Infrastructure Projects in Region XII — Region XII - South Cotabato 1st District Engineering Office, 2023
This page lists public infrastructure projects implemented by Region XII - South Cotabato 1st District Engineering Office in Region XII during 2023. All data are sourced from the Department of Public Works and Highways (DPWH) official database (as of 9/30/2025): https://www.dpwh.gov.ph/dpwh/projects/infrastructure
This information is shared to promote transparency and public awareness. We encourage visitors to validate project details using the official DPWH source. In case of discrepancies, please refer to the original records published by the DPWH.
| Contractor | Projects | Total Price |
|---|---|---|
| J.G. ORANZA CONSTRUCTION (33370) | 13 | ₱669,379,336.50 |
| TSQUARE CONSTRUCTION CORPORATION (FORMERLY:T-SQUARE BUILDERS) (14268) | 4 | ₱239,929,432.00 |
| CHL CONSTRUCTION & DEVELOPMENT ENTERPRISES, INC. (15001) | 3 | ₱182,798,348.00 |
| VICENTE T. LAO CONSTRUCTION (7040) | 3 | ₱158,582,504.00 |
| DELLOSA DESIGN BUILDERS CORP.(FORMERLY:DELLOSA DESIGN-BUILD SERVICES) (11533) | 2 | ₱147,998,500.00 |
- PREVENTIVE MAINTENANCE - PRIMARY ROADS - MARBEL - MAKAR RD - K1661+(-551) - K1661+348, K1663+104.70 - K1663+790, K1663+825 - K1663+ 896, GENERAL SANTOS CITY
- Contractor: GEMMA CONSTRUCTION SUPPLY, INC.(FORMERLY:GEMMA CON (5044)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-08-07
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱70,249,048.00
- Contract status: Completed Report
- PREVENTIVE MAINTENANCE - PRIMARY ROADS - MARBEL - MAKAR RD - K1668+563 - K1668+694, GENERAL SANTOS CITY
- Contractor: MGBJ RISING CONSTRUCTION & LAND DEVELOPER (18656)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-07-07
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱9,483,761.00
- Contract status: Completed Report
- PREVENTIVE MAINTENANCE - PRIMARY ROADS - MARBEL - MAKAR RD - K1669 + 812 - K1674 + 000
- Contractor: CHL CONSTRUCTION & DEVELOPMENT ENTERPRISES, INC. (15001)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2024-01-10
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱80,724,592.00
- Contract status: Completed Report
- PREVENTIVE MAINTENANCE - PRIMARY ROADS - MARBEL - MAKAR RD - K1674 + 000 - K1676 + 247
- Contractor: J.G. ORANZA CONSTRUCTION (33370)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-12-06
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱48,998,796.00
- Contract status: Completed Report
- PREVENTIVE MAINTENANCE - PRIMARY ROADS - MARBEL - MAKAR RD - K1680 + 000 - K1681 + 175.5
- Contractor: GEMMA CONSTRUCTION SUPPLY, INC.(FORMERLY:GEMMA CON (5044)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-11-20
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱66,336,584.00
- Contract status: Completed Report
- ROAD WIDENING - PRIMARY ROADS - MARBEL - MAKAR RD - K167 7 + 684 - K1677 + 764, K1684 + 344 - K1684 + 361, K1684 + 381 - K1684 + 410
- Contractor: FASTRUCT DESIGN AND CONSTRUCTION (37980)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-07-10
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱4,881,124.50
- Contract status: Completed Report
- CONSTRUCTION OF CONCRETE REVETMENT, (SOUTH TUPI BRIDGE), TUPI, SOUTH COTABATO
- Contractor: AMPLEX CONSTRUCTION AND SUPPLIES (35090)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-12-02
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱53,074,048.00
- Contract status: Completed Report
- CONSTRUCTION OF CONCRETE REVETMENT, (UPSTREAM OF SOUTH P OLOMOLOK BRIDGE), POLOMOLOK, SOUTH COTABATO
- Contractor: ACCELERATED METAL TECHNOLOGY & CONSTRUCTION, INC. (32073)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-10-08
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱42,634,628.00
- Contract status: Completed Report
- CONSTRUCTION OF CONCRETE REVETMENT, BARANGAY KLINAN 6, P OLOMOLOK, SOUTH COTABATO
- Contractor: J.G. ORANZA CONSTRUCTION (33370)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-08-06
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱53,060,948.00
- Contract status: Completed Report
- CONSTRUCTION OF CONCRETE REVETMENT, BARANGAY SIMBO, TUPI , SOUTH COTABATO
- Contractor: MRRM TRADING & CONSTRUCTION (19657) / SALMEGA BUILDERS (45281)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-09-01
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱50,139,872.00
- Contract status: Completed Report
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECL ARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - AC CESS ROAD LEADING TO MT. MATUTUM JUMP-OFF POINT, BRGY. KABLON-SITIO GLANDAN G, TUPI, SOUTH COTABATO
- Contractor: TSQUARE CONSTRUCTION CORPORATION (FORMERLY:T-SQUARE BUILDERS) (14268)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-09-19
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱44,094,416.00
- Contract status: Completed Report
- CONST/IMP. OF ACCESS RDS LEADING TO TRADES, IND. AND ECO NOMIC ZONES (ROADS LEVERAGING LINKAGES FOR IND. AND TRADE INFRASTRUCTURE PR OGRAM - ROLL-IT)-NRJ CROSSING PALKAN-LAMCALIAF-KALSANGI ROAD CONNECTING NAT IONAL HIGHWAY IN SUPPORT OF AGRIBUSINESS, POL. SC
- Contractor: CHL CONSTRUCTION & DEVELOPMENT ENTERPRISES, INC. (15001)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-10-09
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱53,074,992.00
- Contract status: Completed Report
- CONST./IMP. OF ACCESS ROADS LEADING TO TRADES, INDUSTRIE S AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFR ASTRUCTURE PROGRAM - ROLL- IT) - UPPER KLINAN JUNCTION TO POLO ROAD LEADING TO PROCESSING CENTERS, POLOMOLOK, SOUTH COTABATO
- Contractor: UNIFIED WORKERS CONSTRUCTION & DEVELOPMENT MPC, INC. (36530)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-07-25
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱24,499,678.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD AT PUROK 2, BARANGAY PALIAN, TUPI, SOUTH COTABATO
- Contractor: RED BRICKS CONSTRUCTION SERVICE AND SUPPLY (41926)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-05-28
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,931,762.50
- Contract status: Completed Report
