Infrastructure Projects in Region VIII — Region VIII - Biliran District Engineering Office, 2024
This page lists public infrastructure projects implemented by Region VIII - Biliran District Engineering Office in Region VIII during 2024. All data are sourced from the Department of Public Works and Highways (DPWH) official database (as of 9/30/2025): https://www.dpwh.gov.ph/dpwh/projects/infrastructure
This information is shared to promote transparency and public awareness. We encourage visitors to validate project details using the official DPWH source. In case of discrepancies, please refer to the original records published by the DPWH.
| Contractor | Projects | Total Price |
|---|---|---|
| LCTING CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: L.C. TING CONSTRUCTION) (23666) | 11 | ₱568,894,260.00 |
| RMA BUILDERS & SUPPLIES CORPORATION (53055) | 26 | ₱330,803,597.00 |
| CHUROCK BUILDERS INC.(FORMERLY: CHUROCK BUILDERS) (45010) | 5 | ₱184,917,214.00 |
| E.G. CANABE CONSTRUCTION (27358) | 3 | ₱146,604,048.00 |
| AQUALINE CONSTRUCTION CORPORATION (FORMERLY: AQUALINE CONSTRUCTION) (11555) | 3 | ₱144,551,744.00 |
- CONSTRUCTION OF AMAMBAHAG FLOOD CONTROL ALONG BILIRAN CI RCUMFERENTIAL ROAD, PHASE VII, CULABA, BILIRAN
- Contractor: VK BUILDERS INC. (52730)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-07-29
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱29,379,046.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY INASUY AN, KAWAYAN, BILIRAN
- Contractor: ROVING PREMIER CONTRACTORS, INC. (42347)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-06-29
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱14,546,001.00
- Contract status: Completed Report
- IMPROVEMENT OF ACCESS ROAD LEADING TO VILLA CANEJA - ANI SLAGAN ROAD CONNECTING TO ANISLAGAN CERAMICS PRODUCERS ASSOCIATIO (ACPA), N AVAL, BILIRAN
- Contractor: CHUROCK BUILDERS INC.(FORMERLY: CHUROCK BUILDERS) (45010)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-12-16
- Fund source: Regular Infra - GAA 2024 CP
- Contract price: ₱48,983,924.00
- Contract status: Completed Report
- NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL RD-K1021+674 -K1022+910
- Contractor: E.G. CANABE CONSTRUCTION (27358)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-10-07
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱48,969,440.00
- Contract status: Completed Report
- REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAV ED ROADS-SECONDARY ROADS- BILIRAN CIRCUMFERENTIAL RD - K1023+500- K1023+700
- Contractor: E.G. CANABE CONSTRUCTION (27358)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-09-26
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱48,934,824.00
- Contract status: Completed Report
- CONSTRUCTION OF CARAYCARAY FLOOD CONTROL ALONG BILIRAN C IRCUMFERENTIAL ROAD, PHASE VII, NAVAL, BILIRAN
- Contractor: SUNRISE BUILDERS (39757)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-07-22
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱29,374,884.00
- Contract status: Completed Report
- CONSTRUCTION OF SEAWALL, BARANGAY VILLA CORNEJO, KAWAYAN , BILIRAN
- Contractor: M.B. ANG CONSTRUCTION & SUPPLY (25001)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-04-25
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,845,187.50
- Contract status: Completed Report
- CONSTRUCTION OF SEAWALL, BARANGAY POBLACION, ALMERIA, BI LIRAN
- Contractor: W.B. ALAGAO CONSTRUCTION (15622)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-05-16
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,850,108.50
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLI PS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - BILIRAN CIRCUMFERENTIA L RD - K1050+375 TO K1050+854
- Contractor: LCTING CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: L.C. TING CONSTRUCTION) (23666)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-09-11
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱33,650,072.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY HABUHA B, CULABA, BILIRAN
- Contractor: QYT CONSTRUCTION AND SUPPLIES (40210)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-07-04
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱19,585,420.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, SITIO ALANG-ALANG, BARANGAY LUCSOO N, NAVAL, BILIRAN
- Contractor: MKB BUILDERS AND SUPPLY (41239)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-04-21
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,945,131.50
- Contract status: Completed Report
- CONSTRUCTION OF GUERON FLOOD CONTROL ALONG NAVAL-CAIBIRA N CROSS COUNTRY ROAD, PHASE I, NAVAL, BILIRAN
