This page lists public infrastructure projects implemented by Region XII - Sultan Kudarat 1st District Engineering Office in Region XII during 2017. All data are sourced from the Department of Public Works and Highways (DPWH) official database (as of 9/30/2025): https://www.dpwh.gov.ph/dpwh/projects/infrastructure
This information is shared to promote transparency and public awareness. We encourage visitors to validate project details using the official DPWH source. In case of discrepancies, please refer to the original records published by the DPWH.
| Contractor | Projects | Total Price |
|---|---|---|
| GEMMA CONSTRUCTION SUPPLY, INC.(FORMERLY:GEMMA CON (5044) | 2 | ₱94,232,552.00 |
| C.A. BETALAC CONSTRUCTION & GEN. MDSE., INC. (FOR: C.A. BETALAC CONSTRUCTION & GEN. MDSE.) (28222) | 2 | ₱48,116,706.00 |
| DALANON CONSTRUCTION CORPORATION (FORMERLY:DALANON CONSTRUCTION REF. SUPPLY & SERVICE) (11205) | 1 | ₱45,557,776.00 |
| ROBETH CONST. AND DEV'T. CORP. (FORMERLY: ROBETH GEN. MDSE. CONST. & SUPPLY) (23175) | 2 | ₱22,323,577.50 |
| THREE W BUILDERS, INC. (10722) | 1 | ₱21,348,654.00 |
- CONSTRUCTION OF RIVER CONTROL ALA RIVER LAMBAYONG (RIVER BANK RPOTECTION REVETMENT), MATIOMPONG SECTION, BRGY. MATIOMPONG SECTION A 0+000-0+290, SECTION B 0+490-0+630
- Contractor: GEMMA CONSTRUCTION SUPPLY, INC.(FORMERLY:GEMMA CON (5044)
- Implementing Agency: Region XII - Sultan Kudarat 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2017-09-21
- Fund source: Regular Infra - GAA 2016 MFO-2
- Contract price: ₱46,738,504.00
- Contract status: Completed Report
- CONST./UPGRADING/REHABILITATION OF DRAINAGE ALONG KIDAPA WAN-ALLAH JCT. ROAD K1673+(-458)-K1673+164, TACURONG CITY, SULTAN KUDARAT
- Contractor: THREE W BUILDERS, INC. (10722)
- Implementing Agency: Region XII - Sultan Kudarat 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2018-02-10
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱21,348,654.00
- Contract status: Completed Report
- IMPROV'T/WIDENING OF NAT'L. RDS. ALONG DULAWAN-MARBEL RD ., K1759+944-K1761+944, TACURONG CITY
- Contractor: C.A. BETALAC CONSTRUCTION & GEN. MDSE., INC. (FOR: C.A. BETALAC CONSTRUCTION & GEN. MDSE.) (28222)
- Implementing Agency: Region XII - Sultan Kudarat 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2017-10-24
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱45,581,112.00
- Contract status: Completed Report
- IMPROV'T./WIDENING OF NAT'L. RDS. ALONG ISULAN JCT. NINO Y AQUINO RD. K1776+451-K778+482, ISULAN, SULTAN KUDARAT
- Contractor: DALANON CONSTRUCTION CORPORATION (FORMERLY:DALANON CONSTRUCTION REF. SUPPLY & SERVICE) (11205)
- Implementing Agency: Region XII - Sultan Kudarat 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2017-10-24
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱45,557,776.00
- Contract status: Completed Report
- REPAIR OF DECK, MAIN STRUCTURES, SLOPE OR BANK PROTECTIO N AND APPROACHES AT KALAWAG BRIDGE (B00289MN) ALONG KID.-ALLAH JCT. RD., IS ULAN, SULTAN KUDARAT
- Contractor: FPJ CONSTRUCTION AND SUPPLY (28493)
- Implementing Agency: Region XII - Sultan Kudarat 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2017-07-03
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱5,612,357.00
- Contract status: Completed Report
- REPAIR OF DECK, MAIN STRUCTURES, SLOPE OR BANK PROTECTIO N AND APPROACHES AT KALIPA BRIDGE (B00607) ALONG ISULAN JCT. NINOY AQUINO R OAD, ISULAN, SULTAN KUDARAT
- Contractor: FPJ CONSTRUCTION AND SUPPLY (28493)
- Implementing Agency: Region XII - Sultan Kudarat 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2017-06-29
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱4,292,021.50
- Contract status: Completed Report
- WIDENING OF GANSING BRIDGE FROM 2 LANES TO 4 LANES ALONG DULAWAN-MARBEL ROAD (B00291MN) K1757+398-1757+418.6, GANSING, TACURONG CIT Y
- Contractor: ROBETH CONST. AND DEV'T. CORP. (FORMERLY: ROBETH GEN. MDSE. CONST. & SUPPLY) (23175)
- Implementing Agency: Region XII - Sultan Kudarat 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2017-11-07
- Fund source: Regular Infra - GAA 2017 MFO-1
- Contract price: ₱19,053,432.00
- Contract status: Completed Report
- CONST. OF RIVER CONTROL ALONG ALA RIVER (PANAS- BAMBAD S ECTION), KO+000-KO+210, ISULAN, SULTAN KUDARAT
- Contractor: AJYSC MARKETING (26924)
- Implementing Agency: Region XII - Sultan Kudarat 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2017-09-20