- CONSTRUCTION OF ROAD WITH LINED CANAL/FLOOD CONTROL AT B ARANGAY DANLAG, TAMPAKAN, SOUTH COTABATO
- Contractor: BETTER WORK CONSTRUCTION (24432)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-06-24
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,909,680.50
- Contract status: Completed Report
- CONSTRUCTION OF ROAD WITH LINED CANAL/FLOOD CONTROL AT B ARANGAY PALO 19, TAMPAKAN, SOUTH COTABATO
- Contractor: BETTER WORK CONSTRUCTION (24432)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-10-07
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,933,027.50
- Contract status: Completed Report
- CONSTRUCTION OF ROAD WITH LINED CANAL/FLOOD CONTROL AT B ARANGAY PULA BATO, TAMPAKAN, SOUTH COTABATO
- Contractor: BETTER WORK CONSTRUCTION (24432)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-06-20
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,949,647.50
- Contract status: Completed Report
- CONSTRUCTION OF ROAD WITH LINED CANAL/FLOOD CONTROL AT B ARANGAY SAN ISIDRO, TAMPAKAN, SOUTH COTABATO
- Contractor: BETTER WORK CONSTRUCTION (24432)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-06-20
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,948,342.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, BARANGAY CANNERY SITE, POLOMOLOK, SOUTH COTABATO
- Contractor: A.L. ACHARON CONSTRUCTION AND SUPPLY (33068)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-04-21
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,949,994.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, BARANGAY CROSSING RUBBER, TUPI, SO UTH COTABATO
- Contractor: ED SIXTY FOUR ENTERPRISES (42734)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-05-04
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,920,565.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, BARANGAY LANDAN, POLOMOLOK, SOUTH COTABATO
- Contractor: VAL ENGINEERING AND CONSTRUCTION (44833)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-07-25
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,939,294.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, BARANGAY LUMAKIL, POLOMOLOK, SOUTH COTABATO
- Contractor: FASTRUCT DESIGN AND CONSTRUCTION (37980)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-04-21
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,949,878.50
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, BARANGAY POBLACION TO BARANGAY BUT O, TAMPAKAN, SOUTH COTABATO
- Contractor: C E K CONSTRUCTION AND WATER SUPPLY (13713)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-06-15
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,948,990.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, BARANGAY POBLACION, POLOMOLOK, SOU TH COTABATO
- Contractor: DEDASE CONSTRUCTION SERVICES (40312)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-07-30
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,942,089.50
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, BARANGAY POLO, POLOMOLOK, SOUTH CO TABATO
- Contractor: CROSMAK CONSTRUCTION WORKS INCORPORATED (32761)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-06-16
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,945,008.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, BARANGAY SILWAY 7, POLOMOLOK, SOUT H COTABATO
- Contractor: J.G. ORANZA CONSTRUCTION (33370)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-04-24
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,949,667.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, MANGGA ROAD CONNECTING THE MANGOST EEN ROAD, BARANGAY MALTANA, TAMPAKAN, SOUTH COTABATO
- Contractor: BETTER WORK CONSTRUCTION (24432)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-06-26
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,949,526.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, PUROK MAKUGIHON, BARANGAY UPPER KL INAN, POLOMOLOK, SOUTH COTABATO
- Contractor: JAMI CONSTRUCTION AND SUPPLY (40592)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-04-24
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,949,630.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD WITH DRAINAGE ALONG PUROK HONEYVILL E, BARANGAY SILWAY 8, POLOMOLOK, SOUTH COTABATO
- Contractor: JANMARIE CONSTRUCTION SERVICES & SUPPLY (42956)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-06-09
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,839,898.00
- Contract status: Completed Report
- CONSTRUCTION OF DRAINAGE SYSTEM (BOX CULVERT), PUROK 6, BUNAO, TUPI, SOUTH COTABATO
- Contractor: ROCKSTONE CONSTRUCTION SERVICES & SUPPLY (22702)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-12-18
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,948,882.50
- Contract status: Completed Report
- ROAD CONCRETING PUROK CENTRO, BARANGAY MALIGO, POLOMOLOK , SOUTH COTABATO
- Contractor: MANUELA CONSTRUCTION SERVICES (50143)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-07-31
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,884,777.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, BARANGAY BUNAO-SITIO ACFAON, TUPI, SOUTH COTABATO
- Contractor: MGBJ RISING CONSTRUCTION & LAND DEVELOPER (18656)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-07-25
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,233,579.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, KABLON-SITIO LATIL, BARANGAY KABLO N, TUPI, SOUTH COTABATO
- Contractor: MJ TIONGSON CONSTRUCTION (FORMERLY: MJT BUILDERS) (24202)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-11-10
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱22,560,078.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, KITUBO-LAMLATANG, BARANGAY MIASONG , TUPI, SOUTH COTABATO
- Contractor: AMPLEX CONSTRUCTION AND SUPPLIES (35090)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2024-09-01
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱40,589,760.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) A CMONAN INTEGRATED SCHOOL, TUPI, SOUTH COTABATO
- Contractor: FREDEN CONSTRUCTION (22665)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-06-20
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,949,997.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PUPROSE BUILDING (COVERED COURT) J UAN LORETO TAMAYO ELEMENTARY SCHOOL, SITIO KITUBO, BARANGAY MIASONG, TUPI, SOUTH COTABATO