- Contractor: SUNRISE BUILDERS (39757)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-11-16
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱26,578,804.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY PINANG OMHAN, PHASEIII, BILIRAN, BILIRAN
- Contractor: CHUROCK BUILDERS INC.(FORMERLY: CHUROCK BUILDERS) (45010)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-07-04
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱19,584,390.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLI PS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - BILIRAN CIRCUMFERENTIA L RD - K1061+078 TO K1061+380
- Contractor: RMA BUILDERS & SUPPLIES CORPORATION (53055)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-08-28
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱23,888,804.00
- Contract status: Completed Report
- REHABILITATION OF ROAD, BARANGAY MATANGGO, ALMERIA, BILI RAN
- Contractor: 4K VERMARK CIVIL ENGINEERING CONSTRUCTION (52485)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-05-15
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,944,751.00
- Contract status: Completed Report
- CONSTRUCTION OF DRAINAGE ALONG NATIONAL ROAD - SECONDARY ROADS BILIRAN CIRCUMFERENTIAL RD - K1030 + 200 - K1031 + 252
- Contractor: VK BUILDERS INC. (52730)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-06-24
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱19,586,052.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY AGPANG I, NAVAL, BILIRAN
- Contractor: MKB BUILDERS AND SUPPLY (41239)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-06-04
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱9,791,565.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, BARANGAY BACOLOD, CULABA, BILIRAN< /span>
- Contractor: M.B. ANG CONSTRUCTION & SUPPLY (25001)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-04-28
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,794,924.00
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLI PS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - BILIRAN CIRCUMFERENTIA L RD - K1073+232 TO K1073+428, K1073+569 TO K1073+841
- Contractor: LCTING CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: L.C. TING CONSTRUCTION) (23666)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-09-14
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱33,923,204.00
- Contract status: Completed Report
- NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AN D DIVERSION ROADS - ALMERIA BYPASS ROAD, BILIRAN
- Contractor: RMA BUILDERS & SUPPLIES CORPORATION (53055)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-09-10
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱19,190,762.00
- Contract status: Completed Report
- CONSTRUCTION OF ACCESS ROAD LEADING TO TRADES, INDUSTRIE S AND ECONOMIC ZONES, NRJ AGPANGI CONNECTING TO SITIO PONGON ROAD IN SUPPOR T OF THE FOOD & RESOURCE-BASED PROCESSING, NAVAL, BILIRAN
- Contractor: QYT CONSTRUCTION AND SUPPLIES (40210)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-05-28
- Fund source: Regular Infra - GAA 2024 CP
- Contract price: ₱9,797,011.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY ERMITA , PHASE I, MARIPIPI, BILIRAN
- Contractor: RMA BUILDERS & SUPPLIES CORPORATION (53055)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-07-02
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱9,646,439.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SITIO BUWAON, B ARANGAY BUNGA, CABUCGAYAN, BILIRAN
- Contractor: INFRASERVE BUILDERS AND SUPPLIES (36222)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-06-04
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱9,716,103.00
- Contract status: Completed Report
- REHABILITATION OF FLOOD CONTROL STRUCTURE, BARANGAY CATM ON, NAVAL, BILIRAN
- Contractor: RMA BUILDERS & SUPPLIES CORPORATION (53055)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-05-07
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱6,775,427.50
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, DISPO ROAD, BAR ANGAY CALUMPANG, NAVAL, BILIRAN
- Contractor: ANG YAP BUILDERS AND AGGREGATE SUPPLIES INC. (46016)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-04-27
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱5,807,387.50
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PHASE IV, BARAN GAY ANISLAGAN, NAVAL, BILIRAN
- Contractor: RMA BUILDERS & SUPPLIES CORPORATION (53055)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-05-02
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,886,184.00
- Contract status: Completed Report