- Fund source: Regular Infra - GAA 2017 MFO-2
- Contract price: ₱18,503,312.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING AT BRGY. SADS ALAN, LAMBAYONG, SULTAN KUDARAT
- Contractor: C.A. BETALAC CONSTRUCTION & GEN. MDSE., INC. (FOR: C.A. BETALAC CONSTRUCTION & GEN. MDSE.) (28222)
- Implementing Agency: Region XII - Sultan Kudarat 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2017-10-03
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱2,535,594.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING @ BRGY. LILIT, LA MBAYONG, SULTAN KUDARAT
- Contractor: PALMARES CONSTRUCTION & GENERAL MERCHANDISE CORP. (FORMERLY: PALMARES GENERAL MERCHANDISE) (24657)
- Implementing Agency: Region XII - Sultan Kudarat 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2017-10-03
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱2,482,817.25
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING @ BRGY. KALANAWE II, PRES. QUIRINO, SULTAN KUDARAT
- Contractor: JSY CONSTRUCTION (34760)
- Implementing Agency: Region XII - Sultan Kudarat 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2017-09-29
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱2,527,603.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING @ BRGY. TUATO, PR ES. QUIRINO, SULTAN KUDARAT
- Contractor: NIRVANA CONSTRUCTION & SUPPLIES (18691)
- Implementing Agency: Region XII - Sultan Kudarat 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2017-09-30
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱2,540,311.25
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING @ BRGY. BARAS, TA CURONG CITY
- Contractor: COFEJOK CONSTRUCTION AND SUPPLY CORPORATION (FORME (27493)
- Implementing Agency: Region XII - Sultan Kudarat 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2017-09-30
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱2,535,658.25
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING @ BRGY. D'LEDESMA
- Contractor: COFEJOK CONSTRUCTION AND SUPPLY CORPORATION (FORME (27493)
- Implementing Agency: Region XII - Sultan Kudarat 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2017-09-30
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱2,535,421.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING @ BRGY. TINA , TA CURONG CITY
- Contractor: MINROCK MULTI-BUILDERS (15845)
- Implementing Agency: Region XII - Sultan Kudarat 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2017-09-30
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱2,534,485.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING @ BRGY. NATIVIDAD , COLUMBIO, SULTAN KUDARAT
- Contractor: JSY CONSTRUCTION (34760)
- Implementing Agency: Region XII - Sultan Kudarat 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2017-10-03
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱2,532,009.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING @ BRGY. EL BEBE, COLUMBIO, SULTAN KUDARAT
- Contractor: ANGKAT CONSTRUCTION AND SUPPLIES (34328)
- Implementing Agency: Region XII - Sultan Kudarat 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2017-10-03
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱2,539,361.75
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING @ BRGY. SAMPAO, L UTAYAN, SULTAN KUDARAT
- Contractor: MINROCK MULTI-BUILDERS (15845)
- Implementing Agency: Region XII - Sultan Kudarat 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2017-09-03
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱2,532,751.50
- Contract status: Completed Report
- CONSTRUCTION OF RIVER CONTROL (ALA RIVER) LAMBAYONG, S.K ., BRGY. MATIOMPONG, K0+000-K0+400
- Contractor: GEMMA CONSTRUCTION SUPPLY, INC.(FORMERLY:GEMMA CON (5044)
- Implementing Agency: Region XII - Sultan Kudarat 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2017-11-26
- Fund source: Regular Infra - GAA 2017 MFO-2
- Contract price: ₱47,494,048.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (BRGY. HALL) AT BRGY. KALANDANGAN, TACURONG CITY, S.K.
- Contractor: NIRVANA CONSTRUCTION & SUPPLIES (18691)
- Implementing Agency: Region XII - Sultan Kudarat 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2017-10-04
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱2,548,245.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (BRGY. HALL) AT BRGY. UPPER LOMOYON, COLUMBIO, S.K.