- Contractor: VPMS OPC (52074)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-09-26
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,935,259.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) K ABLON NATIONAL HIGH SCHOOL, TUPI, SOUTH COTABATO
- Contractor: FREDEN CONSTRUCTION (22665)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-06-21
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,949,994.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (SATELITE MARKET) , BARANGAY KLINAN 6, POLOMOLOK, SOUTH COTABATO
- Contractor: HVC SAGITTARIUS COMMERCIAL & CONSTRUCTION (12954)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-07-03
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,400,829.00
- Contract status: Completed Report
- ROAD CONCRETING FROM CROSSING PALKAN ELEMENTARY SCHOOL P UROK 3 TO NATIONAL HIGHWAY, BARANGAY CROSSING PALKAN, POLOMOLOK, SOUTH COTA BATO
- Contractor: DEDASE CONSTRUCTION SERVICES (40312)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-07-30
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,928,231.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY MIASONG , TUPI, SOUTH COTABATO
- Contractor: FASTRUCT DESIGN AND CONSTRUCTION (37980)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2024-11-08
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,949,412.50
- Contract status: Completed Report
- CONSTRUCTION OF POTABLE WATER SYSTEM AT BARANGAY TABLU, TAMPAKAN, SOUTH COTABATO
- Contractor: KGD BUILDERS INC. (21960)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-10-27
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱7,400,227.00
- Contract status: Completed Report
- PREVENTIVE MAINTENANCE - PRIMARY ROADS - DIGOS - MAKAR R D - K1650 + 445 - K1650 + 593, K1650 + 745 - K1651 + 135, K1651 + 221 - K16 51 + 293, K1651 + 293 - K1651 + 432
- Contractor: MGBJ RISING CONSTRUCTION & LAND DEVELOPER (18656)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-07-07
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱10,019,378.00
- Contract status: Completed Report
- PREVENTIVE MAINTENANCE - PRIMARY ROADS - DIGOS - MAKAR R D - K1650 + 593 - K1650 + 731
- Contractor: MGBJ RISING CONSTRUCTION & LAND DEVELOPER (18656)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-06-24
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱9,176,616.00
- Contract status: Completed Report
- PREVENTIVE MAINTENANCE - PRIMARY ROADS - MAKAR - MARBEL RD - K1655 + (-033) - K1655 + 565
- Contractor: LHE CONSTRUCTION & INDUSTRIAL SERVICES, INC. (FORMERLY: LHE CONSTRUCTION & ENG'G. SERVICES) (34789)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-10-02
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱15,872,007.00
- Contract status: Completed Report
- ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMAR Y ROADS-MAKAR-MARBEL RD-K1658+214-K1658+389, K1658+449 - K1659+301, K1659+4 24- K1660+453
- Contractor: J.G. ORANZA CONSTRUCTION (33370)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2024-04-23
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱61,945,056.00
- Contract status: Completed Report
- ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS - ALBERT MORROW BLVD - K1646 + 696 - K1647 + 188
- Contractor: LHE CONSTRUCTION & INDUSTRIAL SERVICES, INC. (FORMERLY: LHE CONSTRUCTION & ENG'G. SERVICES) (34789)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-07-05
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱9,678,872.00
- Contract status: Completed Report
- ASSET PRESERVATION -PREVENTIVE MAINTENANCE - SECONDARY R OADS - ALBERT MORROW BLVD - K1662 + 208 - K1662 + 300
- Contractor: LHE CONSTRUCTION & INDUSTRIAL SERVICES, INC. (FORMERLY: LHE CONSTRUCTION & ENG'G. SERVICES) (34789)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-05-03
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱2,639,678.25
- Contract status: Completed Report
- ASSET PRESERVATION - REHABILITATION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - DIGOS - MAKAR RD - K1634+2 00-K1634+250
- Contractor: AB VISION ENGINEERING CONSTRUCTION (19845)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-09-01
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱12,853,466.00
- Contract status: Completed Report
- ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF ROAD S WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - DIGOS - MAKAR RD - K1634 + 250 -K1634 + 488
- Contractor: REYDAN BUILDERS (13059)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2024-01-04
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱92,636,552.00
- Contract status: Completed Report
- ASSET PRESERVATION - REHABILITATION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - DIGOS MAKAR RD - K1635 + 2 90 - K1635 + 377
- Contractor: BAYTORR CONSTRUCTION AND DEVELOPMENT CORPORATION (44719)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-08-24
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱15,800,042.00
- Contract status: Completed Report
- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS - DIGOS - MAKAR RD - K1647+010 - K1648 + 360
- Contractor: TSQUARE CONSTRUCTION CORPORATION (FORMERLY:T-SQUARE BUILDERS) (14268)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2024-05-04
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱86,846,864.00
- Contract status: Completed Report
- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS, DIGOS - MAKAR RD - K1654 + 163 - K1654 + 36 7
- Contractor: MJ TIONGSON CONSTRUCTION (FORMERLY: MJT BUILDERS) (24202)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-09-01
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱10,334,900.00
- Contract status: Completed Report
- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS, MAKAR - MARBEL RD - K1655 + 205 - K1656 + 2 25
- Contractor: VICENTE T. LAO CONSTRUCTION (7040)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2024-08-03
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱48,477,356.00
- Contract status: Completed Report
- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS, MAKAR - MARBEL RD - K1656 + 625 - K1658 + 0 45