- REHABILITATION OF ROAD, BARANGAY MAGBANGON, CABUCGAYAN, BILIRAN
- Contractor: QYT CONSTRUCTION AND SUPPLIES (40210)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-04-27
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,945,137.50
- Contract status: Completed Report
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL RD - K1 068+913 TO K1069+301, K1069+131-K1069+301, K1069+945- K1070+112
- Contractor: COLLERA CONSTRUCTION (13246)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-11-29
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱48,164,696.00
- Contract status: Completed Report
- NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL RD- K1068+600-K1069+121, K1069+301-K1069+945
- Contractor: COLLERA CONSTRUCTION (13246)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-10-11
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱48,230,980.00
- Contract status: Completed Report
- CONSTRUCTION OF CATMON FLOOD CONTROL ALONG BILIRAN CIRCU MFERENTIAL ROAD, NAVAL, BILIRAN
- Contractor: RMA BUILDERS & SUPPLIES CORPORATION (53055)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-07-30
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱23,980,324.00
- Contract status: Completed Report
- OFFCARRIAGE IMPROVEMENT - SECONDARY ROADS - BILIRAN CIRC UMFERENTIAL RD K1039+032 - K 1039+224; K1039+884 - K1040+724
- Contractor: M.B. ANG CONSTRUCTION & SUPPLY (25001)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-10-07
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱19,594,452.00
- Contract status: Completed Report
- REHABILITATION OF ROAD, BARANGAY TOMALISTIS, CAIBIRAN, B ILIRAN
- Contractor: INFRASERVE BUILDERS AND SUPPLIES (36222)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-05-19
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,843,684.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, NAV AL NATIONAL HIGHSCHOOL (NNHS), BARANGAY LARRAZABAL, NAVAL, BILIRAN
- Contractor: RMA BUILDERS & SUPPLIES CORPORATION (53055)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-05-11
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱1,978,230.00
- Contract status: Completed Report
- CONSTRUCTION OF CANILA FLOOD CONTROL, BILIRAN, BILIRAN
- Contractor: RMA BUILDERS & SUPPLIES CORPORATION (53055)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-08-12
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱28,765,800.00
- Contract status: Completed Report
- REHABILITATION OF ANAS FLOOD CONTROL, NAVAL, BILIRAN
- Contractor: RMA BUILDERS & SUPPLIES CORPORATION (53055)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-07-28
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱23,957,986.00
- Contract status: Completed Report
- CONSTRUCTION OF BOOL EAST FLOOD CONTROL, CULABA, BILIRAN
- Contractor: RMA BUILDERS & SUPPLIES CORPORATION (53055)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-07-05
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱9,608,686.00
- Contract status: Completed Report
- CONSTRUCTION OF SANGGALANG FLOOD CONTROL, BILIRAN, BILIR AN
- Contractor: RMA BUILDERS & SUPPLIES CORPORATION (53055)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-07-03
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱9,610,486.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BILIRAN CENTRAL SCHOOL, BARANGAY SAN ROQUE, BILIRAN, BILIRAN
- Contractor: RMA BUILDERS & SUPPLIES CORPORATION (53055)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-07-03
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,875,047.50
- Contract status: Completed Report
- CONSTRUCTION OF ACCESS ROAD LEADING TO PONDOL FALLS, ALM ERIA, BILIRAN
- Contractor: BNL CONSTRUCTION (15725)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-06-18
- Fund source: Regular Infra - GAA 2024 CP
- Contract price: ₱4,820,017.50
- Contract status: Completed Report
- CONSTRUCTION OF DRAINAGE ALONG NATIONAL ROAD-SECONDARY R OADS BILIRAN CIRCUMFERENTIAL RD - K1026 + 130 - K1027 + 104
- Contractor: M.B. ANG CONSTRUCTION & SUPPLY (25001)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-09-05
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱19,580,014.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY IMELDA, NAVAL, BILIRAN
- Contractor: MKB BUILDERS AND SUPPLY (41239)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-06-18
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,872,023.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY LUCSOON , NAVAL, BILIRAN
- Contractor: MKB BUILDERS AND SUPPLY (41239)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-07-03
