, CEBU
- Contractor: ZION CONSTRUCTION(FORMERLY MASTERPIECE CONST. & SU (14881)
- Implementing Agency: Region VII - Cebu 4th District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2016-08-10
- Fund source: Regular Infra - GAA 2016 MFO-2
- Contract price: ₱41,896,816.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL DRAINAGE/FACILITIES, BOGO-C URVA-MEDELLIN-DAANBANTAYAN, BOGO-MEDELLIN
- Contractor: R.U. AQUINO CONSTRUCTION AND DEVELOPMENT CORP. (FO (23507)
- Implementing Agency: Region VII - Cebu 4th District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2016-09-23
- Fund source: Regular Infra - GAA 2016 MFO-2
- Contract price: ₱36,256,820.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL DRAINAGE/FACILITIES AT CEBU NORTH HAGNAYA WHARF ROAD, BOGO CITY, CEBU
- Contractor: R.U. AQUINO CONSTRUCTION AND DEVELOPMENT CORP. (FO (23507)
- Implementing Agency: Region VII - Cebu 4th District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2016-07-24
- Fund source: Regular Infra - GAA 2016 MFO-2
- Contract price: ₱14,733,129.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL DRAINAGE/FACILITIES, BOGO-C URVA-MEDELLIN-DAANBANTAYAN ROAD
- Contractor: P.B. OBIAL CONSTRUCTION (16784)
- Implementing Agency: Region VII - Cebu 4th District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2016-07-14
- Fund source: Regular Infra - GAA 2016 MFO-2
- Contract price: ₱8,511,010.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL DRAINAGE/FACILITIES AT BOGO -CURVA-MEDELLIN-DAANBANTAYAN ROAD
- Contractor: R.U. AQUINO CONSTRUCTION AND DEVELOPMENT CORP. (FO (23507)
- Implementing Agency: Region VII - Cebu 4th District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2016-07-24
- Fund source: Regular Infra - GAA 2016 MFO-2
- Contract price: ₱8,287,318.50
- Contract status: Completed Report
- CONSTRUCITON OF FLOOD CONTROL DRAINAGE/FACILITIES AT BOGO -CURVA-MEDELLIN-DAANBANTAYAN ROAD
- Contractor: PLD CONSTRUCTION AND DEVELOPMENT INC. (FORMERLY: PLD CONSTRUCTION) (01859)
- Implementing Agency: Region VII - Cebu 4th District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2016-08-23
- Fund source: Regular Infra - GAA 2016 MFO-2
- Contract price: ₱16,514,484.00
- Contract status: Completed Report
- CONSTRUCTION OF LOCAL ROADS IN BARANGAYS POBLACION, MEDEL LIN, CEBU
- Contractor: R.U. AQUINO CONSTRUCTION AND DEVELOPMENT CORP. (FO (23507)
- Implementing Agency: Region VII - Cebu 4th District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2016-03-23
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱1,939,077.75
- Contract status: Completed Report
- CONSTRUCTION OF ROADS AT BARANGAY LOGON, MALAPASCUA, DAAN BANTAYAN, CEBU
- Contractor: BANTAY CONSTRUCTION (35290)
- Implementing Agency: Region VII - Cebu 4th District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2016-05-12
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱1,949,912.75
- Contract status: Completed Report
- IMPVT/CONST/UPGRADING/REHAB OF DRAINAGE ALONG NATIONAL RO AD, BCMDM ROAD, (K0134+200...), DAANBANTAYA
- Contractor: GONZALODO ENTERPRISES (30681) / SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC. (25226)
- Implementing Agency: Region VII - Cebu 4th District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2016-09-06
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱45,432,800.00
- Contract status: Completed Report
- CONST. & MAINT. OF BRIDGES ALONG NATL RDS.; WIDENING OF DAYHAGON BR. ALONG BCMDM ROAD, MEDELLIN
- Contractor: DUROS DEVELOPMENT CORP. (22729)
- Implementing Agency: Region VII - Cebu 4th District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2016-10-02
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱28,314,152.00
- Contract status: Completed Report
- PREVENTIVE MAINTENANCE BASED ON PAVEMENT SYSTEM-HDM4, CN HW ROAD (K0104+000...), SAN REMEGIO
- Contractor: DUROS DEVELOPMENT CORP. (22729)
- Implementing Agency: Region VII - Cebu 4th District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2016-07-23
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱45,134,000.00
- Contract status: Completed Report
- REHAB/RECONST/UPGRADING OF DAMAGED PAVED NATIONAL RDS IN CLUDING DRAINAGE (K0113+532...), TABUELAN
- Contractor: DUROS DEVELOPMENT CORP. (22729)