- Contractor: DELLOSA DESIGN BUILDERS CORP.(FORMERLY:DELLOSA DESIGN-BUILD SERVICES) (11533)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2024-01-10
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱48,998,500.00
- Contract status: Completed Report
- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS, ALBERT MORROW BLVD - K1651 + 701 - K1653 + 730, K1653 + 780 - K1654 + 430
- Contractor: J.G. ORANZA CONSTRUCTION (33370)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2024-12-30
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱88,708,816.00
- Contract status: Completed Report
- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS - JCT DIGOS - BUAYAN AIRPORT RD - K1652 + 220 - K1653 + 229
- Contractor: VERTICAL BUILDERS (14029) / BETTER WORK CONSTRUCTION (24432)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2024-05-20
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱55,727,372.00
- Contract status: Completed Report
- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS - MAKAR - KIAMBA RD - K1659 + 160 - K1660 + 066
- Contractor: REYDAN BUILDERS (13059)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2024-03-05
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱39,149,172.00
- Contract status: Completed Report
- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROAD - MAKAR - MARBEL RD - K1656 + (-213) - K165 6 + 844
- Contractor: GRECO CONSTRUCTION AND SUPPLY (21884)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2024-01-18
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱37,436,156.00
- Contract status: Completed Report
- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS - MAKAR - MARBEL RD - K1656 + 973 - K1657 + 426
- Contractor: HANNA VIA CONSTRUCTION, INC. (FORMERLY:HANNA VIA DESIGN & CONSTRUCTION) (32887)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-08-07
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱7,313,313.50
- Contract status: Completed Report
- ROAD WIDENING - PRIMARY ROADS - DIGOS - MAKAR RD - K1654 + 749 - K1654 + 848, K1654 + 848 - K1654 + 877
- Contractor: THREE MB BUILDERS (45704)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-08-25
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱2,937,711.75
- Contract status: Completed Report
- NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS - MAKAR - KIAMBA RD - K1669 + 107 -K1669 + 186, K1669 + 246.60 - K1671 + 227< /span>
- Contractor: VICENTE T. LAO CONSTRUCTION (7040)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2024-05-15
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱58,960,160.00
- Contract status: Completed Report
- ROAD WIDENING - SECONDARY ROADS - MAKAR - MARBEL RD - K1 656 + (-1069) - K1656 + (-390), K1656 + (-131) - K1656 + 000
- Contractor: A.L. ACHARON CONSTRUCTION AND SUPPLY (33068)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-08-16
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱23,800,094.00
- Contract status: Completed Report
- OFF-CARRIAGEWAY IMPROVEMENT - PRIMARY ROADS - DIGOS - MA KAR RD - K1638 + 000 - K1638 + 600
- Contractor: A.L. ACHARON CONSTRUCTION AND SUPPLY (33068)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-04-21
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱4,869,257.50
- Contract status: Completed Report
- OFF-CARRIAGEWAY IMPROVEMENT - PRIMARY ROADS - DIGOS - MA KAR RD - K1639 + 089 -K1639 + 257
- Contractor: A.L. ACHARON CONSTRUCTION AND SUPPLY (33068)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-04-11
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱1,944,725.88
- Contract status: Completed Report
- OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS - ALBERT M ORROW BLVD - K1651+841-K1653+059
- Contractor: PASE CONSTRUCTION (15849)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-11-12
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱13,955,742.00
- Contract status: Completed Report
- OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS - ALBERT M ORROW BLVD - K1653+059-K1653+485, K1653+863-K1654+300
- Contractor: SHEPPERD CONSTRUCTION AND SUPPLY (37373)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-11-20
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱15,570,906.00
- Contract status: Completed Report
- WIDENING OF PERMANENT BRIDGES-BALNABU BR. (B01025MN) ALO NG MAKAR-KIAMBA RD
- Contractor: TSQUARE CONSTRUCTION CORPORATION (FORMERLY:T-SQUARE BUILDERS) (14268)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2025-01-30
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱57,898,804.00
- Contract status: Completed Report
- CONSTRUCTION OF CONCRETE REVETMENT, MABUHAY BRIDGE, GENE RAL SANTOS CITY
- Contractor: TSQUARE CONSTRUCTION CORPORATION (FORMERLY:T-SQUARE BUILDERS) (14268)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-12-25
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱51,089,348.00
- Contract status: Completed Report
- CONSTRUCTION OF CONCRETE REVETMENT ALONG SINAWAL RIVER, GENERAL SANTOS CITY
- Contractor: JDRC CONSTRUCTION & SUPPLIES, CORP. (33869)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2024-03-20
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱86,847,864.00
- Contract status: Completed Report
- CONSTRUCTION OF CONCRETE REVETMENT, BUAYAN RIVER, GENERA L SANTOS CITY
- Contractor: VICENTE T. LAO CONSTRUCTION (7040)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2024-03-13
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱51,144,988.00
- Contract status: Completed Report
- CONSTRUCTION OF CONCRETE REVETMENT, MAKAR RIVER, (DOWNST REAM OF UPPER MAKAR BRIDGE), GENERAL SANTOS CITY
- Contractor: MJ TIONGSON CONSTRUCTION (FORMERLY: MJT BUILDERS) (24202) / REYDAN BUILDERS (13059)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-09-23
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱51,143,544.00
- Contract status: Completed Report
- CONSTRUCTION OF CONCRETE REVETMENT, MAKAR RIVER, BARANGA Y LABANGAL, GENERAL SANTOS CITY
- Contractor: J.G. ORANZA CONSTRUCTION (33370)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-08-07
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱65,136,464.00
- Contract status: Completed Report