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,871,763.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY MARVEL, CULABA, BILIRAN
- Contractor: M.B. ANG CONSTRUCTION & SUPPLY (25001)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-07-03
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,944,653.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BARI-IS , CAIBIRAN, BILIRAN
- Contractor: QYT CONSTRUCTION AND SUPPLIES (40210)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-07-18
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,870,814.50
- Contract status: Completed Report
- REHABILITATION OF ANAS FLOOD CONTROL STRUCTURE, PHASE 3, BARANGAY ATIPOLO, NAVAL, BILIRAN
- Contractor: LCTING CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: L.C. TING CONSTRUCTION) (23666)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-08-04
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱19,595,820.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PHASE 4, BARANG AY ANISLAGAN, NAVAL, BILIRAN
- Contractor: RMA BUILDERS & SUPPLIES CORPORATION (53055)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-08-16
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱19,597,850.00
- Contract status: Completed Report
- CONSTRUCTION OF MAINIT FLOOD CONTROL STRUCTURE, CAIBIRAN , BILIRAN
- Contractor: LCTING CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: L.C. TING CONSTRUCTION) (23666)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-08-04
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱19,595,944.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PHASE 3, CALAMB IS ALONG CABIBIHAN-VICTORY ROAD, DOWNSTREAM, CAIBIRAN, BILIRAN
- Contractor: RMA BUILDERS & SUPPLIES CORPORATION (53055)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-08-01
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱19,595,714.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PHASE 3, BARANG AY SANGGALANG, BILIRAN, BILIRAN
- Contractor: RMA BUILDERS & SUPPLIES CORPORATION (53055)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-08-16
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱19,302,950.00
- Contract status: Completed Report
- CONSTRUCTION OF MAPULA FLOOD CONTROL ALONG CABIBIHAN-VIC TORY ROAD, PHASE II, BARANGAY CABIBIHAN, CAIBIRAN, BILIRAN
- Contractor: LCTING CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: L.C. TING CONSTRUCTION) (23666)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2025-02-06
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱96,496,688.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE FACILITY, CAIBIRAN NATIONA L SCHOOL, SITIO PARAISO, BRGY. MANLABANG, CAIBIRAN, BILIRAN
- Contractor: RMA BUILDERS & SUPPLIES CORPORATION (53055)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-07-25
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,795,405.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY BURABOD, KA WAYAN, BILIRAN
- Contractor: 4K VERMARK CIVIL ENGINEERING CONSTRUCTION (52485)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-08-04
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,803,790.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING.,BRGY. KANSANOK, KAWAYAN, BILIRAN
- Contractor: RMA BUILDERS & SUPPLIES CORPORATION (53055)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-07-30
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,895,710.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, SITIO COGON, BAR ANGAY LARRAZABAL, NAVAL, BILIRAN
- Contractor: RMA BUILDERS & SUPPLIES CORPORATION (53055)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-07-25
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,948,049.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE FACILITY, BARANGAY VILLA C ANEJA, NAVAL, BILIRAN
- Contractor: RMA BUILDERS & SUPPLIES CORPORATION (53055)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-08-09
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,890,870.50
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BAR ANGAY LICO, NAVAL, BILIRAN
- Contractor: MKB BUILDERS AND SUPPLY (41239)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-06-05
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱1,903,280.75
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (GYM NASIUM), NAVAL, BILIRAN
- Contractor: MKB BUILDERS AND SUPPLY (41239)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-09-05
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱19,794,870.00
- Contract status: Completed Report
- CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS)