- Implementing Agency: Region VII - Cebu 4th District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2016-10-10
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱45,115,048.00
- Contract status: Completed Report
- REHAB/RECONST/UPGRADING OF DAMAGED PAVED NATL RDS INCL D RAI, TOLEDO-TABUELAN-SAN REMEGIO, TABUELAN
- Contractor: P.B. OBIAL CONSTRUCTION (16784)
- Implementing Agency: Region VII - Cebu 4th District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2016-11-02
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱36,849,380.00
- Contract status: Completed Report
- REHAB/RECONST/UPGRADING OF ROADS INCLUDING DRAINAGE, BCM DM ROAD (K0125+000...), DAANBANTAYAN
- Contractor: DUROS DEVELOPMENT CORP. (22729)
- Implementing Agency: Region VII - Cebu 4th District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2016-10-25
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱40,764,944.00
- Contract status: Completed Report
- IMPVT/CONST/UPGRADING/REHAB OF DRAINAGE ALONG CNHWR, K00 81+000..., TABOGON, CEBU
- Contractor: R.U. AQUINO CONSTRUCTION AND DEVELOPMENT CORP. (FO (23507)
- Implementing Agency: Region VII - Cebu 4th District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2016-08-05
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱20,682,696.00
- Contract status: Completed Report
- OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE ALONG AYD PH, K0125+000..., ANTONIO Y DE PIO HIGHWAY
- Contractor: P.B. OBIAL CONSTRUCTION (16784)
- Implementing Agency: Region VII - Cebu 4th District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2016-08-11
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱26,957,254.00
- Contract status: Completed Report
- REHAB/MAJOR REPAIR OF PERMANENT BRIDGES; LAMBUSAN BR (B0 0017CB), AYDPH, LAMBUSAN BR., SAN REMEGIO
- Contractor: DUROS DEVELOPMENT CORP. (22729)
- Implementing Agency: Region VII - Cebu 4th District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2016-07-15
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱11,053,224.00
- Contract status: Completed Report
- CONST. & MAINT. OF BRIDGES; WIDENING OF BANGON BR (B 00010CB), BCMDM ROAD, BANGON, MEDELLIN
- Contractor: DUROS DEVELOPMENT CORP. (22729)
- Implementing Agency: Region VII - Cebu 4th District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2016-09-16
- Fund source: Regular Infra - GAA 2016 MFO-1
- Contract price: ₱30,396,366.00
- Contract status: Completed Report
- CONST/REP/REHAB/IMPVT OF LOCAL PROJECTS-CONC/IMPVT OF BR GY. MAHAWAK-DAANLUNGSOD-ANTIPOLO, MEDELLIN
- Contractor: ZION CONSTRUCTION(FORMERLY MASTERPIECE CONST. & SU (14881)
- Implementing Agency: Region VII - Cebu 4th District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2016-08-07
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱42,600,600.00
- Contract status: Completed Report
- CONST/REP/REHAB/IMPVT OF ROADS-CONC/IMPVT OF BRGYS. POBL ACION-TAPUL-KAL-ANAN ROAD, TABOGON
- Contractor: ZION CONSTRUCTION(FORMERLY MASTERPIECE CONST. & SU (14881)
- Implementing Agency: Region VII - Cebu 4th District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2016-10-17
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱48,022,820.00
- Contract status: Completed Report
- CONST/REP/REHAB/IMPVT OF PROJECTS-CONC/IMPVT OF BRGY. MA NLAGTANG-BRGY. SOMOSA ROADS, TABOGON, CEBU
- Contractor: ZION CONSTRUCTION(FORMERLY MASTERPIECE CONST. & SU (14881)
- Implementing Agency: Region VII - Cebu 4th District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2016-11-04
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱48,020,012.00
- Contract status: Completed Report
- CONSTRUCTION OF CEBU TECHNOLOGICAL UNIVERSITY, POBLACION , TABOGON, CEBU
- Contractor: V.O. CHUPUICO CONSTRUCTION (17585)
- Implementing Agency: Region VII - Cebu 4th District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2016-06-08
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱2,963,678.75
- Contract status: Completed Report
- CONSTRUCTION OF 3-CLASSROOM BUILDING FOR MADRIDEJOS COMM UNITY COLLEGE, MADRIDEJOS, CEBU
- Contractor: GONZALODO ENTERPRISES (30681)
- Implementing Agency: Region VII - Cebu 4th District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2016-07-11
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱2,470,000.25
- Contract status: Completed Report
- IMPROVEMENT OF MUTLI-PURPOSE BUILDING, BARANGAY POBLACIO N, TABUELAN