- CONSTRUCTION OF CONCRETE REVETMENT, UPPER SILWAY BRIDGE, SILWAY RIVER, GENERAL SANTOS CITY
- Contractor: J.G. ORANZA CONSTRUCTION (33370)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-10-29
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱51,143,096.00
- Contract status: Completed Report
- CONSTRUCTION OF CONCRETE REVETMENT, UPPER SINAWAL BRIDGE , SINAWAL RIVER, GENERAL SANTOS CITY
- Contractor: RUCS KONSULT & CONSTRUCTION SERVICES (35107) / SALMEGA BUILDERS (45281)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-08-27
- Fund source: Regular Infra - GAA 2023 OO-2
- Contract price: ₱51,145,000.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, BARANGAY TINAGACAN, GENERAL SANTOS CITY
- Contractor: KEVIN YOSHI BUILDERS(FORMERLY:CON BUILDERS) (32216)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-10-04
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,948,180.50
- Contract status: Completed Report
- CONSTRUCTION OF ROAD WITH DRAINAGE SYSTEM, BARANGAY LABA NGAL, GENERAL SANTOS CITY, SOUTH COTABATO
- Contractor: RL ANTONNE BUILDERS (49370)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-09-24
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱24,714,874.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD WITH DRAINAGE SYSTEM, CITY HEIGHTS, GENERAL SANTOS CITY
- Contractor: J.G. ORANZA CONSTRUCTION (33370)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-06-21
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,949,583.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, BARANGAY CALUMPANG, GENERAL SANTOS CITY, SOUTH COTABATO
- Contractor: GYJ CONSTRUCTION (41854)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-06-09
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,944,981.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, BARANGAY LABANGAL, GENERAL SANTOS CITY, SOUTH COTABATO
- Contractor: A.L. ACHARON CONSTRUCTION AND SUPPLY (33068)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-06-09
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,905,900.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, BARANGAY OLYMPOG, GENERAL SANTOS CITY, SOUTH COTABATO
- Contractor: JP BEATHRIZ CONSTRUCTION AND SUPPLY (42818)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-06-12
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,946,224.00
- Contract status: Completed Report
- CONSTRUCTION OF DRAINAGE, BARANGAY APOPONG, GENERAL SANT OS CITY, SOUTH COTABATO
- Contractor: MJ TIONGSON CONSTRUCTION (FORMERLY: MJT BUILDERS) (24202)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-09-24
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,899,952.00
- Contract status: Completed Report
- CONSTRUCTION OF DRAINAGE, BARANGAY DADIANGAS NORTH, GENE RAL SANTOS CITY, SOUTH COTABATO
- Contractor: GRECO CONSTRUCTION AND SUPPLY (21884)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-07-10
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,949,312.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (BAR ANGAY HALL), BARANGAY DADIANGAS WEST, GENERAL SANTOS CITY, SOUTH COTABATO
- Contractor: J.G. ORANZA CONSTRUCTION (33370)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-10-24
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,945,250.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY FATIMA, GENERAL SANTOS CITY, SOUTH COTABATO
- Contractor: EJC BUILDERS & GENERAL MERCHANDISE (41249)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-08-02
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,929,924.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY MABUHAY, GENERAL SANTOS CITY, SOUTH COTABATO
- Contractor: JCML BUILDERS INC. (46252)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-08-02
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,919,425.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, (COVERED COURT), BARANGAY BUAYAN, GENERAL SANTOS CITY, SOUTH COTABATO
- Contractor: BAYTORR CONSTRUCTION AND DEVELOPMENT CORPORATION (44719)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-08-06
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,934,998.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, (COVERED COURT), BARANGAY KATANGAWAN, GENERAL SANTOS CITY, SOUTH COTABATO
- Contractor: THE TRENDSETTER CONSTRUCTION AND SUPPLY CORP. (43157)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-08-23
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,949,992.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, (COVERED COURT), BARANGAY LAGAO, GENERAL SANTOS CITY, SOUTH COTABATO
- Contractor: CBC SQUARE BUILDERS CO. (49062)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-09-16
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,930,666.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, (COVERED COURT), BARANGAY SAN ISIDRO, GENERAL SANTOS CITY, SOUTH COTABATO
- Contractor: A.L. ACHARON CONSTRUCTION AND SUPPLY (33068)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-08-06
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,934,946.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY DADIANG AS EAST, GENERAL SANTOS CITY, SOUTH COTABATO
- Contractor: MARDI INFRA BUILDERS (39713)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-07-01
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,911,041.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BULA, G ENERAL SANTOS CITY, SOUTH COTABATO
- Contractor: MANUELA CONSTRUCTION SERVICES (50143)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-10-29
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,934,743.50
- Contract status: Completed Report
- REHABILITATION OF MULTI-PURPOSE BUILDING (COVERED COURT) , BARANGAY SINAWAL, GENERAL SANTOS CITY, SOUTH COTABATO
- Contractor: MJ TIONGSON CONSTRUCTION (FORMERLY: MJT BUILDERS) (24202)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-08-06
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,927,243.50
- Contract status: Completed Report
- REHABILITATION OF MULTI-PURPOSE BUILDING, BARANGAY BATOM ELONG, GENERAL SANTOS CITY, SOUTH COTABATO
- Contractor: VPMS OPC (52074)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-08-06
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,925,048.00