- Contractor: M.B. ANG CONSTRUCTION & SUPPLY (25001)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-10-04
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱2,860,820.00
- Contract status: Completed Report
- IMPROVEMENT OF ACCESS ROAD LEADING TO DECLARED TOURISM D ESTINATIONS, ULAN-ULAN FALLS, SAMPAO, ALMERIA, BILIRAN
- Contractor: LCTING CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: L.C. TING CONSTRUCTION) (23666)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-12-18
- Fund source: Regular Infra - GAA 2024 CP
- Contract price: ₱67,113,680.00
- Contract status: On-Going Report
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - PAWIKAN-ES PERANZA DIVERSION ROAD, BILIRAN, CABUCGAYAN, BILIRAN
- Contractor: CHUROCK BUILDERS INC.(FORMERLY: CHUROCK BUILDERS) (45010)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-11-26
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱48,487,132.00
- Contract status: On-Going Report
- CONSTRUCTION OF EMBANKMENT, BARANGAY BUNGA, CABUCGAYAN, BILIRAN
- Contractor: INFRASERVE BUILDERS AND SUPPLIES (36222)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-05-15
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱9,613,096.00
- Contract status: On-Going Report
- CONSTRUCTION OF CALAMBIS FLOOD CONTROL ALONG CABIBIHAN-V ICTORY ROAD, PHASE II, CAIBIRAN, BILIRAN
- Contractor: CHUROCK BUILDERS INC.(FORMERLY: CHUROCK BUILDERS) (45010)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-07-29
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱29,371,336.00
- Contract status: On-Going Report
- NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL RD- K1053+970-K1054+680, K1054+720-K1055+200
- Contractor: VICTORIA DEVELOPMENT AND VENTURES CORP. (FOR: VICTORIA DEV'T AND CONST. CORP.) (32638)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-08-28
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱48,962,292.00
- Contract status: On-Going Report
- CONSTRUCTION OF DRAINAGE ALONG NATIONAL ROAD - SECONDARY ROADS-BILIRAN CIRCUMFERENTIAL RD - K1029 + 085 - K1029 + 814
- Contractor: VK BUILDERS INC. (52730)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-08-08
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱29,385,986.00
- Contract status: On-Going Report
- CONSTRUCTION OF SEAWALL, BARANGAY VIRGINIA, CULABA, BILI RAN
- Contractor: M.B. ANG CONSTRUCTION & SUPPLY (25001)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-04-26
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,808,553.00
- Contract status: On-Going Report
- CONSTRUCTION OF EMBANKMENT, BARANGAY BINONGTO-AN, MARIPI PI, BILIRAN
- Contractor: QYT CONSTRUCTION AND SUPPLIES (40210)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-04-26
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,844,036.00
- Contract status: On-Going Report
- CONSTRUCTION OF LOMBOY FLOOD CONTROL STRUCTURE, BARANGAY CALUMPANG, NAVAL, BILIRAN
- Contractor: LCTING CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: L.C. TING CONSTRUCTION) (23666)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-11-13
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱77,136,480.00
- Contract status: On-Going Report
- CONSTRUCTION OF DRAINAGE, BARANGAY BUNGA, CABUCGAYAN, BI LIRAN
- Contractor: QYT CONSTRUCTION AND SUPPLIES (40210)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-05-11
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,841,280.00
- Contract status: On-Going Report
- CONSTRUCTION OF DRAINAGE, BARANGAY PALANAY, CAIBIRAN, BI LIRAN
- Contractor: R.K. ENGINEERING & CONSTRUCTION WORKS (12534)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-04-20
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,843,719.50
- Contract status: On-Going Report
- CONSTRUCTION OF SLOPE PROTECTION ALONG CARAYCARAY-CALUMP ANG ROAD, NAVAL, BILIRAN 0+297 - 0+620
- Contractor: E.G. CANABE CONSTRUCTION (27358)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-12-26
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱48,699,784.00
- Contract status: On-Going Report
- REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLI PS, SLOPE COLLAPSE AND LANDSLIDE -SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL RD - K1062+560 TO K1063+220
- Contractor: LCTING CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: L.C. TING CONSTRUCTION) (23666)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-10-29
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱48,717,588.00
- Contract status: On-Going Report
- CONSTRUCTION OF ACCESS ROAD LEADING TO KASABANGAN FALLS, CABUCGAYAN, BILIRAN
- Contractor: INFRASERVE BUILDERS AND SUPPLIES (36222)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-06-19