- Contractor: DUROS DEVELOPMENT CORP. (22729)
- Implementing Agency: Region VII - Cebu 4th District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2016-05-07
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱4,925,250.00
- Contract status: Completed Report
- IMPROVEMENT OF MULTI-PURPOSE BUILDING, BARANGAY CURVA, M EDELLIN, CEBU
- Contractor: MEGA PLUS CONSTRUCTION AND SUPPLY CORP. (FORMERLY: MEGA PLUS CONSTRUCTION) (28322)
- Implementing Agency: Region VII - Cebu 4th District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2016-05-07
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱3,923,436.75
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE (CLASSROOM) BUILDING AT MA DRIDEJOS COLLEGE COMMUNITY, MADRIDEJOS, CEBU
- Contractor: GONZALODO ENTERPRISES (30681)
- Implementing Agency: Region VII - Cebu 4th District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2016-06-01
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱1,975,000.88
- Contract status: Completed Report
- CONST. OF COVERED COURT IN BARANGAY CURVA, MUNICIPALLITY OF MEDELLIN
- Contractor: MEGA PLUS CONSTRUCTION AND SUPPLY CORP. (FORMERLY: MEGA PLUS CONSTRUCTION) (28322)
- Implementing Agency: Region VII - Cebu 4th District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2016-04-22
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱2,456,655.50
- Contract status: Completed Report
- CLUSTER I - IMPVT. OF MP BLDG AT DAANBANTAYAN: 1) BAKHAW AN, 2) MALBAGO, 3) PAYPAY, AND 4) POBLACION
- Contractor: R.U. AQUINO CONSTRUCTION AND DEVELOPMENT CORP. (FO (23507)
- Implementing Agency: Region VII - Cebu 4th District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2016-04-22
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱1,979,201.25
- Contract status: Completed Report
- CLUSTER 2-IMPVT. MP BUILDINGS AT TABOGON, CEBU: 1) BRGY. LOONG; AND 2) BRGY. SAMBAG
- Contractor: V.O. CHUPUICO CONSTRUCTION (17585)
- Implementing Agency: Region VII - Cebu 4th District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2016-05-14
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱993,485.31
- Contract status: Completed Report
- CLUSTER 3-IMPVT. OF MP BLDG AT TABOGON: 1) ALANG-ALANG; 2) KAL-ANAN; 3) MANLAGTANG; AND 2-MORE
- Contractor: PAGAY CONSTRUCTION (34255)
- Implementing Agency: Region VII - Cebu 4th District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2016-10-29
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱2,490,246.75
- Contract status: Completed Report
- IMPROVEMENT OF MULTI-PURPOSE BUILDING AT BARANGAY ILIHAN , TABOGON, CEBU
- Contractor: R.U. AQUINO CONSTRUCTION AND DEVELOPMENT CORP. (FO (23507)
- Implementing Agency: Region VII - Cebu 4th District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2016-04-29
- Fund source: Regular Infra - GAA 2016 Locally Funded Projects
- Contract price: ₱494,500.00
- Contract status: Completed Report
- CLUSTER 4-CONST. OF RAIN WATER COLLECTION SYSTEM (20-SIT ES): 1) TABOGON (6-SITES); 2) SAN REMIGIO
- Contractor: P.B. OBIAL CONSTRUCTION (16784)
- Implementing Agency: Region VII - Cebu 4th District Engineering Office
- Region: Region VII
- Contract effectivity:
- Contract expiry: 2016-10-14
- Fund source: Regular Infra - GAA 2016 MFO-3
- Contract price: ₱3,243,050.50
- Contract status: Completed Report
| Contractor | Projects | Total Price |
|---|---|---|
| ZION CONSTRUCTION(FORMERLY MASTERPIECE CONST. & SU (14881) | 6 | ₱258,462,680.00 |
| DUROS DEVELOPMENT CORP. (22729) | 7 | ₱205,702,984.00 |
| P.B. OBIAL CONSTRUCTION (16784) | 4 | ₱75,560,694.50 |
| R.U. AQUINO CONSTRUCTION AND DEVELOPMENT CORP. (FO (23507) | 4 | ₱61,216,345.25 |
| GONZALODO ENTERPRISES (30681) / SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC. (25226) | 1 | ₱45,432,800.00 |
| R.U. AQUINO CONSTRUCTION AND DEVELOPMENT CORP. (FO (23507) | 3 | ₱23,156,397.25 |
| PLD CONSTRUCTION AND DEVELOPMENT INC. (FORMERLY: PLD CONSTRUCTION) (01859) | 1 | ₱16,514,484.00 |
| MEGA PLUS CONSTRUCTION AND SUPPLY CORP. (FORMERLY: MEGA PLUS CONSTRUCTION) (28322) | 2 | ₱6,380,092.25 |
| GONZALODO ENTERPRISES (30681) | 2 | ₱4,445,001.12 |
| V.O. CHUPUICO CONSTRUCTION (17585) | 2 | ₱3,957,164.06 |
| PAGAY CONSTRUCTION (34255) | 1 | ₱2,490,246.75 |
| BANTAY CONSTRUCTION (35290) | 1 | ₱1,949,912.75 |