- Contract status: Completed Report
- PREVENTIVE MAINTENANCE - PRIMARY ROADS - MARBEL - MAKAR RD - K1689 + 565 -K1690 + 449
- Contractor: SARANGANI ROCKMIXER INCORPORATED (FORMERLY:SARANGANI ROCKMIXER) (6549)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-08-29
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱48,987,224.00
- Contract status: Completed Report
- ROAD WIDENING-SECONDARY ROADS - ALBERT MORROW BLVD - K16 46 + 258 - K1647 + 215, K1649 + 438 - K1650 + 878
- Contractor: MJ TIONGSON CONSTRUCTION (FORMERLY: MJT BUILDERS) (24202)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2024-09-28
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱57,397,168.00
- Contract status: Completed Report
- CONSTRUCTION OF SOLAR WATER SYSTEM, PUROK PALAKASAM, BRG Y. PALKAN, POLOMOLOK, SOUTH COTABATO
- Contractor: FASTRUCT DESIGN AND CONSTRUCTION (37980)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2024-05-03
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,731,476.00
- Contract status: Completed Report
- CONSTRUCTION OF SOLAR WATER SYSTEM, BRGY. SANTA CRUZ, TA MPAKAN, SOUTH COTABATO
- Contractor: HANNA VIA CONSTRUCTION, INC. (FORMERLY:HANNA VIA DESIGN & CONSTRUCTION) (32887)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2024-05-09
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,578,914.00
- Contract status: Completed Report
- CONSTRUCTION OF SOLAR WATER SYSTEM, BRGY. LINAN, TUPI, S OUTH COTABATO
- Contractor: RIT CONSTRUCTION AND SUPPLIES (46559)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2024-05-03
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,755,747.00
- Contract status: Completed Report
- CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY MIASONG, TU PI, SOUTH COTABATO
- Contractor: RIT CONSTRUCTION AND SUPPLIES (46559)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2024-07-31
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,800,000.00
- Contract status: Completed Report
- ROAD CONCRETING, JCT. CROSSING KAWIT TO MALAGTING TO PUR OK ESTREBILLA HILLS, BRGY. MALIGO, POLOMOLOK, SOUTH COTABATO
- Contractor: J.G. ORANZA CONSTRUCTION (33370)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2024-03-29
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱77,199,184.00
- Contract status: Completed Report
- CONCRETING OF JCT. NHW CROSSING REPOLYO, BARANGAY LAMCAL IAF - BARANGAY KINILIS ROAD, MUNICIPALITY OF POLOMOLOK
- Contractor: J.G. ORANZA CONSTRUCTION (33370)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2024-06-20
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱95,531,128.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, BARANGAY RUBBER, POLOMOLOK, SOUTH COTABATO
- Contractor: FREDEN CONSTRUCTION (22665)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2024-03-27
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱19,786,434.00
- Contract status: Completed Report
- CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY BRGY. SAN J OSE, GENERAL SANTOS CITY, SOUTH COTABATO
- Contractor: LHE CONSTRUCTION & INDUSTRIAL SERVICES, INC. (FORMERLY: LHE CONSTRUCTION & ENG'G. SERVICES) (34789)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2024-05-15
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,758,369.00
- Contract status: Completed Report
- CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY BRGY. SINAW AL, GENERAL SANTOS CITY, SOUTH COTABATO
- Contractor: ANNCORP BUILDERS, INC. (48291)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2024-05-07
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,800,000.00
- Contract status: Completed Report
- CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY BRGY. FATIM A, GENERAL SANTOS CITY, SOUTH COTABATO
- Contractor: KGD BUILDERS INC. (21960)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2024-06-13
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,749,526.00
- Contract status: Completed Report
- CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY BRGY. CONEL , GENERAL SANTOS CITY, SOUTH COTABATO
- Contractor: KGD BUILDERS INC. (21960)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2024-05-03
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,749,579.00
- Contract status: Completed Report
- CONSTRUCTION OF SOLAR WATER SYSTEM, BRGY. APOPONG, GENER AL SANTOS CITY
- Contractor: AVL CONSTRUCTION SERVICES AND SUPPLY (54940)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2024-05-09
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,778,218.00
- Contract status: Completed Report
- CONSTRUCTION OF SOLAR WATER SYSTEM, BRGY. MABUHAY, GENER AL SANTOS CITY
- Contractor: KGD BUILDERS INC. (21960)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2024-04-28
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,760,763.00
- Contract status: Completed Report
- CONSTRUCTION OF SOLAR WATER SYSTEM, BRGY. KATANGAWAN, GE NERAL SANTOS CITY
- Contractor: VERGUZ CONSTRUCTION (26641)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2024-04-28
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,773,218.00
- Contract status: Completed Report
- CONSTRUCTION OF SOLAR WATER SYSTEM, BRGY. OLYMPOG, GENER AL SANTOS CITY
- Contractor: VERGUZ CONSTRUCTION (26641)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2024-06-14
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,757,409.00
- Contract status: Completed Report
- CONCRETING OF ROAD WITH DRAINAGE SYSTEM, PUROK UDAGRI, B RGY. CONEL, GENERAL SANTOS CITY
- Contractor: VERGUZ CONSTRUCTION (26641)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2024-01-05
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱14,699,778.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, BALAKAYO, BARANGAY OLYMPOG, GENERA L SANTOS CITY, SOUTH COTABATO
- Contractor: MFN BUILDERS (36402)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-10-26
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱14,644,339.00
- Contract status: Completed Report
- CONCRETING OF ROAD WITH DRAINAGE SYSTEM, PUROK KABULING, BRGY. TINAGACAN TO PUROK LOWER LABAY, BRGY. TINAGACAN, GENERAL SANTOS CITY
- Contractor: MANUELA CONSTRUCTION SERVICES (50143)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2024-01-14