- Fund source: Regular Infra - GAA 2024 CP
- Contract price: ₱18,892,416.00
- Contract status: On-Going Report
- CONSTRUCTION OF ALMERIA FLOOD CONTROL ALONG ALMERIA BYPA SS ROAD, ALMERIA, BILIRAN
- Contractor: RMA BUILDERS & SUPPLIES CORPORATION (53055)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-09-05
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱19,187,252.00
- Contract status: On-Going Report
- NETWORK DEVELOPMENT-CONSTRUCTION OF BY-PASS AND DIVERSIO N ROADS - NAVAL DIVERSION ROAD (RIVERSIDE TO PROVINCIAL HOSPITAL), BILIRAN STA. 0+000 TO STA. 0+055
- Contractor: RMA BUILDERS & SUPPLIES CORPORATION (53055)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-07-02
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱21,736,060.00
- Contract status: On-Going Report
- CONSTRUCTION OF ACCESS ROAD LEADING TO SUBING SUBING HIL L, KAWAYAN, BILIRAN
- Contractor: VICTORIA DEVELOPMENT AND VENTURES CORP. (FOR: VICTORIA DEV'T AND CONST. CORP.) (32638)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-07-12
- Fund source: Regular Infra - GAA 2024 CP
- Contract price: ₱18,875,170.00
- Contract status: On-Going Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (LEGISLATIVE BUIL DING), BARANGAY ERMITA, MARIPIPI, BILIRAN
- Contractor: M.B. ANG CONSTRUCTION & SUPPLY (25001)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-06-27
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,851,575.50
- Contract status: On-Going Report
- REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLI PS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - BILIRAN CIRCUMFERENTIA L RD - K1047+750 TO K1048+400(R/S)
- Contractor: AQUALINE CONSTRUCTION CORPORATION (FORMERLY: AQUALINE CONSTRUCTION) (11555)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2025-02-20
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱48,015,652.00
- Contract status: On-Going Report
- REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLI PS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - BILIRAN CIRCUMFERENTIA L RD - K1047+750 TO K1048+389(L/S)
- Contractor: AQUALINE CONSTRUCTION CORPORATION (FORMERLY: AQUALINE CONSTRUCTION) (11555)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2025-03-30
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱47,995,280.00
- Contract status: On-Going Report
- NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL RD- K1058+942-K1060+365, K1060+508-K1060+755
- Contractor: AQUALINE CONSTRUCTION CORPORATION (FORMERLY: AQUALINE CONSTRUCTION) (11555) / RMA BUILDERS & SUPPLIES CORPORATION (53055)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-12-05
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱48,214,020.00
- Contract status: On-Going Report
- CONSTRUCTION OF ACCESS ROAD LEADING TO TRADES, INDUSTRIE S AND ECONOMIC ZONES, CARAYCARAY-CABUNGAAN-LIBTONG ROAD IN SUPPORT OF THE A GRIBUSINESS: FOOD & RESOURCE-BASED PROCESSING IN BRGY. LIBTONG, NAVAL, BILIRAN
- Contractor: MKB BUILDERS AND SUPPLY (41239)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-06-01
- Fund source: Regular Infra - GAA 2024 CP
- Contract price: ₱9,789,189.00
- Contract status: On-Going Report
- CONSTRUCTION OF ACCESS ROAD LEADING TO TRADES, INDUSTRIE S AND ECONOMIC ZONES, NRJ VILLA CONSUELO CONNECTING TO LIBTONG ROAD IN SUPP ORT OF THE FOOD & RESOURCE-BASED PROCESSING, NAVAL, BILIRAN
- Contractor: M.B. ANG CONSTRUCTION & SUPPLY (25001)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-11-21
- Fund source: Regular Infra - GAA 2024 CP
- Contract price: ₱4,855,208.50
- Contract status: On-Going Report
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL RD - K1 040+219 TO K1040+718
- Contractor: LCTING CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: L.C. TING CONSTRUCTION) (23666)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-12-24
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱47,840,960.00
- Contract status: On-Going Report
- NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL RD- K1084+914-K1086+112
- Contractor: ROTAFLEX CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY:ROTA FLEX CONSTRUCTION) (23408)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-09-13
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱48,157,708.00
- Contract status: On-Going Report
- CONSTRUCTION OF MAINIT FLOOD CONTROL ALONG BILIRAN CIRCU MFERENTIAL ROAD, CAIBIRAN, BILIRAN
- Contractor: CHUROCK BUILDERS INC.(FORMERLY: CHUROCK BUILDERS) (45010)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-09-03
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱38,490,432.00