- Contractor: FPJ CONSTRUCTION AND SUPPLY (28493)
- Implementing Agency: Region XII - Sultan Kudarat 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2017-10-04
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱2,540,608.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (GYM) AT COLUMB IO NHS, COLUMBIO, S.K.
- Contractor: FPJ CONSTRUCTION AND SUPPLY (28493)
- Implementing Agency: Region XII - Sultan Kudarat 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2017-09-24
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,957,342.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (GYM) AT BRGY. MAINDANG, LUTAYAN, S.K.
- Contractor: MINROCK MULTI-BUILDERS (15845)
- Implementing Agency: Region XII - Sultan Kudarat 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2017-08-25
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,959,321.12
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (GYM) AT BRGY. BAYASONG, LUTYAN, S.K.
- Contractor: MINROCK MULTI-BUILDERS (15845)
- Implementing Agency: Region XII - Sultan Kudarat 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2017-08-25
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,959,321.12
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (GYM) AT LUTAYA N NHS, LUTAYAN, S.K.
- Contractor: MINROCK MULTI-BUILDERS (15845)
- Implementing Agency: Region XII - Sultan Kudarat 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2017-08-25
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,959,321.12
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (BRGY. HALL) AT BRGY. UDTONG LAMBAYONG, S.K.
- Contractor: NMM BUILDERS AND ENTERPRISE (39612)
- Implementing Agency: Region XII - Sultan Kudarat 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2017-09-24
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,960,043.38
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (BRGY. HALL) AT BRGY. SIGAYAN, LAMBAYONG, S.K.
- Contractor: ROSAND BUILDERS CORPORATION (FORMERLY: ROSAND BUILDERS) (15781)
- Implementing Agency: Region XII - Sultan Kudarat 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2017-09-24
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,974,890.62
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (BRGY. HALL) AT BRGY. ZENEBEN, LAMBAYONG, S.K.
- Contractor: MINROCK MULTI-BUILDERS (15845)
- Implementing Agency: Region XII - Sultan Kudarat 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2017-09-24
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,960,093.88
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING COVERED COURT A T DPWH COMPOUND, ISULAN, S.K.
- Contractor: COFEJOK CONSTRUCTION AND SUPPLY CORPORATION (FORME (27493)
- Implementing Agency: Region XII - Sultan Kudarat 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2017-08-15
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱1,956,483.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI - PURPOSE BUILDING COVERED COURT A T PUROK KAYAMBANAN, BRGY. GRI C3 91O, T.C., S.K.
- Contractor: PALMARES CONSTRUCTION & GENERAL MERCHANDISE CORP. (FORMERLY: PALMARES GENERAL MERCHANDISE) (24657)
- Implementing Agency: Region XII - Sultan Kudarat 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2017-08-15
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱980,088.69
- Contract status: Completed Report
- COMPLETION OF MULTI-PURPOSE BUILDING (ISULAN CENTRAL SCH OOL) AT BRGY. KALAWAG II, ISULAN, S.K.
- Contractor: JSY CONSTRUCTION (34760)
- Implementing Agency: Region XII - Sultan Kudarat 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2017-10-14
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱4,943,527.00
- Contract status: Completed Report
- COMPLETION OF MULTI-PURPOSE BUILDING (GYM) AT BRGY. CENT RAL MANGILALA, PRES. QUIRINO, S.K.
- Contractor: SOPHIA GEU CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:SOPHIA CONSTRUCTION AND SUPPLY) (33484)
- Implementing Agency: Region XII - Sultan Kudarat 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2017-09-25
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱798,737.62
- Contract status: Completed Report
- COMPLETION OF MULTI-PURPOSE BUILDING (GYM) AT BRGY. BANA WAG, PRES. QUIRINO, S.K.
- Contractor: SOPHIA GEU CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:SOPHIA CONSTRUCTION AND SUPPLY) (33484)
- Implementing Agency: Region XII - Sultan Kudarat 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2017-10-14
- Fund source: Regular Infra - GAA 2017 LFP
- Contract price: ₱996,645.56
- Contract status: Completed Report
- CONSTRUCTION OF 17 UNITS RAIN WATER COLLECTION SYSTEM RE IFORCED CONCRETE GROUND STORAGE TANK
- Contractor: ROBETH CONST. AND DEV'T. CORP. (FORMERLY: ROBETH GEN. MDSE. CONST. & SUPPLY) (23175)
- Implementing Agency: Region XII - Sultan Kudarat 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2017-09-13
- Fund source: Regular Infra - GAA 2017 MFO-3
- Contract price: ₱3,270,145.50
- Contract status: Completed Report