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱14,699,891.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD WITH DRAINAGE, BARANGAY MABUHAY, GE NERAL SANTOS CITY, SOUTH COTABATO
- Contractor: MFN BUILDERS (36402)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-07-30
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱5,937,385.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD WITH DRIANAGE, BARANGAY LAGAO, GENE RAL SANTOS CITY, SOUTH COTABATO
- Contractor: THREE MB BUILDERS (45704)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-08-05
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,925,122.50
- Contract status: Completed Report
- CONSTRUCTION OF ROAD WITH DRAINAGE, BARANGAY WEST, GENER AL SANTOS CITY, SOUTH COTABATO
- Contractor: THE TRENDSETTER CONSTRUCTION AND SUPPLY CORP. (43157)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2024-01-03
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱5,909,709.00
- Contract status: Completed Report
- CONSTRUCTION OF ROAD, ELPIDIO QUIRINO AVE., BRGY. BUAYAN , GENERAL SANTOS CITY
- Contractor: M.G. VILLAMIN CONSTRUCTION (22521)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2024-01-19
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱19,798,706.00
- Contract status: Completed Report
- ROAD CONSTRUCTION INCLUDING DRAINAGE AT PUROK SAN VICENT E, BRGY. LABANGAL, GENERAL SANTOS CITY
- Contractor: VERGUZ CONSTRUCTION (26641)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-10-22
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,865,023.00
- Contract status: Completed Report
- CONSTRUCTION OF FLOODWAY FROM ROAD 7 TO EXISTING CREEK, BRGY. FATIMA, GENERAL SANTOS CITY
- Contractor: HANNA VIA CONSTRUCTION, INC. (FORMERLY:HANNA VIA DESIGN & CONSTRUCTION) (32887)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-12-01
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱19,798,638.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTIPURPOSE BUILDING, BARANGAY MABUHAY, GENERAL SANTOS CITY, SOUTH COTABATO
- Contractor: HANNA VIA CONSTRUCTION, INC. (FORMERLY:HANNA VIA DESIGN & CONSTRUCTION) (32887)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-08-10
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,949,829.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTIPURPOSE BUILDING, BARANGAY SOUTH, G ENERAL SANTOS CITY, SOUTH COTABATO
- Contractor: BAYTORR CONSTRUCTION AND DEVELOPMENT CORPORATION (44719)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-10-27
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,949,681.50
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTIPURPOSE BUILDING, BARA NGAY LAGAO, GENERAL SANTOS CITY, SOUTH COTABATO
- Contractor: JCML BUILDERS INC. (46252)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-10-02
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱2,941,344.50
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTIPURPOSE BUILDING, BARA NGAY FATIMA, GENERAL SANTOS CITY, SOUTH COTABATO
- Contractor: CBC SQUARE BUILDERS CO. (49062)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-10-06
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱1,959,982.62
- Contract status: Completed Report
- CONSTRUCTION OF MULTIPURPOSE BUILDING, BARANGAY SAN ISID RO, GENERAL SANTOS CITY, SOUTH COTABATO
- Contractor: OCTO STAR CONSTRUCTION (44371)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-09-28
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,949,696.00
- Contract status: Completed Report
- CONSTRUCTION (COMPLETION) OF MULTIPURPOSE BUILDING, BARA NGAY UPPER LABAY, GENERAL SANTOS CITY SOUTH COTABATO
- Contractor: LEIGHCHEEN CONSTRUCTION CORPORATION (39677)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-11-16
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,925,545.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, APOPONG, GENERAL SANTOS CITY
- Contractor: RSLORENZO CONSTRUCTION (40752)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-12-03
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱6,654,554.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, CALUMPANG, GENER AL SANTOS CITY
- Contractor: RL ANTONNE BUILDERS (49370)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-09-10
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,939,678.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, UPPER LABAY, GEN ERAL SANTOS CITY
- Contractor: JACOBE CONSTRUCTION SERVICES (50485)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-10-19
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,927,044.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, LIGAYA, GENERAL SANTOS CITY
- Contractor: AA-MATRIX CONSTRUCTION SUPPLIES AND ENGINEERING SERVICES (39987)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-08-06
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,801,189.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, SAN JOSE, GENERA L SANTOS CITY
- Contractor: SEMREH CONSTRUCTION & ENGINEERING SERVICES (43763)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-08-21
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,939,945.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, TAMBLER, GENERAL SANTOS CITY
- Contractor: KGD BUILDERS INC. (21960)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-09-03
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,931,152.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, CONEL, GENERAL S ANTOS CITY
- Contractor: VERGUZ CONSTRUCTION (26641)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-08-21
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,934,727.50
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING, B ULA, GENERAL SANTOS CITY
- Contractor: BAYTORR CONSTRUCTION AND DEVELOPMENT CORPORATION (44719)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-12-28
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,932,000.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (FACULTY LOUNGE) MINDANAO STATE UNIVERSITY (GENERAL SANTOS CITY) - MSU, GENERAL SANTOS CITY SOUTH COTABATO
- Contractor: FREDEN CONSTRUCTION (22665)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-11-15