- Contract status: On-Going Report
- REHABILITATION OF ROAD, BARANGAY PALANAY, CAIBIRAN, BILI RAN
- Contractor: R.K. ENGINEERING & CONSTRUCTION WORKS (12534)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-04-28
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,722,426.50
- Contract status: On-Going Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING , BARANGAY BINONG TOAN, CULABA, BILIRAN
- Contractor: QYT CONSTRUCTION AND SUPPLIES (40210)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-06-17
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,775,612.50
- Contract status: On-Going Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BAR ANGAY ERMITA, MARIPIPI, BILIRAN
- Contractor: M.B. ANG CONSTRUCTION & SUPPLY (25001)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-06-02
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱1,936,026.50
- Contract status: On-Going Report
- REHABILITATION OF CARAYCARAY FLOOD CONTROL STRUCTURE ALO NG BILIRAN CIRCUMFERENTIAL ROAD, NAVAL, BILIRAN
- Contractor: LCTING CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: L.C. TING CONSTRUCTION) (23666)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-10-24
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱95,838,264.00
- Contract status: On-Going Report
- NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS - LEYTE- BILIRAN RD, K1006+(-381)-K1006+(-131)
- Contractor: J PRO BUILDERS (48521) / COLLERA CONSTRUCTION (13246)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2025-04-26
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱96,439,464.00
- Contract status: On-Going Report
- CONSTRUCTION OF TWO-STOREY OFFICE BUILDING, DPWH BILIRAN DEO, DPWH BUREAU OF EQUIPMENT, 8TH RES, BARANGAY LARRAZABAL, NAVAL, BILIRA N
- Contractor: AQUALINE CONSTRUCTION CORPORATION (FORMERLY: AQUALINE CONSTRUCTION) (11555)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2025-04-03
- Fund source: Regular Infra - GAA 2024 LP
- Contract price: ₱48,540,812.00
- Contract status: On-Going Report
- REHABILITATION OF ROAD, CAUCAB-PALAYAN ROAD, ALMERIA, BI LIRAN
- Contractor: BNL CONSTRUCTION (15725)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-10-13
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱28,632,854.00
- Contract status: On-Going Report
- CONSTRUCTION OF ALMERIA FLOOD CONTROL STRUCTURE ALONG BI LIRAN CIRCUMFERENTIAL ROAD, PHASE 2, ALMERIA, BILIRAN
- Contractor: SUNRISE BUILDERS (39757)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-10-06
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱28,740,474.00
- Contract status: On-Going Report
- CONSTRUCTION OF BUNGA FLOOD CONTROL STRUCTURE ALONG BILI RAN CIRCUMFERENTIAL ROAD, PHASE 3, CABUCGAYAN, BILIRAN
- Contractor: INFRASERVE BUILDERS AND SUPPLIES (36222)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-08-16
- Fund source: Regular Infra - GAA 2024 OO-2
- Contract price: ₱19,278,508.00
- Contract status: On-Going Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, PHASE 1, BARANGA Y BINALAYAN WEST, MARIPIPI, BILIRAN
- Contractor: RMA BUILDERS & SUPPLIES CORPORATION (53055)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-07-23
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,850,606.50
- Contract status: On-Going Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, PHASE 2, BARANGA Y BINALAYAN WEST, MARIPIPI, BILIRAN
- Contractor: RMA BUILDERS & SUPPLIES CORPORATION (53055)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-12-05
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱6,115,060.00
- Contract status: On-Going Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BAR ANGAY MAURANG, CAIBIRAN, BILIRAN
- Contractor: QYT CONSTRUCTION AND SUPPLIES (40210)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-05-11
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱1,918,920.38
- Contract status: On-Going Report
- CONSTRUCTION OF SITIO LOMBOY FLOOD CONTROL STRUCTURE, PH ASE 6, BRGY. CALUMPANG, NAVAL, BILIRAN
- Contractor: LCTING CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: L.C. TING CONSTRUCTION) (23666)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-08-21
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱28,985,560.00
- Contract status: On-Going Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY MAGBANG ON, CABUCGAYAN, BILIRAN
- Contractor: MKB BUILDERS AND SUPPLY (41239)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-07-23
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱14,615,724.00
- Contract status: On-Going Report