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,899,999.00
- Contract status: Completed Report
- COMPLETION OFMULTI-PURPOSE BUILDING (MEDICAL ARTS BUILDI NG) MINDANAO STATE UNIVERSITY (GENERAL SANTOS CITY - MSU, GENERAL SANTOS CI TY, SOUTH COTABATO
- Contractor: MFN BUILDERS (36402)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2024-05-13
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱19,778,930.00
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT SALUDIN ANAS E LEMENTARY SCHOOL, BRGY. LABANGAL, GENERAL SANTOS CITY, SOUTH COTABATO
- Contractor: FUENTABUILT CONSTRUCTION CORP. (36098)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-11-27
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,929,322.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE FACILITIES (COMMUNITY PARK ), PUROK DO C3 91A SOLEDAD, BRGY. LABANGAL, GENERAL SANTOS CITY
- Contractor: ANIMAS BROS CONSTRUCTION CORPORATION (FORMERLY: ANIMAS BROS CONSTRUCTION) (35002) / BEMA CONSTRUCTION AND GENERAL MERCHANDISE (48138)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2024-07-18
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱19,735,000.00
- Contract status: Completed Report
- REHABILITATION OF MULTI-PURPOSE FACILTY (LABANGAL NATION AL HIGH SCHOOL GYMNASIUM), BRGY. LABANGAL, GENERAL SANTOS CITY
- Contractor: GRECO CONSTRUCTION AND SUPPLY (21884)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-10-18
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,922,524.00
- Contract status: Completed Report
- COMPLETION OF MULTI-PURPOSE BLDG AT SALUDIN ANAS ELEM. S CHOOL, BRGY. LABANGAL, GENERAL SANTOS CITY, SOUTH COTABATO
- Contractor: WINCH MECHANICAL INNOVATIONS & GENERAL CONSTRUCTION, INC (33211)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-09-28
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,940,000.00
- Contract status: Completed Report
- COMPLETION OF MULTI-PURPOSE BLDG., (P. KINDAT ELEM. SCHO OL), BRGY. LABANGAL, GENERAL SNATOS CITY
- Contractor: THREE MB BUILDERS (45704)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-10-09
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱4,928,981.50
- Contract status: Completed Report
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (BUILDING FOR SOC IAL SERVICES) BRGY. FATIMA, GENERAL SANTOS CITY
- Contractor: FZI CONSTRUCTION PARTS AND SUPPLY CO. (42232)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-12-19
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱6,899,833.50
- Contract status: Completed Report
- CONSTRUCTION OF HEALTH EMERGENCY RESPONSE OPERATIONS CEN TER, BRGY. LAGAO, GENERAL SANTOS CITY, SOUTH COTABATO
- Contractor: J.G. ORANZA CONSTRUCTION (33370) / SALMEGA BUILDERS (45281)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2024-09-23
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱49,499,996.00
- Contract status: Completed Report
- CONSTRUCTION OF SPECIAL CARE COMPLEX AT DR. JORGE P. ROY ECA CITY HOSPITAL, BARANGAY LAGAO, GENERAL SANTOS CITY, SOUTH COTABATO
- Contractor: DELLOSA DESIGN BUILDERS CORP.(FORMERLY:DELLOSA DESIGN-BUILD SERVICES) (11533)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2024-12-26
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱99,000,000.00
- Contract status: Completed Report
- CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAINWATER COLLECTOR SYSTEM, SOUTH COTABATO
- Contractor: MANUELA CONSTRUCTION SERVICES (50143)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2024-03-14
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱2,281,630.50
- Contract status: Completed Report
- CONSTRUCTION OF CONNECTING TAXIWAY, TAMBLER, GENERAL SAN TOS CITY, SOUTH COTABATO
- Contractor: J.G. ORANZA CONSTRUCTION (33370)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2024-04-13
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱38,808,404.00
- Contract status: Completed Report
- CONSTRUCTION OF HARDENED TYPHOON MULTI-PURPOSE HANGAR, T AMBLER, GENERAL SANTOS CITY, SOUTH COTABATO
- Contractor: LHE CONSTRUCTION & INDUSTRIAL SERVICES, INC. (FORMERLY: LHE CONSTRUCTION & ENG'G. SERVICES) (34789) / PASTCAR CONSTRUCTION & SUPPLY CO. (42128)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2024-06-30
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱48,349,452.00
- Contract status: Completed Report
- CONSTRUCTION OF DRAINAGE STRUCTURE ALONG NATIONAL HIGHWA Y, POLOMOLOK, SOUTH COTABATO
- Contractor: CHL CONSTRUCTION & DEVELOPMENT ENTERPRISES, INC. (15001)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2023-07-08
- Fund source: Regular Infra - GAA 2022 CSSP
- Contract price: ₱48,998,764.00
- Contract status: Completed Report
- CONST/IMP. OF ACCESS RDS LEADING TO TRADES, IND. AND ECO N. ZONES (RDS LINKAGES FOR IND. AND TRADE INFRA PROGRAM-ROLL-IT)-POBLACION- SAN-ISIDRO-LIBERTY-PULABATO-PALO RD CONNECT TO HVCC PLANTATION AREAS AND TA MPAKAN PUB MARKET IN SUPPORT OF AGRIBUSINESS IND
- Contractor: BETTER WORK CONSTRUCTION (24432) / FFJJ CONSTRUCTION (16712)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2024-11-11
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱52,670,168.00
- Contract status: On-Going Report
- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS - MAKAR - KIAMBA RD - K1662 + 000 - K1662 + 962
- Contractor: J.G. ORANZA CONSTRUCTION (33370)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2024-01-24
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱74,002,944.00
- Contract status: On-Going Report
- WIDENING OF PERMANENT BRIDGES-BAWING BR. (B01027MN) ALON G MAKAR-KIAMBA RD.
- Contractor: AMPLEX CONSTRUCTION AND SUPPLIES (35090)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2024-08-30
- Fund source: Regular Infra - GAA 2023 OO-1
- Contract price: ₱32,099,334.00
- Contract status: On-Going Report
- CONSTRUCTION OF SOLAR WATER SYSTEM, PUROK 8, BRGY. KINIL IS, POLOMOLOK, SOUTH COTABATO
- Contractor: KGD BUILDERS INC. (21960)
- Implementing Agency: Region XII - South Cotabato 1st District Engineering Office
- Region: Region XII
- Contract effectivity:
- Contract expiry: 2024-11-15
- Fund source: Regular Infra - GAA 2023 CSSP
- Contract price: ₱9,764,904.00
- Contract status: On-Going Report