- REHABILITATION OF ROAD, BARANGAY TABUNAN, ALMERIA, BILIR AN
- Contractor: BNL CONSTRUCTION (15725)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-05-04
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,821,157.50
- Contract status: On-Going Report
- NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL RD- K1088+800 -K1090+000
- Contractor: VICTORIA DEVELOPMENT AND VENTURES CORP. (FOR: VICTORIA DEV'T AND CONST. CORP.) (32638)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-10-11
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱47,870,568.00
- Contract status: On-Going Report
- CONSTRUCTION OF DRAINAGE ALONG NATIONAL ROAD-SECONDARY R OADS BILIRAN CIRCUMFERENTIAL RD - K1010 + 050 - K1011 + 447
- Contractor: MKB BUILDERS AND SUPPLY (41239)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-10-30
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱29,010,780.00
- Contract status: On-Going Report
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PHASE 3, BARANG AY SAN LORENZO, KAWAYAN, BILIRAN
- Contractor: ROVING PREMIER CONTRACTORS, INC. (42347)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-09-19
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱19,275,510.00
- Contract status: On-Going Report
- INSTALLATION OF ROADWAY LIGHTING STRUCTURES ALONG BOUNDA RY (ALMERIA-NAVAL), PULANG BATO- SABANG ROAD TO BRGY. ATIPOLO (NEAR ANAS RI VER) BERNARDES 2, BRGY. ATIPOLO TO SAGRADA VILLAGE, PI GARCIA, NAVAL, BILIR AN
- Contractor: RMA BUILDERS & SUPPLIES CORPORATION (53055)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-05-29
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱9,645,511.00
- Contract status: On-Going Report
- REHABILITATION OF DRAINAGE ALONG NATIONAL ROAD-SECONDARY ROADS BILIRAN CIRCUMFERENTIAL RD - K1013 + 800 - K1013 + 890
- Contractor: K & A LUMBAB CONSTRUCTION AND SUPPLY (46478)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-07-21
- Fund source: Regular Infra - GAA 2024 OO-1
- Contract price: ₱9,792,689.00
- Contract status: On-Going Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, WES TERN BILIRAN HIGH SCHOOL FOR THE ARTS AND CULTURE (WEBHSAC), BARANGAY TAMAR INDO, ALMERIA, BILIRAN
- Contractor: MKB BUILDERS AND SUPPLY (41239)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-05-26
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱1,905,980.88
- Contract status: On-Going Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (MUN ICIPAL BUILDING), CABUCGAYAN, BILIRAN
- Contractor: K & A LUMBAB CONSTRUCTION AND SUPPLY (46478)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-10-13
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱19,408,790.00
- Contract status: On-Going Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. BALACSON, KAWAYAN, BILIRAN
- Contractor: RMA BUILDERS & SUPPLIES CORPORATION (53055)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-07-10
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱4,898,205.50
- Contract status: On-Going Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BIPSU NURSING BU ILDING, PHASE 2, NAVAL, BILIRAN, PHASE 2
- Contractor: INFRASERVE BUILDERS AND SUPPLIES (36222)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2025-04-03
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱67,150,288.00
- Contract status: On-Going Report
- REHABILITATION OF ROAD, CAUCAB-PALAYAN ROAD, ALMERIA, BI LIRAN
- Contractor: ROTAFLEX CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY:ROTA FLEX CONSTRUCTION) (23408)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2025-01-19
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱48,105,680.00
- Contract status: On-Going Report
- CONSTRUCTION OF ROAD, SITIO MANOGSOK, BRGY. SAN ROQUE, B ILIRAN
- Contractor: RMA BUILDERS & SUPPLIES CORPORATION (53055)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2025-05-20
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱19,180,176.00
- Contract status: On-Going Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY VICTORY , CAIBIRAN, BILIRAN
- Contractor: MKB BUILDERS AND SUPPLY (41239)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-10-05
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱9,210,761.00
- Contract status: On-Going Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BAR ANGAY TRABUNGAN, MARIPIPI, BILIRAN
- Contractor: QYT CONSTRUCTION AND SUPPLIES (40210)
- Implementing Agency: Region VIII - Biliran District Engineering Office
- Region: Region VIII
- Contract effectivity:
- Contract expiry: 2024-06-07
- Fund source: Regular Infra - GAA 2024 SSP
- Contract price: ₱1,905,690.25
- Contract status: On-Going Report